PetroVietnam Cooperate Structure PetroVietnam Refinery Petrochemical, Bio-fuel Oil & Gas Exploration And Production Petroleum Services (PTSC) Power Generation Gas Industry Marine Services Offshore Services Offshore Services EPC/ EPCIC Services (PTSC M&C) Supply Base Services Production Services Other Services
PTSC Overview Established since 1976 with nearly 40 years operated in Oil & Gas industry Over 8,500 employees Average growth rate 15-20%/year More than 25 subsidiaries & 04 oversea branches Core services: EPC/ EPCIC Services Marine Services Supply Base Services Offshore (T&I, O&M) Services Seismic & Geophysical Survey and ROV Services Production Services
PTSC M&C Overview A subsidiary of PTSC Established on May 15 th, 2001 QHSE Management system: ISO 9001-2008, ISO 14001-2004 and OHSAS 18001-2007 Located in Vung Tau City, Southern Vietnam. Amongst Top 500 largest companies (VNR500, #67 th in 2012) Average production capacity upto 50,000 MT per year Performed more than 50 projects
PTSC M&C Revenue: Revenue (US$ mil) 600.00 500.00 535.80 556.94 400.00 349.22 300.00 200.00 177.26 100.00-106.39 98.64 51.54 39.45 39.94 15.74 24.44 0.98 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
WORKFORCE (Jun2013) Manpower Resources 1200 1000 800 600 400 200 0 Permanent Casual
HSE FACTS: 148 procedures, instructions, plans.. LTI rate lower than 0.5% TCRF rate at 0.2 Fatality-less HSE Statistic HSE mindset - a core value for our success No Description 2001-2005 1 Total Manhours Worked 2006 2007 2008 2009 2010 2011 2012 06/2013 TOTAL 6,476,872 1,723,959 4,865,002 2,587,970 2,873,171 5,832,071 6,625,567 7,962,141 2,371,462 41,318,215 3 Lost Time Injuries 0 0 0 0 0 1 0 1 0 2 QUALITY FACTS: 02 internal audits conducted per year Welding repair rate less than 0.5% Recorded in Petronas Golden Book and others Clients records (BP, Talisman, Premier Oil..) 4 Lost Work day 0 0 0 0 0 30 0 11 0 41 5 Restricted Duty Injuries 6 Medical Treatment Injuries 0 0 0 0 0 0 0 1 0 1 1 1 1 0 1 1 1 0 1 7 7 First Aid 3 1 1 0 1 2 4 0 0 12 8 Near Miss 6 5 8 6 4 25 12 23 11 100 9 HAZOB Cards 672 700 1,571 734 2,696 3,753 4,450 4,147 954 19,677 10 Fire/Explosion 1 0 3 0 0 0 0 1 0 5 11 Equipment Damage 1 2 2 0 0 0 1 2 0 8 12 Vehicle Incidents 0 0 0 0 0 0 0 0 0 0 13 No. of Fatality 0 0 0 0 0 0 0 0 0 0
Engineering Capabilities More than 100 experienced engineers and designers Self-performed Detailed Engineering activities Well-equipped software, facilities & infrastructures Experienced on DE Management Close partnership with leading international engineering houses
Procurement Capabilities Fully established procedures & policies Experienced procurement team familiar with international trading practices Wide range of vendors & suppliers all over the world Rich master data in price, materials types Close connection with regional and international forwarders
Construction Capabilities Yard location
YARD INFO: Total Area: 23 ha Quay length: 750m Quay width: 28m Water depth: 9.5-14m Jetty Distribution: Max 10.5 MT cargo/m2 Yard Distribution: Max 70 MT/m2 Quay designed for 30,000 DWT Vessels 03 Skid ways (10,000MT; 20,000MT and 25,000 MT) Construction Capabilities Manpower Resources Tools & Equipment Skillful and hard-working workforce; familiar Diversified and modern in-house fabrication with international standards; annually trained; facilities; chain system to increase experienced supervisors team. productivity, minimize human mistakes Subcontractors 3rd parties services Rich experienced and qualified construction Close partnership with various parties in cooperating, supervising and managing subcontractors inside and outside Vietnam production quality & safety; verifying
T&I, HUC Capabilities Provide complete delivery solutions for offshore transportation, installation, hook-up & commissioning projects. Experience of offshore services through out various EPCIC projects implemented Wide range of global T&I, HUC partners
Project Description: Client: Bien Dong POC Major Offshore Projects Bien Dong 1 Project Project type: EPCIC Duration: 03/2010 11/2012 Key Facilities: 01 CPP, 01 WHP, 01 CPP Jacket & Piles, Pipeline & subsea cables Total weight: ~ 35,000 MT Water depth: 133m Subsea: 12 Cladded pipe x 21km, 26 x3.5km, 20 x45km, 20 & 26 SSVI and Umbilical, Flexible Pipelines x 6km, Subsea cable x 12km. PQP Topsides Loadout weight: 13,600 MT PQP Jacket LO weight: 11,500 MT Pile 4,500 MT
Thang Long Dong Do Project Hai Su Trang/ Den Project Dua Subsea Development Project Client: Lam Son JOC Client: Thang Long JOC Client: Premier Oil Vietnam Offshore Project type: EPCIC Project type: EPCIC Project type: epci Duration: 12/2011 07/2013 Duration: 07/2011 05/2013 Duration: 07/2012 08/2013 Key Facilities: 02 WHPs, PLEMs/ PLET and 2km (12 -MPF); 5km (8 -WIF); 5km (6 GLF); 2km (10 -MPF) and 6km Umbilical Key Facilities: 02 WHPs, 02 Jackets, 02 Drilling Decks, Piles,, subsea templates, infield pipeline (6, 8, 10 ) x 36 km Key Facilities: 02 Nos. of 10 pipeline 17km/each; 01 PLEM; 01 Manifold; Umbilical system; TPAM Total weight: ~ 2,500 MT Total weight: ~ 7,000 MT Total weight: ~ 400 MT
Su Tu Trang Project Te Giac Trang Project Su Tu Den North East Project Client: CuuLong JOC Client: Hoang Long JOC Client: Cuulong JOC Project type: EPCIC Project type: epcic Project type: EPCIC Duration: 03/2010 06/2012 Duration: 11/2009 08/2011 Duration: 02/2008 07/2010 Key Facilities: 01 WHP, 01 jacket, pipelines 12 x 17km Key Facilities: 01 WHP, 02 jacket, 01 drilling deck, infield pipeline x 35km (6, 8,10,16 ), 8 SSIV Total weight: ~ 3,600 MT Total weight: ~ 6,000 MT Key Facilities: 01 WHP, 01 jacket, infield pipelines x 27km (10 x6,7km, 16 x13,3km, 24 x7,3km) & submarine cable Total weight: ~ 4,000 MT
Chim Sao Development Project Rong Doi Booster Compressor Project Bunga Orkid Project Client: Premier Oil Vietnam Offshore Client: Korea National Oil Company Client: Talisman Malaysia Limited Project type: EPCIC Project type: EpC Project type: EPC Duration: 08/2008 10/2010 Duration: 07/2011 07/2012 Duration: 07/2006 03/2008 Key Facilities: 01 WHP, 01 jacket & piles, pipeline 10 X 96 km, 16km (4, 6 10 ), 02 Plems & Umbilical Key Facilities: 02 compressor modules Key Facilities: 03 WHPs Total weight: ~ 500 MT Total weight: ~ 4,000 MT Total weight: ~ 7,500 MT
Su Tu Den South West Project Ruby B Project Pearl Project Client: CuuLong JOC Client: Petronas Carigali Vietnam Client: Petronas Carigali Vietnam Project type: EPCI Project type: EPC Project type: PCC Duration: 05/2002 10/2003 Duration: 10/2004 09/2005 Duration: 01/2008 06/2009 Key Facilities: 01 WHP, 20 x 20km Key Facilities: 01 WHP Key Facilities: 01 WHP Weight: 2,200 MT Weight: 1,300 MT Weight: 600 MT
Topaz Project Song Doc A Project Bunga Tulip A Project Client: Petronas Carigali Vietnam Client: Truong Son JOC Client: Talisman Malaysia Limited Project type: PCC Project type: PC Project type: C Duration: 08/2009 08/2010 Duration: 06/2007 02/2008 Duration: 12/2005 07/2006 Key Facilities: 01 WHP, 01 Jacket, Piles & Conductors Key Facilities: 01 WHP Key Facilities: 01 WHP, 01 Mono-pod Jacket Weight: 600 MT Total weight: 900 MT Total weight: ~ 4,000 MT
WHP-C1/CLPP/NBR3 Project Rang Dong-S1 Project Lan Tay Compression Module Project Client: Japan Vietnam Petroleum Company Client: Japan Vietnam Petroleum Company Client: British Petroleum (BP) Vietnam Project type: C Project type: C Project type: PC Duration: 10/2004 05/2005 Duration: 02/2002 08/2002 Duration: 07/2006 08/2007 Key Facilities: 02 WHPs, 01 bridge Key Facilities: 01 WHP Key Facilities: 01 Compression Module Total weight: ~ 1,500 MT Weight: 450 MT Weight: 2,000 MT
LQ-CPP/99 Project Bunga Raya A LQ Project NULQ Project Client: VietsovPetro JV Client: Talisman Malaysia Limited Client: Japan Vietnam Petroleum Company Project type: EPC Project type: EPC Project type: EPC Duration: 12/1999 12/2000 Duration: 03/2002 07/2003 Duration: 02/2002 08/2003 Key Facilities: 02 LQs (70 men each) Key Facilities: 01 LQ (48 men), 01 Bridge Key Facilities: 01 LQ (63 men), 02 bridges Total weight: ~ 2,300 MT Total weight: 1,000 MT Total weight: 1,400 MT
100 Men LQ Project Client: Petrovietnam Marine Shipyard Project type: C Duration: 10/2010 03/2011 Key Facilities: 01 LQ (100 men) for 90m water depth jack-up rig Total weight: 300 MT PTSC-01 Barge Project Client: PTSC Project type: EPC Duration: 10/2008 11/2009 Key Facilities: 5,000DWT Ballast Barge for transporting topsides, jackets,.. Total weight: 2,400 MT 3509 Tug Boat Project Client: PTSC Project type: PC Duration: 12/2009 10/2010 Key Facilities: 02 tug boats with capacity 3,500 BHP and 4,750 BHP Total weight: 1,000 MT
Project Description: Client: Dung Quat Refinery PMT Major Onshore Projects Dung Quat Refinery Project Project type: PC Location: Dung Quat, Quang Ngai, Vietnam Duration: 06/2006 12/2007 Key Facilities: Berth 1 to 6 of Product Export harbor for Dung Quat Refinery Harbor Project. Other auxiliary systems for the harbor such as: Cathodic protection, ship lanes with dividing buoys, and turning area
Phu Quy wind-turbine Project Client: PetroVietnam EIC Project type: Installation Duration: 10/2010 11/2010 Key Facilities: transportation and installation of 03 wind-turbines. GPPIC Project Client: PetroVietnam Gas Company Project type: EPC Duration: 08/2001 02/2002 Key Facilities: Four (04) big compressors NCS Condensate Storage Project Client: Client: PetroVietnam Gas Company Project type: EPC Duration: 11/2001 11/2003 Key Facilities: Two condensate tanks, condensate pumps, metering skid system, floating roofs Capacity: 16,500 m3/each
Clients & Partners