TOWN OF WAYLAND MASSACHUSETTS CONSERVATION COMMISSION

Similar documents
CCSD#1 Stormwater Standards

TOWN OF BERKLEY ARTICLE 32 STORM WATER BYLAW

Imminent Threat Tree Removal

Tree Preservation and Protection (Effective May 1, 2003)

CHARLES SOIL CONSERVATION DISTRICT COMPLIANCE AGREEMENT FOR THE STANDARD EROSION AND SEDIMENT CONTROL PLAN FOR FOREST HARVEST OPERATIONS

Sec NPDES Municipal Separate Storm Sewer System (MS4) Program. (Ord HR; )

Chapter 21 Stormwater Management Bylaw

Unhealthy Tree Removal

Compensatory Mitigation Plan Requirements For Permittee Responsible Mitigation Projects St. Louis District, Corps of Engineers May 2010

Ordinance No Lot Surface Drainage

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

LAKE COUNTY STORMWATER MANAGEMENT COMMISSION GENERAL PERMIT NUMBER 3 AUTHORIZING MINOR MAINTENANCE DREDGING ACTIVITIES

City of Valdosta Land Development Regulations

Village of Glen Ellyn TREE PRESERVATION GUIDELINES

Lake Elmo, MN Code of Ordinances STORM WATER AND EROSION AND SEDIMENT CONTROL

STORM WATER MANAGEMENT STANDARDS DRAFT

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

TOWN OF SMYRNA Water Quality Buffer Zone Policy

Chapter 5: Water Quality Buffer Requirements

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application


CHAPTER 19 TREES. a) Establish and maintain the maximum amount of tree cover on public and private lands in the City of Hartford.

Addition to Section 4 - Special Use Regulations

Chapter 34 Index. Article V Violations And Penalties Misdemeanor Injunction Civil Damages...

ORDINANCE NO. 08-O-72AA

Chapter NONPOTABLE WATER DISTRIBUTION SYSTEM

STORMWATER MANAGEMENT PROGRAM. Table of Contents

130A Alternative process for wastewater system approvals. (a) Engineered Option Permit Authorized. A professional engineer licensed under

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

Submittal Checklist for PRIVATE TREE REMOVAL REQUEST

ENCROACHMENT PERMIT APPLICATION INSTRUCTIONS

MUNICIPAL OFFICES 1481 EAST COLLEGE AVENUE, STATE COLLEGE, PA TELEPHONE: FAX:

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Permit Application Review Permit No Received complete: March 19, 2019

TREE PRESERVATION & PROTECTION PERMIT APPLICATION INSTRUCTIONS

3.0 Planning and Submittal Requirements

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION

TREE PERMIT APPLICATION Private Property- Section MBMC COMMUNITY DEVELOPMENT DEPARTMENT

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

KANKAKEE COUNTY PLANNING DEPARTMENT APPLICATION FOR CLASS I & II GRADING AND DRAINAGE/STOMRWATER PERMIT APPLICATION

LOWNDES COUNTY BOARD OF COMMISSIONERS

SECTION 10: WETLANDS PROTECTION

If you need any additional information concerning this requirement, please contact Superintendent of Public Works John Batchelder.

Sub-Chapter B To Chapter 14, Building Code

GUIDELINES FOR DEVELOPING A PRESERVE MANAGEMENT PLAN

STORMWATER OPERATION AND MAINTENANCE AGREEMENT

SHORELAND PROTECTION PERMIT APPLICATION

POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS

HIGHLAND HILLS MAINTENANCE COMMISSION Board of Trustees. BOARD POLICY NO: 3-7 Dated: July 1992 Last Revised: 5 Nov 2008 (effective 1 Jan 2009)

SAN MARINO PLANNING AND BUILDING DEPARTMENT Submittal Checklist for PRIVATE TREE REMOVAL REQUEST

CITY OF DURANGO Stormwater Quality Permit FACT SHEET - CONSTRUCTION

TREE REMOVAL PERMIT NARRATIVE OR 213: I-205 REDLAND ROAD OVERCROSSING PROJECT

TITLE 2 BOARDS AND COMMISSIONS, ETC. CHAPTER 1 TREE BOARD

Date: March 18, 2016 Meeting Date: March 29, 2016

Alberta Transportation The City of Edmonton The City of Calgary

Sub-Chapter B To Chapter 14, Building Code

ORD WHEREAS, the public necessity, convenience, general welfare and good zoning practice so require;

DeKalb County Planning & Development Department VEGETATION PROTECTION AND REPLACEMENT (VPR)

LAND DISTURBANCE PERMIT

Whatcom County Public Review Draft Birch Bay Habitat Mitigation Fund: Watershed Based Management Plan November 2, 2011

This ordinance applies to the entire unincorporated areas of Waupaca County.

CHAPTER 110 SEWAGE DISPOSAL

APPROVAL/INTENT TO ISSUE A DISCRETIONARY APPEALABLE COASTAL DEVELOPMENT PERMIT (CDP)

ATTACHMENT B: CONDITIONAL USE PERMIT

City of Tacoma Planning and Development Services

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT

ADOPTION OF CHAPTER 120 (TREE CONSERVATION ORDINANCE) OF THE 1976 CODE OF THE COUNTY OF FAIRFAX, VIRGINIA

Check the box below if you are operating mobile tire processing equipment [APC&EC Reg ]: Mobile Tire Processing Equipment

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II

P.C. RESOLUTION NO

CHAPTER 8 "RICHMOND TREE ORDINANCE" 8.00 Title. This ordinance shall be known and may be cited as the "RICHMOND TREE ORDINANCE" of RICHMOND, ILLINOIS.

State of Wisconsin DEPARTMENT OF NATURAL RESOURCES Shawano Office 647 Lakeland Road Shawano, WI 54166

Three copies (one original and two copies) of your completed NOI should be submitted to:

6.6 RESIDENTIALLY-SCALED, LAND-BASED WIND ENERGY CONVERSION FACILITIES

TITLE TEN - STREETS AND SIDEWALKS

NOTICE OF DECISION BEFORE THE SKAGIT COUNTY HEARING EXAMINER Worline Road Bow, WA Collins Road Sedro Woolley, WA 98284

Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782

BUILDING & INSPECTIONS DIVISION 200 East Wood Street Palatine, IL Telephone (847)


TREE REMOVAL PERMIT. Note: If you fail to provide all required documentation, issuance of your permit could be delayed.

Tree removal permits. [Added by Ord. No ; amended by Ord. No ]

NOXIOUS WEED REGULATORY GUIDELINES. Noxious Weeds in Aquatic Critical Areas: Regulatory Issues. What are Aquatic Critical Areas?

City of Bellingham Policies

*Note: Please contact the Soil Erosion Specialist at with questions regarding application requirements

LAND DISTURBANCE/SITE DEVELOPMENT PERMIT APPLICATION

Town of Tarboro TREE ORDINANCE

Summary of 2017 NWPs NWP #3 NWP #5 NWP #7 NWP #12 NWP #13 NWP #14 NWP #15 NWP #18 NWP #19 NWP #21 NWP #23 NWP #25 NWP #27 NWP #29 NWP #30 NWP #31 NWP

ORDINANCE # 854. Stormwater Management / Operation and Maintenance Requirements

TOWN OF OCEAN RIDGE CONSTRUCTION SITE MANAGEMENT HANDBOOK

SUDAS Revision Submittal Form

Ordinance No NOW THEREFORE, be it hereby ordained by the Glasgow City Council as follows:

CITY OF SPRING HILL Water Quality Buffer Zone Policy (Adopted April 22, 2008)

TOWN OF SAN ANSELMO PLANNING COMMISSION STAFF REPORT. For the meeting of March 20, Agenda Item 6A

Title 15 BUILDINGS AND CONSTRUCTION

S.O.P. No. HMD

LAKE BOWEN IRRIGATION PLAN

GRADING PERMIT CITY OF RAPID CITY 300 SIXITH STREET RAPID CITY, SD ID NO: (605) PIN NO:

February 19, 2007 DENR SUMMARY OF LANDFILL RECOMMENDATIONS

ARTERIAL BLOCK WALL REPLACEMENT PERMIT APPLICATION Please Type or Print

Transcription:

TOWN OF WAYLAND MASSACHUSETTS 01778 CONSERVATION COMMISSION TOWN BUILDING 41 C0CHITUATE ROAD TELEPHONE: (508) 358-3669 FAX: (508) 358-3606 Wayland s Wetlands and Water Resources Bylaw CHAPTER 194 (D-768) Town-wide November 15, 2010 Project Description: The Wayland Conservation has made an application filed under the Wayland Wetlands and Water Resources Bylaw Chapter 194 seeking to create a general guideline and streamlined approval during the permit period for the removal by owners of lots with existing residences of up to three trees not less than 4 and not more than 18 inches diameter at breast height (dbh) and of up to four trees less than 4 inches dbh where those trees are located in the buffer zone, land subject to flooding and inundation, and/or riverfront area subject to jurisdiction of the Conservation Commission. Any cutting of trees within 100 feet of the mean annual high water mark of a perennial stream, or within a vegetated or bordering vegetated wetland (BVW) and the required vegetated (15 or 30 as applicable) no disturb of a vegetated wetland and/or bordering vegetated wetland is specifically excluded from the scope of this Permit. Decision: The Wayland Conservation Commission approves the proposed work, as conditioned herein pursuant to Wayland s Wetland and Water Resources Bylaw, Chapter 194. This decision is based upon the findings listed below and subject to the 20 conditions noted thereafter. The Conservation Commission finds that the conditions are necessary, in accordance with the provisions of Chapter 194, to protect those interests noted in the findings. Plan Reference/s: There is no plan. The Conservation Commission hereby finds that the following conditions are necessary to protect those interests noted herein. The Commission orders that all work shall be performed in accordance with said conditions. Special Conditions Issued by the Wayland Conservation Commission: 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause for enforcement action by the Conservation Commission against the property owner and/or hired contractors. Failure to comply with the conditions shall result in the imposition of a non-criminal penalty, not less than $300, and other action as deemed appropriate by the Conservation Commission. 2. Anyone using this Permit to conduct work shall have a copy available at the property and shall provide a copy to any contractor used for the cutting or planting work.

Page 2 of 4 3. All written submissions or correspondence to the Conservation Commission related to work approved by this Permit shall include: the date, reference File Number D-740, and the property address where the work will be conducted. 4. Application for Coverage in Advance of Cutting - This decision applies to a property owner seeking to remove a limited total number of trees located outside the 15 or 30 as applicable no-disturb buffer area surrounding wetland resource areas cumulative over the 5 year period of this Permit. The use of this Permit must be done with advance notice in writing to the Conservation Commission through the office as conditioned herein. The notice must be submitted not less than two business days prior to commencing cutting indicating with a sketch plan where the tree(s) to be removed is (are) located, tree size measure by diameter at breast height measured 5 feet above grade and, as applicable, the number, type(s) and location(s) where replacement plantings will be installed. 5. Preservation of Undisturbed Vegetative Buffer and 1 00-Foot Riverfront - In the event there is any question on delineation of the bordering vegetated wetlands (BVW) and the associated buffer zone, or cutting work is being proposed within 50 feet of BVW or within the first 100 feet of a perennial stream (Riverfront), the property owner must also request a site inspection with the advance notice of work above. The Commission will issue a decision with confirmation in writing, in advance of the work, whether a cutting of a particular tree(s) within 50 feet of BVW or within Riverfront will be allowed under this Permit. 6. Limited Approval - This Permit approves cutting of not more than a total of three trees that are equal to or greater than four (4 ) inches in diameter at breast height (dbh) and less than 18 inches dbh on any property with an existing residence during the 5 year period of this Permit. Cutting of trees equal to or greater than 18 inches dbh is not allowed by this Permit and will require a project-specific permit. Cutting of trees less than 4 inches dbh is limited to less than four during the Period. The above limits for tree cutting under this Permit apply to the property without regard to ownership at the time of the work. 7. Maintenance of Habitat A tree 6 inches or greater in size that is cut with a remaining tree trunk that is 15 feet tall above grade (called a snag) does not require installation of replacement plantings. This option may be preferred where a large tall tree threatens a structure but is within a naturalized area. These stumps provide habitat and food for wildlife. 8. Replacement Plantings If a tree is cut down without leaving the snag, the tree shall be replaced with new plantings according to the schedule below: Existing dbh Size Of Tree to be Cut Minimum Number of Replacement Trees 2.5 inch dbh or greater in size per tree cut Number of Replacement Native Shrubs 3 in height or greater in height size per tree cut Less than 6 inches 1 2 6 inches to less than 12 inches 2 5 12 inches to less than 18 inches 3 8

Page 3 of 4 9. Replacement Plantings New plantings shall be a native species or cultivar of a native species that has been approved in advance. Replacement plantings must be installed within 180 days of the day when the existing tree is cut. Replacement plantings that do not survive for at least two growing seasons must be replaced. 10. Equipment for tree cutting, stump grinding, or planting shall not pass through or operate within the no-disturb zone or within any wetland. Stumps may be ground using a stump grinder if not being preserved as a snag. 11. There is no filling, grading, or earthwork (other than that needed to plant the required plantings) permitted by this application. 12. Landscaping other than the limited cutting and replacement plantings done within wetland resource areas including the 100-feet buffer zone of vegetated wetlands is not allowed by this Permit and shall be subject to separate formal application and approval by the Conservation Commission. 13. Upon completion of the cutting and installation of required plantings, the applicant shall notify the Conservation Commission, in writing, that the work has been completed in accordance with the conditions of this Permit. The letter shall include a request for an on-site inspection to be held with the applicant, the Conservation Commission or agent of the Commission to verify compliance. 14. This decision does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. 15. The Permit does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 16. Equipment shall not be refueled or serviced within 100-feet of the wetlands. 17. All cutting debris shall be property disposed of by the party doing the work within thirty (30) days of the tree being cut. Such cutting debris shall not be accumulated or stored within 50 feet of BVW. 18. There is to be no cutting allowed within a wetland. 19. No automatic sprinkler systems, whether connected to the municipal water or private water supply, shall be used to irrigate the lawns or grounds located within the 100-foot buffer zone. 20. By acceptance of this Permit and commencement of work authorized herein, the applicant, owner, and their respective agents, assign, and successors in title agree to indemnify, defend and hold harmless the town for any damages that might occur on or off the subject property, or any legal claims which may be attributable to any alterations undertaken or construction performed on the subject property pursuant to this Permit. Issuance of this Permit does not in any way imply or certify that the subject property or downstream or adjacent properties will not be subject to flooding, storm damage, or any

Page 4 of 4 other form of water damage that might result from alterations undertaken or construction performed on the subject property pursuant to this decision. This decision is not valid without a signature sheet. This Permit expires on November 17, 2015. Findings: a. Chapter 194 requires filing an application for any work to be done in a resource area work is proposed in a resource area for this project. b. Resource areas include: riverfront area, land subject to flooding and inundation, 100-year floodplain, vegetated wetlands and the Buffer Zone. c. There is no plan on record for this application. The Commission s decision does not define property lines nor grant permission to the applicant to work on the property of others. d. This decision does not define the limits of resource areas regulated by the Bylaw. e. This allows limited and selective tree cutting in riverfront area more than 100 feet from the mean annual height water mark so as to not have significant adverse environmental impact to Riverfront, land subject to flooding and inundation, or buffer zone to wetlands. f. The resource areas identified have values relating to: the protection of public and private water supplies, prevention of pollution, wildlife habitat, prevention of flooding, prevention of storm damage, protection of ground water, unusual plants, wildlife, wildlife habitat, and passive recreation. g. The public meeting on this application under the Wayland Wetlands and Water Resources Protection Bylaw, Chapter 194 was opened on September 16, 2010. h. The Wetlands Bylaw provides greater protection of the buffer zone a resource area defined within Chapter 194. i. The Conservation Commission finds that the buffer zone and wetlands is critical to wildlife, wildlife habitat, and passive recreation. j. There is a negative Determination of Applicability ( DOA ) issued by the Conservation Commission pursuant to the Wetlands Protection Act. k. The requirements and findings of this decision are consistent with the provisions of Chapter 194 and are intended to be more stringent than the DOA. As noted above, the buffer zone is a resource area as defined by Chapter 194. l. Buffer zones are critical to the protection of a wetland or other resource areas regulated by Chapter 194. m. The Conservation Commission has considered information including the report Buffer Zones and Beyond Wildlife use of Wetland Buffer zones and their Protection under the Massachusetts Wetland Protection Act, by Lynn Boyd, Department of Natural Resources Conservation, University of Massachusetts, July, 2001 and: Wetland Buffers: Use and Effectiveness prepared for the Washington State Department of Ecology, February 1992. n. The Conservation Commission considers the installation of sprinkler systems within the buffer zone to have the potential impact of increasing hydraulic loading on the site and to the wetland thus altering local hydrologic conditions. o. The Conservation Commission considers the installation of sprinkler systems within the buffer zone to have the potential impact of increasing the elution (washing) of applied fertilizers (nutrients) and pesticides (toxic substances) from the lawn into the wetland resource area.

Page 5 of 4 p. To protect wetland areas from disturbance by invasive plants, the Conservation Commission requires that landscaping be achieved with native noninvasive plants according to The Vascular Plants of Massachusetts: A County Checklist by Bruce A. Sorrie and Paul Somers for work in a resource area or buffer zone. Cultivars may be accepted as a substitute plant on a case-by-case basis. q. Tree cuttings must be properly disposed outside of wetland resource areas. r. Nothing in this decision is intended to permit an increase in rate or volume of water discharged from the applicant s property onto the property of others as a result of work being permitted by this decision. s. The Conservation Commission s decision is not intended to confer property rights of any abutting property owners. t. A growing season, for the purposes of interpreting this Permit, is considered April through October of any given year. u. During the tree removal precautions must be taken to avoid accidental spills of oils or hazardous materials in or near the wetlands or other resource areas. Precautions include limiting where equipment is serviced and refueled, having spill containment kits at the site, and taking steps to avoid spills and accidents. v. Any deviation from these findings and conditions will require a formal determination by the Conservation Commission as to whether an individual application is required. w. Section 194-9 of the Wetlands and Water Resources Bylaw permits the Commission secure the performance and observance of the conditions imposed herein by a proper performance guarantee or deposit of money or negotiable securities. Failure to comply with the conditions of this permit is a violation of the Wetlands Bylaw. Violations of Chapter 194 may result in the imposition of non-criminal penalties in the amount of $300 in addition to other remedies available. Each day the violation exists may be considered a separate violation of the Bylaw. x. Any required approval by the Conservation Commission will be provided within 21 business days unless additional information is requested. y. Any required approval or action by the Conservation Administrator will be taken within 12 business days unless additional information is requested. z. The Commission has not imposed a performance guarantee at the present time. However, if there is a change in the project, the Commission may elect to impose a bond at that time.