BlueCrest Energy Activity Update, J. Benjamin Johnson CIRCAC Board of Directors Meeting Kodiak, 9/12/2014

Similar documents
Cook Inlet Natural Gas Supply Update

Cook Inlet Natural Gas Supply Update

ASX RELEASE 20 JUNE 2013 RESERVES & RESOURCES - NORTH COOK INLET DEEP OIL RIGHTS

Cook Inlet Gas Study Update

For personal use only

Meet Alaska Aligned Alaska = Strong Oil and Gas Industry & Stronger Alaska for another 40 Years

Point Thomson Project

Alaska Oil and Gas Conservation Commission (AOGCC)

Federal Outer Continental Shelf Oil and Gas Overview From the Eastern Gulf of Mexico Perspective

Alaska LNG Outlines Issues For Next Round of Resource Reports

TAPS Highlights. December 8, Alyeska Pipeline Service Company

TIPTIG PIPELINE NEWS THE THOMSON PROJECT(ALASKA) THE FIRST ONSHORE CRA-PIPELINE FOR EXXON/MOBIL CONTRACTOR DOYON LLC ASSOCIATED LLC/ALASKA

Eastern Mediterranean

Nenana Basin Update Oil and Gas Exploration

Alaska LNG Concept Information. Alaska LNG. Overview. October

New Technologies for Cost Effective Abandonment Operations. Delaney Olstad, Weatherford

Center for Energy Studies. David E. Dismukes Center for Energy Studies

Outlook for the Oil and Gas Industry

BUILDING A SUSTAINABLE GROWTH BUSINESS IN ALASKA

SANTA MARIA BASIN MONTEREY SHALE ONGOING DEVELOPMENT (PROVED-INFILL) DRILLING PROGRAM THIRD QUARTER

Shale Fracking What are the Risks? Control of Well Coverage Issues

For personal use only

Advancing Technology in Well Completions & Stimulations

Case Study. The Challenge. Deep Micropile Installation Under Existing Multistory Building

CAIRN ENERGY INDIA PTY LIMITED (Incorporated in New South Wales, Australia ACN )

NATURAL GAS IN COOK INLET

1951 Clarence Iverson #1

SHELL ONSHORE OPERATING PRINCIPLES

The Business of Oil & Gas in Alaska Joshua Kindred, Alaska Oil and Gas Association. November 12, 2015

2016 Statistics. About BP in Alaska. Employees 1,700 people. Operating budget $1.1 billion. Capital investment $600 million

Questions & Answers: Boulder County Third Draft Preliminary Comprehensive Drilling Plan (CDP) Jan. 11 Surface Owner Meeting

For personal use only

Experiences in the Salt Creek Field CO2 Flood

For personal use only

WELL CONTROL THE RISING EAST NOVEMBER/DECEMBER INTERNATIONAL ASSOCIATION OF DRILLING CONTRACTORS Drilling

Outline. Senate Bill 4 Overview

Drilling Inside Municipal Boundaries What are the Issues?

For personal use only. AWE Limited. Asian Roadshow Presentation. June 2012

2018 Reserves and Resources Statement

Who is WesPac Midstream?

ECONOMIC COMPARISON BETWEEN OIL AND LNG FOR DECISION MAKING TO EVALUATE WHICH PRODUCT TO DEVELOP FROM A DEEPWATER WEST AFRICA FIELD

AT A GLANCE. $17 billion $52 billion 41 million 5,300

ATP UK Offices Guildford, Surrey March 7, 2007 DRIVEN TO SUCCEED

Point Thomson: Key gas field that s challenging to produce

ASX Release. First Bivouac Peak Test Well Fully Committed

Outlook for the Upstream Sector of the Oil and Gas Industry

ASX Release NILDE AREA OIL PROJECT PROGRESS UPDATE HIGHLIGHTS. 21 April 2016

Weld County Oil & Gas Update June Active Wells, Drilling Permits, Production, Rig Count, Trends

State will answer most of FERC s questions by June; last items Aug. 1

Alaska South Central LNG (SCLNG) Project

Center for Energy Studies. David E. Dismukes Center for Energy Studies

SCOPE OF SERVICES. Structural grouting (cementing of jacket s piles, gravitational foundations and suction piles)

DEFINITIONS. A shallow bored hole under the derrick substructure in which the kelly is temporarily stored during tripping operations.

Pryme Oil and Gas Building a World-Class Independent Oil & Gas Company. Australian Securities Exchange (ASX):PYM Presentation: March 2008

Opportunities for Methane Emissions Reductions in Natural Gas Production. Technology Transfer Workshop. April 25, 2006 Villahermosa, Mexico

2.0 PROJECT DESCRIPTION 2.0 PROJECT DESCRIPTION

OUTLINE PART I: Introduction to Alaska and its Enormous Resource Basin PART II: Progress on Gas Commercialization/LNG PART III: Why Alaska? Comparativ

Analysis of Oil and Gas Production in the Arctic National Wildlife Refuge

The project consisted of 7 miles of 36-inch pipeline and associated facilities. UPI provide EPCM

Well Control Plan for Under Rig Floor Logging in the Gulf of Thailand

Learn more at

STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 333 West Seventh Avenue Anchorage, Alaska ) ) ) ) ) )

Department of the Environment

Challenges of Offshore Geotechnical Engineering

Early Production in Deep Waters. Mats Rosengren, Frontier Drilling do Brasil Vitoria, Brazil

For personal use only

First appraisal wells brought online on the Western Surat Gas Project ahead of schedule, on budget and using local contractors

PXP Point Arguello / Gaviota

PIANC UK Seminar Design Developments and Specification for Steel. Duncan Nicholson Arup Fellow 9/3/17 ICE London

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Yours faithfully SUN RESOURCES NL

Colorado Oil and Gas Conservation Commission

Iran Oil Industry. Arkutun-Dagi Oil and Gas Field, Sakhalin 1, Russia. (Reference:Offshore Technology & Other Sources)

8 th Annual Wyoming CO 2 Conference

An Evaluation of Well Construction/Drilling/Conversion Methodologies Associated with Gas Storage Depleted Field Operations in the United States

The Hibernia Development Project

FUNDAMENTALS OF THE PETROLEUM INDUSTRY CERTIFICATION

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

SEISMIC RETROFIT OF AN UNDERGROUND RESERVOIR. Robert Small 1, Rob Jameson 2

Rapid Axial Load Testing of Drilled Shafts

EXPLORATION & NEW VENTURES

Course Duration Location Course Delivery 6 Days Lagos Instructor Led

EXAMINER S REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE

What we stand for. safe ethical innovative responsive quality and cost conscious driven to deliver

Navigating through the Challenges of NSPS OOOOa

Exploration and Appraisal Drilling Update March 2019 (ASX: OSH ADR: OISHY POMSoX: OSH)

Reducing Methane Emissions from Production Wells: Reduced Emission Completions in Gas Wells; Smart Automation of Gas Well Plunger Lifts

Development of offshore fields

Conventional Explorers in an Era of Shale Corporate Presentation September OTCBB:PTRC

OAR Table 240-1

Natural Gas Pipeline Update

Common Oil & Gas Environmental Issues

STATUS REPORT; SEME OIL FIELD WITH INSTALLATIONS AND CONNECTED ONSHORE FASILITIES.

TURN-KEY OIL & GAS PROJECT CAPABILITIES ONSHORE & OFFSHORE

On Board Regasification for LNG Ships. 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry

SAMPLE. US Shale. Insight Report

Kathryn Wallin Bennett Trenchless. Bo Botteicher Underground Solutions. Pipe Users Group Sharing Technologies Seminar Berkeley, CA February 18, 2016

Public Notice of Application for Permit

Shale Development: Understanding and Mitigating Risks Associated with Well Construction and Hydraulic Fracturing

LONESOME DOVE ENERGY LLC

Transcription:

BlueCrest Energy Activity Update, J. Benjamin Johnson CIRCAC Board of Directors Meeting Kodiak, 9/12/2014 September 12, 2014

BlueCrest Energy Overview

Business Highlights Small privately-held oil and gas development company Entire focus is 100%-owned oil and gas assets in the Cook Inlet basin (Cosmopolitan Project) BlueCrest shareholders have invested more than $100 million to date in the company s Cook Inlet assets Experienced directors and management Former high-level oil industry executives (ARCO, Conoco, El Paso, Eni) Close personal ties to Alaska and the Cook Inlet Long track record of successful large field developments Emphasis on personnel safety and environmental sensitivity Alaska-based operations team Anchorage headquarters Anchor Point operations base 3

Cook Inlet Legacy - Johnson home, Anchor Point (1954)

Current Alaska and Cook Inlet Focus BlueCrest Alaska Operations LLC Operations senior management all Alaska based Alaska contractors where practical Excavation work beginning September 2014 Local hiring preference for construction and operations 5

Cosmopolitan Project History and Introduction

Over 1.3 billion barrels of oil and 7.6 tcf of gas have been produced from the basin, essentially all of which was discovered by 1967 (when Prudhoe Bay was discovered) Beluga River 1,218 BCF Anchorage Tyonek North Cook Inlet 1,854 BCF McArthur River 935 MMBO + 1,615 BCF Granite Point 148 MMBO+132 BCF Redoubt Shoal Nikiski Tesoro Refinery ConocoPhillips LNG Kenai Kenai Loop Kenai, Cannery Loop 2,573 BCF Swanson River 230 MMBO Cook Inlet Basin Gas fields Oil fields Oil pipelines Ninilchick 129 BCF Cosmopolitan Seward Seward Gas pipelines Mean Winter Ice Southern Limit 4 20 mi. Anchor Point North Fork Homer Gulf of Alaska Gulf of Alaska

Cosmopolitan Project History Pennzoil drilled the first exploration well that barely penetrated the outer limit of one oil zone. The well tested 75 bopd and was plugged and abandoned. Pioneer conducted a 3D seismic survey of the entire field area. The survey confirmed a large clear anticline structure. Pioneer finalized its development plan for oil wells drilled from the onshore location. Prior to implementation of the development, Pioneer's board decided to shift capital investments to their Permian Basin leases instead of developing the Cosmopolitan Unit. BlueCrest acquired Buccaneer's interest in all the Cosmopolitan leases, thus owning 100% of all the properties, and began actions to develop the field. Filed for re-unitization of the Cosmopolitan Unit. ConocoPhillips directionally drilled the Hansen 1 well from an onshore location 3 miles away. The Cosmopolitan Unit was formed for testing and development of the field. Pioneer took over 100% of the working interest. Pioneer disbanded the former Cosmopolitan Unit but retained the two main productive leases. BlueCrest and Buccaneer Energy began negotiating with Pioneer for the two main productive leases. Apache acquired the remaining minor productive leases. 1967 1994 2001 2003 2005 2007 2010 2011 2012 2013 2014 ConocoPhillips drilled the Hansen 1A well to further penetrate the deepest oil zone. BlueCrest and Buccaneer closed the purchase of the two main productive leases (75% BlueCrest and 25% Buccaneer). ARCO took a new look at the old Pennzoil well data and concluded that the first well may have just missed a larger field. The Missed Pay Prospect Pioneer drilled the Hansen 1AL1 well in the highest-known oil zone at the time. The well produced 35,000 bbls of oil. Pioneer could not permanently produce the well due to the lack of a gas pipeline, but Pioneer began planning for a full field development of the two oil zones confirmed at the time. BlueCrest and Buccaneer drilled the Cosmopolitan State #1 vertical well from offshore, proving up six new productive gas zones and four new productive oil zones all above the two oil zones previously identified by ConocoPhillips and Pioneer. BlueCrest/Buccaneer acquired Apache s leases. 7

N Starichkof State #1 (1967) Original Discovery Well 1 Oil Zone E-Logs, Mud Log, DST Starichkof State Unit #1 (1967) Drilled below Oil-Water Contact Cored Upper Tyonek and Star 8 ADL391902 1,109 acres Cosmopolitan State #1 (2013) Discovery Well 4 New Oil + 6 New Gas Zones E-Logs, Mud Log, DST ADL391903 3,619 acres Hansen #1A-L1 (2007) Lateral drill in Upper Starichkof only Produced 33,504 BO on test. Currently Completed Awaiting Facilities Hansen #1A (2003) Delineation Well Produced 14,851 BO on test Hemlock, Starichkof Oil Zones Hansen #1 (2001) Confirmation Well 1 New Oil Zone Hemlock, OWC, Star 5-8 ADL391904 4,036 acres ADL018790 3,959 acres Onshore Surface-Use Lease 38 acres Approximate areal extent of known productive reservoirs 3-D Seismic (2005) 40 square miles Coverage of entire field and all leases Thorough structure definition ADL391899 5,589 acres 1-mile

Cosmopolitan Development Plan

Cosmopolitan Plan of Development Oil Development Onshore oil wells only Extended-Reach-Drilling ( ERD ) wells to oil zones (>5400 TVD) Current proven technology with design by world experts Onshore Rig LOI executed Permitting and facilities design ongoing Offshore delineation well Q2-2015 Initial oil development wells drilled and facilities constructed in 2015 First oil sales in 1H-2016, trucked to Tesoro refinery Initial water injection wells drilled in 2016 55 1-mile N

Drilling of Hansen 1 Well 58

Onshore Rig Configuration 59

Hansen 1AL1 wellhead (existing) 61 Onshore surface use lease Current gravel pad showing future wellheads

Facility Layout 62

Environmental and Community Considerations: Onshore Tall berms (as much as 14 feet high) to reduce noise and light from the site for the neighbors The berms also serve as containment so nothing can drain off the site and especially into Stariski creek or Cook Inlet. High noise equipment installed inside of an insulated building to contain the noise Light deflectors for area lighting to contain the light within the site Use of grid power to eliminate emissions from the site from power generation unless the grid goes down Use of both natural gas power generator and diesel generator for backup power The natural gas generator will produce less emissions and will be the primary backup generator while the grid is down. In case natural gas is not available, the diesel generator can be used for primarily for people protection during extreme weather while also allowing the site to maintain production. Each generator is sized to allow Train A oil to stay in production. Containment for the truck loading racks for any spills Spills drain back to the drain system where it will then be reprocessed and then sent back to the oil tanks for trucking to customers. Primary containment around all tanks for catastrophic events such as tank rupture This is a very unlikely event, but any rupture/spill is fully contained and will drain to the sump system. 62

Cosmopolitan Plan of Development Gas Development Offshore wells from two platforms Shallow dry gas zones Platforms similar to one being installed in northern Cook Inlet by Furie Subsea pipelines tie-in to onshore oil facility Initial Cosmo designs complete Offshore jackup rig LOI executed with Spartan Drilling Development timing awaiting gas marketing and investment decision 1-mile N 56

Offshore Monopod Gas Platform Characteristics Platform Specifications 18-ft diameter central outer caisson 3 thick steel walls 11ft diameter inner caisson Six 30-inch well conductors and grout in annulus between caissons Eight 42-inch diameter skirt piles Water depth 60 70ft Pile penetration = 120ft Cantilevered jackup rig used for drilling Support for small platform rig (workover, wireline, coiled tubing) 2 pipeline risers inside inner caisson Each platform designed for 30 mmscfd, dry gas no liquid hydrocarbons 63

Platform Characteristics - Deck Automated operations 12-man temporary quarters Elevations Helideck TOS (+)102 Main Deck TOS (+)82 Production Deck TOS (+)62 Crane Flare boom Walled production deck Wellhead access from deck Skid beams for small rig or well work equipment 64

Environmental and Community Considerations: Offshore No liquid hydrocarbon production, dry gas only Entire process system is computer automated and continuously monitored Multiple-redundancy in process safety systems Every component of the process system has been analyzed for potential failures, and accommodations made (including procedures) for handling such failure to prevent safety and/or environmental breaches Fail-safe design to force automated shut-down in the event of system failure Monpod caisson has 3-ft of steel and cement around exterior Platform design has smooth round exterior at water line to allow ice and any floating objects to pass by Subsea pipelines located below fishing net depths All physical connections between onshore and offshore (pipelines, cables) are bored under the beach Small platform size to minimize visual impact 62

Photo of Endeavor Rig Drilling Cosmopolitan #1-2013 Endeavor jack-up rig drilling Cosmopolitan #1 well 62

Photo of Endeavor Rig Drilling Cosmopolitan #1-2013 Cosmopolitan production platform shown to scale 62

75