Study of Material Management Techniques on Construction Project

Similar documents
Analysis of Improper Material Management Affecting Cost in Construction Projects

Case Study on Inventory Management System Followed by Major Builders in Chennai Region and Proposing Recommendations to Improve the System

Factors Affecting Material Management on Construction Site

An Introduction to Inventory Management with reference to Bokaro Steel Plant

Identification of Critical Construction Delay Factors

Causes of Delay in Construction of Bridge Girders

Stores or Warehouse Design and Operations: Assessing its Effectiveness, Case Study of Regional Medical Stores, Kumasi

FACTORS AFFECTING LABOUR PRODUCTIVITY IN ROAD CONSTRUCTION

ANALYZING INVENTORY MATERIAL MANAGEMENT CONTROL TECHNIQUE ON RESIDENTIAL CONSTRUCTION PROJECT

Construction Resources Management System for Gaza Strip Building Contractors

TIME AND COST OPTIMISATION IN PROJECT EXECUTION

ISSN: [Jadhav* et al., 5(9): September, 2016] Impact Factor: 4.116

Inventory Optimization using ERP to reduce final product lead time, Inventory value an inbound logistics cost for MTO, FMCG Company

Pushover Analysis Of RCC Building With Soft Storey At Different Levels.

Modern Logistics & Supply Chain Management

IMPLEMENTING ECONOMIC ORDER INTERVAL FOR MULTI ITEM TO REDUCE TOTAL INVENTORY COST

SCOPE OF WORK FOR ELECTRICAL WORK

AN ASSESSMENT OF ROLE OF MATERIAL MANAGEMENT IN CONSTRUCTION PROJECTS

Cost Optimization Using EOQ

PROCUREMENT DEFINITION

MATERIAL MANAGEMENT PRACTICES IN INDIA

Keywords Activities, Efficiency measurement, labor efficiency

IV/IV B.Tech (Mech. Engg.) 7th sem, Regular Exam, Nov Sub: OPERATIONS MANAGEMENT [14ME705/A] Scheme of valuation cum Solution set

1. Inventory management

Diploma in Construction Management

CHAPTER 5 TO IDENTIFY AND EVALUATE FACTORS AFFECTING COST ESCALATION IN INDIAN BUILDING CONSTRUCTION PROJECTS

STRATEGIC ROLE OF MATERIALS MANAGEMENT

EIM. Effective Replenishment Parameters. By Jon Schreibfeder. icepts Technology Group, Inc. l ext.

Materials and Supply Chain Management. Contents are subject to change. For the latest updates visit

On the way to CPFR from ARS.docx

Investigation of Factors Influencing Cost Overrun in High-Rise Building Constructions

Construction Waste Minimization and Reuse Management

RISK MANAGEMENT IN PROCUREMENT AND LOGISTICS SYSTEMS

OPTIMAL RESOURCES UTILIZATION IN CONSTRUCTION INDUSTRY

Automation of Embodied Energy Estimation Using Programming Tool

Improved Inventory Management System for a Jute Mill - A Case Study.

Evaluation of High Performance Concrete by Partial Replacement of Cement with Silica Fume Natural Sand and Manufactured Sand

ISSN: (Online) Volume 3, Issue 6, June 2015 International Journal of Advance Research in Computer Science and Management Studies

Scholars Journal of Economics, Business and Management e-issn

Chapter 12 Inventory Management. Inventory Management

Introducing Business Process Reengineering Concepts In Construction Education

A Various Factors Affecting Labour Productivity and Method to Improve It

Namakkal, Tamilnadu, India

JUST IN TIME APPROACH IN INVENTORY MANAGEMENT

ISSN: (Online) Volume 3, Issue 5, May 2015 International Journal of Advance Research in Computer Science and Management Studies

Experimental Study to Increase the Life of Welding Nozzle

Project Material Management by ABC with EOQ Analysis

CAUSES OF THE TIME DELAY IN CONSTRUCTION HOUSING PROJECTS IN GWALIOR DIVISION

INTERNATIONAL JOURNAL OF PURE AND APPLIED RESEARCH IN ENGINEERING AND TECHNOLOGY

SIGNIFICANCE OF MATERIALS MANAGEMENT IN INDUSTRIES CONSTRUCTION

SIGNIFICANCE OF MATERIALS MANAGEMENT IN INDUSTRIES CONSTRUCTION

IJMT Volume 2, Issue 6 ISSN:

The Impact of Variation Orders on Public Building Projects

ASSIGNMENT SOLUTIONS GUIDE ( ) E.C.O.-10

Total No. of Questions : 6] [Total No. of Printed Pages : 1 [3693]-1. P. G. D. M. L. M. (Semester - I) Examination

Experimental Analysis of Asbestos Fibre Reinforced Concrete Composite

SmartPlant Materials Benefits and Case Studies. Callum Ford

Ibrahim Sameer (MBA - Specialized in Finance, B.Com Specialized in Accounting & Marketing)

CHAPTER-8 DEVELOPMENT OF SPARCS

Cost Engineering Dr. Nabil I El Sawalhi Assistant Professor Construction Management

CH2404 Process Economics Unit I Inventory Control. Dr. M. Subramanian

FACTORS AFFECTING LABOR PRODUCTIVITY ON CONSTRUCTION PROJECT

School of Business and Economics Department of Management Accounting and Logistics

Planning. Dr. Richard Jerz rjerz.com

Impact of Cost and Time Overrun on Building Construction Projects

The execution of a Complex Project A guided tour

Ramesh Pandi R *1, Rajesh S *2, Pothinathan S.K.M *3 123* Department of civil engineering, Kalasalingam University,

Introduction to Production Planning

International Journal of Advance Engineering and Research Development. Business Development Model of Contracting Firm for Real Estate Projects.

LECTURE NOTES ON CONSTRUCTION MANAGEMENT. Emad Elbeltagi, Ph.D., P.Eng., Professor of Construction Engineering and Management

Punjab Rural Water Supply and sanitation Sector Improvement Project Community Driven Development (CDD) projects

Measurements That Count (and Some That Don t) Hank IT DEPENDS Barr CFPIM, CSCP, CLTD, CSCM, 6σBB, C.P.M., CLA/CLT Vancouver BC November 1, 2018

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz

Seismic Analysis of RCC and Steel Frame Structure By Using ETABS

As part of the tasks and responsibilities of project control, the aspect of (time) control during the course of a project can be applied in many ways.

[Ganesh S* et al., 5(7): July, 2016] ISSN: IC Value: 3.00 Impact Factor: 4.116

Producing Goods & Services

S. A. Santhosh 1, Dr. G. Chitra 2 1 PG Scholar, 2 Associate Professor, Department of Civil Engineering. IJRASET: All Rights are Reserved

COST AND TIME CONTROL FACTORS FOR HIGH RISE RESIDENTIAL CONSTRUCTION PROJECTS

IMPLEMENTATION OF LEAN METHODOLOGY IN INDIAN CONSTRUCTION

EVALUATION OF CONSTRUCTION COST AND TIME ATTRIBUTES


Business Decision Making

Production rate, Efficiency, Effectiveness, Performance

مدیریت موجودی Inventory Management

A Study of Factors Influencing Buying Behaviour in the Indian White Goods Industry for Indore City

IMPLEMENTATION OF LEAN METHODOLOGY IN INDIAN CONSTRUCTION

International Journal of Advance Engineering and Research Development

Producing Goods & Services

Evaluation on the Application of Quality Management System in Tanzania Building Construction Projects

MATERIALS MANAGEMENT OF POWER TRANSMISSION LINE CONSTRUCTION PROJECT: A MODEL STUDY FROM RAMPURA TO JAGULUR POWER TRANSMISSION LINE CONSTRUCTION

Mitigations on Joint Venture Risks in Real Estate Projects

Unit 3: Inventory Management

Analysis of the Cost Effective Construction Waste Management Plan

GOVERNMENT OF RAJASTHAN URBAN DEVELOPMENT DEPARTMENT

Inventory Control Model

Mr. Shaban E. A. Salem 1, Dr. Shabana Mazhar 2

Productivity Improvement in Assembly Line of an Automobile Industry

Standard Costing in the Gem and Jewellery Industry

BSC (HONS) QUANTITY SURVEYING (PART-TIME, TOP- UP) E 413

Transcription:

IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-issn: 2278-1684,p-ISSN: 2320-334X, Volume 13, Issue 4 Ver. II (Jul. - Aug. 2016), PP 12-17 www.iosrjournals.org Study of Material Management Techniques on Construction Project Sachin S. Pal 1, Prof. Himanshu Ahire 2 1 M.E. (Construction & Management)Civil Department, D.Y. P.I.E.T, Savitribai Phule Pune University, India 2 Civil Department, D.Y. P.I.E.T, Savitribai Phule Pune University, India Abstract: Materials management is a critical component of the construction industry. As such, organizations need to understand the effects of proper materials management techniques on the effectiveness of project execution. A properly implemented materials management program can achieve the timely flow of materials and equipment to the jobsite, and thus facilitate improved work face planning, increased labor productivity, better schedules, and lower project costs. Materials management is an important function in order to improve productivity in construction projects. It is defined materials management functions which include planning and material take off, vendor evaluation and selection, purchasing, expenditure, shipping, material receiving, warehousing and inventory, and material distribution. In this project we have prepare scheme of material management in The construction industry for building project.also conducting survey of industry and determine the various format for construction material management also discussing the tracking system of material management in the industry and also discuss the soft ware technology developed for proper management are discuss. Keywords: Inventory, Management, Purchasing. I. Introduction Construction material constitutes a major cost component in any construction project. The total cost of installed material may be 50% or more of the total cost. The goal of material management is to ensure that the materials are available at their point of use when needed hence, efficient procurement of material represents a key role in the successful completion of the work. Materials management is a critical component of the construction industry. As such, organizations need to understand the effects of proper materials management techniques on the effectiveness of project execution. Extensive literature and reports deplore the lack of efficiency and productivity in the construction industry. Too often, construction projects suffer from delays, budget overruns, and claims. A properly implemented materials management program can achieve the timely flow of materials and equipment to the jobsite, and thus facilitate improved work face planning, increased labor productivity, better schedules, and lower project costs. Tracking materials and components on construction projects implies primarily two different sets of requirements for positional accuracy; in both cases, identification is also required. When the delivery and receipt of materials to a construction site are tracked, it suffices to determine their location in the supply chain, e.g., a fabrication shop, or a constructor s lay down yard. However, after delivered to the site, the location of materials needs to be tracked with better positional accuracy. For example, though requisite materials may be known to be within a constructor lay down yard, each item needs to be physically found in order to be issued to crew workers for installation. Such positional accuracy may also facilitate automatic determination of whether a certain material item is in close proximity to its appropriate handling equipment and by inference, whether it is being handled by the equipment.tracking materials thus helps ascertain the basic construction activities being performed with the equipment. It is important for the contractor to consider that there may be significant difference in the date that the material was requested or date when the purchase order was made, and the time at which the material will be delivered, thus material management is a key of project management. Material management is defined as the process to provide right material at right place at right time in right quantity so as to minimize the cost of project. Material management is concerned with the planning, identification, procuring, storage, receiving and distribution of material. The responsibility of Material management department for the flow of material from the time the material is ordered, received, and stored until they are used is the basic responsibility of material management. Materials represent a major expense in construction, so minimizing procurement cost improves opportunities for reducing the overall project cost. DOI: 10.9790/1684-1304021217 www.iosrjournals.org 12 Page

1. Objectives of Material Management Efficient material planning Buying or purchasing Procuring and receiving Storing and inventory control Stock and waste control Supply and distribution of material Quality assurance Good supplier and customer relationship Improved departmental efficiency Reduce the cost of project Time saving Achieve economy in project Study of Material Management Techniques on Construction Project To fulfill all these objectives, it is necessary to establish harmony and good co-ordination between all the employees of material management department and this department should have good co-ordination with the other departments of the organization to serve all production centers. 2. Process of Material Management Material management process initiates from need generated from site then this information conveyed to store department and material is ordered in the store, indent is generated. Vendor selection is to be carried out for the least value and best items. Materials are received at store department and inspection is carried out. Fig Process of Material Management 3. Outline of Research Work Aim:- The aim of this research is to SCHEME OF MATERIAL MANAGEMENT FOR CONSTRUCTION SITE. By applying inventory control technique so as to analyze the effect of material management on construction projects. Also gaining a stronger research design and achieving more valid and reliable findings. Objectives:- Objectives which have covered in this project study are as follows: 1. To Compare Planned Vs Actual material consumption using MSP software then to find the problems in planning, purchasing, procurement & to suggest remedies regarding the material management. 2. S Curve Analysis is used for comparison of planned and actual cost of construction material DOI: 10.9790/1684-1304021217 www.iosrjournals.org 13 Page

3. Reasoning over S curve Analysis. 4. Apply inventory control technique so as to minimize the total cost of inventory Research Methodology The research approach, which is the combination of both the qualitative and quantitative methodologies were adopted in this research. This research has the advantage of gaining a stronger research design and achieving more valid and reliable findings. As such, semi-structured interview, questionnaire survey and literature reviews were the methodologies conducted to carry out the objectives of the research. Accordingly, it is believed that a deeper and more detailed quality of information could be obtained with interview opted as the methodology instrument whereas questionnaire survey could cover a broad range of the study in fulfilling both objectives. The experimental analysis consists of theories and practical consideration of the concepts. Therefore the work can be classified as site management, inventory controlling, purchasing procedure, cost,and procurement and tracking etc. Basically this research is divided in two parts such as first one Qualitative analysis & second Quantitative analysis. Qualitative analysis: This analysis is carried out using MSP software for analyzing planned and actual material consumption through S curve analysis. Reasoning over the deviations curve is the s shaped graph produced by the the cumulative expenditure of certain parameters (man-hours cost) against time and it is the representation of project path. This analysis is carried for comparison of planned and actual cost for material. Quantitative Analysis: This study mainly focuses on Inventory Control techniques which includes ABC analysis, EOQ analysis. ABC Analysis. The ABC inventory control technique is based on the principle that a small portion of the items may typically represent the bulk of money value of the total inventory in construction process, while a relatively large number of items may from a small part of the money value of stores. The money value is ascertained by multiplying the quantity of material of each item by its unit price. The items A Category 5% to 10% of the items represent 70% to 75% of the money value. B Category 15% to 20% of the items represent 15% to 20% of the money. C Category The remaining number of the items represent 5% to 10% of the money value. The relative position of these items show that items of category A should be under the maximum control, items of category B may not be given that much attention and item C may be under a loose control. EOQ analysis: The EOQ refers to the order size that will result in the lowest total of ordering and carrying costs for an item of inventory. If a firm place unnecessary orders it will incur unneeded order costs. If a firm places too few order, it must maintain large stocks of goods and will have excessive carrying cost. Result from Qualitative Analysis: II. Report On Present Investigation Fig. S Curve for Cement DOI: 10.9790/1684-1304021217 www.iosrjournals.org 14 Page

Fig :- S Curve for Steel Fig : S Curve for Bricks Above graphs shows the comparison of cumulative cost of planned actual material. This cost is less at initial stage. This S curve Analysis recognize that there is too much increase in material cost while actual execution. Though this is small project but material management aspect never differs whether it is small or big. Result From Quantitative Analysis EOQ Analysis: In this study EOQ analysis is performed on Cement, Reinforcement Steel, Bricks, Sand & Aggregate. While performing EOQ analysis Ordering Cost & Inventory Carrying Cost is assumed for each material with practical execution procedure of construction. Inventory carrying cost incurred for maintaining the inventory, This includes Cost of Storage, Insurance taxes, Deterioration & obsolescence this calculates in %. Inventory Carrying Cost = 26% Economic Order Quantity is calculated by following formula, where, Co = Ordering Cost, S = Total Consumption Cu = Cost of Item I = Inventory carrying Cost Table No.2 EOQ Analysis Name of Material Annual requirement EOQ No. Of orders Frequency Of ordering Total cost of Inventory using EOQ in lacs CEMENT 15000 512 30 15 43.5 STEEL 130 MT 14 10 21 58.5 BRICKS 190000 CUM 18500 11 27 15 SAND 1213 CUM 35 37 8 10 AGGREGATE 268 CUM 20 13 18 25 DOI: 10.9790/1684-1304021217 www.iosrjournals.org 15 Page

Fig :- Graph Name of Material Vs Frequency Of ordering Fig :- Graph Name of Material Vs No. Of orders III. Conclusion 1. Construction material constitutes a major cost component in any construction project. The total cost of material may be 52% of total cost; so that it is important for contractor to consider that timely availability of material is potential cause of successful completion of project. 2. S curve analysis: It is concluded that major causes of variations are as following : Due to unavailability of RCC Design drawings this causes problems to contractor to work out accurate actual quantities. Due to deviation in Items it will affect on material procurement and finally affects the total project budget. If the tender is quoted accurately so that non tender will not arises because basic rate of material fluctuate day to day leading to increase in cost. Instead of quantities that item should be quoted as Rate only item so it is profitable to contractor & Client. Due to uneven geographical conditions in case soling extra depth of excavation to be considered. EOQ Analysis After EOQ analysis for cement it is concluded that economic order quantity which is 506 Bags & frequency of ordering 15days which has overcome the problems of Stock out successfully over the actual Site stock records. For B class material such as sand and aggregate on site material are ordered as per requirement because of space availability they could not maintain stock as per EOQ. After performance of EOQ on sand & Aggregate it can be concluded that those material does not gives satisfactory results because ordering frequency after EOQ was 8 days & 18 days but actually on site demand is as per daily requirement The Total cost of inventory after adoption of EOQ analysis is less than without adopting EOQ. References [1]. L.C. Bell, G. Stukhart Attributes of material management systems, ASCE, Vol.112, No. 1, March 1986 [2]. K.V. Patel, C.M. Vyas Construction material management on project sites, national conference on recent trends in engineering and technology,1314 May 2011 [3]. E.A. Haddad Construction material management system for gaza strip building contractors, Dec 2006. [4]. D.U. Kini The material management is key to successful project management, journal of management in engineering/january/february 1999 DOI: 10.9790/1684-1304021217 www.iosrjournals.org 16 Page

[5]. Elbeltagi, E., Hegazy, T. and Eldosouky. A., Dynamic Layout of Construction Temporary Facilities Considering Safety, Journal of Construction Engineering and Management, Vol. 130, No. 4, 2004, pp 534-541 [6]. Formoso, C. T., Soibelman, L., De Cesare, C. and Isatto, E. L, Material Waste in Building Industry: Main Causes and Prevention Journal of Construction Engineering and Management. Vol. 128, No. 4, 2002,pp. 316-325. [7]. J. R. Arnold and S. N. Chapman, Introduction to Materials Management 5th Ed., New Jersey: Prentice-Hall, 2004. [8]. F. Harris and R. MacCaffer, Modern Construction Management London: Blackwell Science, 2001. [9]. H. Abdul-Rahman and M. N. Alidrisyi, A Perspective of Material Management Practices in a Fast Developing Economy: the case of Malaysia, Construction Management and Economics, vol. 12, pp. 412-422, 1994. [10]. E. T. T. Wong and G. Norman, Economic evaluation of materials planning systems for construction, Construction Management and Economics, vol. 15, pp. 39-47, 1997. [11]. D. M. Lambert, J. R. Stock, and L. M. Ellram, Fundamentals of Logistics Mangagement United States: McGraw Hill, 1998. [12]. V. Ahuja, J. Yang, and R. Shankar, Study of ICT adoption for building project management in Indian Construction Industry, Automation in Construction, pp. 1-9, 2008. [13]. P. Ang and N. B. Kasim, Implementation of ICT in Materials Management in Construction Projects, Degree Thesis, University Tun Hussein Onn Malaysia, January 2009 [14]. R. K. Yin, Case Study Research Design and Methods, Third Editions, Sage Publication, United Kingdom, 2003. DOI: 10.9790/1684-1304021217 www.iosrjournals.org 17 Page