An Epicor White Paper. Best Practices for ERP Implementation Success

Similar documents
An Epicor White Paper. 10 Critical Questions Small Manufacturers Should Ask Before Buying a Cloud-based ERP Solution

TEN TIPS FOR A SUCCESSFUL INFOR IMPLEMENTATION

Discover 10 Characteristics of a Grow Getter. Become a high-growth manufacturer

TEN TIPS FOR A SUCCESSFUL SAP IMPLEMENTATION

An Epicor White Paper. Choosing the Right ERP Solutions to Support a Global Business

An Epicor White Paper. Understanding ERP Deployment Choices October 2014

An IT Briefing produced by. How CA Clarity PPM On Demand Delivers Value: Building the Business Case. Sponsored By:

Epicor White Paper. Eight Habits of High-Gross-Margin Distributors

Electronics and High Tech

The Five Sure-Fire Strategies

Planning for a Successful Implementation

Medical Devices. Epicor for. Functionality. Meeting the Challenges for Medical Devices

Energy. Epicor for. An Innovative Breakthrough to Overcome the Barriers to Success for the Energy Industry. Functionality

How Cisco IT Manages IT Service Costs

Printing and Packaging

An Epicor White Paper. 10 Critical Questions Small Manufacturers Should Ask Before Buying a Cloud-based ERP Solution

Successful ERP Implementation Requires Planning

Epicor Informance. Enterprise Manufacturing Intelligence Overview

Solar Eclipse Role Maintenance. Release 9.0.3

Using ClarityTM for Application Portfolio Management

Migrate to a New Testing Tools

The Accenture 2011 High Performance Finance Study. Redefining High Performance in the Insurance Finance Function

Furniture and Fixtures

WHITE PAPER. The Foundation of a Successful ITAM Program - In 5 Not So Easy Steps

Evaluating Treasury Management Systems

Seven Key Success Factors for Identity Governance

DEVELOPING A PERSUASIVE BUSINESS CASE FOR CRM. Glenda Parker

4/26. Analytics Strategy

Internal controls over financial reporting

Agile Portfolio Management for a Fast- Paced World. Are you ready? Are you ready?

10 Steps in Presenting an Effective Business Case for a Learning Management System

Managing the Business of IT - Integrating Enterprise Architecture and Application Portfolio Management

Business Outcomes Management: The Undervalued Business Priority

The Change Challenge: Realizing the Full Value of Your Business Initiatives

Effective SOA governance.

Epicor Financial Services Overview

5 SURE-FIRE STRATEGIES. for Gaining Management Approval for WMS Projects

An Epicor White Paper. All Downtime Is Not Equal

Supply Chain Innovation Fuels Success SAP ERP and Oracle Supply Chain Management: A Case for Coexistence. An Oracle White Paper

IT Portfolio Management. Information technology (IT) has become a required core competency for almost

7 ways to know you are selecting the right ERP software for your apparel company

Internal controls over financial reporting

The Foundation of Sound Technology Investment: The Total Economic Impact Methodology

Project Risk Management (PRM)

An Epicor White Paper. Epicor ERP 10 Reaching Out: Connected ERP

Know Your Numbers: Doing More with Performance Manager

HOW TO START A HIGH-IMPACT MENTORING PROGRAM

Epicor Human Capital Management Overview

Business Process Management: The Right Way to Do It

2008 ERP REPORT. CONTACT: Panorama Consulting Group Part One in a Series

Governance for GIS Esri International User Conference 2018

CA Mainframe Resource Intelligence

WHITE PAPER. How Startup Businesses Can Maximize Human Capital 10 Principles for building an effective human capital plan

Minimizing fraud exposure with effective ERP segregation of duties controls

ITAM Review SAP Certification; Snow Optimizer for SAP Software v2.0, Expires October 2019 Page 2 of 12

OPTIMIZED FOR EXCELLENCE. An Incentive Compensation Management (ICM) Assessment Case Study of OpenText Corporation

Building a Business Case for KYield

2010 ERP REPORT. Organizational Change Management

Contents About This Guide... 5 Upgrade Overview... 5 Examining Your Upgrade Criteria... 7 Upgrade Best Practices... 8

Transformation Services. Maximize the value of your investments

HOW TO CREATE A CUSTOMER SUCCESS PLAN. A step-by-step guide to delivering on expectations and ensuring success

Preparing your organization for a Human Resource Outsourcing implementation

WHITE PAPER. The Business Architecture Practice. February Whynde Kuehn, S2E Consulting Inc., USA

Advanced Cycle Counting. Release 9.0.2

2010 ERP REPORT ERP Vendor Analysis

Ten Steps to Evaluate and Select A Mid-Market Budgeting, Forecasting, and Reporting Solution

Adobe Captivate Prime Enables Improved Employee Experience And Learning Effectiveness

Cutting through cloud choice

Epicor Commerce Connect

How well does your procurement measure up?

Securing Intel s External Online Presence

Embracing SaaS: A Blueprint for IT Success

A successfully implemented CRM solution can deliver tremendous value to your organization, helping you to grow revenues and reduce operational costs.

Best Practices for Achieving Meaningful Business Transformation An itelligence Buyer s Guide

WHAT TO LOOK FOR IN A CMMS/EAM SOLUTION

Navigating the ERP Selection Process 7 Time Saving Steps with Insights

NEW SKILLS AND PARTNERSHIPS IN IT ASSET MANAGEMENT

A successfully implemented CRM solution can deliver tremendous value to your organisation, helping you to grow revenues and reduce operational costs.

To Build or Buy? A Decision-Making Framework for Buy-Side Firms

Enterprise Systems for Management. Luvai Motiwalla Jeffrey Thompson Second Edition

Risk Advisory SERVICES. A holistic approach to implementing effective governance, managing risk and maintaining compliance

Digital Transformation Built on Cloud ERP

BUSINESS INTELLIGENCE STANDARDIZATION

Referral Management Workflow. A Guide for Improving Your Referral Management Workflow

IBM Business Consulting Services. Providing excellence and delivering value in Oracle, PeopleSoft and J.D. Edwards applications services

IBM Rational Software

Business Process Management and the Benefits of Automation

Using the Vendor Scorecard. Release 9.0.2

ORACLE SOA GOVERNANCE SOLUTION

Creating a Customer-Centric Communications Strategy

How Can I Better Manage My Software Assets And Mitigate The Risk Of Compliance Audits?

COM B. Eisenfeld, S. Nelson

Governance in a Multi-Supplier Environment

Transforming Your ERP System into a Solution for Higher Profitability. White Paper. Chris Jones, MAVERICK Technologies, LLC

Epicor Solution Overview

7 Ways to Build a Better Business Case for HIGH IMPACT TALENT MANAGEMENT Technology

ANARCHY IN ENTERPRISE SOFTWARE: THE REVOLUTION OF TIER III ERP VENDORS

WMS IN THE CLOUD: ROI CONSIDERATIONS. The cloud makes advanced technology accessible and affordable for any company.

Enterprise Monitoring Management

WMS IN THE CLOUD: ROI CONSIDERATIONS. The cloud makes advanced technology accessible and affordable for any company.

Transcription:

An Epicor White Paper Best Practices for ERP Implementation Success

Table of Contents Introduction...1 Best Practices for ERP Implementation...3 Understand business processes and key requirements...3 Build a business case for ERP with a positive ROI...4 Ensure proper project management and resource commitment...4 Gain executive and organizational commitment...5 Recognize the value of early planning...5 Focus on data migration early in the implementation process...5 Invest in training and change management...6 Know why you re implementing ERP...6 The Value of a Structured Methodology...7 About Epicor...8

Introduction The role of Enterprise Resource Planning (ERP) systems in managing business processes has expanded significantly over the past decade from a focus on specific business areas such as manufacturing, procurement, or human resources, to broader use throughout the company. Although IT has traditionally been responsible for specifying and implementing technology within an organization, successful ERP implementations require involvement from stakeholders at all levels, from executives to end users. For many companies, the transition from existing traditional systems to a new ERP one can consume significant corporate resources, including time, expense, and risk to business operations. However, as we ll explore below, this need not be the case. Panorama Consulting Solutions, an ERP consulting firm based in Centennial, Colo., publishes an annual report on the state of ERP worldwide. Their most recent report found that 54 percent of ERP implementations take longer than expected, while 56 percent of these implementations exceed budgeted costs. As Figure 1 shows, less than 50 percent of implementations achieve expected benefits, while only 17 percent of the companies experienced more than eighty percent of their projected benefits. Figure 1: Percent of Benefits Realized in ERP Implementations 33% 51 80% of projected benefits 31 50% of projected benefits 2% 27% 0 30% of projected benefits 81 100% of projected benefits 4% We have not experienced any measurable benefits so far 17% 17% We didn t have a business case Source: Panorama Consulting Solutions 1

Eric Kimberling, president and founder of Panorama Consulting, believes that one of the reasons that ERP implementations take longer than expected or fail to achieve their expected benefits can be attributed to the high degree of code customization used to tailor ERP systems to business requirements (see Figure 2). The research shows that 60 percent of companies perform some degree of customization which can contribute to longer implementation times and higher costs. Figure 2: Level of ERP Customization 38% Minor customization (1 10% of code modified) Some customization (11 25% of code modified) 4% 32% Significant customization (26 50% of code modified) No customization 5% Extremely customized (Over 50% of code modified) 11% 12% Completely customized, in-house developed, or best-of-breed solution Source: Panorama Consulting Solutions Of course, customization is only one of the factors that can affect an ERP initiative. Many of the issues associated with difficult or failed ERP implementations can be avoided by adopting the best practices described below. 2

Best Practices for ERP Implementation According to Kimberling, The problem isn t in the software; it s in the way companies implement the software and get their organizations to adapt to it. Based on Panorama Consulting s ERP industry research and direct consulting experience, Kimberling identified eight best practices that are common to successful ERP implementations: Understand business processes and key requirements The first step in executing any business system is to gain a thorough understanding of the processes that comprise business operations. This is especially true for ERP implementations, because they are often intended to be the core management system for company operations. A complete understanding of corporate business processes is essential to selecting the right ERP vendor and to planning the implementation. Once business processes are understood, the next steps are to define and prioritize key business requirements. Because they are the basis for evaluating and selecting ERP software and, ultimately, determining how much customization is needed, definition of requirements should begin as early as possible. Says Kimberling, The more time spent up front defining what s important, and what standardized processes should look like in the future, the easier it will be to find the right software for your organization. Prioritizing business requirements is just as important as defining them. There is so much information available during the evaluation phase of implementation that it s easy for companies to get lost in specifying lower level processes, which can lead to analysis paralysis. A better strategy is to develop priorities based on satisfying immediate business needs, the ones that affect normal business processes, followed by longer-term strategic objectives. Moreover, defining business requirements is not a one-time activity, resulting in a static set of requirements for vendor selection. Instead, it should be viewed as an ongoing process that can be refined on a regular basis to reflect the changing needs of the organization. Finally, make sure that the ERP software s technical capabilities match the defined business requirements. Many companies concentrate more on the technical aspects of ERP software, rather than on what requirements are most important to the business. Software features or functionality that don t align with the company s business needs often lead to an unnecessary waste of implementation resources, time, and money that might be better spent on other activities such as software customization or training. 3

Build a business case for ERP with a positive ROI Building a comprehensive business case will help justify the acquisition of an ERP system. A good one will present tangible business benefits based on defined requirements and include key performance metrics; in business, facts are always harder to dispute than opinions. Most companies require a business case demonstrating a positive ROI before corporate resources and funds are committed to a project. Again, the scope and complexity of many ERP projects will demand a business case that addresses the concerns and needs of all project s stakeholders. A business case that anticipates potential problems or objections can also be a powerful tool to sell the project in the organization. Involving key stakeholders in the development of a business plan can also be a strong way to build organizational support for the new system. A compelling business case will assess current system performance against expected postimplementation performance. Establishing key performance indicators (KPI) allows quantifiable measurement of progress during implementation and ensures a tie to real changes in performance. These metrics can also be used to evaluate ERP software vendors and select which software modules match business requirements. The issue of whether customization is necessary to satisfy a new business requirement is often raised during the implementation process. A business case with a positive ROI allows the merits of customization to be considered on the same basis as the original implementation. Investments in customization can be evaluated according to whether they fit the requirements defined in the business case, based on performance metrics that are quantifiable, rather than subjective. Ensure proper project management and resource commitment Another characteristic that distinguishes best-in-class ERP implementations is how well the implementation is managed. A prerequisite for a successful ERP implementation is a dedicated project manager who is involved in both planning and ongoing management. In addition, the company must also be willing to commit sufficient resources to the project before, during, and after implementation. Kimberling observes that companies tend to focus too much on whether implementation resources are internal or external to the company. Don t rely only on internal resources because you need people who are experts in ERP and who know how to do business process reengineering, he notes. Ideally, augment the internal team with people who have done ERP implementations before. However, it is important for the internal organization to be actively involved in implementation because they will own the project once the implementation phase is completed. Strong project controls and governance are also needed to implement an ERP system. A formal risk management and mitigation plan should be developed in advance. It should include ongoing reviews of project phases throughout implementation, with full participation of all inside and outside resources. A combination of project management skills, resources, and methodologies are vital to a successful ERP implementation. 4

Gain executive and organizational commitment A distinguishing trait of best-in-class ERP implementations is that they have the full support and commitment of the company s executives. In fact, it can be argued that this characteristic is the most important one for a successful ERP implementation; without this support, ERP initiatives are more likely to be starved for corporate funds and resources. ERP initiatives often begin with the CIO or IT director, but the support of the CEO, CFO, and other C-level executives is critical. These people are responsible for setting corporate business strategy and direction, so they should be making higher-level decisions about how the ERP system will be involved in running the business. Lack of executive participation in an ERP project can also have legal ramifications. We are expert witnesses for many lawsuits where the executive team simply delegated the project to someone without providing any management oversight, Kimberling notes. ERP initiatives are big and complex projects; without the right management support, they will fail. The broad scope and duration of most ERP implementations can also cause changes in familiar workflows or business processes for people throughout the organization, whether they are directly involved in the implementation or not. For this reason, it is important to gain broad organizational support during all phases of an ERP implementation. Finally, the establishment of regular project reviews with the executive team or the project steering committee will keep them informed about project progress. It will also provide a forum so that the appropriate decision makers can deal with issues that arise. Recognize the value of early planning In any ERP implementation, there is no substitute for careful planning; in fact, planning should begin during the earliest project phases. Remember that 54 percent of companies complained that their ERP implementation took longer than expected, some of which can be attributed to poor planning. Companies get excited about the benefits of implementing ERP and tend to want to dive in without a fully developed plan. Too often we see clients who bring in all kinds of consultants while the meter s running, Kimberling says. Companies need to allow the time to put a solid project plan in place. The project plan should have time built into it for activities associated with requirements definition, key performance measures, and vendor evaluation and selection. The best plans have buffers built into the schedule to account for activities such as testing, data migration, and unforeseen events that occur in every implementation. Companies that invest in comprehensive, upfront planning often experience shorter implementation times and spend less money overall than their peers. Focus on data migration early in the implementation process Many companies tend to focus on software testing and configuration and put off dealing with data migration until late in the implementation process. An attribute of successful ERP implementations is that data migration is put into the project plan as early as possible. A company s data is one of its primary assets and issues with migrating data between legacy systems and a new ERP system can have a sizable negative impact on business operations, especially those that are exposed late in the process. 5

Once the scope of the data to be migrated is determined, activities such as data scrubbing and mapping can be performed independent of the larger implementation process. Similarly, work on forms and reports can be conducted without relying on the rest of the implementation. It s also a good idea to incorporate a data component into conference room pilots and testing processes, so that data is tested within the software along with business processes. Another important decision is how much historical data should be brought into the new system. Many companies have a policy of saving everything rather than make decisions about what data should be saved and what should be put in long-term storage. Some companies are required to retain data for compliance with the Sarbanes-Oxley Act; others are concerned about threat of e-discovery and consequent legal penalties. Nonetheless, all companies should establish a data retention and storage strategy. At the very least, data to be migrated should be put through a de-duplication process to remove redundancies. The old computer axiom, garbage in = garbage out, applies here; even a new ERP system won t fix corrupted data. Invest in training and change management ERP implementations don t just affect systems and business processes; they also involve people who may find it difficult to change roles, processes, and behaviors that they may have learned over many years of work. It s unreasonable to expect employees to change their behavior during the relatively short duration of an ERP implementation. Kimberling notes that managing change is a constant, ongoing process that needs to start from day one and continue throughout the implementation to the end-user training at the close of the project. Change management is crucial to the success of an ERP initiative. Employees need to be introduced to new processes and job roles over a period of time so that they can accept and internalize these developments. Neglecting this aspect of implementation or putting it off until late in the project may result in organizational resistance to the new system, even to the point of operational risk. To be most effective, training should concentrate on business workflows and how these changes affect job roles and the people who do the work. Know why you re implementing ERP Successful ERP implementations are characterized by a clearly defined purpose and a set of attainable goals. These companies have done the work of defining requirements, establishing metrics, and building a business plan that clearly articulates what benefits the company expects from an implementation. Some companies have a tendency to look at what others or their competitors have done with ERP, especially if corporate executives have prior experience with an ERP system at another enterprise. This isn t to say that companies shouldn t learn from others experience; but it should be clear from the preceding discussions that a successful ERP installation is based on a clear vision and articulation of the needs that are unique to each firm. 6

The Value of a Structured Methodology Although Panorama Consulting Solutions has the option to use many different ERP software vendors, they often choose to work with Epicor Software Solutions. Kimberling notes, Epicor 9 is a robust and flexible product that is designed to provide many of the benefits of ERP without the need for customization. Epicor Software promotes what they call the Signature Methodology, a phased approach to reducing the inherent risks of ERP implementation that incorporates project best practices (see Figure 3). Figure 3: The Epicor Signature Methodology Signature Methodology Prepare Plan Design Validate Deploy Requirements Discovery Scope Definition Project Initiation Epicor Process Review Project and Resource Plan Foundation Education Configuration Business Procedures Proof of Concept User Acceptance Preparation Testing Analysis End-User Training Deployment/Go Live Normalize/Optimize Project Close Support Hand-Off Project Governance Collaborative Implementation Continuous Improvement Source: Epicor Software Corporation The Signature Methodology highlights the importance of developing a solid business case for the ERP initiative at the outset, one that presents a positive ROI and KPIs that accurately capture the business processes to be measured throughout the implementation. It s no accident that Epicor Software s methodology and Panorama Consulting s best practices agree on many of the same implementation principles; they are based on the similar experiences and lessons learned from hundreds of ERP implementations. While every ERP initiative is different, following these best practices may spell the difference between a successful ERP implementation and a failed one. 7

Six S Partners 866-579-7497 sales@sixspartners.com www.sixspartners.com Contact us for more information on Epicor Products and Services 866-579-7497 sales@sixspartners.com www.sixspartners.com This document is for informational purposes only and is subject to change without notice. This document and its contents, including the viewpoints, dates and functional content expressed herein are believed to be accurate as of its date of publication, April 2014. However, Epicor Software Corporation makes no guarantee, representations or warranties with regard to the enclosed information and specifically disclaims any applicable implied warranties, such as for fitness for a particular purpose, merchantability, satisfactory quality, and reasonable skill and care. As each user of Epicor software is likely to be unique in their requirements in the use of such software and their business processes, users of this document are always advised to discuss the content of this document with their Epicor account manager. All information contained herein is subject to change without notice and changes to this document since printing and other important information about the software product are made or published in release notes, and you are urged to obtain the current release notes for the software product. We welcome user comments and reserve the right to revise this publication and/or make improvements or changes to the products or programs described in this publication at any time, without notice. The usage of any Epicor Software shall be pursuant to an Epicor end user license agreement and the performance of any consulting services by Epicor personnel shall be pursuant to the standard services terms and conditions of Epicor Software Corporation. Epicor and the Epicor logo are trademarks of Epicor Software Corporation, registered in the United States, certain other countries and/or the EU. All other trademarks mentioned are the property of their respective owners. Copyright 2014 Epicor Software Corporation. All rights reserved.