Fixed Facility Owners & Managers

Similar documents
Moisture and Mold Control

BUILDING EXTERIOR SHELL TRAINING

Water Intrusion Management Plan for Construction Firms. XL Group Insurance. Risk Control Guidance. Environmental

SUMMARY 792 Youngfield Ct., Lakewood CO Frank Oz January 13, 2018

MOLD INSPECTION REPORT Block Home Inspections LLC

Table of Contents. C. Recommended Remediation Firms: upon request

FirstEnergy Program Overview

RIVER VALE BOARD OF EDUCATION PROPERTY Page 1 of Indoor Air Quality Standards 7421 INDOOR AIR QUALITY STANDARDS

Alabama Home Inspections

Foundations. Issue. Slab-On-Grade Liquid Water Control (See Figure 2-2) Goals. Guidance

Water Management & Damage Prevention: A Guide for Homeowners

Disaster Prevention and Protection Checklist

6954 Lakeside Dr. Property Inspection Report. - Provided by First Class Property Inspections, LLC -

Indoor Air Quality Program

Madison's Home Inspections

3D Home Improvement and Inspection Services, Inc

Mold Remediation. Containment guidelines: based on the size of the infected area.

Storm Damage Assessment Report For: 1234 Example Street., Houston, TX 77002

Indoor Air Quality Program

NADCA S MOLD AWARENESS

1234 Main St. Buyer Name. Table of Contents

New Montgomery County Elementary School. Construction Indoor Air Quality Management Plan IEQc3.1 IAQ Plan During Construction

Chapter 2 Understanding The Problem

SITE AND BUILDING INSPECTION CHECKLIST

Inspection Report. Prepared for: Gil Turiel. Property Address: 545 Briar Run Court Loganville, GA Date: July 17, 2011

Encapsulated, Sealed & Closed Crawlspace Installation Manual

UNIVERSITY OF TOLEDO

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings)

Inspection Report. Prepared for: Tonia Mann. Property Address: 2557 Briar Valley Way Dacula, GA Date: March 01, 2012

Model Written Indoor Air Quality Program. The Summit Board of Education Administrative Offices 14 Beekman Terrace Summit, NJ

Construction Indoor Air Quality (IAQ) Management Plan

Indoor Air Quality Management Plan

Before You Start Renovating Your Bathroom

SUMMARY 1234 Main St.Loudon TN Buyer Name 08/28/2018 9:00AM

Inspection Report. Property Address:

Builders Risk - Water Damage Inspection Checklist

South Brunswick School District Indoor Air Quality (IAQ) Written Plan

The Inspector. Property Inspection Report

1234 Main St Denver CO 80210

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

Inspection Report. Prepared for: Yossi Berg. Property Address: 4925 Diggers Way Sugar Hill, GA. Date: July 20, 2011

WEST VIRGINIA UNIVERSITY ALUMNI CENTER Morgantown, West Virginia

Gramercy Place Condo Association, Inc.

Inspection Report. Prepared for: Tonia Mann. Property Address: 1295 Greyland Hills Drive Lawrenceville, GA Date: April 24, 2012

Indoor Air Quality Plan

A Sample Report On The Conditions At:

Stucco Moisture Inspection Report

Summary. Inspect It Like A Girl. P.O. Box 2283 Madison, MS Customer Happy Home. Address 123 Happy Home Road Jackson MS 39157

The ECHO System The basement ventilated and drained insulation system

INDOOR AIR QUALITY WRITTEN PLAN

about your house Before You Start Repairing or Replacing Roof Finishes Figure 1 Common problems

Willamette Home Inspection

REPORT CHECKLIST SUPPLEMENT

HOME INSPECTION CHECKLIST

New Home Warranty Handbook

Building Inspection Report

TOWN OF HAGUE GUIDELINES FOR PERMIT APPLICATION

PROPERTY PRESERVATION AND CAPITAL PLANNING

New Jersey Home Inspection - Standards of Practice

STEP UP TO THE ENERGY STAR INDOOR AIR PACKAGE. A new opportunity for leading builders to create better environments inside and out

Property Condition Assessment

bout your house before you start Repairing or Replacing Roof Finishes

Mold, Moisture and Remediation BROUGHT TO YOU BY JEFF ROSTONI OF AIR QUALITY CONSULTANTS, LLC

All Pro Home Inspection. Home Report South Your Town

Roof Systems ROOFS. Inspections

Indoor Air Quality Self Inspection Checklist

A Summary of the Basic Duties of Maintenance, Repair and Replacement for CARRIAGE PARK CONDOMINIUM ASSOCIATION

WPN 17-7 Table of Issues Table of Contents. Air-Conditioning and Heating Systems/Units Asbestos - in Siding, Walls, Ceilings, etc...

component was performing its intended function; installation and condition were appropriate for age and use.

Presenter: Mr. Rob Orwig, P.E. Senior Forensic Engineer/Heartland Regional Manager

Inspection Report. Prepared for: Tonia Mann. Property Address: 56 Riverview Place Douglasville, GA Date: September 19, 2012

Crawl Spaces and Basements: Defining the Building Envelope

Moisture Survey Inspection Report

WILLIAM LYON HOMES 3-YEAR WARRANTY & SERVICE PROGRAM

SECTION INDOOR AIR QUALITY MANAGEMENT PLAN. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

Residential 1 to 3 Story CALGreen (CGBSC) Correction List (To be inserted within the body of the Residential Plan Check Correction List)

Sanitary Design and Construction of Food Processing and Handling Facilities Introduction To ensure safe food and adequate sanitation programs, the

General Specifications for HVAC System Cleaning

10 TIPS FOR FALL AND WINTER FACILITY MAINTENANCE

HOW DO YOU TALK ABOUT MOLD WITHOUT SAYING THE M WORD IMG = A NEW NAME FOR AN OLD PROBLEM. Mold Growth!

Property Inspection Report

Assessing the Renovation Project

2001 National Workshop on State Building Energy Codes July th, 2001 Burlington, Vermont

COMMISSIONING, OPERATION AND MAINTENANCE

National Property Inspections

2015 WSSCA Conference

Quality Work Plan for Retrofit Installer Arkansas Weatherization Assistance Program Name Credential

COMPANY: CERTIFIED HOME INSPECTIONS ADDRESS: 92 NORTH RD. CITY, STATE, ZIP: NUTLEY NJ PHONE:

BELLA PALERMO HOMEOWNERS ASSOCIATION MAINTENANCE MATRIX DIVISION OF MAINTENANCE AND REPAIR RESPONSIBILITY

SECTION GREEN BUILDING POLICY IMPLEMENTATION

Background. AEM Tier 2 Worksheet Greenhouse Maintenance

DESIGN & CONSTRUCTION PHASE COMMISSIONING PLAN TEMPLATE

about your house Assessing the Renovation Project Figure 1 Problems that should be addressed

Exterior structures (fences, sheds, decks, retaining walls, detached garages) in good condition, no evidence of termite damage or rotted wood

Evergreen Project Implementation Plan Instructions Low Income Housing Tax Credit Program

Napa County Building Officials Coalition

9) Home Inspection: As defined in Section 1-10 of the Act.

TITLE 68: PROFESSIONS AND OCCUPATIONS CHAPTER VIII: DEPARTMENT OF FINANCIAL AND PROFESSIONAL REGULATION

BELLA PALERMO HOMEOWNERS ASSOCIATION MAINTENANCE MATRIX DIVISION OF MAINTENANCE AND REPAIR RESPONSIBILITY

Attic Access Hatch to have an area not less than 0.32m²/3.4ft² and no dimension less than 500mm with a min R-15 insulation value Crawlspace

Transcription:

Fixed Facility Owners & Managers WIM/WIST Responsibilities Checklists/Forms for Water Intrusion Prevention Protocol A & B

WIM Responsibilities General - May select a WIST (Water Intrusion Surveillance Team) to help assess building conditions and respond to problems. The WIST frequently includes the cleaning/maintenance crew and building engineers. - Directs periodic meeting of Surveillance Team members (WIST), which will focus on prevention, reviews of prior problems, inspection procedures, new developments, etc. - Ensures all team members are appropriately trained and have attended refresher classes. - Evaluates the severity of all water intrusion issues and instructs the surveillance team member(s) with respect to the appropriate protocol to be followed. - Evaluates all risk factors and determines if a microbial investigation by qualified experts should be performed. - Evaluates third party microbial consultant and remediation contractor qualifications for use on projects. - Reports directly to senior company managers on all incidents, response actions, etc. - Evaluates whether third party contactors need to be called in to assist in remediation. Documentation/Communication - Creates, tracks, and maintains a file for all water intrusion issues on all projects. - Carefully documents including photographs, interviews, site visits (if possible) all water intrusion issues. - Directs communication with any third parties involved. Immediate Communication and Immediate Response are critical. Informs third parties with respect to the actions that will be taken/protocol to be followed/project schedule/controls. - Responsible to obtain and maintain any and all MSDS sheets for any products used during remediation. - Responsible for ensuring that an appropriate Respiratory Protection Plan is in place if employees will be wearing respirators. - Ensures all water intrusion event forms are filled out and completed, signed, dated, etc. as and when required. Construction/Renovation & Maintenance Activities - Responsible for ensuring that all systems and their components have been delivered from third parties appropriately packed and free from visible contamination prior to arrival. - Develop maintenance protocol for periodic system inspections which are directed at identifying and testing for water intrusion/leakage issues.

- Ensure that all company policies with respect to system maintenance (i.e., filter changing, coil cleaning, etc.) are in strict compliance with manufacturer s instructions. - Responsible to meet with project architects, engineers, etc., to verify renovation building designs will not be conducive to creating future water intrusion problems. - Responsible to oversee subcontractor activities during renovation/construction.

WIST Responsibilities General - Treat all reports of water intrusion and all reports of mold related to the HVAC systems as an EMERGENCY. - Report all instances of water intrusion (no matter how small), all suspect areas of fungal growth (no matter how small), all complaints and/or other indications, which could conceivably be related to an issue of water intrusion or mold immediately to the Water Intrusion Manager. - Attend periodic meeting with WIM. - Attend all required microbial training classes. - Function as the eyes and ears for the WIM on each individual project. Documentation/Communication - Responsible for completing water intrusion forms for individual projects and forwarding to WIM. Construction/Renovation Maintenance Activities - Responsible for inspecting materials upon arrival at job site to ensure they are in good condition and free from visible fungal growth. - Responsible to inspect the project environment prior to renovation/construction or upon taking over the management of a new building to verify the environment has not sustained prior water intrusion issues. This responsibility will include documentation (photographs, notes, etc.) of any preexisting conditions such as stained ceiling tiles, roof leaks, floor tile buckling, etc. - Responsible to verify all required repairs and maintenance are being performed as required by company policy or manufacturer s recommendations.

WATER INTRUSION INCIDENT EVENT FORM This form MUST be completed each time there is a water intrusion event. Date: Time: Site Location: Describe the incident: Was the cause of the event determined? Describe: Was the extent of damage determined? Describe: Are there any occupant complaints? Describe:

Were any of the following observed: Visible Mold Musty Odors Water Stained Building Materials Water Damaged Building Materials Impact to the HVAC System Sewage or Gray Water? Describe: Was the W.I.M contacted? Yes No What remediation methods were instituted? Supply Timeline: What follow up precautions will be instituted? Were the services of a microbial consultant retained? Yes No If so, what were the scope of services? Was Clearance Sampling performed? Yes No Attach laboratory results.

Are there any outstanding issues? Yes No And Has the cause of the problem been repaired? Yes No All reports filed must have accompanying photos. Prepared by Maintenance Supervisor Date Reviewed by Water Intrusion Manager Date

Checklist HVAC Issues (To be completed on a monthly basis) General Risk Management - HVAC Primary conduit and vehicle for distribution of any microbial contamination - Expedites aerosolization - Increases risk of exposure and potential illness - Once mold impacts the HVAC system it is usually impossible to evaluate if the building contaminated the HVAC system or vice versa. 1. Has a monthly inspection of HVAC system and all components been conducted Yes No to verify the system is in good working condition and not contributing to water intrusion issues? 2. Are temperatures maintained between 70 degrees and 80 degrees F and relative Yes No humidity maintained between 40% and 59%? If not state temperature: If not state relative humidity: Prevent moisture condensation by reducing the relative humidity in the air. To increase surface temperature insulate or increase air circulation. To reduce the moisture level in the air, repair leaks, increase ventilation (if outside air is cold/ dry), or dehumidify (if outdoor air is warm/humid). 3. Are heating, ventilation, and air-conditioning (HVAC) drip pans clean, properly Yes No sloped, and unobstructed? 4. Have secondary condensate lines been inspected to ensure they are dry? Yes No 5. Have building thermostats and vents been inspected regularly to ensure tenants Yes No have not altered building air balance? Date last balanced: 6. Are drain pans cleaned and inspected every 3 months? Yes No 7. Are air handler unit liners inspected every 3 months? Yes No 8. Are air filters inspected monthly and changed regularly? Yes No

9. Is equipment inspected to verify it is operating with filters installed properly? Yes No 10. Are coils inspected at least every 3 months for accumulation of debris? Yes No 11. Are plenum areas inspected monthly for accumulation of dust/debris and to Yes No verify they are not being used for storage? 12. Are humidifiers cleaned and chlorinated weekly? Yes No 13. Are maintenance meetings set up on a regular basis to discuss any HVAC Yes No issues? 14. Are exhaust vents in kitchens and bathrooms examined on a regular basis Yes No to verify they have been installed and are working properly? 15. Has it been verified that all building ventilation is in compliance with Yes No ASHRAE 61:2001 based on space utilization, number of occupants, and square footage? 16. Is building pressurization appropriate for climate and use? Yes No When was this tested? What were the results? 17. Are AC units appropriately sized for the area to be cooled? Yes No 18. Are all ducts appropriately sealed, vented, and maintained? Yes No 19. Are all appliances, bathrooms, cooking areas appropriately vented to the Yes No outside? 20. If the facility is located in a warm humid climate, have interior vapor barriers Yes No such as wall coverings been limited in use? Are exterior vapor barriers in good condition? 21. Are all AHUs operating properly and located in accessible areas protected Yes No from outside elements including pollutants, birds, etc? Explain any No answers:

Advise what corrective actions have been instituted: Checklist completion date: Completed by: Reviewed by: Checklist Landscape/Exterior Building Envelope Issues

(To be completed on a monthly basis) Conduct monthly inspection of sprinkler systems, building landscaping, and building exterior to verify that water is not negatively impacting the building envelope. 1. Has the building envelope been inspected for the following? Built-up (berms) at perimeters of buildings? Yes No Planters at the perimeter of the buildings? Yes No Vegetation in close proximity to the perimeter of the buildings? Yes No Drainage issues and appropriateness of property slope? Yes No 2. Have sprinklers been placed so that moisture will not impact the Yes No building envelope? 3. Has the building been inspected to ensure that all weep screeds are Yes No are properly placed and not obstructed? 4. Are indoor plants, terrariums, trees, ponds, etc. carefully maintained? Yes No Are they regularly inspected for issues such as leaks, accumulation of Yes No debris, and verification that any building materials in close proximity to these items should be non conducive to microbial growth? Date of last inspection: Explain any No answers: Explain any No answers (cont.)

Advise what corrective actions have been instituted: Checklist completion date: Completed by: Reviewed by: Checklist Plumbing Issues

(To be completed on a monthly basis) Conduct monthly inspection of all accessible plumbing components to identify leaky pipes, fittings, valves, etc. for signs of leaking, corrosion or water intrusion. 1. Have valve packing glands been inspected to ensure they are not dry Yes No and brittle? Date of last inspection: 2. Have water heaters been inspected for fitting corrosion? Yes No Date of last inspection: 3. Have sealants at fixtures and escutcheons been inspected? Yes No Date of last inspection: 4. Have all locations where flexible sealant has been used (sinks, ceramic Yes No tile joints, etc.) been inspected? Date of last inspection: 5. Have all insulated pipes been inspected to ensure the insulation is intact Yes No to prevent condensation? 6. Are fire sprinkler leads, valves, joints regularly inspected for corrosion/ Yes No weeping? Date of last inspection: Is this in compliance with state/local codes? Explain any No answers:

Explain any No answers (cont.) Advise what corrective actions have been instituted: Checklist completion date: Completed by: Reviewed by: Checklist Roofing Issues

(To be completed on a monthly basis) Conduct periodic (monthly) inspection of all interior ceiling and wall areas for signs of water intrusion through the roof or plenum. 1. Has the roof been inspected on at least a yearly basis for problems? Yes No Date of last inspection: 2. Did the inspection account for the following: General maintenance? Yes No Ponding areas? Yes No Seals at penetrations, skylights, chimneys? Yes No Broken/damaged roof products? Yes No Debris accumulation at valleys, crickets? Yes No Organic debris/vegetation contact? Yes No Condition of roof flashing? Yes No Condition of roof coating? Yes No 3. Are weep screeds properly placed, visible, and unobstructed? Yes No 4. Are gutters and drain spouts maintained properly, free of debris, and Yes No directing water away from the building? 5. Do roof overhangs direct water away from building? Yes No 6. Is there damage to, improperly installed, maintained chimney caps? Yes No 7. What is the service life of the roof and associated products?

8. Has the roof been impaired by weather, lack of maintenance, etc? Yes No If yes, explain: 9. Are there any items present on the roof that could impair the integrity Yes No of the roof? If yes, explain: Explain any No answers to 1, 2, 3 and 5 above: Advise what corrective actions have been taken: Checklist completion date: Completed by: Reviewed by: Checklist Exterior Envelope Issues

(To be completed on a monthly basis) Conduct monthly periodic inspection of all interior and exterior wall systems and finishes for signs of water intrusion. 1. Verify the following are in good condition: Caulking? Yes No Painting? Yes No Window frame connections? Yes No Exterior trim? Yes No 2. Have window/door tracks been inspected and cleaned to ensure proper Yes No function and water drainage? 3. Are thresholds appropriately placed above grade? Yes No 4. Is EIFs present in the building? Yes No 5. If EIFs is present, the system should be checked monthly for: Penetrations? Yes No Gaps? Yes No Soil/vegetation contact? Yes No Explain any No answers to 1, 2, or 3 above: Explain any No answers (cont.):

Advise what corrective actions have been taken: Checklist completion date: Completed by: Reviewed by: Checklist Renovation/Maintenance Issues

The answer to all the following questions should be No. If there are any Yes answers, please provide an explanation at the bottom of the page. 1. Is carpet present in bathrooms/wet areas? Yes No 2. Are monolithic vapor barriers present (such as carpet over concrete slab Yes No floors or chair mats in ground floor offices)? 3. Are interior vapor barriers present (warm climate)? Yes No 4. Are exterior vapor barriers present (cold climate)? Yes No 5. Do balconies, patios, and/or roof areas show evidence of ponding? Yes No 6. Is drywall present in bathrooms? Yes No 7. Are crawl spaces present? Yes No If so, are building materials conducive to mold growth present? Yes No 8. Do drainage systems, gutters, direct water toward or under the building Yes No in any location? 9. Is heat generating equipment located near thermostats? Yes No 10. Are registers/vents blocked or turned off in the building? Yes No 11. Do elevator pits show signs of water intrusion/staining? Yes No 12. Are inspections performed on a monthly basis to assess conditions Yes No such as stained ceiling tiles, buckled floors, wallpaper detachment, and other indications of water intrusion issues? 13. Have maintenance staff, cleaning personnel, and others involved in Yes No maintaining the property been trained to take notice and promptly report any signs of water damage, staining, flooding, leaks, and condensation, etc? 14. Are required maintenance schedules for HVAC, plumbing, exterior Yes No

maintenance, etc. complied with? 15. Are buildings maintained within temperature and relative humidity Yes No guidelines (70-80 F, 40-50% RH)? 16. Are building occupancies within acceptable limits? Yes No 17. Is air balancing performed on regular basis (Inspect building Yes No thermostats and vents)? 18. Is building able to maintain a slight positive air pressure? Yes No 19. Are cold water pipes insulated and is the insulation intact? Yes No 20. Are materials installed in the building without consideration to their Yes No mold resistance based on intended use and building history? Explanation of Yes answers to questions 1 11: Explanation of No answers to questions 12 20: List corrective actions taken for Yes answers: Checklist completion date: Completed by: Reviewed by: Checklist Tenant Obligations

Property Management firms along with building owners should consider requiring tenants to perform the following to assist in preventing conditions which are conducive to mold growth. 1. Are tenants required to promptly notify property management with Yes No respect to any and all water intrusion issues? 2. Are tenants required to maintain temperature/relative humidity in the Yes No occupied space within the building guidelines? (temperature 70-80 F and RH 40-59%, if possible) 3. Are tenants required to maintain good housekeeping practices (especially Yes No with respect to maintaining indoor plants, terrariums, pets, etc.)? 4. Are tenants required to ensure that plenum areas are not used for storage? Yes No 5. Are tenants required to prevent accumulation of items such as cardboard Yes No boxes, paper, etc. which are good food sources for mold? 6. Are tenants required to perform their own periodic inspection of the Yes No occupied areas and promptly report any areas of water staining, damage, musty odors, problem building conditions, employee complaints, etc.? 7. Are tenants required to promptly clean up all small accumulations of Yes No water in kitchens, bathrooms, and other areas? 8. Are tenants required to notify property management prior to installing Yes No any fixtures/vapor barriers? 9. Are tenants prohibited from accessing the roof? Yes No 10. List any present tenant complaints with respect to water intrusion issues

and how they are being handled: 11. Are tenants required to shut off water if vacating their units for Yes No more than 48 hours? 12. If water shut off to the units is not practical, are tenants required to Yes No notify property management when they will be out of their units for extended periods of time? Explain all No answers with corresponding justification: Checklist completion date: Completed by: Reviewed by: Checklist Emergency Situations

Power Failure/Weather Issues - In the event of a power failure, a backup generator or alternate power source should be able to maintain building humidity at acceptable levels and keep any sump pumps operating properly. - Plans should be in place to respond promptly to water damage. - Verify all drains, gutters, catch basins etc. are free from debris. - Maintain vegetation, trees, storage items a safe distance from building to minimize impact. - Emergency contact information, including emergency contractors, police, electricians should be current and easily accessible. Protocol A Water Intrusion Event Not Significant

Is Water Intrusion Event Significant? No Is remediation necessary (as determined by the superintendent)? No No action required Yes Does the water intrusion event impact the contractual scope of services or is otherwise covered by the builder? No The Superintendent or WIM should make sure the impacted party is aware of the event Yes Have we determined the extent of damage? No This should be done by Foreman or Superintendent during the site visit Yes Have all sources of possible water intrusion into the area been identified? Yes No Superintendent needs to evaluate. If there may be causes of water intrusion unrelated to or outside the scope warranty, appropriate parties upstream at the company should be contacted Is the impacted party liable for the remediation costs? No Yes Has the impacted party been contacted by the WIM and provided us with direction? Yes No Do not proceed with any work until response is received from impacted party Has the impacted party directed us to perform No action required the remediation?

No Yes Has the WIM prepared appropriate documentation? Yes The Foreman completes the remediation and documents in his Foreman s Log. Protocol B Water Intrusion Event Significant

Is the water intrusion event significant? Yes Does the water intrusion event impact the contractual scope of services? Yes The Superintendent completes the first part of the Water Intrusion Event Form and gives it to the WIM who notifies the impacted party and requests directions. No The Superintendent or WIM should make sure the impacted party is aware of the event. Impacted party responds The impacted party provides us with direction to proceed consistent with company remediation protocols or agrees to let us proceed with the remediation. Yes No Does the WIM believe this issue is significant enough to inform Senior Management? No Yes WIM must send the appropriate notices to the impacted party. The WIM must continue to keep the Senior Management up to date on the status of this issue. Is there a threat of litigation? Yes Senior Management needs to contact the Legal Department No Legal Department/Senior Management/WIM will develop response to the impacted party and notify the Superintendent how to proceed.

Superintendent develops a response remediation plan approved by WIM and/or Senior Management. The WIM and/or Senior Management will determine if 3 rd parties need to be called in to perform remediation and/or sampling. Remediation can begin following guidelines in the text. Once remediation is complete, WIM needs to ensure that all records/forms for this event have been completed as per company protocol and will be maintained on site for the future. WIM and/or Senior Management should also determine if any follow up work, postremediation inspections, etc. may be needed in the future.