STANFORD UNIVERSITY UNIVERSITY ARCHITECT / CAMPUS PLANNING AND DESIGN

Similar documents
RULON LINEAR OPEN SUSPENDED WOOD CEILING SYSTEMS ARCHITECTURAL SPECIFICATIONS

A. Product Data shall be provided for each type of product indicated.

CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION CHAIN LINK FENCING

1. Include plans, elevations, sections, details, and attachments to other work.

SERIES SA30 STEEL/ALUMINUM FIXED DETENTION WINDOWS SECTION 08651

SECTION 1043 FENCE MATERIAL

SECTION FOLDING DOORS AMSTEL AS900CC DIVIDER SOUND

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT

SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651

ITEM 555 CHAIN LINK FENCING

Houston Community College 3200 Main Parking Garage November 15, 2010 Houston Community College

Phenolic Exterior Wall Cladding

SECTION CHAIN-LINK FENCES AND GATES 02821/1

SECTION 410 FENCES All materials shall be new and without flaws or defects of any type GENERAL

SECTION ACCORDION FOLDING PARTITIONS

Series 3000 Pocket Doors

LINEAR METAL CEILINGS Section

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2015 EDITION

MO: Tl RSA: 1406B

SECTION RESIDENTIAL OVERHEAD DOORS SIGNATURE COLLECTION WOOD GARAGE DOORS

A NEW PRE-K BUILDING FOR BIG SPRING LAKE KINDERGARTEN SCHOOL FOR THE ALBERTVILLE CITY BOARD OF EDUCATION ALBERTVILLE, ALABAMA

Modular Simplicity Dero

PIPE AND TUBE RAILINGS. Evansville Christian High School RELATED DOCUMENTS 1.1

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION FABRICATED ENGINEERED STRUCTURES. A. Pre-engineered, shop-fabricated structural steel building with formed purlin framing.

SECTION FENCING. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION POLYPROPYLENE FABRIC WALL COVERING

SECTION ORNAMENTAL WELDED STEEL FENCING

SECTION DECORATIVE METAL FENCES AND GATES

UNISTRUT CORPORATION GENERAL NOTES 1. THIS UNISTRUT SUPPORT SYSTEM IS DESIGNED TO SUPPORT A MAXIMUM UNIFORM LOAD OF PSF.

SECTION ALUMINUM HANDRAIL SYSTEMS

SECTION RESIDENTIAL OVERHEAD DOORS SIGNATURE COLLECTION WOOD GARAGE DOORS

Northpointe Renovation EPN #1701 F/A Prroject #17027 September 8, 2017

Preassembled steel stairs with concrete-filled treads.

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

Architectural Wall Products Guide Specifications

SECTION SECTIONAL OVERHEAD DOORS 511 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories.

SECTION Summit Phenolic Lockers (Solid Phenolic Lockers)

NEW ILLUMINATED LED SIGNAGE PAINTED STOREFRONT W/ VINYL GRAPHIC AND NEW LED SIGNAGE PAINT FINISHES (PROVIDE (2) COATS FOR ALL PAINTING) PT-1

SECTION CHAIN LINK FENCES

DIVISION 10 SPECIALTIES

SECTION CHAIN LINK FENCES AND GATES

University Apartments on Brooklyn PROJECT MANUAL

CONSTRUCTION SIGNS DESIGN MANUAL

SECTION Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces.

Series - 1

SECTION SECTIONAL OVERHEAD DOORS 416 SERIES SECTIONAL STEEL DOORS

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

B5B SERIES CRL SMOKE BAFFLE SYSTEMS

SPECIFICATIONS: Architectural Aluminum Railings

SECTION SECTIONAL OVERHEAD DOORS 424 SERIES SECTIONAL STEEL DOORS

Octaform Quick Liner Wall & Ceiling Panels Guide Specification CAN Page 1

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Glenlake Modular Railing System

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

Keuka Studios May 2008 SECTION {05720} CABLE RAILING SYSTEM {CABLE RAILING SYSTEM} Display hidden text for Specifier Notes.

1. Decks, balconies, and sun porches 2. Walkways, ramps, and stairways 3. Patios and courtyards

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Casino Modular Railing System

Architectural Roof and Wall Products Guide Specifications

SECTION CHAIN LINK FENCES AND GATES (PARK)

SECTION SECURITY GRILLES 679 SERIES SUPERGARD SIDE FOLDING GRILLE

SECTION ORNAMENTAL ALUMINUM RAILING

SECTION SECTIONAL OVERHEAD DOORS 418 SERIES INSULATED STEEL DOORS

SECTION SECTIONAL OVERHEAD DOORS 432 SERIES INSULATED STEEL DOORS

SECTION SECTIONAL OVERHEAD DOORS 422 SERIES INSULATED STEEL DOORS

Student Services & Classroom Addition

SECTION PREHUNG WOOD DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

DIVISION 10 SPECIALTIES SECTION METAL LOCKERS

SECTION DIRECTORIES

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Summit tm Modular Railing System

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

CONSTRUCTION SPECIFICATION FOR STRUCTURAL WOOD SYSTEMS

SECTION PREFORMED CLADDING. A. Part A and DIVISION 1 of PART B are hereby made a part of this SECTION.

CW 3550 Chain Link and Drift Control Fence TABLE OF CONTENTS

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Monaco tm Modular Railing System

METALS Commissioning of Metals Structural Steel Framing Steel Studs... 2

SECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION ENTRANCE FLOOR GRILLES SPECIFICATIONS

SECTION IMPACT RESISTANT WALL PROTECTION

Genesis Panel Systems LLC Dura-Max Brick Panel Siding Installation Instructions

SECTION ORNAMENTAL ALUMINUM FENCING

SECTION / HEAVY DUTY WIRE MESH WINDOW GUARDS

SECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate.

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System

1. Manufacturer's product lines of railings assembled from standard components.

SECTION RESILIENT SHEET FLOORING

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION METAL STAIRS

7. New railings for existing buildings shall be designed to match any existing railings unless there is a compelling reason for change.

SECTION ORNAMENTAL ALUMINUM RAILING

SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section.

B. LEED Submittals (Projects authorized for LEED certification only)

WALCOOM. Walcoom Corporation CHAIN LINK FENCE.

ARCHITECTURAL SPECIFICATIONS

SECTION METAL STUDENT LOCKERS

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION PLATE CONNECTED WOOD TRUSSES

SECTION CHAIN LINK FENCING

Transcription:

STANFORD UNIVERSITY UNIVERSITY ARCHITECT / CAMPUS PLANNING AND DESIGN CONSTRUCTION FENCING SPECIFICATIONS PERIMETER AND PROJECT INFORMATION FENCING University Architect / Campus Planning and Design Office Updated MARCH 2013 INTRODUCTION Prior to the siting and implementation of the perimeter and project information fencing, refer to the Construction Project Temporary Facilities Siting Policy found on the Facilities Design Guidelines (FDG). This policy specifies all necessary approvals needed before setting up the project information fencing. The informational fencing concept and the standards below were developed to inform campus users about building and site improvements, and to provide a positive visual image at construction activity sites campus wide. This specification applies to all capital projects, and select department and facilities projects, as approved by the University Architect / Campus Planning and Design Office (UA/CPD). The information below specifies standards and procedures for installing construction project enclosure fencing and project information panels. There are four components of construction fencing: perimeter project fencing, graphic panels, project information sign, and wood fence. For each project UA/CPD will determine which of these components are required, based on project size, complexity, and duration. Specifications and layout should respond to unique site conditions, and will be finalized on site through meetings with UA/CPD and project manager/engineer. FENCING STANDARDS AND MATERIALS PERIMETER PROJECT FENCING Perimeter project fencing is to be supplied and installed by the project, under the direction of the project manager/engineer, to enclose and secure the project site and associated laydown areas, while providing screening from construction activities. HEIGHT: 6-4 (+/-) above grade at project areas or combined project and laydown areas, and 8 feet at dedicated construction/laydown areas where materials and large equipment may be stored. All fence panels to align with adjacent panels along top,( including wood fence if used) at information nodes. MATERIALS: Fencing metals to be low sheen black finish, 2-3/8 galvanized posts with 11 gauge chain link fencing, 1-5/8 top and bottom rail. All fencing to have screening fabric, attached with galvanized metal heavy gauge wire clips, black color. Page 1 of 4

FABRIC: Black, Signature 96 closed mesh woven polyethylene cloth, with reinforced band and grommets along top and sides for secure anchoring to chain link panels. Available through CI Fabrics (San Diego, CA), or equal as approved by UA/CPD prior to installation. ANCHORING: Embed fence posts for 6 panels securely into ground whenever possible, as determined at on-site meetings. For sections holding graphic panels, posts to be installed at 8 feet on center. Fence posts may be installed on concrete blocks if frequent relocation is anticipated, only if approved by UA/CPD. 8 fencing to be securely embedded into ground where possible to avoid tipping from wind load. Pull fabric tight and smooth, overlap grommets and clip together if fence fabric ends between posts. Metal wire clips to be used in all grommets, crimped tight. No cuts or openings allowed in fence fabric. VENDOR/INSTALLER: Diamond Fence Company, Los Gatos, CA, 408-374-4282 or equal. GRAPHIC PANEL FENCING Graphic panels with imprinted images to be installed by the project and supplied by UA/CPD. Project fence contractor to install posts and panels to match perimeter fencing and attach graphic panels and black mesh fabric to them at each side of wood fencing (if applicable), or per the drawing and agreement with UA/CPD. Attach black fabric to the chain link fence on the interior (construction site) side of the graphic panels, beginning at the first post adjacent to the wood fencing (if applicable) and continuous across all posts holding graphic panels, to provide a dark background for images. A layout drawing will be provided by UA/CPD showing graphic panel placement and image locations, which will supersede other specifications. HEIGHT: 6-4 (+/-) above grade at project areas, to match project perimeter fencing height. MATERIALS: Fencing metals to be low sheen black finish, 2-3/8 galvanized posts with 11 gauge chain link, 1-5/8 top rail and bottom rail, to match construction fencing. Metal galvanized heavy gauge wire clips, black color required, for attaching mesh fabric to chain link or posts. No other types of attachments are permitted. FABRIC: White, vinyl mesh, with reinforced band and grommets 12 on center all sides, and nylon reinforcing webbing. Fabric will be imprinted with an image from a digital source, supplied to the vendor by UA/CPD. The black background fabric is to match the perimeter fabric fencing. Contact UA/CPD for graphic printing vendor information. ANCHORING: Embed fence posts securely into ground at 8-0 (+/-) on center, to hold panels flat and tight and minimize space between panels and posts. Hang chain link on tension rods centered between posts, with minimal space between post and rod. Center panels between top and bottom rails. Fasten graphic panels securely to chain link fence on all sides with galvanized metal heavy gauge wire clips crimped tight, through all grommets. Page 2 of 4

Match center line of fabric panels with center line of fencing panels per drawing. Align heights of project fencing and graphic panel fencing. VENDOR/INSTALLER: Diamond Fence Company or equal. PRODUCTION/DELIVERY TIME: Allow two weeks panel fabrication time, to include three to five days graphic production, five to seven days Fed-Ex Ground delivery, or pick up in Santa Clara. UA/CPD to supply graphic panels at time of perimeter fence installation, or per schedule agreed upon with project manager/engineer. PROJECT INFORMATION SIGN The project information sign will be supplied and installed under the direction of UA/CPD. Location will be determined by the UA/CPD in collaboration with the project manager/engineer and installer on site. Information and drawings to be supplied by project manager/engineer or appropriate designee. HEIGHT: 9-0 above grade MATERIALS: 4 wide tongue and grooved surfaced redwood panel finished with Cabot acrylic stain Dark Grey, attached to two 2X4 redwood posts routered to accept panel, finished with Cabot acrylic stain Black. Cap with 2X4, trim with 1X8 and 1X4 surfaced redwood. Aluminum j-rail channel (black) to accept digital print applied to.080 aluminum backing. Project title letters to be acrylic, 3 tall or per drawing, and 3/8 thick painted smoke metallic. ANCHORING: Embed fence posts securely into hole, core drill if on pavement, with base rock as anchoring foundation to allow for eventual removal and reuse. Sign top to be 9-0 above finished grade. Attach j-rails and digital information panel to tongue and grooved panels with hidden fasteners. Attach acrylic letters with studs and epoxy, or equal. VENDOR/INSTALLER: Facilities Operations Carpenter Shop and Sign Shop or equal. PRODUCTION/DELIVERY TIME: UA/CPD will install on a schedule as agreed upon with project manager/engineer. NOTE: Drawings provided to the project by UA/CPD will serve as the most current specifications, since specifications may need to change to fit specific site conditions and constraints. However, bring all conflicts to the attention of UA/CPD before proceeding. Page 3 of 4

WOOD FENCE (if required) Wood fence to be supplied to the project by UA/CPD, and installed by UA/CPD. Fence location will be determined by UA/CPD in collaboration with the project manager/engineer. A layout drawing will be provided by UA/CPD showing wood fence panel placement. HEIGHT: 6-4 +- above grade. Top of perimeter and graphic panel fencing to match height of wood panel fencing. MATERIALS: Stock lumber, redwood rough sawn siding panel with grooves at 4 o.c., finished with Cabot acrylic solid color stain Dark Grey, mounted between 4X4 redwood posts routered to accept panel, finished with Cabot acrylic solid color stain Black. Cap with 2X4; trim with 1X4 redwood, finished with Cabot acrylic solid color stain Black. ANCHORING: Embed fence posts securely into hole, core drilled if on pavement, with. base rock as anchoring foundation to allow for eventual removal and reuse. Do not anchor in concrete. VENDOR/INSTALLER: Facilities Operations Carpenter Shop or equal. PRODUCTION/DELIVERY TIME: UA/CPD to install fencing materials on a schedule as agreed upon with project manager/engineer. INSTALLATION PROCESS AND SITE MEETINGS A meeting will be scheduled by project manager/engineer with UA/CPD to determine the project information fencing locations and production schedule. Logistics plans should be approved by the UA/CPD representative and all appropriate parties prior to the site walk. INITIAL SITE VISIT The project manager/engineer and UA/CPD will meet on site to discuss the project perimeter fence locations, and to determine an installation completion date. Fence locations will not be moved without approval from UA/CPD. INSTALLATION REVIEW WALK The project manager/engineer will call UA/CPD at least five days in advance, whenever possible, to confirm a site visit meeting for review of the finished installation. Site visit date should be at least five days before the installation completion date to allow time for any changes. This review will be done to assure compliance with the specifications and to discuss any project or UA/CPD concerns with the layout. Agreed upon changes are to be completed before the installation completion date. FABRIC PANEL REMOVAL AND RETURN At the conclusion of the project, all fabric panels must be returned to UA/CPD. Each panel must be washed to clean and remove any construction debris/dust. Panels also should be rolled, not folded, before returning to prevent any permanent creasing or tears. Page 4 of 4