SBSA. DATE: 31 May 2016 HILL AIR FORCE BASE CEN/CEIE PLAN REVIEW CHECKLIST FOR NEW DEVELOPMENT AND REDEVELOPMENT CONSTRUCTION

Similar documents
Items in this checklist identify the base requirements that are to be provided by the design professional.

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Middle Tennessee State University (MTSU) Stormwater Plan Review Checklist

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

Will County Site Development Permit Submittal Checklist TAB 1 PROJECT OVERVIEW

Construction Documents Checklist

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

CONSTRUCTION PLAN CHECKLIST

3.0 Planning and Submittal Requirements

Richland County Department of Public Works Engineering (Land Development) Division

CON APPENDIX C USAG HI Storm Water Pollution Prevention Plan Content Review Checklist

Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Memo. To: From: cc: For further assistance please contact Ben Ruzowicz, GSWCC Technical Specialist at (706)

SECTION 4 SURFACE WATER MANAGEMENT DESIGN AND CONSTRUCTION REQUIREMENTS

7.00 INTRODUCTION... 1

ENGINEERING REVIEW CHECKLIST City of Mount Clemens

Erosion & Sedimentation Control Policy

CITY UTILITIES DESIGN STANDARDS MANUAL

iswm TM Criteria Manual City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June Chapter 1

Building Permit Application Office Use Only Please Print Clearly in Ink or Type

SITE DEVELOPMENT PERMIT APPLICATION

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT

12 DRAINAGE General Administrative Requirements Standards

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

GRADING, EROSION AND SEDIMENTATION CONTROL

KANKAKEE COUNTY PLANNING DEPARTMENT APPLICATION FOR CLASS I & II GRADING AND DRAINAGE/STOMRWATER PERMIT APPLICATION

LOT GRADING GUIDELINES FOR COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, MEDIUM AND HIGH DENSITY RESIDENTIAL PROPERTIES

TOWN OF BETHLEHEM SWPPP APPLICATION REVIEW CHECKLIST

CCSD#1 Stormwater Standards

Appendix K: Soil Erosion and Sedimentation Control Plan Check List

Stormwater Pollution Prevention Plan Engineering Department Requirements

Washoe County PLAN SUBMITTAL

6.3.5 Chemical Removal of Sediment Laden Water from Construction Erosion Control in the Development Review Process Map

Submittal Requirements. Post Construction Verification Document Plan Requirements

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No

20 North Main Alpine, UT (Phone) (Fax) SITE PLAN

Index. Composition and Order of Plan Set. Utility Plan... 5

CHAPTER 6 - How to Prepare a SWPPP

Building Permit Application Office Use Only Please Print Clearly in Ink or Type

A. PROJECT LOCATION. B. PERMITTEE (Responsible party for day to day supervision and control of the MANAGMENT PLAN)

LOS ANGELES UNIFIED SCHOOL DISTRICT REFERENCE GUIDE

3. LAND DISTURBANCE PROJECT PLAN APPROVAL - STORMWATER MANAGEMENT AND EROSION AND SEDIMENT CONTROL PLANS

Appendix A Stormwater Site Plan Report Short Form

CITY OF BENICIA IMPROVEMENT PLAN REVIEW CHECKLIST

LOWNDES COUNTY BOARD OF COMMISSIONERS

Walker County Manufactured Home Rental Community Regulations Infrastructure Development Plan

EROSION CONTROL AND GRADING PERMIT APPLICATION

DRAINAGE SUBMITTAL CHECKLIST

WATER QUALITY MANAGEMENT PLAN PROCEDURES

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

Instructions for Notice of Ground Disturbance Form:

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION

CITY OF BROOKFIELD STORMWATER MANAGEMENT PLAN APPLICATION PACKAGE STANDARD FORM

CITY OF MERIDIAN LAND DEVELOPMENT SERVICES SUBDIVISION PLAN REVIEW CHECK LIST

ADDENDUM NUMBER TWO. A. SECTION ADVERTISEMENT FOR BIDS 1. REVISE Sealed Bid Date/Time/Location paragraph to read as follows:

ENCROACHMENT PERMIT APPLICATION INSTRUCTIONS

BARTOW COUNTY RESIDENTIAL DRAINAGE PLAN or RDP

Engineering Plan Submittal Requirements. Revised: October 6, 2017

a. Title of Report Example: Final Hydrologic and Hydraulic Drainage Report For Tract #### (or Planning and Zoning Permit ##-###-###)

CITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413

MD Exhibit MD1 SMALL POND DESIGN CHECKLIST. ProjectName. Engineering Firm Date Submitted. Vicinity Map Pond Summary Sheet (MD-ENG-14) Pond Class

Ordinance No Lot Surface Drainage

GRADING PERMIT CITY OF RAPID CITY 300 SIXITH STREET RAPID CITY, SD ID NO: (605) PIN NO:

SITE PLAN NOTES 1. MECHANICAL EQUIPMENT SHALL BE FULLY SCREENED FROM VIEW WITH HEDGE.

Sediment & Stormwater Management Plan Review Checklist DATE RECEIVED: PROJECT NUMBER: PROJECT NAME:

TOWN OF WINDSOR, CONNECTICUT INLAND WETLANDS & WATERCOURSES COMMISSION. 1. APPLICANT Name: Phone: Address: Cell:

Chapter 2 ADMINISTRATIVE PROCEDURES

ARTICLE 14: ADMINISTRATION

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

LAND DISTURBANCE PLAN AND IMPLEMENTATION REQUIREMENTS

SITE GRADING (LOT GRADING) - CITY OF TORONTO In Compliance with Sentence B of the Ontario Building Code, every site is to be graded so that w

Overview of Section 2

Project: Developer/Designer: Reviewer:

S.O.P. No. HMD

Chapter 2 ADMINISTRATIVE PROCEDURES

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

City of Maryville Grading & Construction Site Pollution Management Policies & Procedures Manual RESIDENTIAL COMMERCIAL BUSINESS INDUSTRIAL

STORM DRAINAGE IMPROVEMENTS

Stormwater Management and Sediment and Erosion Control Plan Review Checklist for Design Professionals

City of Glendale Stormwater Management Plan Checklist

GRADING AND DRAINAGE CHECKLIST. Project Address Applicant Name Telephone Applicant and/or Property Owner Signature(s) Date _

York County STORMWATER LUNCH & LEARN

ORDINANCE. AMENDMENT TO THE CECIL COUNTY ROAD CODE and STANDARD SPECIFICATIONS

Engineer s Report Infrastructure Improvements

EXHIBIT A FEE SCHEDULE

Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual

STORMWATER ENGINEERING STANDARDS

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

Community Development Agency Erosion Control Section 223 Washington Avenue Marietta, Georgia 30060

ARTICLE IV: DEVELOPMENT STANDARDS GRADING AND DRAINAGE

Design Specifications & Requirements Manual

STORM WATER MANAGEMENT STANDARDS DRAFT

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET

Transcription:

SBSA PROJECT TITLE: KRSM095002, wo54127 Construct Clubhouse near Bldg 720; KRSM150043, wo54127 Replace Piping Utilities near Bldg 720, KRSM130012, wo54127 Demo Golf Clubhouse Bldg 720. General: DATE: 31 May 2016 HILL AIR FORCE BASE CEN/CEIE PLAN REVIEW CHECKLIST FOR NEW DEVELOPMENT AND REDEVELOPMENT CONSTRUCTION Submittal of the documents identified herein, completion of the site plan review by CEN and CEIE, and use of this checklist are required by the Utah Pollutant Discharge Elimination System (UPDES) permits issued by the Utah Division of Water Quality (DWQ), for construction projects disturbing an area one acre or greater in size. These permits include the Storm water General Permit for Construction Activities (obtained directly by the contractor from DWQ) and the General Permit for Discharges from Small Municipal Separate Storm Sewer Systems (MS4); a permit issued to the base. The attached checklist is required to be submitted by the contractor with the Storm water Pollution Prevention Plan (SWPPP) during the project review process. The contractor is responsible for compliance with all Department of Defense (DoD), Air Force Instruction (AFI), Unified Facilities Criteria (UFC), and State of Utah DWQ requirements. In addition, the contractor is responsible for compliance with the DoD Implementation of Storm water Requirements under Section 438 of the Energy Independence and Security Act (EISA) and obtaining all necessary permits and approvals. This form is intended for use by the design engineer in determining the necessary submittals for a plan review. It is also intended to be used by CEN and CEIE for review and approval of these documents. This checklist is not intended to be allinclusive; consult with CEN and CEIE for site-specific issues. Proper completion of this checklist will expedite the approval processes. Instructions: The attached form is a list of typical storm water review criteria for all construction projects. The A-E s responsible engineer is required to check each item on the list; if an item is not applicable to this project, the item will be noted as N/A. Documents submitted to CEN and CEIE shall be organized according to the following general format: A. Title and general Sheets (project name, vicinity map, sheet index, notes, etc.) B. Boundary and topographical survey C. Grading/Drainage Plan D. Master Utility Plan E. Plan and Profile Sheet(s) (for final submittal) F. Detail Sheets G. Operation/Maintenance Plan for Post-Construction Stormwater Controls Upon submittal for plan review, the A-E Project engineer must sign this form indicating the checklist and all required documents have been submitted by the responsible engineer. A copy of this checklist must accompany the plans with all subsequent reviews. Plans will not be accepted for review without this signed checklist. In providing approvals, CEN and CEIE assumes that applicants have not made any errors and have complied with all applicable regulations. If after an approval, an error is discovered or it is discovered that some aspect of approved drawings does not comply with applicable regulations, the applicant shall, at his own expense, revise the drawings and modify any infrastructure as necessary to correct the problem. Applicants and their design professionals shall remain responsible for their projects at all times. Suggested Resources: HAFB Guidance Document for Stormwater Management, 2006 SWPPP Guidance Document: http://www.waterquality.utah.gov/updes/stormwatercon.htm Contact Information: Utah DWQ Construction Activities Stormwater Permit: 801-536-4391 Page 16

SBSA PROJECT TITLE: KRSM095002, wo54127 Construct Clubhouse near Bldg 720; KRSM150043, wo54127 Replace Piping Utilities near Bldg 720, KRSM130012, wo54127 Demo Golf Clubhouse Bldg 720. DATE: 31 May 2016 North Davis Sewer District: 801-825-0712 Davis Weber Canal Company: 801-774-6373 Fife s Ditch Company: 801-540-0571 Corps of Engineers: 801-295-8380 CEN: Dave Murray 801-777-2118 CEIE: Mark Roginske 801-775-3651 Page 17

CEN/CEIE PLAN REVIEW CHECKLIST PROJECT NAME: PROJECT NUMBER: Required Submittals: (mark the appropriate box) CEN/CEIE USE ONLY AF Form 332 # YES NO Accepted Initial N/A Project name/title Project number Geotechnical report Boundary and topographical survey showing all relevant information Stormwater Pollution Prevention Plan (SWPPP) Storm drainage calculations (not on drawing) for pipe system, surface route and detention/retention ponds. Stamped and certified by a Utah-licensed professional engineer, with the following statement: I hereby certify that this report for the onsite drainage of the project was prepared by me (or under my direct supervision) in accordance with the provisions of Specification Section 01 57 20 Environmental Protection and Section 438 of the EISA, and was designed to comply with the provisions thereof. I understand that the CEN/CEIE Project Manager does not and will not assume liability for drainage facility designs Copy of UPDES NOI (required prior to pre-construction kickoff meeting controls Locations of materials/equipment/stockpile storage Construction Plans on D-size sheets, stamped and signed by a licensed professional engineer North Davis County Sewer District permit for sanitary sewer connection Permit/coordination with Army Corps of Engineers if impacting wetlands Permit from Davis Weber Canal Company if impacting the canal Coordination letter from water users if impacting Fife s Ditch Pothole data for storm drain crossing in existing roadways Nature/sequence of construction activity (phasing) Necessary easement and convenant documents Operation/Maintenance Plan for Post-Construction stormwater

YES N/A CEN/CEIE USE ONLY All Sheets Must Contain: Accepted Initial N/A Call red Stakes note on site plans North arrow and drawing scale (when applicable) Abbreviations and Legend (when applicable) References to specific Standard Plan as applicable Title/General Sheets: Project name, location and description of project A-E s and contractor address and contact information Contact information for all project team members Vicinity map with north arrow Sheet index for all sheets and index figure Grading/Drainage Plan and Erosion Control Plan: Davis/Weber County benchmark elevation relative to identified Section Corner CEN Enter Date Init. Existing contour lines (in gray scale) at one-foot (1 ) intervals Proposed contour lines at one-foot (1 ) intervals Stamped and certified by a licensed professional engineer, with the following statement: I hereby certify that this report for the onsite drainage of the project was prepared by me (or under my direct supervision) in accordance with the provisions of Section 01000 General Requirements, and was designed to comply with the provisions thereof. I understand that the CEN/CEIE Project Manager does not and will not assume liability for drainage facility designs Storm drain system showing pipe sizes, clean-out boxes, combination boxed, catch basins and outfall(s) 100-year flood overland route clearly shown terminating at a stormwater facility FEMA Flood Zone delineation and Davis/Weber County 100-year flood elevation Overland runoff route for stormwater at all sag points Separate detail sheets showing detention/retention ponds, sized orifice design, spillways, pollutant removal structural BMPs, interim & permanent stabilization BMPs, etc. Ditch master s name, phone number and written coordination if altering existing irrigation ditches

YES N/A CEN/CEIE USE ONLY Operation/Maintenance Plan for Post-Construction Stormwater Controls: Accepted Initial N/A Master Utility Plan Sheet: Inventory of all post-construction stormwater controls Description of the routine maintenance required for each control Schedule for maintenance of each control Inspection requirements for each control Stamped and signed by a licensed Professional Engineer Utility locations (e.g. manholes) don t conflict with survey monuments Plan and Profile Sheets: Detail Sheets: I have personally reviewed this submittal and verify that it is complete and that all items have been addressed and comply with current Base Codes and Requirements. A-E Project Engineer: Print Name: Date: Locations of existing and proposed power poles Sewer, storm drain and irrigation systems to the next manhole beyond the project boundary CEN/CEIE USE ONLY The submittals for this project have been reviewed and approved by CEN/CEIE. Stamped and signed by a licensed Professional Engineer Vicinity map with project location for each sheet Storm drain pipe size, type, length and slope between manholes Storm drain boxes with rim and flow-line elevations Sewer and irrigation systems Custom details X CEN Plan Reviewer X CENE Plan Reviewer