NON-CONFORMING MATERIAL

Similar documents
NON-CONFORMING MATERIAL

Nonconforming Material System Procedure

Standard Operating Practice S.O.P. No

Quality Assurance Manual

SUPPLIER DISPOSITION REQUEST

ANCHOR ISO9001:2008 RPR-004 MARINE SERVICES REQUIRED PROCEDURE NON-CONFORMING PRODUCTS

OP Page. 1 of 7 QUALITY. 2/3/2010 Issue Date. Notes: Breeze-Eastern

Quality Assurance Manual

CAG 9000 QUALITY REQIRMENTS FOR SUPPLIERS TYPE 12 & 13.

INS QA Programme Requirements

ROTEK. IIInnInstI Instrument Corp. ISO 9001 Quality System Manual

General Quality Assurance Procedure (QAP) QAP: 13.0 Subject: Control of Nonconforming Product Date: 11/21/13 Created By: Approved By: Rev: C

FAA Conformity Inspection Checklist Form N/C 10JAN16

How to Set Up a Quality Assurance System A Step by Step Guide to Quality Control Management System

CORPORATE QUALITY SYSTEM PROCEDURE

Product Realization. Ameritube LLC 1000 N. Hwy 77, Hillsboro TX Revision Level: Procedure No. A

SELLER QUALITY REQUIREMENTS QCS-001 PROCESSING SOURCES

Mechanical & Electrical Product Workmanship Standards Procedure

Supplier Quality Requirements SQR-1.0 Rev. 3

Self-Audit Checklist

12. Inventory - Receiving & Shipping

Florida Department of Transportation Office of Freight, Logistics and Passenger Operations Part 4 QUALITY ASSURANCE PROVISIONS #TRIPS-17-CA-RFP

The Standard Illustrations ISO The International Standard for Quality Management Systems. Year 2000 Edition. Leland R.

Quality Manual ISO 9001:2000

Trident Precision Manufacturing

SUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: GENERAL INFORMATION Attn: Manager of Quality

OUTLINE OF IQCS-440 F-16 CO-PRODUCER FIRST ARTICLE INSPECTION REQUIREMENTS

Supplier Quality Requirements

NONCONFORMANCE REFERENCE HANDBOOK FOR SUPPLIERS SQR-003. Revision Date: 22 November Approved David Copeland, Manager Supply Chain Quality

ANCHOR ISO9001:2008 RPR-007 MARINE SERVICES ADDITIONAL PROCEDURE PRODUCT REALISATION

LAT PROJECT DOCUMENT CHANGE NOTICE (DCN) SHEET 1 OF 1

GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS

LAT PROJECT DOCUMENT CHANGE NOTICE (DCN) SHEET 1 OF 1

QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised.

Quality Management System

The purpose of this procedure is to establish the system for initiating, processing, and controlling Nonconformance Reports and Stop Work Notices.

4. SPLITTING QUANITITES OF DEFECTIVE MATERIAL IN CAMSTAR

ZOLL Document Number: 90F1087 Page 3 of 18 MES/ERP Nonconforming Material Transaction Instructions REV B

Control Of Non-conforming Material

AAI CORPORATION TEXTRON SYSTEMS

Electro-Miniatures Corp. 68 West Commercial Ave. Moonachie New Jersey Phone: Fax:

TURBO MACH A DIVISION OF VT SAA

PMA Quality Assurance Manual Rev. 2 Date 12 Feb 2016

Supplier Quality Requirements

Procurement Quality Assurance Requirements

Price Electronics,LLC Quality Assurance Manual

Purchase Order Quality Clause SCC20 Revision E, Effective 1/20/2015

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A

SUPPLIER QUALITY REQUIREMENTS

Quality Assurance Policy and Procedures

Langham Creek Machine Works, Inc.

Printed versions may not be the latest. Suppliers shall utilize the latest version which can be found on our website at

QUALITY MANUAL RED CHECK DENOTES THIS IS A CONTROLLED COPY. APPROVED BY: (President) APPROVED BY: (Production Manager) APPROVED BY: (Quality Manager)

VACCO. Supplier Training. Updated 8/21/18

QP Supplier Quality Requirements Manual. Purchasing. Dearborn Inc. Revision: E Page 1 of PURPOSE

Supplier Quality Requirements

Approved Supplier Guidance

SUPPLIER QUALITY REQUIREMENTS

REQUIREMENTS FOR SAFETY RELATED (ASME AND NON-ASME) ITEMS OR SERVICES

Infor LN Quality User Guide for Non-Conforming Report & Corrective Action Plan

YOUNG & FRANKLIN / TACTAIR FLUID CONTROLS QUALITY ASSURANCE SURVEY. Company Name: Address: City: State: Zip: Phone: Fax: Response Prepared By:

YOUNG & FRANKLIN / TACTAIR FLUID CONTROLS QUALITY ASSURANCE SURVEY. Company Name: Address: City: State: Zip: Phone: Fax: Response Prepared By:

CERTIFICATE OF REGISTRATION

Quality Assurance Plan For VOILA. Dwg. No

Table of Contents Table of Contents... 2 Introduction to Manual... 3 Scope... 3

Helical Products Company

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14

ESCC NON-CONFORMANCE CONTROL SYSTEM. ESCC Basic Specification No

MANUAL QUALITY CONTROL & QUALITY ASSURANCE

QUALITY MANUAL REVISION CONTROL LOG. Number Rev Rev Date SS Description of Change By Chk App

Manufacturing Supplier Requirements Manual

2.2. The Seller shall be responsible for achieving and maintaining a quality performance level of either:

CiDRA External Provider Quality Standards

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

GKN Aerospace Advanced Composite Structure

Medtronic XOMED. Top Level Procedure for Handling, Storage, Preservation and Movement of Inventory

Installation Qualification Equipment (Reference SOP: )

Procedure QAP-10 Date Issue Page ALTA Quality Requirements for Suppliers 25 Sept

Medtronic XOMED. Top Level Procedure for General Inspection and Testing

QUALITY OPERATIONS STANDARD

SQR-009 QUALITY ASSURANCE ACCEPTANCE SAMPLING REQUIREMENTS FOR SUPPLIERS

YOUNG & FRANKLIN / TACTAIR FLUID CONTROLS QUALITY ASSURANCE SURVEY. Company Name: Address: City: State: Zip: Phone: Fax: Response Prepared By:

General Quality Assurance Procedure (QAP) QAP: 9.0 Subject: Process Control Date: 3/24/14 Created By: Approved By: Rev: C

QUALITY SYSTEM REQUIREMENTS FOR Raw Material YFTFC004

Document Title: Icore Supplier Quality Requirements Revision: D Released Date:

FIRST ARTICLE INSPECTION/TEST REQUIREMENTS

Quality Control Manual Revision 5 1/21/2011

EP-QC Supplier s General Requirements. Revision AH

PURCHASING QUALITY CLAUSES

Supplier Quality Requirements Master List

PMA SUPPLIER QUALITY REQUIREMENTS QS Revision J

Documents are in Microsoft Word for ease of editing

ASM AEROSPACE SPECIFICATION METALS, INC NW 34 th Place #B28 Terrace Pompano Beach, Florida Tel: Fax:

PURCHASE ORDER REQUIREMENTS (Quality Assurance Provisions)

NON-CONFORMING PRODUCT AND CORRECTIVE ACTION. PDF created with FinePrint pdffactory trial version Procedure No.

EB 2678K Compliance Checklist

Definitions contained in the above mentioned document and industry regulations are applicable herein.

DRAWING NUMBER REVISION TITLE REV DATE PAGE

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

In case of of differences or inconsistencies with texts in the Main Contract, the stipulations in this Appendix I will prevail.

Transcription:

NON-CONFORMING MATERIAL AND NONCONFORMING MATERIAL REPORTS 1.0 SCOPE This document describes the procedure used in determining the disposition of nonconforming items associated with MIT/CSR parts, materials, processes, or equipment. The documentation required on nonconforming flight material and hardware is defined, as identified in the sponsored project Performance Assurance Implementation Plan. 2.0 APPLICABLE DOCUMENTS Not identified. 3.0 FAILURE REPORTING The reporting of failures, although closely related, is not a subject of this procedure. 4.0 MATERIAL REVIEW BOARD The MIT/csr Material Review Board (MRB) consists of the Performance Assurance Manager, the appropriate Design or Test Engineer, and the Government (ONR) Representative if required, as a minimum. This board may be augmented with knowledgeable individuals who are intimately involved with a specific discrepancy. The GSE Engineer, Systems Engineer, Project Engineer, Project Manager, and Manufacturing Manager are examples of such augmentation. 5.0 MATERIAL DISPOSITION 5.1 INITIAL DISPOSITION Initial material disposition will be performed by Quality Assurance and Engineering. They will review all non-conformances and assign one of the following dispositions: Rework to specification Nonconforming material that can be reworked without adverse effect on safety, performance, interchangeability, reliability, or quality may be dispositioned for rework. Material that has been satisfactorily reworked is returned to the normal flow of material. 2

Return To the Vendor (RTV) Purchased nonconforming material may be dispositioned "Return to Vendor" This is done when the discrepancy is clearly the suppliers responsibility and MIT rework, scrap, or MRB action are not recommended. Scrap Nonconforming material is scraped when the item is unusable on flight projects and the dollar value is low. Scrap material is identified and segregated from all other material. Material Review Board (MRB) Nonconforming material not recommended for disposition as "rework to specification", "RTV", or "scrap" is refereed to the Material Review Board. If there is question or disagreement regarding disposition of any material, it is refered to the MRB. 5.2 FINAL DISPOSITION The MRB will make final disposition of non-conforming material submitted to the board. The decisions of the MRB shall be unanimous or the matter will be referred to the sponsoring Project Office for adjudication. The MRB may disposition hardware as above, or may additionally specify the repair of the hardware, or determine it to be suitable for "use-as-is". 3

6.0 DOCUMENTATION A Nonconforming Material Report (Figure 7-1) will be completed for all nonconformances of flight hardware. The decisions of the Material Review Board shall be supported by records of all cases submitted for action, as documented in the nonconforming material report. Figure 6-1 details the distribution of nonconformance reports. The "official records" of all nonconformance reports are the QA File/MRB File, maintained by Performance Assurance. DISPOSITION TO QA FILE/ WITH WITH VENDOR MRB FILE 1/ AWO BONDED STOCK 2/ RTV X X SCRAP X REWORK X X X TO SPEC. REPAIR X X X USE AS IS X X X 1/ The Quality Assurance files of nonconformance reports include the reports of the Material Review Board 2/ Nonconformance reports for incoming material (other than scrap and RTV)are kept with the item in bonded stores. When the item is kitted, the nonconformance report is kept with the Assembly Work Order (AWO). Figure 6-1 Copies of nonconformance reports and MRB actions are available for review by the cognizant Government representative. 4

7.0 NONCONFORMING MATERIAL REPORT 7.1 INSTRUCTIONS 7.1.1 ENTRIES A. Incoming/Receiving personnel will make entries in blocks 1 through 4 and 6 and 8 through 18 when purchased material is found to depart from specification. B. Fabrication,Quality Assurance, or Engineering personnel will make entries in blocks 1 through 7 and 16 through 18 when work in process or final assemblies are found to depart from specification. NOTE:Block 20 should be completed as soon as the information becomes available. C. The fabrication supervisor shall complete Block 24 to describe the necessary rework operations. Block 23 must be signed by Engineering to approve the rework plan. D. Members of the Material Review Board (MRB) shall Complete Blocks 21 and 22 for any items submitted to MRB for disposition 7.1.2 DETAILED INSTRUCTIONS The following details the entries for blocks 1 through 27 on the Nonconforming Material Report, Figure 7-1. Block 1 Part Description Enter the name of the part or assembly for which the nonconformance is being written. Block 2 Part No, Rev. Enter the complete number and revision of the part, subassembly, or assembly. Block 3 Originated by & Date The name of the initiator of the nonconformance report and the date. Block 4 Serial/Lot no Enter the serial number of the part, subassembly, or assembly. In cases of unserialized items, the lot or batch number may be used. If neither are applicable, enter N/A. Block 5 Operation Number Enter the operation number from the Assembly Work Order (AWO) wherein the discrepancy was discovered, if applicable. 5

7.1.2 DETAILED INSTRUCTIONS (continued) Block 6 Project Name Enter the name of the project from the AWO or purchase order account number. Block 7 Quality Assurance & Date The QA individual will review the form and signify his/her approval of the necessary contents by signature and entering the date. Block 8 Suppliers Name/Location Enter manufacturer's name and location, if known, as it appears on the purchase order or packing list. Block 9 Quantity Received Enter the quantity received as identified on the packing list or from the actual receiving count. Block 10 Sample Size Enter the size of the sample taken if applicable. Block 11 100% Check this block if 100% test or inspection was performed. Block 12 P.O. Number Enter the purchase order number Block 13 Requisitioner Enter the requisitioner's last name Block 14 Quantity Accepted To be filled in upon completion of inspection of the lot Block 15 Quantity Rejected To be filled in upon completion of inspection of the lot Block 16 Item Designate an item number for each discrepancy Block 17 Quantity Enter number of parts, subassemblies, or assemblies applicable to each discrepancy Block 18 Discrepancy Enter the description of the nonconformance. Be brief but be specific. Show the tolerance or specification limit. Identify drawing or specification requirement. Block 19 Disposition To be used by authorized individuals making dispositions for discrepancies reported in block 18. 6

7.1.2 DETAILED INSTRUCTIONS (continued) Block 20 Corrective Action Statement Identify cause of discrepancy(s) and action(s) taken to prevent recurrence. Statement should be provided by individual deemed responsible for discrepancy(s) reported. Block 21 MRB Approval Sign-off by appropriate Material Review Board Members Block 22 Material Review Disposition Indicate disposition of material referred to MRB by item per disposition. Block 23 Preliminary Review/Action The Engineer initially making disposition signs and dates in this block. (Approval of instructions in Block 24). Block 24 Operation Instruction All routing and detailed rework or repair instructions should be recorded here. Instructions normally provide for re-inspection or follow-up review by the MRB. Block 25 Operator Name of the individual performing the task and the date. Block 26 Inspection Signature or stamp of QA inspector approving work performed on each individual item. Block 27 QA Close out Signature or stamp of QA Inspector performing inspection and/or review of documentation verifying that all specified reprocessing is complete. Block 28 N M R Serial Number Enter the sequential serial number, which is obtained from the nonconforming material report log book when the N M R is initiated. 7

NONCONFORMING MATERIAL REPORT MASSACHUSETTS INSTITUTE OF TECHNOLOGY CENTER FOR SPACE RESEARCH PART DESCRIPTION PART NO. REV. 1 2 SERIAL/LOT NO OPERATION NO 4 5 SUPPLIER NAME/LOCATION 8 PROJECT NAME 6 N M R SERIAL NUMBER 28 ORIGINATED BY DATE 3 QUALITY ASSURANCE DATE 7 QTY REC'D 9 SAMPLE SIZE 10 100% P.O. NUMBER 12 ITEM QTY REQUISITIONER LOT DISPOSITION 13 DISCREPANCY (BRIEF BUT SPECIFIC; INCLUDE TOL. OR SPEC. LIMIT) QTY ACCEPT 14 DISPOSITION 11 QTY REJECT 15 16 17 18 19 CAUSE/DIAGNOSIS & CORRECTIVE ACTION (ITEMIZE): 20 22 MRB APPROVAL 21 MATERIAL REVIEW DISPOSITION ENGINEERING DATE RTV ITEM RWK TO ITEM SCRAP ITEM SPEC QUALITY ASSURANCE DATE USE AS IS ITEM REPAIR ITEM OTHER ITEM GOVERNMENT REPRESENTATIVE DATE NO REJ. ITEM *INVALID OR NOT RELEVANT TO ITEM PRELIMINARY REVIEW/ACTION (SIGNATURE & DATE): 23 QTY OPERATION INSTRUCTION OPER DATE INSP 24 25 26 Q A CLOSE OUT 27 Figure 7-1 8