Environment Canada Regulatory Compliance

Similar documents
Environmental Legislation for Real Property Managers

WASTEWATER SYSTEMS EFFLUENT REGULATIONS [FEDERAL]

UNDERSTANDING AND OPTIMIZING THE PERFORMANCE OF MUNICIPAL WASTE STABILIZATION PONDS IN THE FAR NORTH

Environment Canada s proposed implementation Claude Fortin December 14, 2006

Determination of Treatment Requirements for Municipal and Private Sewage Treatment Works Discharging to Surface Waters

Application Form and Guide for an EPEA Registration Code of Practice for Wastewater Systems Using a Wastewater Lagoon

Facts About.. Draft General Permit No. 16-VW

Emergency Plan Under the Storage Tank Systems for Petroleum Products and Allied Petroleum Products Regulations

Module 20: Trickling Filters Answer Key

Delvin Wastewater Treatment Plant

SUMMARY OF COMMENTS/RECOMMENDATIONS

Additional Information Requirements for Wastewater Treatment Projects

Overview of Pollution Prevention (P2) GHG-Cost and Hazardous Materials Calculators

WASTEWATER TREATMENT. Nelson Environmental Inc. Nelson Environmental Inc.

2017 Annual Performance Report

Dundalk Wastewater Treatment Plant

PETROLEUM STORAGE AND DISTRIBUTION FACILITIES STORM WATER REGULATION 168/94

To meet our acceptance criteria, we may require you to pre-treat your wastewater before it is discharged to sewer.

UNIVERSITY OF BOLTON SCHOOL OF ENGINEERING. MSc CIVIL ENGINEERING SEMESTER TWO EXAMINATION 2017/2018 URBAN DRAINAGE SYSTEMS MODULE NO: BLT4022

Comprehensive Plan Update - Sanitary Sewer Section Planning Commission Workshop: November 10, 2014

Pollution Prevention is Key. Develop Waste Management Plan. Wastes Generated by Airports. Waste Collection and Recycling

S200 ENVIRONMENTAL EMERGENCY PLANNING REGULATIONS

2017 Annual Performance Report

Thames River Water Quality 2017

Overview of Pollution Prevention (P2) GHG-Cost and Hazardous Materials Calculators

2017 Performance Report for Bobcaygeon Waste Water Treatment Facility

Best Management Practices. Vehicle Wash Operations

Duffin Creek Water Pollution Control Plant Technical Information

Australian Standard. The storage and handling of flammable and combustible liquids AS (Incorporating Amendment Nos 1 and 2) AS

Overview of Pollution Prevention (P2) GHG & Cost Calculators

Lagoons Operation and Management in New Brunswick

CHEMICAL FREE PHOSPHOROUS ELIMINSTION P-UPTAKE PROCESS

Dundalk Wastewater Treatment Plant

Air Pollution Sources Overview. Amy Roberts, Division Manager January 24, 2019

Annual Environmental Report 2015

Waste Discharge Permit Application. for. Commercial, Industrial and Institutional Discharges

Pollution Prevention: Private, commercial and military airfields.

A Hybrid Constructed Wetland System for Decentralized Wastewater Treatment

6.1 Introduction to Wastewater Issues

CITY OF LONDON WASTEWATER TREATMENT OPERATIONS ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT 2013 ANNUAL REPORT ADELAIDE WASTEWATER TREATMENT PLANT

Cannington Water Pollution Control Plant Annual Performance Report Annual Performance Report 2015

ON MOE Reg. 127/01 - Ontario Ministry of the Environment for the Airborne Contaminant Discharge Monitoring and Reporting Regulation

Appendix 8. Petroleum Hydrocarbon Products, Ammonium Nitrate and Explosives Management Plan

Canada s Challenges and Opportunities to Address Contaminants in Wastewater

Sand Interceptor Sector Control Policy For Automotive Shops, Car Washes, & Facilities with Significant Potential for Sand or Inert Debris Discharge

RULES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION WATER RESOURCES DIVISION CHAPTER PRIORITY RANKING SYSTEM

Performance of a Tire Chip Media Constructed Wetland Presented by William Li, PE, Stantec Consulting Inc Geoffrey Holmes, Superintendent, Fisherman

Overview of Pollution Prevention (P2) GHG & Cost Calculators

c. Sites subject to regulation under Subtitle D of RCRA. The following discharges are not authorized by this permit:

The Environment and Mining An Overview of Ontario s Regulatory Framework

EGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT

Waste Discharge By-law

This document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works

February 16, Ministry of the Environment Southwestern Region 733 Exeter Road London, Ontario N6E 1L3. Attn.: Mr. Tom Clubb

Hazardous Waste Management

PQS TRAINING PROGRAM REMOTE FACILITIES

Yours very truly, Municipality of West Perth. Environmental Services

Companion Document INITIAL SET OF ACTIONS FOR CANADA-WIDE STANDARD FOR BENZENE PHASE 1

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No

Spills Action Centre: 2005 Summary Report

Stage II Vapor Recovery

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT

BRACEBRIDGE WASTEWATER TREATMENT 2016 SUMMARY REPORT

2014 Annual Compliance Report Operation & Maintenance Of Tara Wastewater System

This unofficial translation of. Ministerial Decision No 421/1998. was downloaded from METS is not the copyright owner.

Bracebridge Wastewater Treatment 2017 Summary Report

Annual Environmental Report 2017

NEW BIOLOGICAL PHOSPHORUS REMOVAL CONCEPT SUCCESSFULLY APPLIED IN A T-DITCH PROCESS WASTEWATER TREATMENT PLANT

RE: Annual Report 2016 Wardsville Wastewater Treatment Plant and Collection System

Advanced Onsite Wastewater Treatment Overview

Dundalk Wastewater Treatment Plant

Summary of LAKE ONTARIO Policies. 1. Requiring SPC approval: LO SEW 3 LO FUEL 2

Fiddler s Lake Treatment System Plan

Decentralized WW Management: Issues for Small-Scale WWTPs. Mike Stephens MWEA Local Sections Committee Frankenmuth, MI

OIL/WATER SEPARATORS & GREASE INTERCEPTORS. Requirements for Oil/Water Separators and Grease Interceptors discharging into Kitsap County Sewer mains

AIR QUALITY STATUS OF BENZENE, TOLUENE, ETHYLBENZENE AND XYLENE IN MUMBAI CITY

Construction Wastewater Treatment System. WF Chan Senior Officer Hong Kong Productivity Council 31 May 2018

IN THE PROVINCIAL COURT OF ALBERTA CRIMINAL DIVISION HER MAJESTY THE QUEEN. -and- GAS PLUS INC. STATEMENT OF AGREED FACTS

b. Equipment cleaning and maintenance (including vehicle and equipment rehabilitation, mechanical repairs, painting, fueling, and lubrication).

All About Permit for Equivalent Level of Safety

Communal Sewage Inspection Report

Report Date:April 03, 2018 Report Number: File: C-13 RR#3 Dickson Road Powell River, BC V8A 5C1

PHYSICAL INTEGRITY: IMPACT OF URBAN AREAS ON GREAT LAKES WATER QUALITY

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

Health, Safety & Environment. Federal Tank Registry Information for Sales & Delivery Operations

4 Desired Levels of Service (LOS)

TERMS AND CONDITIONS FOR APPROVAL No. AA February 17, General

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012

Rulemaking Hearing Rules of the Tennessee Department of Environment and Conservation State Revolving Fund Loan Program

TOWN OF FORT SMITH. Employment Opportunity. Water Plant Operator I

October 6, Mr. Donny Roberts, Mayor City of Hoxie 400 S.W. Hartigan Hoxie, AR RE: Compliance Inspection. Dear Mr.

Introduction. Background. Case Study: The Role of Optimization in Plant Re-rating Prepared by D.T. Chapman, CPO Inc.

Table 30. Summary of benzene concentrations (mg/l). MCL=0.005 mg/l.

Module 1: Introduction to Wastewater Treatment Answer Key

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be:

Introduction. Client-Specific Safety Summit. The purpose of this presentation is to provide: Primary Federal Environmental Programs CAA

Decentralized & Onsite Wastewater Solutions

Environmental Management Procedure (EMP)

Annual Environmental Report 2017

The Corporation of the Town of Milton

Transcription:

Environment Canada Regulatory Compliance Lisa McClemens Compliance Promotion Officer Environmental Protection Operations Directorate Ontario OFNTSC Conference August 25, 2015 Page 1 September-10-15

Storage Tank Systems for Petroleum Products and Allied Petroleum Products Regulations

Introduction It is your responsibility to: Prevent leaks and spills compliant systems; Report spills Implement emergency response; and Exercise due diligence in everyday actions. Understand how your actions impact the earth. Page 3 September-10-15

Overview of the Regulations Identification with EC Withdraw leaking systems Remove 'high risk' systems Mandatory compliance with technical requirements for 'new' systems Leak detection for components without secondary containment Containment of spills at product transfer areas Page 4 September-10-15

Overview of the Regulations, cont d Emergency plans Approved installers Operation and Maintenance Release Reporting Withdrawal from Service Record keeping Page 5 September-10-15

What must an emergency plan include? 1. Properties and characteristics of products stored 2. Characteristics of site where STS is located 3. A description of the measures to be used to prevent, prepare for, respond to an emergency 4. A list of the individuals who are required to carry out the plan and a description of their roles and responsibilities 5. Identification of the training required 6. A list of the emergency response equipment including location 7. Measures to be taken to notify members of the public Page 6 September-10-15

What is a PTA - Definitions The following definitions are from the STR: transfer area means the area around the connection point between a delivery truck, railcar, aircraft or vessel and a storage tank system in which the tanks have an aggregate capacity of more than 2,500 L. spill means any loss of a petroleum product or an allied petroleum product in liquid form from a storage tank system, including a loss during a transfer of such a product to or from a storage tank system, but not including a loss that does not reach outside the storage tank system s secondary containment. With respect to PTAs, section 15 of the STR says: The owner or operator of a storage tank system must ensure that petroleum product and allied petroleum product transfer areas are designed to contain spills that occur during the transfer process. Page 7 September-10-15

Page 8 September-10-15

What is a PTA? CURB - The area around the connection point between a delivery vehicle and STS - When developing a risk-management approach to a PTA, the STS, the delivery vehicle and the area in between must be considered Page 9 September-10-15

Contacts Program and Risk management: Waste Reduction and Management Division Tankregistry_IDstockage@ec.gc.ca Compliance Promotion Ontario Region: Lisa McClemens 613-949-8278 Lisa.McClemens@ec.gc.ca Page 10 September-10-15

Gasoline & Gasoline-Blend Dispensing Flowrate Regulations

Contents Background Requirement Method to Measure Flow Rate Disclaimer: Refer to the Regulations for official wording Page 12 September-10-15

Background Page 13 September-10-15

Background Regulations released in 2001 Enforcement officers are authorized to inspect fuel-dispensing nozzles through scheduled or unscheduled visits to verify compliance Flow rates are regulated to protect health Reducing emissions of benzene (a cancer-causing substance) Reducing emissions of volatile organic compounds (VOCs) Minimizing risk of spills Page 14 September-10-15

Background (continued) Who does this apply? Retailers (e.g., gas stations) and wholesale purchaserconsumers of gasoline and gasoline blends who use, or offer for use, any nozzle to dispense those fuels into on-road vehicles (e.g., cars, SUVs, vans) Does not apply to nozzles dedicated to refuelling heavy-duty vehicles (e.g., buses, semi-trucks, garbage trucks) Page 15 September-10-15

Requirement Flow rate from the nozzle can not exceed 38 litres per minute Page 16 September-10-15

Method to Measure Flow Rate Step 1: Start pump at maximum flow rate. Start a stopwatch when the volume reads 2.0 litres. Step 2: Stop the stopwatch when the volume reads 12.0 litres. Step 3: Time should be 16 seconds or higher. Page 17 September-10-15

Environment Canada s Wastewater Systems Effluent Regulations Page 18 September-10-15

Who is Subject to the WSER? The Regulations apply to any wastewater system that: deposit pollutants specified in the Regulations into fishbearing waters AND is designed to (or actually does) collect an average daily wastewater volume of 100,000 litres or more 60-70 First Nations in Ontario are anticipated to be subject to the Regulations Page 19 September-10-15 19

Who is NOT Subject to the WSER? The Regulations do not apply to: On-site septic systems Subsurface discharges Systems or sewers connected to municipally operated systems Wastewater systems in the Northwest Territories, Nunavut and North of the 54 th parallel in Quebec and Newfoundland and Labrador Page 20 September-10-15 20

Wastewater Systems Effluent Regulations Effluent quality standards are in effect January 1, 2015 Carbonaceous biochemical oxygen demand (CBOD) Suspended solids (SS) Total Residual Chlorine (TRC)* Un-ionized ammonia (NH 3 ) average average average maximum 25 mg/l 25 mg/l 0.02 mg/l < 1.25 mg/l * TRC standard for systems < 5000 m 3 /day is in effect January 1, 2021 Page 21 September-10-15 21

Effluent Monitoring and Reporting Reporting done through on-line system ERRIS ERRIS Click Page 22 September-10-15 22

Effluent Monitoring and Reporting Requirements vary depending on the type of system Captured Ontario FN facilities to fall into one of two categories: Hydraulic Retention time > 5 days e.g. Lagoons Hydraulic Retention time < 5 days e.g. Mechanical systems More frequent monitoring and reporting for systems with HRT < 5 days Page 23 September-10-15 23

ON-LINE REPORTING SWIM Single Window Information Management ERRIS Effluent Regulatory Reporting Information System Page 24 September-10-15 24

What is SWIM? SWIM is the acronym for Single Window Information Manager Serves as the front door to many reporting programs and provides a way of connecting individuals to these programs, including ERRIS SWIM has tools to help manage information for organizations, facilities, and individuals Page 25 September-10-15 25

Environment Canada Single Window (SW) Road Map Users GC Key or Secure Key Concierge (Authentication) Environment Canada s Single Window Information Manager (SWIM)(Manage your profile, link your organization, etc.) Select a Reporting Module Chemicals Management Plan National Pollutant Release Inventory and Partners Effluent Regulatory Reporting Information System (ERRIS) Renewable Fuels Regulation Electronic Reporting System (RFRERS) Vehicle Engine and Emissions Reporting Registry (VEERR) Page 26 September-10-15 26

How to get started in SWIM 1. Go to https://ec.ss.ec.gc.ca/ 2. Register for GCKey 3. Create your SWIM Profile 4. Create your organization* (Wastewater System Owner) 5. Create your facility* (Wastewater System) 6. Grant access to yourself, and others as needed: WSER Signing Authority and WSER Regulatee 7. Follow the link to ERRIS that will appear on your SWIM home page once you have access. * In some cases the organization and/or facility will already be in the SWIM database and will not need to be re-created. Page 27 September-10-15 27

How SWIM data flows into ERRIS SWIM element Organization Organization Physical Address Organization Mailing Address Facility Facility Physical Address ERRIS element Owner Owner Civic Address Owner Mailing Address Wastewater System Wastewater System Civic Address Page 28 September-10-15 28

Steps to Create & Submit an Identification Report in ERRIS 1. On the ERRIS Welcome page, click on Reports tab and select View/Edit Identification Report 2. Enter Wastewater system information* 3. Create Owner Information* 4. Create Operator Information 5. Create Contact Information 6. Create Operational Details * Information for some fields in ERRIS will already be pre-populated from the SWIM database and will not need to be re-created. Page 29 September-10-15 29

Steps to Create & Submit an Identification Report in ERRIS 7. Enter the Point of Entry (in relation to the Final Discharge Point) and the Final Discharge Point. 8. Click Save Identification Report before adding additional discharge points. 9. If applicable, click on button Add Discharge Point in order to add all combined sewer overflows and sanitary sewer overflows. 10.After adding additional discharge points, click Save Identification Report and Approve. 11.Click checkbox to approve regulatory submission and then click the Approve Report button. Page 30 September-10-15 30

Questions About SWIM : SS_Admin@ec.gc.ca About ERRIS : ww-eu@ec.gc.ca Wastewater Web site http://www.ec.gc.ca/eu-ww Page 31 September-10-15 31

Thank You Questions? Page 32 September-10-15