METRO SUSTAINABILITY. Washington Metropolitan Area Transit Authority. sustainability

Similar documents
SUSTAINABILITY. Washington Metropolitan Area Transit Authority. Office of Planning Sustainability Sustainability

How Walking, Cycling and Transit Can Save The World. November 13, 2014 Rachel Healy

Safety and Service Delivery Committee. Action Item III-A. January 11, 2018

MBTA: Moving Forward with Sustainability John Markowitz

Notice of Public Hearing

2016 Sustainability Progress Report Building a better tomorrow MAY 2017

Safety and Operations Committee. Information Item IV-A. December 13, 2018

SUSTAINABILITY An Energy & Emissions Case Study

Policy on LEED Certification

What is greenlv? North Las Vegas is a City that has HOPE!

The following item was handed out at the October 4, 2018 NVTC Meeting.

Highest Priority Performance Measures for the TPP

Appendix C: Greenhouse Gas Reduction Calculations

December 8, 2010 By Clare Frederick

ARLINGTON COUNTY TRANSIT DEVELOPMENT PLAN

EVALUATION OF ALTERNATIVES CARRIED FORWARD

Michael J. Usen, AICP Sustainability Program Coordinator King County Metro Transit Seattle, Washington

Sustainability Plan 2015 Update

100% Renewable Energy Agenda

Alberta Transportation Gas Tax Fund and Public Transit Fund Outcomes Report December 2009

The Village s Strategic Plan for established being

Sustainability. Sustainability Principles. 1. Framework. Spokane Transit s definition of Sustainability is:

Washington Metropolitan Area Transit Authority INVITES YOUR INTEREST IN THE POSITION OF CHIEF ENGINEER

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014

sustainability at missouri state university A better tomorrow starts with wise decisions today

Northern Virginia Region Draft Needs Summary

Requires all new county-owned buildings greater than 5,000 square feet to be Leadership in Energy and Environmental Design (LEED) certified.

Completed energy audits on 20 percent of the city s buildings with the remaining buildings to be completed within four years.

Summary of transportation-related goals and objectives from existing regional plans

2014 Sustainability Progress Report

Prioritization of Capital Needs Inventory

Approval of Retail Services Demonstration Program

Anaheim Resort Transportation

2 nd Greenhouse Gas Inventory Report

The Cincinnati Insurance Companies ENVIRONMENTAL STEWARDSHIP 2017

Conduct an energy audit of municipal facilities and implement the recommendations. Implement an energy tracking and management system.

TransLink Green Bond Framework

GreenDOT Advisory Group

2017 Sustainability Progress Report Building a better tomorrow JUNE 2018

Transit Works. Improving the quality of life for all Californians.

Public Hearing for April 2018 Major Service Changes. January 4, 2018

SUSTAINABILITY BASELINE ASSESSMENT

CHAPTER 2: Goals, Objectives & Standards

Measuring Marin County s Ecological Footprint

Requires all new county-owned buildings greater than 5,000 square feet to be Leadership in Energy and Environmental Design (LEED) certified.

Introduction. Background

FAIRFAX COUNTY PARK-AND-RIDE DEMAND ESTIMATION STUDY

Title VI Required Service Standards, Policies and Definitions

Laurel School Upper Campus Building Features

ADDENDUM TO RECOGNITION APPLICATION APTA SUSTAINABILITY COMMITMENT

Appendix 2016 Sustainability Inventory

Massachusetts GreenDOT: Sustainability and Stewardship

Water 2. Compliance 5

FCEDA MarComm Session SWOT Workshop. September 18, 2012

Performance Measures Workshop, May 18, 2017

Montclair State University Environmental Assessment: MOU SemiAnnual Report June 26, 2012

Waste Management. Our Approach REDUCE, REUSE, SAFELY DISPOSE

2016 Environmental Benchmarking Survey

M-NCPPC Celebrating Sustainability

the air we breathe matters.

Regional Transit System Plan

1) ENERGY CONSERVATION

NEED ECONOMIC TRANSPORTATION LOCATIONS EXAMPLE

New Strategies in Purchasing Transportation Services. Warren G. Lavey May 2015

SUSTAINABILITY REPORT

Climate Change Action Plan

Transit Investment Direction and Plan Introduction. Transportation Advisory Board TPP Workshop August 16, 2017

Project location includes access to existing roads, existing water and wastewater infrastructure, and within or contiguous to existing development.

College of Lake County Sustainability Center

A Win/Win Strategy: Fixing Transportation and Reducing Greenhouse Gas Emissions in Massachusetts

A Plan for Sustainable Transportation at Yale. June 2012 [Updated September 1, 2013] INTRODUCTION

Strategies Region-wide Implementation Example Elements

Learn more about the many ways The Swift is eco-friendly throughout our building and surrounding area and how you can do your part!

MANAGING CONTAMINATION FOR THE METROPOLITAN WASHINGTON AIRPORT AUTHORITY (MWAA) RAIL PROJECT

Space Utilization Master Plan

This document has been developed to provide context to the Board as part of the strategic planning process. Regional development and travel trends

Chapter 3 - Goals, Objectives, & Strategies

Rail Service Criteria Update

Montclair State University Environmental Assessment: MOU SemiAnnual Report December 19, 2012

Appendix E: Air Quality Tables

Blue/Yellow Line Service Realignment

Climate Action Plan. University of Toledo Public Meeting #1 April 24, 2013

Wayne County Airport Authority Sustainability Program

In July 2000, City Council adopted an. Environmental Protection Program for. the City of North Vancouver.

Regional Bus Rapid Transit

AIR QUALITY AND CLIMATE CHANGE EVALUATION GUIDANCE

Fairfax County Countywide Transit Network Study

Class Transportation Survey

Montclair State University Environmental Assessment: MOU SemiAnnual Report January 26, 2011

ECO-AMBASSADORS SESSION #2. Medford Campus February 18, 2014

SD 44 North Vancouver Carbon Neutral Action Report. 30 April 2011

LOS ANGELES DEPARTMENT OF WATER AND POWER

METRO SYSTEM PERFORMANCE REPORT. PERFORMANCE INDICATORS AND CUSTOMER SATISFACTION Customer Service, Operations and Safety Committee February 16, 2006

Part 6 Appendices & Schedules

OUR ENVIRONMENT, OUR ROLE 2013 REPORT TO THE COMMUNITY ENVIRONMENTAL MASTER PLAN

Climate Action Roots What Does This Mean to the Port?

Customer Service and Operations Committee. Board Information Item III-B. October 9, 2014

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

2011 Enterprise Green Communities Criteria Checklist

WELCOME. Schedule. Contact Information. Please Provide Written Comments

Transcription:

METRO SUSTAINABILITY 2017 Washington Metropolitan Area Transit Authority sustainability

SafeTrack - Sustainability 2016 8,220 $2,631 1,000+ Wooden crossties recycled Annual energy savings from new LED signals Tons of metal recycled - SafeTrack Three years of maintenance in a little more than one year - SafeTrack promotes sustainability by extending the life of Metro s track assets and replacing or repairing assets that have reached the end of their useful life. To achieve these goals, the program expands maintenance time on weeknights, weekends and midday hours and includes 16 Safety Surges for major projects in key parts of the system. 1 SAFETY, SERVICE RELIABILITY, AND FISCAL RESPONSIBILITY

General Manager/CEO Message Sustainable projects facilitate long-term cost savings In 2017, Metro continues to improve the overall safety of the system, while placing a much greater emphasis on the customer experience. By investing in our infrastructure, we are working to get Back2Good. We hope that customers will see tangible improvements once unscheduled delays due to track problems are reduced and the reliability of our train fleet improves. The Back2Good plan also focuses on improving Metro s financial management and stability. As we rebuild the system, it s critical that we invest smartly and demonstrate responsible stewardship of the region s dollars. My leadership team and I recognize that sustainable projects facilitate long-term cost savings. That s why Metro has initiated an Authority-wide energy audit to recommend smart, sustainable investments. The audit will identify programs that can help us meet ambitious energy reduction targets while also reducing costs. The report will provide concrete recommendations, including integration into capital programming, asset management, as well as how we rebuild and operate the system. In addition, Metro is launching an Enterprise Energy Management system that will allow internal transparency, accountability and asset management of Metro s $107 million energy budget. By incorporating the management of energy use across the Authority, WMATA will be able to reach its ambitious energy reduction targets and achieve associated cost savings. Since its adoption in 2014, Metro s Sustainability projects have included efficient passenger garage lighting, rail yard switch heaters, and building automation systems at key facilities. These projects have saved approximately $2.5 million annually across the agency while reducing use of utilities, upgrading equipment and reducing labor requirements. The Sustainability program will continue to help Metro provide a sustainable transit network around which our region can prosper. Paul J. Wiedefeld General Manager/CEO Washington Metropolitan Area Transit Authority 2 2

Ridership & Mode Share In 2016, Ridership on Metrorail and Metrobus declined by a total of 9%. At the same time, the regional transit mode share increased between 2013 and 2015, to 20% of commutes using transit. To improve safety and reliability and prevent continued ridership decline, Metro s SafeTrack program is aggressively tackling deferred maintenance. As rail safety issues were being completed under SafeTrack, Metro also targeted improvements in reliability and customer service: Launched BusETA and MyTripTime to assist riders with bus location and Metrorail trip reliability information Provided real-time train location data to third-party software developers, who are creating improved ways for customers to interact with Metro Improved station signage and lighting Improved pedestrian and bus facilities at Franconia-Springfield Metro station Launched the NH2 Metrobus service between Alexandria and National Harbor With the SafeTrack program scheduled to be completed in mid-2017, a new preventative maintenance program of track and power systems will take effect to continue the focus of restoring reliable service. In 2017, Metro will also address systemic railcar failures by accelerating the retirement of the oldest and most unreliable cars, commissioning a total of 30 new trains, and implementing the Railcar Get Well Plan to reduce passenger offloads and cut delays due to train car issues by 25%. Annual Ridership 500 400 Target Millions of Riders 300 200 100 Legend Metrorail Metrobus 3 0 2013 2014 2015 2016 2017 2018 2019 2020 Year 2021 2022 2023 2024 2025

20% of the Washington DC Metro region commutes by transit, up from 17% in 2013. 2015 Metropolitan Washington Council of Governments State of the Commute Survey Regional Mobility and Access - Beyond SafeTrack In 2017, Metro s Railcar Get Well Plan aims to reduce delays and offloads from railcar failures by 25%. Metro will be running new, more reliable, 7000 Series car trains and retiring many of the oldest and least reliable cars, which are responsible for a third of all train delays. The Get Well Plan will also target delays due to train offloads through legacy fleet component fixes to the HVAC, propulsion system, and pneumatic brakes. 4

Connect Communities Metro and its regional partners work together to develop and implement projects that improve connectivity and strengthen ridership. These projects include developing Metro-owned land adjacent to stations, identifying and prioritizing regional pedestrian projects within station areas, and making stations more pedestrian and bike friendly. Metro also provides regional partners with key performance indicators that measure how effectively they are taking advantage of transit infrastructure investments. The two metrics are: Concentration of development near transit stations - as of 2015, 47% of Metrorail station areas are meeting job and household density targets (measured every 5 years) Path and road access to transit - as of 2016, 48% of Metrorail station areas are meeting the high-performing walkshed target (63.7% coverage ratio) In 2016, Metro improved access and connections to rail stations and bus services: Initiated construction of new secure Bike & Rides for 204 bikes in Vienna and East Falls Church Stations. Completion anticipated in 2017 Increased bike locker usage at Metrorail stations by 19% due to I m a Bike Locker poster campaign Developed a Metrorail Station Investment Strategy with a priority list of regional pedestrian and bicycle projects that would improve station accessibility Finalized joint development at Dunn Loring Station with 628 residential units Advanced multi-year joint development efforts on Metro-owned land at Navy Yard, Capitol Heights, College Park-U of Md, Grosvenor-Strathmore, and New Carrollton Stations In 2017, Metro will support access and connectivity through a number of new projects: construction of secure Bike-and-Rides at West Hyattsville and Franconia- Springfield Stations; installation of bike fix-it stands at 20 stations; installation of bike share stations at 7 Metrorail stations (College Park, Shady Grove, Tysons Corner, Wheaton, White Flint, Twinbrook, and Virginia Square-GMU); and construction will commence in summer of 2017 for phase one of the New Carrollton joint development project. 5

Development and Accessibility 6.8% greater value for residential properties - Metrorail boosts tax revenue and property values located within 0.5 miles of a station - Customer Service In 2017, stations will receive a makeover to improve visibility and cleanliness. Metro is launching an annual station cleaning routine to improve the station look and feel for customers. Each station is being assigned a champion among senior managers to work with station personnel to ensure internal coordination of timely repairs to equipment and systems. 6

Greenhouse Gas Emissions Authority Emissions In 2016, Metro s greenhouse gas (GHG) emissions per vehicle mile declined by 7%. This decrease was due to a reduction in the carbon intensity of regional electrical supply, increased energy efficiency at facilities due to investments in efficient equipment, and reduction in railcar miles due to SafeTrack. In 2016, Metro continued to take steps to reduce emissions: Received first zero emission, battery-powered bus for testing Purchased new maintenance-of-way equipment that meets the Tier 4 emissions standards to minimize particulate matter (PM) and Nitrogen Oxides (NOx) emissions by 95% Invested in energy efficient equipment and practices 75% of the region s transit passenger miles were on Metro in 2015 In 2017, Metro will continue to invest in efficiency and clean power sourcing. For example, install remote monitoring of maintenance-ofway fleet, which is expected to generate a 5-10% reduction in diesel consumption; initiate use of solar-powered temporary lighting to replace diesel powered units; and begin an effort to integrate clean solar power into facilities. Annual GHG Consumption per Vehicle Mile 4 Kilograms of carbon dioxide (C0 2e ) per vehicle mile 7 3 2 1 0 2013 2014 2015 2016 2017 2018 2019 Year 2020 2021 2022 2023 2024 2025 Target

Greening the region with each trip Regional Emissions Impact Metro plays a key role in reducing regional greenhouse gas emissions. The impact on the region is measured by the amount of greenhouse gas our customers avoided using transit, and nets out Metro s annual tailpipe emissions. This is called greenhouse gas displacement. In 2016, Metro displaced, or avoided, nearly 400,000 metric tons of greenhouse gas emissions from the region. This is a 5% increase over the prior year. In 2017, Metro will focus on enhancing the efficiency of service delivery. As riders return, it is anticipated that the net value of greenhouse gas savings from transit will continue to grow. Metro Regional GHG Displacement 500,000 Target - Bus In 2017, Metrobus will begin testing a zero emission, battery powered bus that could become the fleet vehicle of the future. Once fully operational, each battery powered bus could save the region up to 68 metric tons of carbon dioxide equivalent emissions annually. Metric tons of carbon dioxide (C0 2e ) prevented 400,000 300,000 200,000 100,000 0 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Year 8

Energy Consumption In 2016, Metro continued to reduce energy consumption per vehicle mile. Absolute energy consumption was reduced by 187 Million Mbtu, or a one-percent reduction per vehicle mile. In 2016, Metro continued to reduce energy consumption through a number of innovative projects: Upgraded train signals with energy efficient LED bulbs, which also improved safety and visibility to train operators Retired data center physical servers through virtualization Implemented efficient lighting, mechanical and power systems upgrades at facilities Outfitted new escalators with energy saving variable frequency drive systems Continued to install building automation systems, bringing a total of 19 support facilities online for remote energy monitoring and management In 2017, the Authority will take a major step forward in controlling energy costs. Metro will complete and begin implementing recommendations from an Authority-wide energy audit and prioritized action plan, and stand up an energy monitoring program to manage performance. Annual Energy Consumption per Vehicle Mile 40 Energy Consumption per Vehicle Mile (MBtu) 30 20 10 0 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 9 Year

Station Lighting Upgrades $2.1million potential program energy savings from conversion of track and pylon lights to LED - Lighting In 2017, Metro will begin replacing existing lighting with new LED technology as the standard for station lighting. These enhancements, which provide better visibility and improve accessibility, are underway throughout the system. To date, 55 station mezzanines have been upgraded and the final six mezzanines are beginning construction in April 2017. Construction will commence on interior station platform lighting upgrades in early 2018, resulting in an 80% reduction in energy use. 10

Water and Stormwater Metro uses water to cool stations and facilities, clean the exterior of buses and trains, and in its office buildings. In 2016, Metro s water use per vehicle mile increased by 2%, primarily due to water usage at chiller plants during particularly warm summer and falls seasons. In 2016, Metro continued to take steps to reduce water consumption and increase sustainable stormwater management: Installed new efficient chillers, including water treatment systems, at Metro Center, Potomac Avenue, and Crystal City Stations Installed low-flow and flush fixtures (31% water usage savings), storm filters, and bioretention facilities at the new LEED Silver Greenbelt Commissioning Facility Trained 28 Environmental Compliance Officers and 55 Deputy Environmental Compliance Officers charged with ensuring compliance with federal, state, and local environmental regulations Added drain medallions to storm drains at 22 rail stations in Maryland as a Best Management Practice for stormwater education and outreach In 2017, the Authority plans to reduce consumption by completing construction on its first rainwater harvesting system at the Landover bus garage and initiating a pilot project to clear wrap railcars to reduce the reliance on acid based cleaners at railcar washes. To improve stormwater management, it will expand drain medallion placement to an additional 25 rail stations and conduct a stormwater infrastructure assessment to prioritize future green infrastructure investments. 1.0 Annual Glide Path Water Consumption per Vehicle Mile 11 Water Consumption per Vehicle Mile (Gallons) 0.8 0.6 0.4 0.2 Year Target

A Commitment to the Bay - Facility Upgrades In 2017, Metro will continue to retrofit bathroom and breakroom facilities. Improved facilities will be fitted with low-flow fixtures. This will help Metro reduce its annual water consumption per vehicle mile, and reduce the wastewater load to the region s sewage plants. Helping the Bay Urban and suburban stormwater runoff from parking lots, roofs and other hard surfaces account for 15% of nitrogen pollution in the Chesapeake Bay. Smart growth patterns and public transportation investments help preserve permeable surfaces like open fields, woods or parklands that play a key role in preserving the health of the Chesapeake Bay. Models comparing proposed regional development patterns show that a more transit-oriented future, the region could save 6,000 acres of permeable area that it would otherwise lose between now and 2040 an area 18 times the size of the National Mall, or nearly eight times the size of Reagan National Airport. This would prevent an average of 6.5 billion gallons of particulate-laden rainwater and snowmelt from flowing into the Chesapeake Bay every year. Pollution prevention at stations and facilities 12

2016 Metro Recycled 9,727 Rail Ties 83,299 Gallons of Oil 4,336,946 Pounds of scrap metal 8,334 Bus Tires 2,937 Gallons of Antifreeze 13 Waste and Supply Chain Overall, Metro produced 10% less waste in 2016, showing a decline for the 4th consecutive year. This year, Metro continued to reduce waste and improve supply chain operations: $1.5 million in asset recovery revenue from end-of-life equipment and materials 8,334 Metrobus tires cradle-to-grave recycling and disposal Recycled 4,336,946 lbs of steel, copper and aluminum Continued commitment to universal waste recycling of hazardous wastes such as batteries and mercury-containing lamps Recycled all used toner cartridges and continued a program to reduce paper consumption and printing costs Recycled all decommissioned escalator steps and gear boxes through refurbishment and resale as salvage Successfully implemented construction waste management for all new LEED certified buildings to recycle and/or salvage approximately 90% of nonhazardous construction and demolition debris In 2017, the Authority plans to focus on station and facility recycling, materials reuse in track and construction projects, and to pilot more durable escalator handrails that are suitable for recycling.

1000 Series Railcars Retire 136 1000 series railcars were retired in 2016-10,545,516 lbs of metal recycled - Railcars As part of Metro s Back2Good program in 2017, all remaining 1000 Series cars will be retired and recycled. The retirement of least reliable (4000 Series) cars will also be accelerated. To replace these the Authority will commission a total of 50 new 7000 series trains. This will reduce passenger offloads and cut delays due to train car issues by 25% in 2017. Scrapped railcars are shredded and then melted down to create new steel products. Railcar bodies can be turned into car parts, skins for appliances and piping and duct work. The heavier gauge railcar trucks are melted down and reused as plate and structural steel in industries such as construction. 14

sustainability wmata.com/initiatives/sustainability This Report was printed on paper Certified by the Forest Stewardship Council (FSC)