HOW TO: BOARD ROOMS WITH HIGH HUMIDITY AND CONDENSATION GTEC MOISTURE AND VAPOUR BOARD WITH PLASTERBOARD

Similar documents
HOW TO: INSULATE YOUR HOME AND UNDERSTAND U-VALUES GTEC THERMAL BOARD WITH PLASTERBOARD

HOW TO: CREATE METAL PARTITIONS WALL LININGS AND CEILINGS GTEC FRAMES

HOW TO: FINISH AND REPAIR INTERNAL WALLS GTEC FINISHING PROFESSIONAL RANGE OF WALL FINISHING AND REPAIR SOLUTIONS

HOW TO: BOARD BATHROOMS, WET ROOMS & SHOWERS

DRYLINING PRODUCT RANGE

PLASTERBOARD PORTFOLIO A complete range for any application

DriLyner 5.2. DriLyner. Drywall masonry lining systems. Key facts. Sector Guide

Aqua Board WATER RESISTANT BOARD FOR WET AREAS

SSS001: Substrate Specification Sheet 1 - Plasterboard Drylining Installation and Finishing

TREAT RISING DAMP AND REDECORATE IN UNDER 24HRS

GypLyner. GypLyner. Metal framed wall lining system. All our systems are covered by SpecSure when using genuine Gyproc and Isover products.

GypLyner (walls) Metal framed wall lining system. GypLyner.

2.2. Jointing Jointing materials. Key facts. Sector Guide

FIRE PROTECTION. GTEC Shaftwall systems 244 GTEC Shaftwall Stairwell systems 248 GTEC Horizontal Shaftwall systems 249 GTEC Encasement systems 250

GypWall TM ROBUST 4.4. GypWall ROBUST. Durable impact resistant partition system. Key facts. Sector Guide

Finishes. The visual quality of your finished wall or ceiling is dependent on the quality of workmanship and quality of the materials used.

C08. S04. P02 P08 Tiling

Specifications for Insulation Board wall and ceiling applications

Tiling Tiling Finishes C08

Xtratherm Thin-R Thermal Liner (XT/TL Grade)

Wall Linings. As well as complete dry lining solutions we also provide fast-drying parge coat to ensure airtightness,

PIR Insulation XT/TL. Insulation for Drylining Walls Fixed with Adhesive Dabs. Walls 04/ /0183

Xtratherm Thin-R Thermal Liner (XT/TL Grade)

GypWall QUIET Acoustic separating wall system

Internal walls. Creating perfect living spaces. Technical Advice Centre Tel:

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES. Chapter 10

Superior Performance Phenolic Insulation SR/TB. Insulation for Drylining Walls Fixed with Adhesive Dabs. Walls AS LOW AS

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK ND AND 3 RD FIX FINISHES

GypLyner IWL Independent wall lining system

GypLyner UNIVERSAL Metal framed wall lining system

Independent twin frame high performance acoustic separating wall system

The new high-performance lining for internal and external applications INSIDE OR OUT YOUR CHOICE

NoMorePly The first tile backing system with a lifetime guarantee

GypLyner UNIVERSAL Metal framed wall lining system

Knauf Wall Liner. Head Track. Brackets. Wall Lining Stud. Fixings. Knauf Plasterboard. Floor Track. 98 Wall Liner

Tiling Tiling

RESILIENT ACOUSTIC STUD

The GlasRoc Shaftliner Type X advantage...

Thermal Laminate Board.

C05. S03. P02 P08 FireWall

Knauf Aquapanel Interior. Tile Backing. Cement board for wet areas. Will not deteriorate in water. Easy to score and snap

GypWall QUIET Acoustic separating wall system

Staggered stud acoustic partition system

ting Join Jointing Finishes C08

PRACTICAL TASK MANUAL

The Revolutionary New Plasterboard TIMBER FRAME GUIDE

Single frame acoustic separating wall system

K17 Insulated Plasterboard

The extra strong, extra durable, sound resistant system that you can direct fix to

FERMACELL Powerpanel H 2 O for Wet & Moisture affected areas

MADA FRENCH ADHESIVE MADE IN KSA. Member of

Curved partition and wall lining system

GypWall AUDIO The ultimate cinema wall system

K17 Insulated Plasterboard

TECHNICAL DATA SHEET aqua plus phantasy

Concrete Soffit Direct Fix

GypWall AUDIO The ultimate sound insulating wall system

C05. S03. P02 P08 FireWall

GypLyner UNIVERSAL (Ceilings)

Plastering. Holiday Inn - Sultanate of Oman

PRICE LIST Metal Profiles Addendum effective 1 March 2017

GypLyner (Ceilings) Concealed grid ceiling lining system. GypLyner UNIVERSAL.

PIR Insulation XT/TL-MF. Insulation for Drylining Walls (Mechanically Fixed) Walls 04/ /0183

Project No: Pakenham Branch Library, Pakenham, Ontario Section DECEMBER, 2016 Page 1 of 6

K17 Insulated Plasterboard

SECTION GYPSUM BOARD ASSEMBLIES

Knauf Aquapanel Interior. System Solutions Tile Backing. Cement board for wet areas. Quick and simple to construct

Specifications for Tile Backer Board wall and floor applications

Knauf Safeboard. X-ray partitions. Lead-free X-ray shielding plasterboard. 100% lead-free board. Economical radiation protection.

SoundBlocTM. Gyproc SoundBloc Plasterboard. Technical & Safety Datasheet.

C07. S04. P02 P10 GypLyner universal

aquapanel InstallatIon GuIde

Plaster systems. Plaster systems.

Staggered stud acoustic partition system

Gold Bond BRAND Kal-Kore Plaster Base

GypWall RAPID db Plus

Semi-exposed soffits. Thermal lining system for semi-exposed soffits. Semi-exposed soffits.

Insulation boards PhoneStar

Please Note: PhoneStar was previously branded as Phonewell

Tiling. Capital Gate Hotel, Abu Dhabi - UAE

Cavity fire barriers. Cavity fire barriers. Fire separation within concealed spaces. C06 Floors and ceilings

Garage Conversion - Between and Under Joist Applications

FIRE PROTECTION AND PERFORMANCE DRY LINING BOARD THE ULTIMATE IN FIRE PROTECTION! 91 mins fire integrity and 86 mins fire insulation on 9mm board

TECHNICAL DATA SHEET aqua plus pigment hard-wearing glass fabrics for walls and ceilings

INSTALLATION GUIDE GUIDE TO ASC ISO-WALL CONSTRUCTION SYSTEM APPLICATION ISO-WALL SYSTEM. ASC Iso-Wall System Includes: Materials Required:

SECTION GYPSUM BOARD ASSEMBLIES

FIRE PROTECTION AND PERFORMANCE DRY LINING BOARD THE ULTIMATE IN FIRE PROTECTION! 91 mins fire integrity and 86 mins fire insulation on 9mm board

By Appointment to H.M. The Queen, Building Material Manufacturers Sovereign Chemicals Limited, Barrow in Furness

SECTION GYPSUM BOARD

ThermaSheet. multi-purpose insulated tile backer panels

Data sheet Armatop MP / Page 1

Caparol System PRO Data sheet

Single frame acoustic separating wall system

BIG DISCOUNTS AVAILABLE ON SEMPATAP

Data sheet Armatop A - new / Page 1. Areas of application Bonding Bonding of mineral wool, polystyrene and cork external wall insulation boards.

GigaCrete Specification PlasterMax. PlasterMax : Fire Rated Plaster for Direct Application over Cement Masonry Units (CMU) Interior Walls

Gyproc Habito Plasterboard

Exterior Wall Solutions Building Shell

Installation manual Number TV 02/2016 HE floor coverings Date Pages 5. Tarkett Vinisin Branch of Kalush

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights

Transcription:

HOW TO: BOARD ROOMS WITH HIGH HUMIDITY AND CONDENSATION WITH PLASTERBOARD GTEC MOISTURE AND VAPOUR BOARD

3 MOISTURE AND HUMIDITY Kitchens, utility rooms and cloak rooms are areas of high humidity, modern appliances, cooking and the use of hot water all create increased levels of moisture in a room. Although standard plasterboard can be used in these areas, the best way to ensure a lasting finish is to use a plasterboard designed specifically for this type of application.

4 IDEAL FOR KITCHENS AND UTILITY ROOMS USED IN CLOAK ROOMS AND BATHROOMS

5 SINIAT GTEC MOISTURE BOARD Moisture Board has less than 10% water absorption compared to standard plasterboard which is greater than 25%, so it is perfect for walls and ceilings in high humidity areas. The lower water absorption rate means the boards will not expand or contract as much as standard plasterboard, reducing the risk of cracking or damage to the final finish. KEY SPECIFICATIONS Available in 12.5mm or 15mm thickness Easy to cut, simply score and snap Less than 10% water absorption rate Complies with BS 1230 type 3 and 4, BS EN 520 type H2 Requires priming with GTEC Universal Sealer prior to decorating and treating with a PVA Bonding agent prior to plastering

6 INSTALLATION Direct Bond installation (see page 9 for details) Dryliner wall linings (see page 11 for details) Metal or timber stud partitions (see page 13 for details) GTEC Moisture Board

7 SINIAT GTEC VAPOUR BOARD Siniat GTEC Vapour Board has a metallised vapour control layer on the back face to control condensation. The vapour control layer helps prevent the passage of warm moist air from inside the property from permeating into the wall structure or into the roof space where it can condense and cause damage. Once mounted with the shiny side to the wall or ceiling, the board can be finished in the normal way either by a taping and jointing process or by a plaster skim coat. KEY SPECIFICATIONS Available in 9.5mm, 12.5mm or 15mm thickness Available in square or tapered edge finish Requires priming with GTEC Universal Sealer prior to decorating INSTALLATION Dryliner wall lining (See page 11 for details) Metal or timber stud partitions (see page 13 for details) Please note this product cannot be installed using the Dot & Dab (Direct Bond) method, this is because the bonding compound will not stick to the metallised surface

8 GTEC Vapour Board DAMP Siniat GTEC Vapour Board is not a solution for damp. There is a common misconception that damp on walls can be cured by attaching timber or metal studs and then covering with vapour board, this is not the case and can cause health hazards. WALL SHOWING SIGNS OF DAMP Mould can build up and may eventually contaminate the plasterboard. The damp and the cause of the damp must be treated before any form of plasterboard is installed. Moulds produce allergens (substances that can cause an allergic reaction), irritants and sometimes toxic substances. Inhaling or touching mould spores may cause an allergic reaction and respiratory issues.

9 HOW TO INSTALL USING DOT & DAB METHOD Moisture Board can be installed by either Dot & Dab (Direct Bond) or Dryliner method. The Dot & Dab method should only be used for walls that already include a cavity. Continuous bonding compound ribbon 50mm from top of the board Moisture Board 250 x 75mm Dab of Universal Bonding Compound Continuous dab around socket boxes Cut board to receive socket box Continuous bonding compound ribbon 50mm from base of board Max. spacing of 600mm Check out our Dot & Dab How To Video on our dedicated Siniat UK YouTube Channel www.youtube.com/siniatukchannel

10 INSTALLATION 1. Starting from a window, door reveal or internal angle, mark the wall vertically with a chalk line for the row of dabs. 2. Using Siniat Universal Bonding Compound place a continuous ribbon 50mm at the top and bottom of the board. 3. Then place your Dot & Dabs on the wall making sure that they are 250mm x 75mm in size and at 300mm centres. 4. A maximum spacing of 600mm horizontally should be used. A continuous ribbon should be placed around any plug sockets or light fittings. 5. Press the plasterboard in place against the dabs fitting the board tightly against the ceiling using a wedge or off cut at the base. 6. Tamp the board into place with the floor and ceiling chalk lines using a straight edge. Remove wedges when compound has dried (allow 8 hours). Do not use this installation method for installing Vapour Board.

11 HOW TO INSTALL USING WALL LINING METHOD The dryliner method should be used when upgrading an existing solid wall or to create a cavity. Dryliner Channel Dryliner Track Dryliner Brackets to suit cavity depth Max 600mm Max 800mm Vapour or Moisture Board Check out our Covering Uneven Walls How To Video on our dedicated Siniat UK YouTube Channel www.youtube.com/siniatukchannel

INSTALLATION 12 1. Fix a dryliner track at 600mm centres to the floor and ceiling using suitable fixings. Allow for required cavity of at least 25mm. 2. If applying direct to concrete make sure that the surface is dry and a damp proof membrane has been used. Ensure that the large flange of the dryliner track is on the plasterboard side. 3. Mark vertical lines at 600mm horizontal centres to fix the dryliner channels. 4. Start at the centre of the wall and position the dryliner brackets directly to the wall at a maximum 800mm vertical centres on the marked lines (at shoulder and waist height). Secure using suitable fixings. Fold out the toothed wings of each bracket to form legs. 5. Cut each dryliner channel 5mm shorter in height from the floor to the ceiling and place into the dryliner track. 6. Ensure channel is plumb and secure to each bracket using a GTEC Pan Head Self Tapping screw. 7. If installing kitchen units, install a GTEC fixing channel or timber reinforcement at the height the wall and floor units need to be secured. 8. Cut plasterboard 5mm shorter than the floor to ceiling height. Butt the board firmly against ceiling and fix with Drywall Self Tapping screws at 300mm centres. Screws must be at least 10mm longer than the board thickness. 9. Butt the plasterboard edges lightly against each other and centre the edges over the channels. NOTE: Cannot be used for cavities over 130mm.

13 HOW TO INSTALL A METAL STUD PARTITION C Stud U Track Vapour or Moisture Board Check out our Building A Metal Partition How To video guide on our dedicated Siniat UK YouTube Channel www.youtube.com/siniatukchannel

14 INSTALLATION 1. Fix U Track to ceiling and floor at the desired location starting at the adjoining wall. Use the C studs to assist in aligning ceiling and floor studs if required. 2. Starting at the adjoining wall end cut each C Stud 5mm shorter in height from the floor to the ceiling and place into the U track and screw to the wall at 300mm centres using suitable fixings. 3. Cut each of the remaining studs individually leaving each one 5mm short, place in U Track but do not fix into position so it can be moved during board installation. 4. Starting with half a board cut the board 5mm shorter than the floor to ceiling height. Butt the board firmly against ceiling and wall and fix with Drywall Self Tapping screws at 300mm centres. Move the unsecured stud to the end of the board allowing room for the next board to be attached. 5. Moving to the other side of the partition install a full board marking the centre line and moving the next stud into location at the end of the board. Fix screws at 300mm centres on all 3 studs. 6. Continue with full boards cutting 5mm shorter in length marking the centre of board to highlight the location of each centre stud, installing on alternate sides of the partition for each board. This will set the stud locations perfectly and negate the need for measuring each one individually.

15 HOW TO FINISH THE BOARDS Taping and Jointing is a simple finishing solution for drylining installations, to reinforce joints, to prevent cracking and ensure fire and sound performances are achieved. It is suitable for areas of plasterboard where speed and ease of application can greatly reduce installation time and costs versus a skim finish. TRADITIONAL 3 STAGE PROCESS (RECOMMENDED) BEDDING & FILL COAT Tape or bead is bedded into the compound and taper filled out 1ST FINISH COAT The taper is re-filled with compound where required 2 ND FINISH COAT Final compound layer is applied and sanded for a smooth finish 2 STAGE PROCESS BEDDING & FILL COAT Tape or bead is bedded into the compound and taper filled out 2ND FINISH COAT Final compound layer is applied and sanded for a smooth finish

16 TAPERED EDGE Bed tape into layer of appropriate jointing compound GTEC Joint Tape GTEC Joint Tape and bedding layer Bedding layer down both edges of tape STAGE 1 Max. 60mm Second coat feathered out beyond filling layer STAGE 2 Max. 60mm 300mm approx. Finishing layer feathered out on to plasterboard and sanded once dry STAGE 3 Tapered edge board provides the best finish by allowing the joint tape to sit below the finished surface Board surfaces to be dry, clean, protected from weather, secure and evenly fixed Square edge plasterboard may also be jointed using the method on the following page

17 SQUARE OR CUT EDGE Bed tape into layer jointing compound GTEC Joint Tape GTEC Joint Tape and bedding layer Bedding layer down both edges of tape STAGE 1 200mm 200mm Second coat feathered out beyond filling layer STAGE 2 400mm Finishing layer feathered out on to plasterboard and sanded once dry STAGE 3 Correct screw fixings to be used with screw heads just below surface of board Gaps over 3mm to be filled with GTEC Joint Filler Xtra or GTEC Easy Finish prior to tape installation

18 INTERNAL CORNER Bed tape into layer of appropriate jointing compound GTEC Joint Tape GTEC Joint Tape and bedding layer STAGE 1 Second coat feathered out beyond filling layer STAGE 2 Finishing layer feathered out on to plasterboard and sanded once dry STAGE 3 Compound to be applied in nominal 1mm layers. Thicker layers will extend drying time GTEC Joint Tape cut to length to be pressed into bedding compound Second coat of jointing compound if required to be applied over dry joint, feathered out 50 60mm beyond the edge of first coat Finishing coat of compound feathered out 50 60mm beyond second coat. Finished, dry joint to be sanded to smooth finish for sealing and decoration

19 EXTERNAL CORNER Bed tape into layer of appropriate jointing compound GTEC Joint Tape Tape and bedding layer Filling layer feathered out Second coat feathered out Finishing layer feathered out on to plasterboard and sanded once dry Square edge joints only: Joint width to be wider to reduce visible crowning. External corners only: GTEC Flex Tape to be applied in place of GTEC Joint Tape as reinforcement.

20 DRY WALL SEALER Once the taping and jointing process has been completed, Universal Sealer must be applied to prevent regency striping. This term is used to describe the effect of the paint finish reacting differently on the joints to the surface of the board, if the sealer is not applied the joints may be visible no matter how well the taping and jointing process has been completed. Once dry, a paint finish can be applied in the normal manner.

INSULATION TIPS For a step-by-step video guide and installation tips on Direct Bonding (Dot & Dab), Dryliner and stud partition systems, check out our Siniat UK YouTube Channel. www.youtube.com/siniatukchannel For help with installation: Contact our Technical Enquiry line on: 01275 377 789 or Visit the new Siniat website at www.siniat.co.uk SINIAT Marsh Lane, Easton-in-Gordano, Bristol, BS20 0NE T +44 (0) 1275 377 773 www.siniat.co.uk Copyright 2016 (Siniat)