ATL WEST DECK COMPONENT Project Information Session / Meet and Greet # 3 Holder-Austin-Moody-Bryson, a Joint Venture October 10 th, 2017
Agenda 1. HAMB, a JV Company Overview 2. ATL West Deck Project Description / Update 3. Trade Package Information 4. HAMB Prequalification Process 5. HAMB Procurement Process 6. Meet & Greet
HAMB, JV Company Overview Our Joint Venture Construction Manager at Risk» Holder Construction Company» Austin Commercial» C.D. Moody Construction» Bryson Constructors
Project Overview» 7 Story, Cast-In-Place Parking Deck» +/-2,000,000 Total Square Feet» Interior Courtyard at all levels» +/- 5,700 Parking Spaces» 3,000 SF interior office build-out» New Elevated Pedestrian Bridge connecting to existing rail» RCC Parkway New Elevated Bridge/ Intersection» Project EBO Goals 17.5% MBE & 13% FBE, 30.5% Total» August 2017 Start date» Fall 2019 Project Completion
ATL West Deck Project Overview / Update August 2017
ATL West Deck Project Overview / Update September 2017
» INSERT IMAGE
» INSERT IMAGE
ATL West Deck
» INSERT IMAGE
Trade Package Information DesignTeam/ Document Release Information -HFWT, A Joint Venture HKS, INC Fitzgerald Collaborative Group Walker Parking Consultants Thornton Tomasetti - Bidding Documents 95% Construction Documents - DrawingRelease Date 10/19/2017-100% IFC Drawing Release Date - 11/16/2017 - DrawingInviteswill be sent directly to each bidder via HelixProject on 10/20/17
Trade Package Information Roadway/BridgePackage(Turnkey) Steel H-Piles Roadway Utilities MSE Walls Bridge Extension Site Walls/ Paving Signalization Structural / Misc. Steel PED Bridge Steel Framing Skin Steel Support Steel Railings Bollards Misc. Framing / Support Site Utilities (Remaining) Water Utilities Sanitary Utilities Glass / Glazing Office Windows Curtainwall (Elevator Core Wall) Glass Doors
Trade Package Information Exterior Skin Fabricoil Skin System Artwork Framing Metal Panels Interior Deck Column Wraps PED Bridge Insulated Panels ArchitecturalLouvers Canopy ETFE Canopy Steel Framing Steel Wiring / Diagrid Waterproofing Fluid Applied Below Grade Foundation Drains Expansion Joints PED Walkway Traffic Coatings Misc. Sealants / Caulking
Trade Package Information Masonry Office Walls IDF/Electrical Closet Walls Door Frame Install Paint Office Areas Edge Paint Conditions Interior Elevator Core Walls Misc. Paint Frames / Doors Drywall Office Walls Office Ceilings Wall Insulation Wall Framing Doors / Frames / Hardware Office Doors / Frames / Hardware IDF/ Electrical Room D/F/H Hardware for Glass Sliding Doors Door Installation
Trade Package Information Specialties Restroom Partitions Restroom Accessories Fire Extinguishers / AED Units Asphalt Paving / Striping / Curb Perimeter Fire Lane Paving/Curbs Exterior Flatwork / Paving Adjustments Space Striping (5,700 spaces) Custom Striping Directional Striping Parking Controls Cameras / License Plate Readers Access Control / Monitoring Entrance / Exit Lanes Space Availability(Red/Green) Hardware for Systems Entrance Security Booths Hardscape / Landscape Special Systems Site Walls Site Heavy Duty Paving Trees/Shrubs /Sod Site Amenities Fiber / Security / Low Voltage
Trade Package Information Signage Code Required Signage West Deck Signage Wayfinding Signage Millwork Office Area Millwork Fire Protection Deck / PED Bridge Dry System Office Sprinkler System Site Security / Fencing Permanent Fencing Access Gates Roofing Roofing at Stair Enclosures Roofing at Elevator Cores Flooring Carpet / Tile / Resilient / Base Loading Dock Equipment Corner Guards / Edge Angles
Prequalification Process» Visit www.hambjvteam.com» Click on Prequalification Tab» Download, Complete and Return the Prequalification Form to Doretha Smith (dsmith@hambjv.com)» HAMB will review Prequalification results for each package» All contracts over $5,000,000 must be a Joint Venture» Joint Venture must be with business owner of different race and/or gender» Prequalification letters will be issued by Package» Prime Subcontractor» Sub-Prime Subcontractor
Prequalification Process
Prequalification Process
Prequalification Process
Procurement Process» Basis of Evaluation» Pricing» Completion of Scope Checklist» Plan to Execute the Work» EBO Participation Plan» Workforce Development Plan» Project Team» Schedule» Unit Prices Bid Due Dates 11/10/17, 3 weeks after drawings released *Basedonsize/scope,certainbidpackage due dates may extend past 3 weeks
Prequalification Process
Advertisements Request for Qualifications Outreach Information Sessions, Association Meetings, Industry Events Prequalification Subs Complete Prequalification Statements and Return to HAMB Subs Notified of Status Available Status: Prime Subcontractors, Sub-Prime Subcontractors RFP Issued to Subs HAMB Forms of Agreement Pre-Proposal Meeting Discuss Project Scope, Prime Subs and Sub-Prime Subs Network Proposal Submission Sealed Envelope to HAMB Scope Meetings Scope Review with Each Firm that Submits Final Bid Evaluation Final Bid Evaluation Presented to COA,DOA Owner Approval Owner Approval of Subcontract Award Subcontract Award HAMB Awards the Work to Successful Proponent Issue Subcontract HAMB Issues Subcontract to Successful Proponent
Scope Checklist Format
THANK YOU FOR COMING! ATL WEST DECK MEET AND GREET PRESENTATION IS POSTED TO WWW.HAMBJVTEAM.COM