FACT PATTERN THE RESERVATION

Similar documents
Natural Resource Damages What are the States Doing

Groundwater Natural Resource Damages Assessment: A New Restoration Tool for Massachusetts

Integration of the Great Lakes Restoration Initiative, Superfund Remediation, and Natural Resources Damages Restoration at an Area of Concern

Newtown Creek Superfund Site CAG Meeting October 20, 2016

Portland Harbor Superfund Site - Introduction

Tribal LUST Site Case Studies Pine Ridge Reservation, EPA Region Tribal Lands Forum Koos Bay, OR

Status of the Niagara River (New York) RAP

Mill Street Corridor Assessment/Cleanup Overview

Have You Caught a Case of the Vapors?

FINAL PLAN OF REMEDIAL ACTION. Burns and McBride. South Market and A Streets August 19, 2008

Hudson River Natural Resource Damage Assessment and Restoration

Portland Harbor in the Post-ROD World Integrating In-Water & Upland Remedies and Permitted Discharges --Legal Structure and Tools

Natural Resource Damage Assessment and Restoration

I-275 (State Road 93) Project Development & Environment Study

Rhode Island Standards for Hydrocarbon Contaminated Groundwater a Groundwater Objectives (GA and GB) b

US Steel/Spirit Lake Sediment Cleanup Update for River Corridor Coalition

ENVIRONMENTAL SUMMARY OF CATALYST AREA 1

U. S. Steel Duluth Works - Spirit Lake Cleanup Plan FAQs

Why Camden s environment is important to everyone in the Delaware Watershed...

St. Maries Creosote Site. February 2014

Responding to Natural Resource Damage Associated with the Enbridge Line 6b Oil Spill

Collect deeper soil samples and groundwater from beneath site?

Brownfield Program in California

Use of the PCB CSL to determine boundary is not protective

Buffalo River, New York Great Lakes Restoration Initiative (GLRI) Dredging

Duwamish River Cleanup Coalition

Site Status Report for the

Section 3.11: Hazardous Materials

Summary of Investigations & Remedial Activities

Contacts: Erin Madden, Portland Harbor Natural Resource Trustee Council, (503) Julie Mentzer, Wildlands, (503)

Installation Restoration Program Framework: Introduction to CERCLA

Sediment Strategies and Liability. Denis Roznowski, P.E., Foth James Payne, Environmental Law Group Curtis Hudak, P.G., Foth

Anacostia Watershed Tidal River Toxic Remediation Update 4/30/14. polychlorinated biphenyls (PCBs), polycyclic aromatic hydrocarbons (PAHs), lead,

Site Background December 2005

Atlanta SMAC Conference April 18, 2017

HAZARDOUS SUBSTANCES REPORTING FORM FOR SITE PLAN REVIEW

A Saginaw River/Bay Area of Concern Challenge - Assessing the Eutrophication or Undesirable Algae Beneficial Use Impairment Michelle Selzer Lake

Lower Passaic River Restoration Planning

Restoring The Elizabeth River From The Bottom Up

INTERNATIONAL JOINT COMMISSION NIPIGON BAY STAGE 2 REMEDIAL ACTION PLAN REVIEW

Department of Toxic Substances Control Fact Sheet

Department of Toxic Substances Control Fact Sheet

Nationwide Permit General Conditions

Survey of Bottom Substrate Composition and Fish Habitat Value at Nett Lake

Environmental Assessment. Appendix G Hazardous Materials Technical Report

THE CITY OF NEW YORK LAW DEPARTMENT 100 CHURCH STREET NEW YORK, NY 10007

Chapter 11: Hazardous Materials A. INTRODUCTION

NATURAL RESOURCE DAMAGES, MITIGATION BANKING, AND THE WATERSHED APPROACH

Adak Island. Introduction August Site Background. 1 Drum Storage Area --X- Fence

Nevada Environmental Response Trust Site Fact Sheet

FINAL PLAN OF REMEDIAL ACTION FOR THE NVF-NEWARK COMPANY SITE NEWARK, DELAWARE

Nationwide Permit General Conditions

FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) Site Location

Legal Issues in Valuing Tribal Natural Resource Damage Claims

General Motors (Central Foundry Division) Cleanup Progress Update Massena, St. Lawrence County, NY

SRP GUIDANCE ANNUAL REMEDIATION FEES

Residual LNAPL Remediation Using BOS 200 at Budget Rental Car Site in Louisville, Kentucky USA

2018 SECDEF Environmental Awards Environmental Restoration Installation: DLA San Joaquin

APPLICATION FOR 2013 WEDA ENVIRONMENTAL EXCELLENCE AWARD ENVIRONMENTAL DREDGING CATEGORY RIVER RAISIN AREA OF CONCERN PROJECT, MONROE, MICHIGAN

ABBREVIATED PRELIMINARY ASSESSMENT BUFFALO MINE. Wallowa-Whitman National Forest Grant County, OR

3.11 HAZARDOUS MATERIALS

North River RRS. Conceptual Site Model Presentation

FY2016 LINCOLN AMSA 68. Army Defense Environmental Restoration Program Installation Action Plan

Johanna Heywood, PE, PG

Grand Calumet. River Revitalized

FINAL PLAN OF REMEDIAL ACTION

Fort George G. Meade. Architect of the Capitol - Project Briefing - Restoration Advisory Board Meeting March 20, 2014

Brownfield Redevelopment In Georgia Past, Present & Future. Presented by: Dan Grogan

Chapter 6 Regulations and Requirements

Great Lakes Economic and Environmental Review

Responsible Mining in the Lake Superior Basin Dec. 2013

Management of PCBs Under the MCP

Phase I Environmental Site Assessment

Fort George G. Meade

The following is a short summary of the definitions and acronyms associated with the evaluation process.

Working Together. Ministry of the Environment. Toronto Public Health. Coal Tar Remediation Case Study

Case Study 2. Earl Liverman, OSC Region th Annual OSC Readiness Training Program.

Leaking Underground Storage Tank Program 2003 Annual Report

Introduction to Brownfields: Site Assessment and Cleanup

BEFORE THE DIRECTOR CITY OF TACOMA

ARKANSAS WASTE-TO- ENERGY E.R. MOORE SITE

Enbridge Oil Spill. Kalamazoo. Marshall. Augusta Battle Creek. Galesburg Ceresco. Release Site. Morrow Lake

SECTION X. Northwest Tennessee Regional Harbor

A-8: Hazardous, Toxic and Radioactive Waste Analysis. Environmental Site Assessment: Phase I

Indiana Harbor and Canal (IHC) Confined Disposal Facility (CDF) and Navigational Dredging

Public Presentation. Proposed Plan for Parcels E and UC-3 Hunters Point Naval Shipyard

Pennsylvania s TMDL Program

ASTSWMO LUST and State Fund-Financial Responsibility Workshop. April 27, 2016

Federal Regulation. Copyright 2011 Gary A. Robbins. All rights reserved.

Buffalo River Area of Concern Cleanup Public Meeting

CONTAMINATED MEDIA MANAGEMENT PLAN MIDLAND MARKET RAIL YARD KLAMATH FALLS, OREGON DEQ ECSI SITE #1732 MAY 4, 2009 FOR BNSF RAILWAY COMPANY

Introduction to Brownfields: Site Assessment and Cleanup

St. Marys River Little Rapids Ecosystem Restoration. July 31, th Annual Conference on Ecosystem Restoration July 29 August 2, 2013

Where Brownfields and Land Banks Meet

BEIPC Coeur d'alene Basin Five-year ( ) Work Plan

JAXPORT Overview. JAXPORT Dealing with Legacy Contamination Issues

5.10 HAZARDOUS/REGULATED MATERIALS

Staff Report for Former ANG Coos Head Recommendation for Partial No Further Action for Groundwater at AOC C

FINAL PLAN OF REMEDIAL ACTION

Hudson River Cleanup and PCBs Community Advisory Group March 22, 2012

Transcription:

FACT PATTERN THE RESERVATION Great Lakes Tribal Reservation Surrounded by Big River National Forest Big River flows through Reservation and into Big Lake General Environmental Concerns Wild rice areas located on Big Lake less productive Fishery resources of Big Lake less productive August 18, 2015 Page 1

FACT PATTERN THE LEAD SMELTER The Smelter 5 miles up-river from Reservation Operated from 1950s 1973 by Lead Inc. ( Company ) Environmental Contamination Investigation at Smelter 1995 EPA Preliminary Assessment ( PA ) Studied Big River and surrounding uplands Found: Big River contaminated with metals mostly lead 2004: EPA entered an Agreed Order on Consent ( AOC ) with Company Dredged 3 hot-spots in Big River Capped 4 other areas with clean fill No work performed on Reservation. Only done within 2 miles of former Smelter August 18, 2015 Page 2

FACT PATTERN THE FEE LAND UST SITE The Property Fee land located within Reservation Surrounding land holdings Tribal trust land adjacent to the east and west of Property State-owned highway directly north of Property Privately-owned railroad line also directly north of Property Big River directly south of Property History Bulk fuel plant located on Property from 1955-1985 8,000 gallon UST on Property held gasoline Warehouse 2 above-ground storage tanks ( ASTs ) 1985: USTs and ASTs removed from Property and operations cease August 18, 2015 Page 3

FACT PATTERN THE FEE LAND UST SITE Contamination found near vicinity of Underground Storage Tanks ( USTs ) USTs located upgradient from Big River Past investigation showed presence of: Petroleum hyrdocarbons Lead Benzene Contamination Near USTs Groundwater ( GW ): Petroleum hyrdrocarbons identified in GW at levels that exceed cleanup levels Soil: Petroleum hydrocarbons, lead, and benzene all identified in soils 8 to 12 feet below surface of GW at levels that exceed cleanup levels Contamination Near Shoreline of Big River GW: No GW sampling conducted near bank of Big River Soil: Two sediment samples analyzed show no contaminants above cleanup levels August 18, 2015 Page 4

FACT PATTERN FEDERAL LAW REMEDIES 2005: Tribe petitions EPA to perform a PA for Reservation portions of Big River and Big Lake Tribe initiated formation of NRD Trustee Council Performed an Injury Assessment Plan in 2009 Recently drafted a Preliminary Estimate of Damages ( PED ) Trustee Council PED showed following worst case scenarios: Fish Resources: fish populations declined 50% since year Company began discharging slag into Big River (1950) Big Lake Sediment: 50% loss of benthic organisms Wild Rice: Not injured by releases by Company Appears that petroleum releases from UST Property have impaired wild rice Tribe issued wild rice consumption advisory in 2001 August 18, 2015 Page 5

FACT PATTERN FEDERAL LAW REMEDIES Current status of NRD claim: Company interested in settling Tribal NRD claim Trustee Council meeting with Company next week to discuss settlement options for the Tribal claim Trustee Council s goal for meeting: Develop list of restoration projects to compensate Trustees for losses caused by hazardous substances Proposed settlement projects should consider: Compensate Tribe for losses caused by Company Obtain support of Tribal leadership Acceptable to Trustee Council Technically sound and adequately funded (contingency funding) to withstand known and unknown future impacts (i.e. climate change, upriver impacts, etc) Determine how to address NRD injury to wild rice not related to Company s releases August 18, 2015 Page 6

FACT PATTERN TRIBAL LAW REMEDIES EPA will not use CERCLA to address upland petroleum source. EPA has no LUST program funding. Tribe must address contamination using Tribal law Groundwater concerns Surface water concerns Issues How should Tribe proceed with investigation? What are possible claims against former operator of bulk fuel facility August 18, 2015 Page 7