MCDR INSPECTION REPORT

Similar documents
MCDR INSPECTION REPORT IBM/4800/2011

MCDR INSPECTION REPORT S/ No. 1 Name of the Mine Navalutti Iron Ore Mine 2 Total Lease Area (Ha) with breakup of Non-forest & forest land

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION. MCDR inspection REPORT. Bangalore regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bangalore regional office

MCDR INSPECTION REPORT

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Hyderabad regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office

MCDR INSPECTION REPORT

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION. Mining Plan Modification REPORT. Bangalore regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Ranchi regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Goa regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Ranchi regional office

INDIAN BUREAU OF MINES MINES CONTROL AND CONSERVATION OF MINERAL DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office

INDIAN BUREAU OF MINES MINES CONTROL AND CONSERVATION OF MINERAL DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office

(A govt. of Kerala Undertaking)

Scrutiny comments on examination of FMCP ( lease expiring on 31/03/2020 )of Teherai Iron and Manganese Mine of M/s Bonai Industrial Co.

INDIAN BUREAU OF MINES MINES CONTROL AND CONSERVATION OF MINERAL DIVISION MCDR INSPECTION REPORT Goa regional office

INDIAN BUREAU OF MINES MINES CONTROL AND CONSERVATION OF MINERAL DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office

INDIAN BUREAU OF MINES MINES CONTROL AND CONSERVATION OF MINERAL DIVISION MCDR INSPECTION REPORT. Goa regional office

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

INDIAN BUREAU OF MINES MINES CONTROL AND CONSERVATION OF MINERAL DIVISION MCDR INSPECTION REPORT Ajmer regional office

INDIAN BUREAU OF MINES MINES CONTROL AND CONSERVATION OF MINERAL DIVISION MCDR INSPECTION REPORT. Goa regional office

NOTE COVER PAGE GENERAL

Environment Management Plan

INDIAN BUREAU OF MINES MINES CONTROL AND CONSERVATION OF MINERAL DIVISION MCDR INSPECTION REPORT Dehradun regional office

PRE-FEASIBILITY REPORT

INDIAN BUREAU OF MINES MINES CONTROL AND CONSERVATION OF MINERAL DIVISION MCDR INSPECTION REPORT. Goa regional office

PRE FEASIBILITY REPORT. PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent

1 Name of the Project Gonua Iron & Mn. Mine of Sri Pawan Kumar Ahluwalia

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

PRE-FEASIBILITY REPORT

EXECUTIVE SUMMARY INTRODUCTION : Jayaswal Neco Industries Limited

BRIEF SUMMARY OF THE PROJECT

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

PKA/Gonua/MoEF/ Date:

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005

Star Rating of Mines

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

INDIAN BUREAU OF MINES MINES CONTROL AND CONSERVATION OF MINERAL DIVISION MCDR INSPECTION REPORT. Bangalore regional office

PRE FEASIBILITY REPORT

ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)

[FORM-V] PART-A PART-B

M/s Tiffin s Barytes Asbestos and Paints Ltd (VIGNESHWARA BARYTES MINE) Near Ramalayam, Velpula (V&P) Y.S.R. Disrict.

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

WORKSHOP ON THRESHOLD VALUE OF CHROMITE

JODA WEST MANGANESE MINE Lessee : TATA STEEL LIMITED

The Singareni Collieries Company Limited (A Government Company) Kothagudem Area.

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

PRE FEASIBILITY REPORT For SILICA SAND MINE. At Village- Karlapudi, Tehsil- Kota, Nellore, Andhra Pradesh ha.

Environmental Management Plan. For Mining of. Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village,

EIA Report for ha Bhatia Limestone Mine EXECUTIVE SUMMARY

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II

EXECUTIVE SUMMARY. 1.2 SALIENT FEATURES OF THE PROJECT The mine lease area falls under the Toposheet No. 65 N/11 bearing following Toposheet details:

Pramod S. Kambli. Page 1

2. PRE-FEASIBILITY REPORT

1. PRE-FEASIBILITY REPORT

PRE- FEASIBILITY REPORT

F. No. 8-26/2013-FC (Pt.II)

PRE FEASIBILITY REPORT

ENVIRONMENT MANAGEMENT PLAN

PRE-FEASIBILTY REPORT

WORK PROGRAMME FORM QUARRY RESOURCE CONSENT

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

Mining is being carried out keeping safe distance from seasonal nallah/ stream.

Annexure-I

CENTRAL EMPOWERED COMMITTEE

S.N. Condition in Environmental Clearance Compliance Status upto June (A) Specific Conditions (i)

Project Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II

PRE FEASIBILITY REPORT

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

PRE FEASIBILITY REPORT

Environmental Management Plan. For Mining of. Building Stone & Road Metal

ENVIRONMENTAL MANAGEMENT REPORT COLOUR GRANITE MINE

ENVIRONMENT MANAGEMENT PLAN

GUIDELINES to the MINING ACT

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

GUIDELINES FOR PREPARATION OF MINE CLOSURE PLAN

ENVIRONMENT MANAGEMENT PLAN

INDEX S.NO ITEM PAGE NO 1. INTRODUCTION 3 2. DETAILS ABOUT THE MINE LEASE AREA 4 3. MINING ACTIVITY 5 4. ENVIRONMENTAL MANAGEMENT PLAN 8

EXECUTIVE SUMMARY TABLE 1.2 PROJECT SITE DETAILS

Geological & Mining Consultants. SCHEME OF MINING OF JINDAL CHROMITE MINE OVER AN AREA OF HECTARES IN JAJPUR DISTRICT, ORISSA.

STATUTORY REQUIREMENTS OF MINING PLAN & SCHEME OF MINING AND MINE CLOSURE PLAN

Draft Copy of the mining plan which is submitted for Approval INTRODUCTION

Sl. No. Conditions Compliance

EIA Report for 8.09ha Jam Manganese Ore Mine EXECUTIVE SUMMARY

Environmental Policy Statement:

MANGANESE ORE, CHROME ORE, FERRO ALLOYS

DHANWADA CRUSHER STONE QUARRY

4. Particular of Forests i. Name of Forest Division North (General) Balaehat Forest Division.

1.0 PROJECT DESCRIPTION

Transcription:

1 MCDR INSPECTION REPORT General SN Particulars Details Date of Inspection 18.10.2016 1 Name of the Mine Dhobitola Titaniferous Iron Ore Mine 2 Total Lease Area (Ha) 2.61 Ha (Entire Forest Land) with breakup of Non-forest and forest land 3 Minecode 30MSH31001 4 IBM Registration Number under rule 45 of MCDR, IBM/4800/2011 1988 5 Name of the lessee, Address, phone, email and fax number M/s Jayaswal Neco Industries Ltd, F-8 MIDC Industrial Area, Hingna Road, Nagpur Email - nitin.wath@necoindia.com; mines.neco@gmail.com 6 Village Dhobitola 7 Taluka/Mandal Amgaon 8 District Gondia 9 Pincode 441902 10 State Maharashtra 11 Post office Thana 12 Nearest police station Amgaon 13 Nearest Railway station Amgaon 14 Date of Grant of Mining Lease 12.02.2003 15 Date of Execution 17.07.2003 16 Date of opening of Mine 21.06.2010( re-opening) 17 Date of first Renewal, if applicable and its period & expiry 18 Date of second Renewal, if applicable and its period & expiry 19 Date of submission of renewal application if Mining Operations are continuing under deemed extension 20 Name of the Nominated Owner with Address, phone, email, fax number and date of appointment 21 Name of the Mine Agent with Address, phone, email, fax number and date of appointment 22 Name of the Mines Manager with Address, phone, email, fax number and date of appointment in mines Shri Megh Pal Singh, M/s Jayaswal Neco Industries Ltd, Siltara Growth Centre, Siltara, Raipur(CG) PH - 07721/264241/264263 Email - meghpal.singh@necoindia.com Fax - 07721/264279 Appointed on - 13.11.2014 Shri Nitin Wath M/s Jayaswal Neco Industries Ltd, F-8 MIDC Industrial Area, Hingna Road, Nagpur Email - nitin.wath@necoindia.com; Appointed on 06.08.2008 Shri Jaiprakash Singh M/s Jayaswal Neco Industries Ltd, F-8 MIDC Industrial Area, Hingna Road, Nagpur Email - jaiprakashsingh88@gmail.com

SN Particulars Details Appointed on 16.05.2007 2 23 Name of the Mining Engineer, Qualification and total experience with Address, phone, email, fax number and date of appointment in mine 24 Whether Geologist and Mining Engineer appointed in mines satisfy the rule 42 & carrying out their duties as per rule 43 & 44. 25 Date of Approval of Mining Plan/Modified Mining Plan with five-year period and specific condition in approval letter, if any. 26 Date of Approval of Scheme of Mining/Modified Scheme of Mining with five-year period and specific condition in approval letter, if any. 27 Mineral(s) granted in lease and proved for mining Titaniferous Iron Ore Shri Jaiprakash Singh BE(Mining), 2 nd Class Mine Manager Certificate Total Experience 10 Years M/s Jayaswal Neco Industries Ltd, F-8 MIDC Industrial Area, Hingna Road, Nagpur Email - jaiprakashsingh88@gmail.com Appointed on 16.05.2007 Yes -Mining Plan was approved vide Letter No. GND/FE/MPLN-842/NGP dated 23.05.2003 -First Mining Scheme was approved vide Letter No. GND/FE/MPLN-842/NGP dated 23.11.2009 (Period 2008-09 to 2012-13) -Second Mining Scheme was approved vide Letter No. GND/FE/MPLN-842/NGP dated 28.02.2014 (Period 2013-14 to 2017-18) Mining Scheme approved on 28.02.2014 (Period 2013-2014 to 2017-2018) Mining Scheme is due for submission on 01.10.2017 28 Method of Mining(Opencast, Underground) Opencast 29 Category (Fully Mechanised, Others or Manual) Manual Mine 30 Captive/Non Captive Captive Mine Scientific Mining: Compliance of proposals of approved mining plan/scheme of mining. (Duplication of information in existing TMIS data sheets and draft write up has been avoided.) Exploration 1a Backlog of previous year Drilled 7 boreholes in - year 2014-2015(Aug- Sept 2014) 1b Exploration over lease area for Geological As above - axis 1 or 2. 1c Exploration Agency & Expenditure in lakh In house drilling: - Rupees during the year Tentative expenditure is Rs 1.25 Lacs 1d Balance area to be explored to bring Geological axis in 1 or 2 1e Balance reserves as on 2015-2016 Total Reserve (2013-14) Total Reserve (2015-16)

1f geology, exploration etc. 3 87948 MT 83329 MT Presently area is totally explored Development 2a Location of development w.r.t. lease area For first 2 years As per proposal. (2013-14 to 2014-15) development at south westerly direction and for next 2 years (2015-16 to 2016-17) development at north easterly direction 2b Separate benches in topsoil, overburden and mineral (Rule 15) 2c Stripping ratio or ore to OB ratio 2d Quantity of topsoil generation in m3 2e Quantity of overburden generation in m3 2f development of pit w.r.t. type of deposit etc. All the work is going on within the approved lease area as per proposal Exploitation 3a Number of pits proposed for production One One - 3b Quantity of ROM mineral production proposed 2430 T (2015-2016) 2190 T (2015-2016) 3c Recovery of salable/usable mineral from 2430 T 2190 T 100 % ROM production 3d Quantity of mineral reject generation - As per approved mining scheme 3e Grade of mineral reject generation and - threshold value declared 3f Quantity of sub-grade mineral generation - 3g Grade of sub-grade mineral generation - 3h 3i 3j 3k 3l Manual / Mechanised method adopted for segregating from ROM Any analysis or beneficiation study proposed & carried out for sub-grade mineral and reject Provision of drilling & blasting in mineral benches Provision of mining machineries in mineral benches Whether height of benches in overburden and mineral suitable for method of mining proposed in MP/SOM Manual Mine Manual Mine - Not proposed - Manual mine- No proposal for drilling and blasting As per proposal - Not proposed - -

3m Total area covered under excavation/pits 0.3495 Approx. 0.35 Ha -- 4 3n 3o 3p 3q Ore to OB ratio for the pit/mine during the year Total area put in use under different heads at the end of year Production of ROM mineral during last five-year period, as applicable method of mining etc. -- Mining 0.3495 Ha Road 0.13 Ha Green Belt 0.45 Ha Total Area 1.00 Ha 2011-12 - 2448 T 2012-13 - 2448 T 2013-14 - 2430 T 2014-15 - 2430 T 2015-16 - 2430 T Mining 0.3495 Ha Road 0.13 Ha Green Belt 0.45 Ha Total Area 1.00 Ha (Approx.) 2255 T 2498 T 2492 T 2429 T 2190 T Mine is developed and working is found as per proposal -- --- Solid Waste Management-Dumping 4a Separate dumping of topsoil, OB & No topsoil mineral reject (Rule 32, 33) 4b Location of topsoil, OB & mineral reject dumps 4c Number of dumps within lease area and outside lease area 4d Location of dumps w.r.t. ultimate pit limit (Rule 16) 4e Number of active & alive dumps 4f Number of dead dumps 4g Number of dumps stabilized 4h Whether Retaining wall or garland drain all along dumps are there 4i Length of Retaining wall or garland drain all along dump 4j Number of settling ponds 4k Specific comments of inspecting officer on waste dump management There is no overburden generation/ top soil generation/ reject generation from the mine. Solid Waste Management-Backfilling 5a Status on part or full extraction of mineral The entire area will be -. from mined out area before starting backfilled concurrently backfilling after fully extraction of Mineral 5b Area under backfilling of mined out area - 5c Concurrent use of topsoil for restoration or rehabilitation of mined out area (Rule 32) - 5d Total area fully reclaimed & rehabilitated - 5e backfilling, reclamation etc There is no overburden generation/ top soil generation/ reject generation from the mine

5 Progressive Mine Closure Plan 6a Whether Annual report on PMCP Yes Yes submitted on time and correctly - Rule 23E (2). Details should be given in the format as given in Annexure-20. 6b Management of worked/mined out benches i) Area available for rehabilitation (ha) ii) Afforestation done (ha) iii) No. of saplings planted during the year iv) Cumulative no. of plants v) Any other specific method of rehabilitation vi) Cost incurred on watch & care during the year 6c 6d Compliance on reclamation and rehabilitation by backfilling i) Voids available for backfilling (L x B x D) ii) Void filled by waste/tailings iii) Afforestation on the backfilled area iv) Rehabilitation by making water reservoir v) Any other specific means Compliance of Rehabilitation of waste land within lease i) Afforestation ii) Area rehabilitated (ha) iii) Method of rehabilitation 50 Nos. of trees 50 No. of trees 6e 6f Compliance of Environmental monitoring (core zone & buffer zone) PMCP compliance & progressive closure operations Environmental monitoring is being carried out in accordance with Environment Clearance/ Consent to Operate and regular Environment Statement is being submitted to MPCB. Environmental monitoring done The mine being a small manually operated mine; no rehabilitation is required as on date. Only about 0.3495 Ha area is under mining - Mineral Conservation 7a ROM Mineral dispatch or grade-wise ROM dispatched - sorting within lease area 2179 MT (2015-2016) 7b Method of grade-wise mineral sorting i.e. Manual Sorting Manual Sorting 7c manual or mechanical Different grade of mineral sorted out at mines Only one grade of average 50% of Fe Only one grade of average 50% of Fe

6 content content - 7d Any beneficiation process at mines 7e Mineral conservation & beneficiation issues Working is in small extent on manual method. The iron ore produced from the mine is Titaniferous with average Fe content of 50% Environment 8a Separate removal and utilization of Not given No top soil topsoil (Rule 32) generation 8b Concurrent use or storage of topsoil - 8c 8d 8e 8f Separate dumps for overburden, waste rock, rejects and fines (Rule 33) Use of overburden, waste rock, rejects and fines dumps for restoring the land to its original use Phased restoration, reclamation and rehabilitation of lands affected by mining operations (Pits, dumps etc) Baseline information on existence of plantation & additional plantation Given The entire ore bearing area will be backfilled concurrently after fully extraction of ore 50 no. of saplings during each year- Given Not started Plantation 50 Nos. - 8g Survival rate Not given 50% - 8h 8i Water sprinkling on roads to control airborne dust aesthetic beauty in and around mines area Not given Lease area is forest land. No dust generation on road Compliance of Rule 45 SN Item Comments Remarks 9a Status of submission of Monthly and M.R. Submitted up to last month i.e Sept. 2016 --- Annual returns A.R. submitted up to 2015-2016 SN Item Details given in A.R. 9b Scrutiny of Annual return for information Information on on Mining Engineer, Geologist and Mining Engineer Manager given 9c Scrutiny of Annual return on land use Not given pattern for area under pits, reclaimed area, dumps etc. 9d Scrutiny of Annual return on afforestation Given Observation of I/Officer Information Given in annual return is found correct Remarks 9e Scrutiny of Annual return on mineral reject generation (Grade & quantity)

SN Item Details given in A.R. 9f Scrutiny of Annual return on ROM stock Information on ROM and/or graded ore given 7 Observation of I/Officer Remarks 9g Scrutiny of Annual return on sale value, Ex. Mine price & production cost Production cost- Rs 1105.45 given 9i Scrutiny of Annual return on fixed assets 9k Scrutiny of Annual return on mining machineries Details of violations observed during current inspection and compliance position of earlier violation pointed out:- No violation of rules of MCDR 1988 observed during inspection. During the last inspection dated 30.07.2013 violation of rule 45(7) was found violated, which was communicated to the party vide letter no. MAH/GND/FE-1/NGP, dated 04.09.2013. Party has complied the violation on 23.09.2013 Date 16.12.2016 ( S.M.Dorle) Assistant Mining Engineer (Name of inspecting officer with designation and date)