World Small Hydropower Development Report 2013

Similar documents
World Small Hydropower Development Report 2013

World Small Hydropower Development Report 2013

World Small Hydropower Development Report 2013

World Small Hydropower Development Report 2013

World Small Hydropower Development Report 2013

World Small Hydropower Development Report 2013

World Small Hydropower Development Report 2013

World Small Hydropower Development Report 2013

World Small Hydropower Development Report 2013

World Small Hydropower Development Report 2013

World Small Hydropower Development Report 2013

World Small Hydropower Development Report 2013

World Small Hydropower Development Report 2013

World Small Hydropower Development Report 2013

World Small Hydropower Development Report 2013

World Small Hydropower Development Report 2013

World Small Hydropower Development Report 2013

World Small Hydropower Development Report 2013

World Small Hydropower Development Report 2013

World Small Hydropower Development Report 2013

World Small Hydropower Development Report 2013

World Small Hydropower Development Report 2013

General Information AREA: Population: 143 thousand. km2 (93% of the territory is covered by mountains) 8,7 mln. people Capital: Dushanbe city Independ

World Small Hydropower Development Report 2013

Use of water and energy resources in Central Asia

SECTOR ASSESSMENT (SUMMARY): ENERGY

SORBON KHOLMUHAMADZODA MINISTRY OF ENERGY AND WATER RESOURCES OF THE REPUBLIC OF TAJIKISTAN

World Small Hydropower Development Report 2016

Country Report of The Islamic Republic of Pakistan

The energy security of the Republic of Tajikistan

PEREZ-GUERRERO TRUST FUND FOR ECONOMIC AND TECHNICAL COOPERATION AMONG DEVELOPING COUNTRIES. ( G77 Project ) Final Report

Electricity. It s essential for modern life. Without it, development is delayed and poverty endures.

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Background, Performance, Problems, and Opportunities

Preliminary Findings of the Gap Analysis for Central Asia

Current Status of Energy in Viet Nam: Tran Thuc

CE397 Transboundary Water Resources

World Small Hydropower Development Report 2016

Section 2: Section 3: Section 4: Introduction

World Small Hydropower Development Report 2016

World Small Hydropower Development Report 2016

REGIONAL ELECTRICITY EXPORT POTENTIAL STUDY

INAGAKI Fumiaki. Assistant Professor, Graduate School of Media and Governance Keio University, Japan

SECTOR ASSESSMENT (SUMMARY): ENERGY

2 Strategic goals of Tajikistan NATIONAL DEVELOPMENT STRATEGY ENERGY SECURITY TRANSPORT CORRIDOR FOOD SECURITY

Water and Climate Change in Central Asia

Development of renewable energy sector in the Kyrgyz Republic

AFRICAN RENEWABLE ENERGY DIALOGUE THEME: RENEWABLE ENERGY FOR SUSTAINABLE DEVELOPMENT IN AFRICA

MEMO 27 June District heating and combined heat and power in China

CAMBODIA ENERGY SECTOR

POWER SECTOR IN SOUTH SUDAN

Content Introduction Institutional Arrangement Energy Policy Documents Energy Statistics Legal and Policy Efforts for Hydropower Development Problems

TAJIKISTAN S ENERGY PROFILE - POTENTIAL & PERSPECTIVES. KHUSRAV ABDULLOEV Ministry of energy and water resources of the Republic of Tajikistan

World Small Hydropower Development Report 2016

AFGHANISTAN. Speaking Points. Eng. Aman Ghalib Dy. Mini Energy Minister of Energy and Water Islamic Republic of Afghanistan

PROJECT IDENTIFICATION FORM (PIF) PROJECT TYPE: Full-sized project THE GEF TRUST FUND

SAARC:- Energy Security

The Potentials for Bioenergy Development in Mongolia

CLIMATE CHANGE AND THE ENVIRONMENT IN TURKMENISTAN. World Bank August 6, Outline. Facts Impacts Response Strategic support

Nuclear energy development in the Republic of Armenia. IAEA, Amsterdam June

Chapter 14 Test. Name Date Period. Matching: Fill in the blank using the terms in the box. (2 pts. Each)

In The Name of Allah. Islamic Republic State of Afghanistan Ministry of Energy and Water

SUMMARY SECTOR ASSESSMENT: ENERGY 1

The content of country report 1) General information about Turkmenistan 2) Current Energy Policy and Measures of Turkmenistan 3) Past energy demand an

Member State Perspectives

REGIONAL WHEAT MARKET FUNDAMENTALS Central Asia. November 2016 WHEAT CONSUMPTION AND PRODUCTION IN CENTRAL ASIA

Armenia Nuclear Power Profile. IAEA, Vienna May

World Renewable Energy Technology Congress

THE STUDY ON NATURAL DISASTER PREVENTION IN PYANJ RIVER

Reliable, affordable, and sustainable energy services for agriculture,

DEVELOPMENT OF THE RENEWABLE ENERGY IN KAZAKHSTAN - THE REGULATORY FRAMEWORK OVERVIEW

ACADEMY OF SCIENCES OF TURKMENISTAN SOLAR ENERGY INSTITUTE. Sh. Ilamanov. Deputy director of the Institute. Almaty, KAZAKHSTAN, 24-26January 2018

Prepared by: Diana Castillo, Lisa Marie Izquierdo, Gloria Jimenez, Mari Stangerhaugen, Robert Nixon. Advisor: Ambassador Rafat Mahdi

Energy Efficiency in Central Asia: regional aspects and gaps

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

Renewable Energy Development in Cambodia. Institute of Technology of Cambodia

Developing a Regional Roadmap on Energy Connectivity. China Electric Power Planning & Engineering Institute Bangkok

Environmental and Social Impact Assessment for Rogun Hydro Power Plant

World Small Hydropower Development Report 2016

Joint ICTP-IAEA Workshop on Sustainable Energy Development: Pathways and Strategies after Rio October 2012

TRADE, SERVICES AND DEVELOPMENT

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES

OFF-GRID ENERGY ACCESS ATTAINS NEW HEIGHTS

Presented at the JICA Tokyo International Center. Course: Energy Policy. James Baanabe Isingoma Ministry of Energy and Mineral Development Uganda

List of hydropower stations in the Republic of Tajikistan

Islamic Republic of Afghanistan: Renewable Energy Development

OCCASION DISCLAIMER FAIR USE POLICY CONTACT. Please contact for further information concerning UNIDO publications.

An Interactive Real Time Control Scheme For the Future Grid Operation

Rural Electrification by Renewable Energy in Cambodia

MOUNTAIN ADAPTATION OUTLOOK SERIES. Outlook on climate change adaptation in the Central Asian mountains

Chapter 10. Lao PDR Country Report. September 2016

Presentation Outline

CH2356 Energy Engineering Hydro Power. Dr. M. Subramanian

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

SECTOR ASSESSMENT (SUMMARY): ENERGY

SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Performance, Problems, and Opportunities

In Tajikistan, by 2030 the following objectives should be attained within the frameworks of the Sustainable Energy for All :

Monitoring and Early Warning in Tajikistan

Regional Cooperation and Trade: Examples in Southeastern Europe and Central Asia

China s Efforts in Controlling GHG Emissions in Power Industry

RENEWABLE ENERGY POLICY OF BANGLADESH

Transcription:

World Small Hydropower Development Report 2013 www.smallhydroworld.org TAJIKISTAN

Disclaimer Published in 2013 by United Nations Industrial Development Organization (UNIDO) and International Center on Small Hydro Power (ICSHP). 2013 UNIDO and ICSHP All rights reserved This report was jointly produced by United Nations Industrial Development Organization (UNIDO) and International Center on Small Hydro Power (ICSHP) to provide information about small hydropower. The document has been produced without formal United Nations editing. The designations employed and the presentations of the material in this document do not imply the expression of any opinion whatsoever on the part of the Secretariat of UNIDO and ICSHP concerning the legal status of any country, territory, city or area or of its authorities, or concerning the delimitation of its frontiers or boundaries, or its economic system or degree of development. Designations such as developed, industrialized and developing are intended for statistical convenience and do not necessarily express a judgement about the stage reached by a particular country or area in the development process: Mention of firm names or commercial products does not constitute an endorsement by UNIDO or its partners. The opinions, statistical data and estimates contained in the articles are the responsibility of the author(s) and should not necessarily be considered as reflecting the views or bearing the endorsement of UNIDO and its partners. While every care has been taken to ensure that the content is useful and accurate, UNIDO and ICSHP and any contributing third parties shall have no legal liability or responsibility for the content or the accuracy of the information so provided, or for any loss or damage caused arising directly or indirectly in connection with reliance on the use of such information. Copyright: Material in this publication may be freely quoted or reprinted, but acknowledgement is requested, together with a copy of the publication containing the quotation or reprint. Recommended citation: Liu, H., Masera, D. and Esser, L., eds. (2013). World Small Hydropower Development Report 2013. United Nations Industrial Development Organization; International Center on Small Hydro Power. Available from www.smallhydroworld.org.

3 Asia 3.1 Central Asia 3.2.3 Tajikistan Ugranath Chakarvarty, International Center on Small Hydro Power Key facts Population 7,768,385 1 Area 143,000 km 2. 1 Climate Mid-latitude continental, hot summers, mild winters; semiarid to polar in Pamir Mountains 2 Topography Pamir and Alay Mountains dominate landscape; western Fergana Valley in north, Kofarnihon and Vakhsh Valleys in southwest (highest point: Qullai Ismoili Somon, 7,495 metres) 2 Rain pattern Average annual rainfall in lowland hot deserts of northern Tajikistan and cold high-mountain deserts of East Pamirs: 70-160 mm, while in Central Tajikistan it may exceed 2,000 mm. Electricity sector overview Electrification access in Tajikistan is more than 90 per cent, still the country faces severe shortages of electricity. Around 74 per cent of the population resides in rural areas, but represents merely 8-11 per cent of the country s total electricity consumption. The capital of Tajikistan, Dushanbe, and the aluminium industry consume most of the electric power in Tajikistan. 3 With 8,476 km 2 of glaciers, 947 rivers stretching over 28,500 km and 1,300 freshwater lakes, landlocked Tajikistan is blessed with abundant water resources. 4 Hydropower contributed about 98 per cent of total electricity production in 2009 (16 TWh), clearly indicating the prominence of hydropower in Tajikistan (figure 1). 5 A large part of the generation comes from large-scale hydropower plants, however due to the sparsely distributed population, small hydropower and especially micro and mini hydropower have an invaluable impact on the socio-economic life of Tajikistan. The State-owned company Barqi Tojik is the energy monopolist in the country and deals with maintenance of electric power stations and networks, manufacturing, transmission, distribution and selling of electric and heat power. 6 Thermal Hydropower 1.80% 0% 20% 40% 60% 80% 100% Figure 1 Electricity generation in Tajikistan Source: Taj Hydro 6 98.20% Small hydropower sector overview and potential According to the Law of the Republic of Tajikistan on the Use of Renewable Energy Sources in 2010, hydropower is classified as micro, mini and small if the installed capacity is below 100 kw, 101-1000 kw, and 1001 kw-30 MW respectively. However, a document by the Ministry of Industry and Energy and UNDP Tajikistan from 2007 recommends that the classification be the following for micro <10 kw, mini 10-500 kw and small 500 kw-10 MW. 7 According to Tajhydro, 155 small hydropower stations exist in Tajikistan within four regions with a total capacity of 12 MW (table 1 and figure 2). Technically small-scale hydropower in Tajikistan revolves around micro- and mini-hydropower, due to the low population density in rural areas. Table 1 Installed small hydropower capacity in Tajikistan Total SHP plants Active SHP plants Non-active plants Region Number Total capacity (kw) Number Capacity (kw) Number Electricity generated (MWh) Capacity (kw) GBAO 35 3 432 15 725 497.8 20 2 707 Khatlon Oblast 8 2 185 - - - 8 2 185 Sughd Oblast 38 1 882 37 1 002 460.3 1 880 Districts of Republic Subordination 74 4 685 53 2 959 1 370.2 21 1 726 Total 105 4 686 2 328.3 50 7 498 Source: Tajjhdryo 8 Note: GBAO - Gorno Badakhshan Autonomous Province Most villages of the country are close to at least one water flow and thus of off-grid small to micro hydropower plants have been constructed and operated by local communities, providing electricity especially during winter when national electricity supply is mostly intermittent. Rivers in Tajikistan are characterized by high currents which make them freeze rarely. The associated equipments are made 1

from spare parts, but are not periodically maintained and thereby inefficient, and break down with some frequency. At the same time, local communities use such off-grid schemes and pool their limited resources to cover operations and maintenance expenditure. SHP installed capacity SHP potential 12 MW 115 MW 0 20 40 60 80 100 120 140 Figure 2 Small hydropower capacities in Tajikistan Source: Tajhydro 8 Since 2002, PamirEnergy has invested over US$37 million in maintaining the electrical infrastructure and developing small hydropower in the Gorno Badakhshan Autonomous Province (GBAO) region for a 25-year concession period. PamirEnergy has been providing electricity to 85 per cent of GBAO s population and is now managing all power generation, transmission and distribution in the region. 9 The major part of Central Asia s water resources originates from Tajikistan (53 per cent), hence the country has one of the highest hydropower potentials in the world, estimated to be around 140 GW, with a potential annual electricity generation of 527 TWh and ranked second in the world by its per capita hydropower resources. 10 Technical hydropower potential amounts to 317.82 TWh and the total potential of small hydropower industry is 184.46 TWh per annum. All in all, Tajikistan is home to 4 per cent of the world s hydropower potential. 11 In recent times, conditions for small hydropower have become favourable. According to Tajhydro s Small Hydro Power Development Center, preliminary researches show that 900 small scale schemes, each with output between 100-3,000 kw are technically feasible and economically efficient. 12 Use of small hydropower has been acknowledged by experts to be able to meet 50-70 per cent of rural areas energy demands and in some cases 100 per cent, based upon the presence of small rivers in predominantly mountainous areas. In the long term, small-, medium- and large-sized hydropower stations in Tajikistan have the potential of boosting Tajikistan s economy by exporting electricity and meeting reliable domestic electricity needs for productive uses. UNDP has been implementing several projects in collaboration with the Government of Tajikistan and has developed three strategic documents to confront poverty issues and development progress highlighting the use small hydropower, namely: 8 Intermediate Strategy for Renewable Energy Sources-based Integrated Rural Development (August 2010) National Program for Renewable Energy Sourcesbased Integrated Rural Development- National Scaling Up (October 2010) Energy Efficiency Master Plan (January 2011) UNDP has also designed a National Trust Fund for Renewable Energy and Energy Efficiency in Tajikistan. Once the transmission networks to Afghanistan and Pakistan, which are under construction, have been completed, Tajikistan can enhance profitability by trading with these countries. Table 2 Planned small hydropower plant capacity in Tajikistan, 2009-2020 Period Planned total installed grid connected capacity (MW) Additional stand- alone capacity (MW) Planned annual electricity production from the installed capacity (MWh/year) Required money to incentivise newly installed capacity in given period (US$) Total required money in the given period for incentives (US$) Required money to cover investment costs of stand-alone plants (US$) 2009-2011 43.53 5.00 280.84 5 616 868 5 616 868 5 000 000 2012-2015 32.85 18.62 185.07 3 701 344 9 318 212 18 620 000 2016-2020 26.80 73.20 175.74 3 514 706 12 832 918 73 199 000 Total 2009-2020 103.18 96.82 641.65 12 832 918 27 767 998 96 819 000 Source : United Nations Development Programme 13 A preliminary assessment of finance required to incentivize small hydropower development for the period 2009-2020 is shown in table 2. Furthermore, UNDP s Energy and Environment Programme project Technology Transfer and Market Development for Small Hydropower in Tajikistan in collaboration with the Global Environment Facility and UNDP, started in March 2012, will run until December 2015. 14 Water infrastructure projects, including the development of hydropower capacity, are a complex issue related to the rights of downstream water users, especially in Uzbekistan and Turkmenistan. Both of 2

these countries depend on water from Amu Darya for irrigation purposes. The Water Sharing Protocol of 1987 limits the use of water for hydropower during winter by Tajikistan. 10 With the collapse of Soviet Union, the profitable relationship of Tajikistan along with Kyrgyzstan, providing hydropower in summer to Kazakhstan, Turkmenistan and Uzbekistan and in turn receiving gas and electricity during winters, has ended. In recent times, water rights have become an issue of tension in Central Asia. Renewable energy policy Electricity supply in Tajikistan is unreliable and power cuts often recur. However, the potential to utilize renewable energy is tremendous with small hydropower as top priority and solar and wind as other potential renewable sources. The Law of the Republic of Tajikistan on the Use of Renewable Energy Sources was established in 2010, regulating legal relations between public authorities and stakeholders in the area of priority and effective use of renewable energy with an emphasis on international cooperation. It also aims at increasing the level of energy conservation, reducing anthropogenic impact on environment and climate, saving and conserving nonrenewable sources of energy. The Energy Law was amended in 2007. Both laws based on Energy (2007) and RES (2010) enable the selling of electricity generated from RES to the grid. 6 Barriers to small hydropower development Lack of reliable data on high potential and use of renewable energy; Low electricity tariffs; Uncertainty in the legal and regulatory framework for private sector participation or independent power producers; Monopoly of energy sector; Lack of financing and underdeveloped mechanism to both attract and manage resources effectively from donors or state-funded support for decentralized renewable energy development; Lack of local expertise in project development and maintenance of small hydropower stations and equipment; Lack of awareness on the potential significance of small hydropower technology to reduce winter energy insecurity and correlation of social significance associated with depleting forest wood resources for heating purposes. 2. Central Intelligence Agency (2012). The World Factbook. Available from www.cia.gov/library/publications/the-world-factbook/ 3. United Nations Development Programme (2011) Issue 17: Tapping small hydropower in Tajikistan. 4. The Washington Diplomat (2011). A Special Supplement: A Strategic Partner in a Critical Region- Tajikistan. Silver Spring. Available from http://issuu.com/washdiplomat/docs/tajikistansupple ment. 5. World Bank (2011). Electricity production from hydroelectric sources (kwh). Available from http://data.worldbank.org/indicator/eg.elc.hyro.kh. 6. Taj Hydro (2011). Fuel and energy sector development concept of the Republic of Tajikistan for the period of 2003-2015. Dushanbe. Available from http://tajhydro.tj/en/legal-page-/the-concept. 7. Tajikistan, Ministry for Industry and Energy (2007). Strategy for development of small scale hydropower of the Republic of Tajikistan. Dushanbe. 8. Taj Hydro (2011). A list of operating HPS. Dushanbe. Available from http://tajhydro.tj/en/shp-in-tajikistan- /list-of-shp-stations-?cal_offset=7p?&cal_offset=-1p. 9. Aga Khan Development Network (2012). Aga Khan Fund for Economic Development. Dushanbe. Available from www.akdn.org/publications/2012_tajikistan_akfed.pdf 10. World Bank (2011). Republic of Tajikistan, Country Economic Memorandum. Tajikistan s Quest for Growth: Stimulating Private Investment. Available from wwwwds.worldbank.org/external/default/wdscontentserv er/wdsp/ib/2011/06/16/000386194_2011061601055 8/Rendered/PDF/546770ESW0gray00601401100BOX3 61487B.pdf. 11. Sustainable Energy for All (2012). Tajikistan: Rapid assessment and gap analysis. Available from www.undp.tj/files/reports/se4all_taj_rapid_assess ment_final_english.pdf. 12. Taj Hydro (2011). Potential. Dushanbe. Available from http://tajhydro.tj/en/shp-in-tajikistan-/shp-capacity-. 13. Bukarica, Vesna, Zoran Morvaj and Slavica Robić (2010). National Programme for Renewable Energy Sources Based Integrated Rural Development- National Scaling Up. UNEP. 14. United Nations Development Programme (2012). Technology Transfer and Market Development for Small-Hydropower in Tajikistan. Dushanbe, Tajikistan. References 1. Asian Development Bank (2012). Asian Development Bank and Tajikistan: Factsheet, Tajikistan. Manila. Available from www.adb.org/sites/default/files/pub/2013/taj.pdf. 3

United Nations Industrial Development Organization (UNIDO) Wagramer Straße 2, 1220 Vienna Austria renewables@unido.org International Center on Small Hydro Power (ICSHP) 136 Nanshan Road, 310002 Hangzhou, Zhejiang Province, China report@icshp.org www.smallhydroworld.org