Flue Gas Desulphurisation -Commissioning & Operation "A New Beginning in NTPC" By

Similar documents
Enhancing Capacity Empowering Nation. Technological Parameters in selecting systems to control emissions in Thermal Power Plants

Up gradation of Boilers to Implement New Pollution Norms

CENTRAL ELECTRICITY AUTHORITY NEW DELHI

Wet Flue Gas Desulfurization (FGD)

Flue Gas Desulphurization (FGD) plant 2 x 600 MW Coal based Thermal power plant Cuddalore, Tamil Nadu. By MK Parameswaran 23 rd Dec, 2016

PRE BID MEETING QUERIES & REPLIES FOR FGD SYSTEM REQD. FOR BONGAIGAON PROJECT - REVISED

THERMAL ENGINEERING & TECHNOLOGY DEVELOPMENT DIVISION, CEA

nat Presentation Title ( Arial, Font size 28 ) Control of Sulphur Dioxide, Oxides of Nitrogen and Mercury Date, Venue, etc..( Arial, Font size 18 )

Worldwide Pollution Control Association. August 3-4, 2010

1. Introduction. the overall view of the flue gas desulfurization system of Waigaoqiao Thermal Power Station.

MECON LIMITED. CONTROL OF SULPHUR DI OXIDE (SO 2 ) FROM TPPs TECHNOLOGY, ISSUES, CHALLENGES & WAY FORWARD SOx NOx 2016 THE FIRST CONFERENCE

Flowpac Pump-less High Efficiency FGD Scrubber

Meeting New Environment Norms - Challenges and Possibilities. Presented by: A.K.Sinha General Manager NTPC Limited

Title: Large scale Implementation of WFGD in Eskom: The Medupi Power Station WFGD Plant Retrofit Project

Accord Energy Corporation India Pvt. Ltd.

AQCS (Air Quality Control System) for Thermal Power Plants Capable of Responding to Wide Range of Coal Properties and Regulations

FACILITATING NEW ENVIRONMENT STARNDARDS FOR COAL BASED THERMAL POWER PLANT

Energy Production Systems Engineering

NOx CONTROL FOR HIGH ASH COAL-FIRED PLANT 12 TH E C C R I A, 5-7 S E P T E M B E R , C A R D I F F, UK

New Indian emissions requirements: Advanced DeSOx solutions for a sustainable power generation

Emissions Control Project

The Value Proposition of Circulating Fluidized Bed Scrubbing Technology. Robert Giglio Foster Wheeler Global Power Group

CEMENT PLANT ENVIRONMENTAL TECHNOLOGY FOR ACHIEVING HIGH SO 2 REMOVAL

Wastewater Treatment and Zero Liquid Discharge Technologies: Overview and New Developments Gordon Maller URS Process Technologies, Austin, TX

Semi-Bulk Systems, Inc.

Technology & Solutions Availability SOx. September 2017

Centre for Science and Environment MILESTONE TRACKER

Fluid Bed Scrubbing TECHNOLOGY

ENVIRONMENTAL GUIDELINES FOR PREVENTION AND CONTROL OF FUGITIVE EMISSIONS FROM CEMENT PLANTS

Flue Gas Cleaning of Coal-fired Power Plant and SEC Technology. Shanghai Electric Power Generation Environment Protection Engineering Co., Ltd.

Performance and System Optimisation of Flue Gas Desulphurisation for Oxy-coal Combustion

Advanced AQCS for Oxy-fuel Combustion System; Controlling Mercury & SO3

TECHNOLOGIES for SO 2 and ACID GAS CONTROL

Extending The Lifespan & Improving The Efficiency Of Matured FGD Systems: Benefits & Challenges

Callide Oxyfuel Project Development and Progress

Operating Experience of Circulating Fluidized Bed Scrubbing Technology in Utility Size Power Plants

Worldwide Pollution Control Association

Borregaard Case Study. Sarpsborg I & II

Economics of Lime and Limestone for Control of Sulfur Dioxide

LEVEL AND FLOW INSTRUMENTS FOR FLUE GAS DESULFURIZATION

Gas Suspension Absorber

Omya Water & Energy omya.com. Flue Gas Cleaning. Sustainable and efficient flue gas desulfurization (FGD)

Improvements of the EGTEI Cost Calculation Tool for Emission Reduction Measures in LCPs

Flue Gas Desulphurisation (FGD) Vertical Gypsum Centrifuges

Worldwide Pollution Control Association. August 3-4, 2010

VGB-Standard for Type, Operation and Maintenance of Flue Gas Desulphurisation Plants (FGD)

Worldwide Pollution Control Association

Steinmüller Engineering Conference Modernization and Optimization of Flue Gas Cleaning Plants

Presentation Title ( Arial, Font size 28 )

Zero Liquid Discharge Effluent Guidelines Compliance Strategies for Coal-Fired Power Plants FGD Wastewater

Worldwide Pollution Control Association

Announce Partnership for offering Flue Gas Desulphurization Technologies for South Asian Markets

W P C A. Worldwide Pollution Control Association. WPCA-Duke Energy FGD Wastewater Treatment Seminar March 7, Visit our website at

CIRCULATING FLUIDIZED BED- FLUE GAS DESULFURIZATION TECHNOLOGY EVALUATION PROJECT NUMBER

INDUSTRIAL ACCESSORIES COMPANY

Field Test Program to Evaluate Mercury Emissions from Coal-Fired Facilities with SCR-FGD Systems

DRY HYDRATED LIME INJECTION FOR COAL-FIRED BOILER FLUE GAS DESULFURIZATION (FGD) FOREWORD

COAL WATER SLURRY FUEL Alternate Fuel for Thailand

Wet FGD Materials of Construction. Gregory T. Bielawski Manager, Environmental Aftermarket Services

Economizer Modification A focused perspective (A Case Study on Project Management)

Performance and Benefits of Flue Gas Treatment Using Thiosorbic Lime

Status of Implementation of New Environmental Norms and Way Forward

VGC Gypsum Centrifuge Flue Gas Desulphurisation (FGD)

German experience on compliance of environmental norms by thermal power generation companies

Mercury Capture in Conventional APC Technologies

Duke Energy Seminar September 3 5, 2008 Concord, NC

WET FLUE GAS DESULFURIZATION (FGD) SYSTEMS ADVANCED MULTI-POLLUTANT CONTROL TECHNOLOGY

ABSTRACT INTRODUCTION

Continuous Mercury Monitoring at Cement Plant

AUXILIARY POWER MEASUREMENT, OPTIMIZATION & ANALYSIS. Steag Energy Training Center EEC WORKSHOP to

NTPC, Simhadri, 4X500MW, Visakhapatnam, Andhra Pradesh

Kazushige KUROSAWA*, Zhibao ZHANG**, and Zhengbing WANG** [Delivered Products & Systems] 1. Introduction. 2. Overview of Nanjing

WHITE PLUME REMOVAL USING FUEL ADDITIVES IN THERMAL POWER PLANTS

Perspective on Coal Utilization Technology

Worldwide Pollution Control Association

Acid Gas Control Systems. Spray-Dry Scrubbers and Dry Injection Systems. United McGill products. a McGill AirClean product

Uppgradering av rökgasreningssystem

Gas Flow How to Improve It to Enhance ESP, Boiler, FGD, SCR, SNCR Performance

Dalmia Cement (Bharat) Limited, Kadapa 1 st Workshop on Energy Efficiency in Cement Sector 23 rd June 2015

Particulate Emission Monitoring HN Pathak Supdtg Engr Madhya Pradesh Power Generation Co. Ltd

To Study of Maximum Efficiency Of Power Generation in Thermal Power Plant

FutureGen 2.0 Update

FGD Services Offered By Reagent Technology Services

Evaporative Gas Cooling and Emissions Control Solutions

8 th SGC International Seminar on Gasificaton October 15 th -16 th, 2014 Malmö, Sweden

DESIGN CHALLENGES IN LOW FLUE GAS TEMPERATURE HEAT EXCHANGER

Lünen State-of-the-Art 813MW Coal-Fired USC Boiler with High Efficiency and Flexibility

Worldwide Pollution Control Association

Application of Circulating Fluidized Bed Scrubbing Technology for Multi Pollutant Removal

Flexibilisation Issues of Thermal Stations. Anjan Kumar Sinha NTPC Ltd

Sheffield s Energy Recovery Facility

PERFORMANCE IMPROVEMENT OF ELECTROSTATIC PRECIPITATOR: SOME EXPERIMENTAL STUDIES

Environmental Management Plan

Dual Flow Tray Technology for Wet FGD Performance Upgrades

AIR IMPACT ASSESSMENT OPERATION DUE CET IŞALNIŢA

Verification of Microfine Lime Theoretical Model for SO 2 Removal in Precalciner Cement Plants

Worldwide Pollution Control Association

COMMISSIONING BEST PRACTICES AN EXPERIENCE SHARING

Oxyfuel Combustion - Experience of FGD and FGC at 30 MW th

Heat and electricity from waste Sysav s waste-to-energy plant

Transcription:

Flue Gas Desulphurisation -Commissioning & Operation "A New Beginning in NTPC" By Sanjeev Saxena (AGM-FGD) 1,e-mail : sanjeevsaxena@ntpc.co.in Siraj Ahmad (DGM-FGD) 2,e-mail : sirajahmad@ntpc.co.in Sudesh Choudhary (Manager-FGD) 3,e-mail :sudeshkumarchoudhary@ntpc.co.in Background In continuing efforts to safeguard the environment and reduce emissions from power sector, India has made the following commitments in COP 21 (Conference of the Parties, COP 21 was held in Paris, France, from 30 November to 12 December 2015.) India intends to reduce the emissions intensity of its GDP by 33 to 35 % by 2030 from 2005 level. To achieve about 40 percent cumulative electric power installed capacity from non-fossil Fuel based energy resources by 2030 with the help of transfer of technology and low cost International finance. Introducing new, more efficient and cleaner technologies in thermal power generation. Further, to reduce emissions from Thermal Power Stations, Ministry of Environment, Forest and Climate Change has also issued new environmental norms in December 2015 regarding suspended Particulate matter (SPM), SOx, NOx, Mercury which will directly impact, the present installed capacity of coal based thermal power plants in India which is 1, 88967 MW as on 31.12.2016. Why FGD for Vindhyachal Stage-V? The Environment Clearance issued by MOEF for Vindhyachal Stage-V (1X500 MW) has one of the specific condition as the FGD shall be installed in the Unit for Limiting the Sox Emission from the stack. Further on 07.12.2015 as per MOEF notification So x emission limit from stacks of all thermal power plants in India has also being fixed at less than 200 mg/nm 3 as per table 1. Emission parameter Thermal power plants (units) installed before 31.12.03 Thermal power plants (units) installed after 31.12.03 to 31.12.16 Thermal power plants (units) Installed from 01.01.17 Particulate Matter (PM) 100 mg/nm3 50/Nm3 30 mg/nm3 SO2 600 mg/nm3 for units less than 500MW capacity 200 mg/nm3 for units 500MW and above capacity 600mg/Nm3 (for less than 500 MW Units). 200mg/Nm3 (for 500 MW & Above Units) 100 mg/nm3 NOx 600 mg/nm3 300mg/Nm3 100 mg/nm3 Mercury (Hg) 0.03mg/Nm3 (for 500 MW & Above Units) Fig.1 Table.1 In line with MOEF environment clearance for Stage-V, FGD Plant was awarded on 09.12.13 and is now expected to be commissioned in March-17. The Installed FGD plant is designed for limiting SO 2 in flue gas to less than 200 mg/nm 3 by treating 100 % of flue gas coming from boiler.

Types of FGD In order to extract S0 2 from flue gas different mechanism of extraction can be used which can be in dry & wet form. Types of extraction also depend upon the cost effective input available for capturing the sulphur dioxide from flue gas. Fig.2 Types of FGD systems. Vindhyachal FGD system Overview Vindhyachal being in close vicinity of Limestone rich area of Maihar & Satna, Wet open Spray tower lime stone based FGD system has been selected for SO X emission control. This system is supplied by M/S GE- ALSTOM. The Input for FGD plant is therefore Limestone and the output is Gypsum. The plant is designed to treat 100 % flue gas having 0.49 % sulphur in coal and SO x removal efficiency of 90.6 % and thereby limiting SO x content in flue gas to less than 200mg/Nm 3.The output from FGD plant is chemical gypsum having minimum 90% purity. This gypsum has many commercial uses in cement industry, bricks manufacturing etc. Overall System Description The entire WFGD System can be divided into the following process systems:- Flue Gas Handling System. Limestone Handling System & Reagent Preparation System. Absorber / Oxidation System. Secondary Dewatering System & Gypsum Handling System. P ROCESS FLOW D IAGR AM FOR W FGD 1. FLUE GAS FLOW FLUE GAS FROM ID FAN BOOSTER FAN GAS TO GAS AIRHEATER ABSORBER TOWER GAS TO GAS AIRHEATER FLUE GAS TO CHIMNEY 2. AND FLOW UNLOADING HOPPER BELT CONVEYOR CRUSHER HOUSE CRUSHED IN SILO BALL MILL LIME SLURRY IN REGENT FEED TANK CLASSIFIER BLEED PUMP SLURRY TO SPRAY NOZZLE SPRAY PUMPS SLURRY IN ABSORBER TANK BELT CONVEYOR STACK AREA EFFICIENCY OF FGD SYSTEM 90.6 % FIG.3 Process flow diagram for Vindhychal WFD system.

The Following Chemical reaction takes place in the above process inside the Absorber tower (16.5X32 metres) CaSO3 + 3H2O + 1/2O2 = CaSO4.2H2O + H2O (Limestone) (Oxidation) (Gypsum) The designed consumption of limestone in FGD system for full load --6.25 T/Hr (4500 MT/month ) The designed Production of Gypsum from FGD system for full load -- 11.31 T/Hr ( 8000 MT/month ) (The gypsum guaranteed parameter purity 90 % minimum, moisture 10% maximum. and chlorides 100 PPM max). Due to non flow ability of Gypsum, its transportation is envisages by loading trucks with the help of backhoe loader (JCB). Limestone will also be transported at site in trucks Acceptance of FGD expenses by Regulators as per order dt. 31.08.2016 Capital cost Rs 16104 lakhs Additional 1% increase in APC. Limestone Consumption @ 6250 kg/hr O&M expenses on actual basis. All the above are subjected to revision at the time of truing-up of tariff or the separate norms specified by the commission, if any later on. Commissioning Sequence of Vindhyachal WFGD. Vindhyachal FGD system commissioning as shown in fig.5 is divided into Six steps:- Motor No load trials 183 drives including 09 No s of HT motor. Equipment Commissioning - For critical equipment the commissioning is being done By OEM As per table 2. Sl.no Equipment name Vendor Country 1 Aborber Recirculation pump Duchting pumpen Germany 2 Ball Mills Christian Pfeiffer Austria 3 Vaccum belt Filter & Xuhe China & Japan hydrocyclone 4 Oxidation blower Siemens Italy, Germany 5 GGH ( Gas to Gas heater) Arvos group USA 6 Mist Eliminator REA Plastik tech GmbH Berlin, Germany 7 Agitator Ekato GmbH Germany Fig.4 Table-2 COLD Commissioning System trial with water. FGD Inlet, outlet & Bypass damper Commissioning. Interface between Main plant boiler & FGD checking & commissioning. HOT Commissioning System trial with limestone slurry.

CONTROL ROOM RADINESS CRUSHER HOUSE BOOSTER FAN ABSORBER WITH INTERNAL DAMPER SYSTEM (BHEL SCOPE ) Booster fan Inlet, Bypass & FGD outlet damper having interface with main plant SYSTEM FINE TUNING DRY RUN & LOGIC CHECKING UNTREATED GAS IN SOX EMISSION IN FLUE GAS UNDER LIMIT + PRODUCTION BALL MILL GAS TO GAS HEATER REAGENT INJECTION ( SLURRY) DEWATERING BUILDING CONVEYOR SYSTEM FIG.5 Commissioning sequence for Vindhyachal WFD system System & Procedures Development for O&M of FGD VSTPS Stage-V FGD plant is the first such plant of NTPC. This is the standalone system having separate control room for its operation and interface with main plant boiler at ID fan discharge. In absence of any system, guideless and procedures for O&M of the FGD system, there was a brainstorming at the station to finalize the modus operandi for O&M of the system and the following was arrived. Regular monitoring of FGD activities by HOP exclusively and also in daily HOD meeting, SMC meeting etc. Identification of Executives for FGD commissioning activities and formulation of the System. Visit of High level team from site to Udupi thermal power station, the only operational limestone based wet FGD plant in the country to Study their operation system and procedure. Creation of New department with reporting to head of O&M. Sensitizing and updating the various corporate departments like OS, ERP, Commercial, Finance etc. with regard to status of commissioning and requirement for the same. Creation of web page for FGD in Vindhyachal intranet which is the source of Information & learning. Creation of departmental code, Cost centre, GL account, purchasing group etc. for the department. For separate control room of FGD operation it was decided to operate FGD by diploma Engineers @ 2 per shift and assisted by outsource manpower. Accordingly Diploma Engineer and trainees are identified and given training by. a) NTPC FGD executive. b) OEM-Alstom training : 8 days training at Site EDC. c) On job training for 10 days at Limestone based Wet FGD plant at Udupi thermal power station. d) These Diploma engineers & trainee are posted in FGD department 6 month before expected commissioning period of FGD system and are actively involved in various FGD commissioning activities.

Expression of Interest for sale of gypsum was issued in national newspapers & positive response from cement industry was received. Subsequently with the help of MSTC bid for sale of gypsum was also initiated. For Gypsum having purity less than required by cement industries, It can be used for in-house brick manufacturing in place of cement due to which the cost of brick manufacturing is also expected to come down. Limestone of required specification as per OES is available in Satna (M.P) region and procured. Identification & finalisation of Applicable taxes for sale of gypsum. In absence of any reference for sale of Gypsum in DOP, A Policy for sale of Gypsum is under preparation. SAP module is under development for proper accounting of material handling i.e. Gypsum & Limestone, billing of Gypsum etc. and issue of gate pass system for sale of Gypsum. Initiation of proposal and Award of 06 No s of annual contract for material handling, mechanical maintenance, C&I maintenance, electrical maintenance, chemistry offline testing, Housekeeping etc. Identification and collection of drawings, documents and manual. Preparation of schematic diagram, technical dairy and protection interlocks. Preparation of attributes and codification of spares with help of corporate ERP group. This was the huge task as it requires development and approval of new scheme and codification. Creation of functional location and mapping of equipments for raising PTW & notification in SAP. Identification and Availability of consumable required for commissioning and subsequent top up. Identification of HIRA and control. Expediting the erection and commissioning activities of FGD bypass and outlet damper which are in the scope of Main plant by M/S BHEL to match with the Main plant Overhaul activities. Interfacing & Synchronisation of Main Plant with FGD system for maintaining boiler furnace draft by finalisation of logic, schemes and control among various agencies like BHEL, Yokogawa, Alstoms & Petron. Challenges Ahead Measure to be taken to offset & maintain merit order rating for Stage-V due to increase in tariff on account of installation & operation of FGD. Spare & service Management: The critical equipments being Low in numbers but are from different manufactures and countries, there will be great difficulty in procuring specialised services and spares from original equipment manufacturers, Actions for making Purchase requisitions for the same has being initiated. Creating awareness and building confidence for use of Gypsum in cement industries- After commissioning of FGD system vendor meet is proposed to showcase our gypsum quality and plant. Alternate use of Gypsum as a Green building material other than Brick Manufacturing etc. Plan for future O&M of FGDa) For better management & rationalisation of man power there will be one service provider by Integrating operation, chemistry, Mechanical, Electrical & C&I Maintenance. b) To mitigate the supply & disposal uncertainty and cost effectiveness there should be one service provider for supply of limestone & take off gypsum through MSTC. Scheme for Finalisation of partial operation of FGD and its ZLD ( Zero liquid discharge) scheme are under process. Limestone & Gypsum Storage capacity enhancement- At present design storage capacity is for 10 days both for limestone and gypsum however as sale of gypsum and procurement of limestone are from parties located at far distances to mitigates any eventuality. Proposal for additional 30 days storage capacity each has been initiated.

Procurement of offline laboratory testing equipments-for ensuring the quality of limestone & gypsum for purchase and sell to the parties, relevant offline instrument purchase Proposal has being initiated. FIG.6 Process Flow diagram for Vindhyachal WFD system After Commissioning of FGD system NTPC s commitment, Towards Green & Clean Power will be further Strengthen. References 1. Feedack from Adani Udupi power station and CLP Jajjhar. 2. http://www.cercind.gov.in/ 3. http://envfor.nic.in/ 4. Flue Gas Desulfurization System Operations and Maintenance Manual. 5. O&M review Meeting minutes. Acknowledgements We would like to acknowledge the following individuals for their Support in preparing this paper: Mr. Rajesh kumar (ED) NTPC Vindhyachal, and Mr.A K Tewary (GM-O&M) NTPC Vindhyachal.