The Trinidad LNG Project - Back to the Future

Similar documents
The following sub-systems are provided and the integration of these is described below:

Our technology and expertise are ready to work toward your LNG future today

REDUCING CAPITAL AND OPERATING COSTS IN GAS PROCESSING, LIQUEFACTION, AND STORAGE

Standardized, Modular Liquefaction Equipment and Technology

Passing the Baton Cleanly

Enhanced Reliability, Efficiency and Availability

NOT FOR PRINT DISTRIBUTION

Brazed Aluminum Heat Exchangers (BAHX) for Optimisation of Natural Gas Liquefaction Processes. Gastech 2017

ENHANCED HEAT. transfer solutions

NEW RECYCLE PROCESS SCHEME FOR HIGH ETHANE RECOVERY NEW PROCESS SCHEME FOR HIGH NGL RECOVERY INTRODUCTION. Abstract PROCESS FUNDAMENTALS

LNG Basics for Petroleum Engineers

Optimising. the LNG process. The rapidly expanding global LNG industry continues. Projects

GASTECH 2OO2. Doug Yates, LNG Operations Coordinator, Phillips Petroleum Company

Large LNG plant capabilities for capacity >2 MTPA Benefit from economies of scale and proven technology

MLNG DUA DEBOTTLENECKING PROJECT

Liquefied natural gas. Trust the industry s longest-serving turnkey contractor

LNG basics. Juan Manuel Martín Ordax

DYNAMICS OF BASELOAD LIQUEFIED NATURAL GAS PLANTS ADVANCED MODELLING AND CONTROL STRATEGIES

Yokogawa Corporation of America Receives Analyzer Systems and Shelters Order from Freeport LNG

Safety Results Mirror Expectations at Westlake Petrochemicals New Grassroots Ethylene Plant

Brazed aluminium heat exchangers (BAHXs), also referred to

NOVEL SCHEME FOR SMALL SCALE LNG PRODUCTION in POLAND. W.H. Isalski

A World of Solutions Visit Product Storage Terminals for Bulk Liquids

The LNG Leader. Spring Curtis Island LNG Projects Queensland, Australia INFRASTRUCTURE MINING & METALS NUCLEAR, SECURITY & ENVIRONMENTAL

Hydrogen Recovery by Pressure Swing Adsorption

TECHNIP S LNG AND GTL CAPABILITIES

Alaska Gasline Development Corporation Observation on Current Plant Design

DYWIDAG LNG technology

Mobile Nitrogen Vaporizer Skid

Magnetically Coupled Submerged Cryogenic Pumps and Expanders for Ammonia Applications

Pursuant to Condition 7 above referenced Orders, Sabine Pass is herein submitting its monthly construction progress report for April 2016.

Development of a New High efficiency Dual cycle Natural Gas Liquefaction Process

Application of Vibro Techniques for Infrastructure Projects in India

A NOVEL DESIGN FOR MTPA LNG TRAINS

Gastech Singapore October Capital Cost and Efficiency Data for the ZR-LNG Dual Methane Expander Liquefaction Technology

Freeport LNG Liquefaction Project

Modified Reverse-Brayton Cycles for Efficient Liquefaction of Natural Gas

Precooling strategies for efficient natural gas liquefaction

GTI Small-Scale Liquefier Technology. March 2013

CO 2 RECOVERY FROM CO 2 REMOVAL UNIT AT GL1Z PLANT

Project Agreements, Risk Management and Litigation Risk Sean Ralph, General Counsel, Sasol Canada Phil Scheibel, Partner, Rose LLP

EBARA INTERNATIONAL CORPORATION Cryodynamics Division. Cryogenic Turbine Expanders. cryodynamics. Cryogenic Expanders for Liquefied Gas

TANJUNG JATI B UNITS 3 & 4 ELECTRIC GENERATING STATION PROJECT A MULTINATIONAL EQUIPMENT SOURCING BENCHMARK. Michael W. Johnson Cheng Gang Wang Sen

Transfer and Storage of Flammable Liquefied Hydrocarbon Gases

Drive Selection for LNG FPSO

ecosmrt LNG Reliquefaction INTERTANKO 2 nd May 2018

LNG R&D for the Liquefaction and Regasification Processes

ENERGY MANAGEMENT INITIATIVE AT PETRONAS LNG COMPLEX

BASED ON EXPERIENCE TGE GAS ENGINEERING EVOLUTION OF SAFETY DESIGN FOR CRYOGENIC TANKS REVAMP VS. NEW BUILT

CO₂ purification and liquefaction. Adding value through standardization and modularization.

UNIQUE DESIGN CHALLENGES IN THE AUX SABLE NGL RECOVERY PLANT

GLADSTONE LNG leads the way with its first LNG shipment in 2012

OIL & GAS DOWNSTREAM ASSET OPTIMISATION AND COMPLIANCE FOR PROCESS INDUSTRIES, STORAGE AND DISTRIBUTION

LNG LIQUEFIED NATURAL GAS TECHNOLOGIES

Overview. Economics of the LNG Project Chain

The Separation and Liquefaction of Oxygenated CBM Yang Kejian and Zhang Wu

Table of Contents. iii. vi Tables. Figures. viii Foreword. ix Acknowledgments

LNG Systems for Marine Application. LNG Reliquefaction & LNG Regasification. Oil & Gas Systems

QUALITY INTEGRATED ENGINEERING SERVICES to the energy sector

CO₂ purification and liquefaction. Adding value through standardisation and modularisation.

DAMAGE ANALYSIS AND FATIGUE EVALUATION OF AN ALUMINIUM BRAZED PLATE FIN HEAT EXCHANGER

Yemen LNG Operational feedbacks

LARGE CAPACITY LNG TRAINS TRAINS GNL DE GRANDE CAPACITE

Introduction. FLNG: Costs and Cost Drivers. What is FLNG (and what isn t) FLNG Project Costs

Five Global Pty Ltd ABN (0) (0)

Business Case for Dynamic Simulation

GASTECH 2OO2. Jeff Sawchuk, BP Global Gas Technology. Richard Jones, BP Global Gas Technology. Pat Ward, BP Global Gas Technology

Maximising LNG revenue by operating at peak performance

LIQUEFIED NATURAL GAS LIMITED

Liquefied Natural Gas (LNG) Production and Markets. By: Jay Drexler, Dino Kasparis, and Curt Knight

Partner Up Greg Hallauer, Yokogawa Corporation of America

BASED ON EXPERIENCE TGE GAS ENGINEERING EPC EXECUTION OF BOREALIS ETHANE TANK PROJECT

evolving An ever technology

Title slide. LNG Technology. Compiled by PD.Supriyadi

MITIGATION OF SEASONAL PRODUCTION LOSS FOR THREE PARALLEL 4.7MMTPA

Petrochemical Processing

OUR FFICIENCY ARTNER

Engineering and technologies Enhanced heat transfer solutions

KLM Technology Group Solutions, Standards and Software. KLM Technology Group. Solutions, Standards and Software

Enhanced Heat Transfer Solutions. Energy efficiency and compactness for the oil and gas industry

Giant cooling tower delivers in the Pilbara COVER FEATURE

Heat Recovery Systems and Heat Exchangers in LNG Applications. Landon Tessmer LNG Technical Workshop 2014 Vancouver

LNG PROCESS USES AERODERIVATIVE GAS TURBINES AND TANDEM COMPRESSORS

Neal E. Cammy, BLAC INC. Engineering Manager

Assured Joint Integrity

Improving Natural Gas Liquefaction Plant Performance with Process Analyzers

Processing LNG Offshore: Maximizing Reliability, Performance & Safety. By Inga Bettina Waldmann at KANFA Aragon FLNG World Congress 28 th June 2016

SSPC CERTIFICATION QUALITY PROGRAMS FOR INDUSTRIAL COATING CONTRACTORS AND INSPECTION FIRMS. WHY SHOULD You HIRE An SSPC CERTIFIED CONTRACTOR?

A world of capabilities for the oil and gas industry

LNG LIQUEFACTION, SHIP AND REGASIFICATION GAS MANAGEMENT PROGRAM DEPT. OF CHEMICAL ENGINEERING UNIVERSITY OF INONESIA

Technical solutions for energy recovery

Marine Facilities for LNG Carrier Transfer Alternatives

Creating Optimal LNG Storage Solutions. 40 in detail

Industrial machinery and heavy equipment. With Siemens PLM Software solution, Calder saves time and money

REDUCE GREENHOUSE GAS EMISSIONS ACROSS THE LNG CHAIN

AT&V. Cryogenic/Refrigerated Storage Presentation Rev 18

LNG VACUUM INSULATED PIPE SOLUTIONS.

An Introduction to the Patented. VX TM Cycle. Small-Scale Production of LNG from Low-Pressure Gas by Methane Expansion

FULL RANGE OF SERVICES FOR ALL RECIPROCATING COMPRESSORS

GTI Small Scale Liquefier Technology

Transcription:

The Trinidad LNG Project - Back to the Future Phil Redding, Atlantic LNG Company of Trinidad and Tobago, Frank Richardson, Bechtel Corporation (USA) In the small Caribbean state of Trinidad and Tobago one of the most interesting and challenging LNG projects for many years is nearing completion. Interesting because it has taken a different approach to most recent LNG projects and challenging because many in the industry did not think that the project was possible a mere 4 years ago. The differences are many. The plant under construction at Point Fortin, Trinidad is the first single train baseload LNG plant in 30 years and is the smallest grassroots facility for 20 years. (Although the train size at 3 million tonnes per annum (mta) is world class.) All other recent projects have multiple trains and are at least twice the capacity of the Trinidad plant. The liquefaction process is an updated version of the original cascade process used in the first baseload LNG plants rather than the industry leader, the Propane Pre-cooled Mixed Refrigerant Process. The equipment is different too. Frame 5 gas turbines have been used, not Frame 7's as with most other new projects. Similarly, plate fin heat exchangers, almost abandoned by the baseload LNG industry, have been used for the main heat exchangers. The challenge was enormous. For the project to be economic, the unit cost of the plant needed to be some 30-40% less than that of LNG plants built in the 1980's. Furthermore, the market dictated that these reductions had to be achieved on a relatively small, single train plant. Yet, by being prepared to take a different route to that of other projects and by building on the model of one of the first LNG plants built, the necessary cost reductions were achieved. Larger Lower Cost Plants? Early grassroots projects were built to a capacity of 1-2 mta but capacity soon increased to 4, 6 or even 8 mta. With train sizes now topping 3 mta, most new projects are planned to be around 7 mta or larger. The main drive behind this increase in size has been to improve the project economics by reducing the unit cost of the liquefaction facilities. But whilst larger plants have led to some unit cost reductions there is a negative side as well. The total investment in the LNG chain increases significantly. When gas production and shipping costs are included, many LNG projects are of such a scale, that even the largest companies struggle to undertake them. To counter this, many projects involve multiple partners. This has made projects much more complex and difficult to get off the ground. It is also difficult to find markets all at once for the large volumes produced by such plants. High quality buyers are required to secure the investment and it is difficult to support new markets. With the recent economic down turn in Asia it is becoming even more difficult to find large markets and several planned projects have been either shelved or delayed. The Trinidad Project was market driven with the size set more by the demands of buyers than by the needs of the plant designers. Given the market capacity, the challenge was to build a safe, reliable, cost effective plant of that size. The unit costs for Trinidad are in fact lower than those reported by others at LNG 12 (1). The $1 billion figure used in that paper and widely quoted as the cost of the Trinidad plant relates to 1

all project costs. This includes financing fees, interest during construction, and debt service reserve; these costs were excluded from the other cost estimates to which the Trinidad project cost was compared. On an equal basis the unit cost of the Trinidad project is 10-20% lower than that of other recent projects. This is all the more remarkable since the plant is half the size of the others. The unit cost of a two train plant would of course be even less. The Kenai Model The Kenai LNG plant in Alaska has played an important role in the development of the Trinidad project. It was completed in 1969 and originally provided around 1.2 mta of LNG to Tokyo Electric and Tokyo Gas. Built in just 26 months, the plant uses a Phillips-designed cascade process and six Frame 5 gas turbine drivers. The project has proven very reliable and has not missed a scheduled LNG shipment since it began operation. The Kenai plant attracted the partners and engineers working on the Trinidad project for many reasons. It was small, it was a single train, it was built quickly, it has been safe and reliable, and above all it was low cost. At the same time Bechtel was getting reacquainted with the plant they had built so long ago. In the early 1990s Phillips commissioned Bechtel to perform a debottlenecking program to increase the capacity to 1.5 mta. Bechtel's LNG team was impressed and saw the potential for significant cost savings compared to more conventional plants. That team recommended to the embryonic Trinidad project as early as December 1992 that the Phillips process should be considered. Almost a year later, Bechtel did the first conceptual study and cost estimate, showing the potential to achieve significantly lower costs. Though the cost was not given much credence at that time, two years later the same price was very close to Bechtel's winning lump sum bid for the project. The Phillips Optimized Cascade Process The Phillips Optimized Cascade Process is a modified version of the process used so successfully at Kenai. The process uses three pure component refrigeration circuits: propane, ethylene and methane. The final methane circuit is an open cycle loop, recycling autorefrigeration flash gas. This open cycle allows easy rejection of nitrogen and allows the boil off gas to be re-liquefied in the main process eliminating the need for a large boil-off gas compressor. The additional complexity of the extra refrigeration loop is offset by the simplicity of operating pure component refrigeration systems as opposed to mixed refrigerant systems. One recent process comparison claims that the unit cost of a cascade process is 40% more than the Propane Pre-cooled Process (2). This was certainly not the case for the comparisons examined for the Trinidad Project. Based on comparable detailed designs developed in parallel, with the same annual production rate, and on lump sum bids to the same specifications and contract conditions, the Phillips based plant won out over the Air Products (APCI) based plant. Bechtel and Phillips are continuing to invest in the process and the LNG plant product to improve customer value and sustain their competitive advantage and that of their customers in the LNG marketplace. Frame 5 Gas Turbines Against the trend of other recent projects and most other planned projects Trinidad has chosen to remain with Frame 5 gas turbines rather than move to the larger Frame 6s or 7s. An extensive lifecycle evaluation showed that the same unit cost reductions could be achieved 2

through the use of multiple Frame 5s. This is because the lower unit costs of the Frame 6 and Frame 7 gas turbines themselves are offset by many other factors: Expensive variable frequency drive motors are required to start the Frame 6 and 7. These also require additional power generation capacity. Frame 6 and Frame 7 drivers stretch compressor technology to the limits, requiring extensive and expensive testing before they leave the manufacturer's shop. This adds to both cost and schedule. Spare parts for Frame 6s and Frame 7s are much more expensive than those for Frame 5s. Frame 6 and Frame 7 designs require such large sizes of pipework that there are actually diseconomies of scale in some areas. For example, valves are of such a size that vendors are limited and designs are non-standard, making one of them more expensive than two smaller, standard valves. Even more importantly, Frame 6 and 7 gas turbines require about twice the scheduled maintenance of Frame 5s. For an air-cooled design, the gas turbine maintenance usually controls scheduled downtime for the plant so a Frame 7 design will have a lower overall plant availability. Also, with multiple small machines the gas turbines and compressors can be configured in parallel improving reliability even though there are more pieces of machinery. When one gas turbine or compressor trips the plant can still run and achieve 65-80% of normal production rate. A conventional two train plant would lose 50% and the whole train would have to be restarted. This is a much longer process than bringing one gas turbine back on line, especially if the plant has begun to warm up. This was a critical issue for a single train plant and it is worth noting that Kenai has just this parallel configuration. This concept is fundamental to the Phillips 'two trains in one" reliability. Plate Fin Heat Exchangers Another important area in LNG plant design is the cryogenic heat exchangers. Nearly 90% of the current baseload LNG capacity uses the APCI spiral wound design; this includes all plants built in the last 20 years, apart from Trinidad. Although less expensive, plate fin heat exchangers have in the past been considered too unreliable. Much of this comes from the poor experience with plate fin heat exchangers on the Skikda plants in the 1970's, which was reportedly due to mal-distribution of two-phase flow to the exchangers and failures which occurred due to mercury and water ingress. Whilst the concerns are understandable the complete rejection of plate fin heat exchangers seems unreasonable, especially since water and mercury would have caused similar problems in an aluminum spiral wound heat exchanger. In the rest of the cryogenic industry plate fin heat exchangers have completely replaced spiral wound exchangers because they cost less and have shorter delivery times. A high reliability is demanded from many air separation plants and plate fin heat exchangers have not proven to be a problem in these applications. Despite their deserved reputation for reliability and robustness, spiral wound heat exchangers are not without problems either. In particular, tube leaks lead to shutdowns on some plants and cause others to run at reduced efficiency until the next planned shutdown. Data collected from the manufacturers of both types of exchanger showed that the failure rates and times to repair translated into a similar impact on the overall plant availability. In a cascade process the use of pure refrigerants and the step-wise nature of the process eliminates two phase flow feed distribution problems to the plate fin heat exchangers and limits the potential for thermal shocks. In all the years of operation at Kenai there has been not been a single problem with any of the plate fin heat exchangers. 3

Engineering Approach As has been pointed out many times, the liquefaction plant is only a portion of the overall plant cost and liquefaction technology is limited in its ability to save costs. Well aware of this, the Trinidad team realized that they had to be as cost effective as possible in every aspect of the plant design. Specifications are a key factor that impacts the whole of the plant design. One of the Atlantic shareholders had recently streamlined their specifications to rely more heavily on industry standard practices and allow vendors to bid their state-of-the-art cost effective designs. This overall approach includes developing alliances with high quality vendors and having preapproved standard designs and pricing. This approach was adopted for the Trinidad project and the project specifications are largely based on widely accepted industry standards. For years Bechtel had been developing "alliance vendors" and for this project determined to use "fit for purpose" specifications and maximize the scope of selected vendors. As well as saving equipment and bulk costs, this approach also eliminates the need for some design reviews, some inspection, and saves engineering hours. This has sometimes been referred to as the "gas plant approach". Some have challenged this approach on the basis that it will affect safety and reliability. However, it must be noted that the Trinidad plant is fully compliant with widely accepted codes and standards, and in fact has followed NFPA 59A more rigorously than some other projects. None of these industry proven standards are being changed. However, owner preferences and non-standard items that are often very expensive for a vendor to provide, are being changed and eliminated. Civil Engineering Civil Engineering is a crucial aspect of most LNG projects, having a significant impact on both cost and schedule. Geo-technical expertise and major civil execution know-how are critical for low cost solutions to soil stabilization issues, soil liquefaction possibilities, selecting foundation types and designs, and for engineered structures. As with many LNG projects, the difficult soil conditions for the Trinidad project presented unique challenges. A late change in plant location stretched the civil engineering abilities of the contractors to the limit. Different solutions presented very different risks, costs and schedules and Atlantic LNG insisted on the contractors taking considerable site risk. The current site is located on land that was reclaimed over 15 years ago through hydraulic dredging. It appears that there was little or no segregation of the deposited materials and the soil is a non-homogeneous mass of clay, sand and silt randomly dispersed. Trinidad is a zone three seismic area giving concern over the liquefaction of this soil structure. Bechtel's review of all the possible methods available in the industry to densify ground led to the selection of stone columns as the most effective means to provide a sound foundation base. Stone columns are inserted by a "vibro-replacement" technique developed by Keller in 1957. A large vibrating poker is used to insert a column of aggregate fill into the ground. The reinforcing and compacting action of the stone columns serves to significantly improve the load bearing and settlement characteristics of the ground. Because of the non-homogeneity of the reclaimed land this was the best technical solution and cost less than other more conventional solutions. 4

Construction Approach The project sponsors agreed early on to an aggressive goal to maximize Trinidad content. A minimum target of almost 20% of total EPC cost was set with a stretch target of 25%. The minimum target will be exceeded. In some areas this conflicted with the design philosophy to maximize the scope of key vendors. For example, the large liquefaction "cold boxes" were complete vendor packages supplied from the USA. Furthermore, the turbines and compressors, the air coolers, and most other equipment could not be sourced in Trinidad. This left a challenging assignment to achieve the Trinidad content from the site construction effort. One way to achieve the goal was to maximize the scope for subcontractors. It had already been decided to subcontract the bulk of construction work. This was an easy decision as there are a variety of construction contractors in Trinidad with good experience from the ammonia, methanol, gas processing, and steel related industries, which are present on the island. Local subcontractors have been awarded wide scopes of work including management, planning, scheduling, pre-commissioning, and in some cases, engineering and design. Mirroring the main EPC contract, schedule, quality and safety incentive schemes were included in all major subcontracts. This has resulted in some notable successes and some good lessons learned on both sides. Some of the major subcontractors are: Ballast Nedam Damus, Ltd (T&T) Hafeez Karamath (T&T) Insertech (T&T) Noell-Whessoe Raghunath Singh (T&T) Westminster Dredging - jetty civil work, mechanical erection and piping - mechanical erection and piping - structural steel erection - instrument and electrical - LNG storage - concrete/civil and buildings - harbor dredging Even the international subcontractors have made substantial use of the skilled and well educated local labor and supervision, either through direct hire or their own subcontracting arrangements with local companies. Safety has been made a top priority for everyone from top management down to the individual workers. Every person working on the site is given lengthy safety training and regular reminders. Local subcontractors and their workers have responded very well to the initiatives taken by Atlantic and Bechtel. Commissioning and Start-up Bechtel's scope of work is truly "turn-key". There is to be a single final turnover of the complete operating plant only after the final plant capacity test run for contractual guarantees. Bechtel will supply all operating, maintenance, supervision, and technical service until that turnover. 5

Schedule Another benefit of these design philosophies and approaches is to help improve the project schedule. The EPC schedule for Trinidad is 36 months from lump sum EPC contract signing to final turnover of the performance-tested, fully operating facility to Atlantic LNG. For three months prior to the EPC contract there was a small limited commitment to allow for site clearing and for engineering to begin on the compressors and the LNG tanks. Nowadays it seems that 42 months is more typical for LNG projects, even to the completion of the first train. Here again Trinidad is setting a new benchmark for the modern LNG industry. Back to the Future The Trinidad project marks a return to traditional, well proven technologies that has resulted in an economic project of manageable size. This market driven approach allows new projects to be developed much more easily. In some ways the Trinidad LNG project steps back in time, but on the other hand it shows the way forward, both technically and commercially, for many LNG projects. It is indeed "back to the future". References (1) "LNG Plant Costs: Present and Future Trends", R.N. DiNapoli and C.C. Yost, Proceedings LNG 12 Conference, Perth, Australia,1998. (2) "Comparison of Baseload Liquefaction Processes", K.J. Vink and R.K. Nagelvoort, Proceedings LNG 12 Conference, Perth, Australia,1998. Biographies Phil Redding is currently Atlantic LNG's Engineering Manager for the proposed expansion. As Lead Process Engineer and Engineering Coordinator he played a key role in the strategy and detailed development of the project. He has been with BG (formerly British Gas) for 17 years, much of this time involved in the design of LNG plants. He is a graduate of Imperial College London, a chartered engineer and a Member of the Institute of Chemical Engineers. Frank Richardson is LNG Technology Manager for Bechtel and is currently in Trinidad managing the commissioning of the plant. He has many years experience in LNG plant design, construction and operation, first with Huffco and now for 9 years with Bechtel. He has worked on many LNG projects and carried out Bechtel's conceptual study work for the Trinidad project starting in 1992. He holds degrees in chemical engineering from Lehigh University and New York University and is a registered professional engineer in New York and Texas. 6