Order 831 Offer Validation for Demand Response: Enhancements to DR Hub and Markets Gateway

Similar documents
FERC Order 831Offer Cap Verification Update

Greater Than $1,000/MWh Cost Offer Revised Verification Procedure

Data Viewer, edatafeed, Member Voting, Account Manager, DR Hub, Power Meter, and Data Miner Roadmaps

Max Load Reduction in DRHUB

Market Settlements - Advanced

Data Viewer, Member Voting, Account Manager, DR Hub, Power Meter, and Data Miner Roadmaps

Fixed / Price Sensitive Demand Bids, Load Response, Virtual Bidding & Pump Storage Optimizer in the Day Ahead Market

Data Viewer, Member Voting, Account Manager, DR Hub, Power Meter, and Data Miner Roadmaps

Data Viewer, edatafeed, Member Voting, Account Manager, DR Hub, Power Meter, and Data Miner Roadmaps

Overview Of PJM Demand Response and Energy Efficiency. Issues September 22, Susan Covino, Senior Consultant Market Strategy

Day-Ahead Energy Market

Virtual Workshop on PJM ARR and FTR Market 2017/2018

Relevant changes will be made to corresponding sections of OA and RAA.

Team Card Exercise Workbook. PeopleSoft Team Card

17.3 Release Notes. Dealertrack DMS Job Aid. Revised: 08/09/2017

Creating an Employee - Step 2: Creating Additional Pay Rates

Updated Operating Parameter Definitions

Price Formation. PJM Market Participants February 14, Joe Bowring Catherine Tyler

e-invoice User Manual (June 2014)

CAREER PATHWAY PERFORMANCE MANAGEMENT SYSTEM EMPLOYEE USER GUIDE

Market Monitor Report. July 24, 2017

Generation Attribute Tracking System (GATS) Overview of PJM-EIS

Two Settlement PJM /06/2016

STATE OF THE MARKET REPORT 2005

Purchase Order Creating a Replenishment Order

RPM DR Auction Setup

Revision: 67. Prepared by

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION Total Resource Cost (TRC) Test : Docket No. M

PJM Economic Demand Resource in Energy Market. PJM State & Member Training Dept.

Consignee Guide. Version 1.8

SCHEDULE 2 - COMPONENTS OF COST 1. GENERAL COST PROVISIONS. For generating units powered by boilers Firing-up cost Peak-prepared-for maintenance cost

BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. PJM Interconnection, L.L.C. ) Docket Nos. ER

Fuel Cost Policy FAQs. PJM P age. Last Updated: 10/19/2017

This procedure is used by the Staff Member to change their marital status.

ATA Teaching Staff ATA TEACHING STAFF LEAVE MANAGEMENT USER GUIDE

PJM Interconnection L.L.C., Docket No. ER Amended Compliance Filing Concerning the Offer Cap Rule

Proposed Opportunity Cost Guideline Changes PJM Cost Development Guidelines, Manual 15, Section 8

Market Monitor Report

CUSTOMER GUIDE TO PJM BILLING

Department of Industrial Relations

Fuel Cost Policies New MIRA Module

Generation Dispatch. PJM State & Member Training Dept. PJM /13/2017

Program Change Log. Minor: Case #9730

IMM Reserve Market Proposal

Capacity Performance Training. June 24, 2015

Administrator Quick Reference Virtual TimeClock 18 Pro Edition

EPAF TRANSFER NO DEPARTMENT ACCESS - USER MANUAL

CU Payroll Data Entry (Hourly Employees)

Prior Period Adjustments Last Updated: March 2019

Employee Management Training Guide. P130 Employee Management: Basic

PJM InSchedule User Guide

Procurement Card Exercise Workbook. PeopleSoft Procurement Card

2 Copyright FATbit Technologies. All Rights Reserved.

Price Responsive Demand education. DRS May 11 th, 2017

DIRECT ENERGY PJM MIC. Marji Philips Tyler Little August 12, 2015

Variable Operations and Maintenance (VOM) Costs: Educational Document

Communities Roadmap. As of July 24, PJM 2018

CENTRAL SUSQUEHANNA INTERMEDIATE UNIT Application: HR/Payroll

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Financial Transmission Rights

3.2 Market Settlements.

Demand Response. Overview. Recommendations

Special Session Variable Operations & Maintenance Costs (VOM) - First Read of Proposed Packages

Cost Development Guidelines

PJM ARR and FTR Market

Markets Report. Jennifer Warner-Freeman Senior Economist, Market Analysis January 22, PJM 2018

3.2 Market Buyers Spot Market Energy Charges.

Minimum Wage Survey- Hospice

Billing and Payment For Group Administrators. Enterprise Learning and Development

016 - Layoff Demotion Non-Title Right Option

RPM 301 Performance in Reliability Pricing Model

Interface Pricing Approach Whitepaper May 2015

Vendio Merchant s Guide. Payment Profiles. Vendio Services, Inc Campus Drive San Mateo, CA

State of the Market Report 2006

7/14/2017. West Virginia Consolidated Public Retirement Board. Employer Self Service (ESS) WVEIS Training. Today s Agenda. Overview of COMPASS.

User Guide Part 1: The Basics. March 2014

TERMS OF PURCHASE- Plastic Moulding Shop

MMU Redline. Cost Development Guidelines. PJM Manual 15: Revision: XX. Effective Date: XX. Prepared by Cost Development Task Force

Employee Management User Guide. isolved. Employee Management Guide

Add Period Activity Pay Steps:

Dispatch Signal & Locational Marginal Pricing (LMP)

Opportunity Cost Calculator

Accounts Payable Enter a non-po voucher

Variable Operations & Maintenance Costs (VOM) Summary of PJM Proposed Package

PEOPLE SOFT 9.2 T.R.A.M. MANAGERS GUIDE

System Guide for Board Recognised Employers of Electrical Workers

Overview of Three Pivotal Supplier Test

Basic Generation Service Commercial and Industrial Energy Pricing Overview

Energy Market Offer Flexibility

I.Batch Production Record

Your 5 Step Guide to the Apprenticeship Levy Funding System (TAS) How to allocate your levy to your apprentices

Price Formation. Eric Ciccoretti Attorney-Advisor Office of Energy Policy and Innovation Federal Energy Regulatory Commission June 13, 2017

MIFFLINBURG AREA SCHOOL DISTRICT EMPLOYEE HOW TO ENTER TIMESHEET

Contracts and Communication

Reliability Pricing Model (RPM) DRAFT Business Rules

12: Unemployment Services

Energy Efficiency Resource Requirements

John Holland Contractor Management System. PHASE 3: User Guide for Mernda Rail Extension Project Employee Registration

Opportunity Cost Calculator

PJM Manual 15: Cost Development Guidelines Revision: 2930 Effective Date: May 15, 2017April 9, Prepared by Cost Development Subcommittee

Transcription:

Order 831 Offer Validation for Demand Response: Enhancements to DR Hub and Markets Gateway DRS September 22, 2017

Demand Response Offer Cap Validation Process Demand Response (Economic and Load Management): Default Energy Offer Cap $1000 is the default Energy Offer Cap for both Economic and Load Management registrations Incremental Cost Validation Member validation of Incremental Costs with supporting documentation above $1,000 in DR Hub Ongoing Member management of offers Member monitors offers on a hourly basis to ensure any offers above $1000 have supporting documentation 2

On Nov. 1, 2017 (implementation date), PJM will: Load Management DR Full registrations Load Management Offer Price Update by PJM Update all Offer (Strike) Prices over $1000 to $1000 Example Current Offer Price = $1849, will change to $1000 Current Offer Price = $500, no change Offer (Strike) Prices will no longer be capped by the Lead Time selected on the registration Economic registrations Max energy offer cap in Markets Gateway restricted to $1000 3

Economic DR and Load Management Validation Process DR cost validation process is the same for both Economic DR and Load Management in DR Hub Offers greater than $1,000, Market Seller must enter and validate incremental cost prior to the operating day: 1. Provide summary and details of incremental costs 2. Upload the supporting documentation that details how incremental cost were calculated and associated validation Offers less than $1,000, no validation is required (considered price based ) Offers above $2,000 may be submitted, but can not be used to set LMPs 4

Economic and Load Management Offer Validation Screen Example: Injection Molding Company with offer price= $1,150 Incremental Cost ($/Incremental Cost Description Actions Incremental Cost Description Incremental Cost ($/Mwh) 1 Labor cost employees sent home with pay, no work/product produced $900.00 2 Damaged product net cost - Product cannot be sold and material needs to be recycled (ie: bottle caps in injection molds damaged and need to be recycled). Net cost = Cost to make product minus recycle value. Supporting Documentation $250.00 Incremental Cost Summary $1,150.00 I certify that I have verified and documented the registration s incremental cost in detail as summarized above and in compliance with PJM rules. 08/24/2017 12:20 PM Last Certified Date 5

Offer Validation Screen in DR Hub Max Offer Cap is set to $1000 or the Incremental Cost Summary amount if > $1000 Can enter up to 5 different incremental costs with associated descriptions Updating the Incremental Cost summary will uncheck the Certification checkbox Must click Certification Checkbox each time the Incremental Cost summary screen is saved On Save, time/date stamp is put on Certification May set Incremental Cost to $0 without deleting Description If Incremental Cost Summary is > $1000, there must be at least 1 supporting document uploaded by CSP Registration History will record any changes to the Energy Offer Cap and the Offer Validation screen 6

Economic Registration Validation Energy Offer Cap: If Incremental Cost Details <$1000 (or none), display $1000, otherwise display Incremental Cost Summary 7

Load Management DR Full Validation Energy Offer Cap: If Incremental Cost Details <$1000 (or none), display $1000, otherwise display Incremental Cost Summary 8

Markets Gateway Energy Offer Cap Energy Offer Cap is $1000, unless Incremental Costs are provided in DR Hub and support higher cap Changes to the Energy Offer Cap are transferred to Markets Gateway the next calendar day Example: Incremental Costs documented on 11/13/2017 in DR Hub 11/14/2017 Updated Energy Offer Cap available for Real-Time offers same day for Day-Ahead offers for next day (11/15/2017) 9

Markets Gateway Energy Offer Cap CSPs should manage their offers up to the Energy Offer Cap Any offer over $1000 must have incremental cost documentation that supports the offer time period If CSP lowers their Energy Offer Cap, and has previously copied offers in Markets Gateway over the new Energy Offer Cap for future days, the CSP must take action to lower the future offers to the new Energy Offer Cap PJM intends to audit on periodic basis and any issues with supporting documentation will be escalated to IMM/FERC Office of Enforcement for further investigation, as necessary 10

Load Management DR Full (includes energy payment) - Energy Offer Cap Energy Offer Cap is $1000, unless Incremental Costs are provided and support higher cap Updated Energy Offer Cap available the next calendar day CSPs should manage their energy offers (previously referred to as strike price ) up to the Energy Offer Cap Any offer over $1000 must have incremental cost documentation that supports the offer time period PJM intends to audit on periodic basis and any issues with supporting documentation will be escalated to IMM/FERC Office of Enforcement for further investigation, as necessary 11