REPAIR OF PRECAST PRE-TENSIONED GIRDERS USING EXTERNAL POST-TENSIONING ASIT N. BAXI BAXI ENGINEERING MIGUEL FORERO SUNCOAST POST-TENSION

Similar documents
SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE

The Hashemite University Department of Civil Engineering. Dr. Hazim Dwairi. Dr. Hazim Dwairi 1

Section A A: Slab & Beam Elevation

CHAPTER 11: PRESTRESSED CONCRETE

OXFORD ENGINEERING COLLEGE (NAAC Accredited with B Grade) Department of Civil Engineering LIST OF QUESTIONS

MARTA Rapid Transit Bridges

Earth and Engineering Sciences Building University Park, Pennsylvania

GIRDER DESIGN FOR BUILDINGS

ST7008 PRESTRESSED CONCRETE

STAAD.pro 2007 Design of Wind Turbine Foundations

PROJECT: TULSA COMMUNITY COLLEGE BOOKSTORE RENOVATION PROJECT NUMBER: ISSUE: CONSULTANT: SEAL: SHEET NUMBER: GENERAL NOTES

Statement of Special Inspection Requirements

Flexure Design Sequence

Constitutive Models of Prestressed Steel-Fiber Concrete

FRP-strengthened RC Structures

CONCRETE SPLICED GIRDERS IN TEXAS. Nicholas Nemec, P.E. TxDOT-BRG

Two-way Slabs Using a Dual Banded Tendon Layout. Jonathan Hirsch Rashid Ahmed Asit Baxi

Softening Coefficients for Prestressed Steel Fiber Reinforced Concrete. Prestressed Steel Fiber Reinforced Concrete in Tension.

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Stress Limitations and Prestress Losses

Bijan Khaleghi, Ph, D. P.E., S.E.

7.1 Transmission of Prestress (Part I)

5.4 Analysis for Torsion

1 Prepared By:Mr.A.Sathiyamoorthy, M.E., AP/Civil

POST-TENSIONING VS. PRESTRESSING

Chapter 2 Notation and Terminology

SUNSHINE SKYWAY BRIDGE

14. Structural Concrete

QUIZ 2 Allotted Time: 3 hours

CHAPTER 7: SERVICEABILITY LIMIT STATES

Topic Outline. Two Stage Analysis Procedure: Podium Design. Part 2: Rigid Lower Portion Philip Miller, S.E. 2/8/2018

Integral Bridge Design to EN

ASSIGNMENT 1 ANALYSIS OF PRESTRESS AND BENDING STRESS BFS 40303

LRFD Minimum Flexural Reinforcement Requirements

Appendix A Proposed LRFD Specifications and Commentary

CSU GUIDELINES. April 27, 2018 FOR POST-TENSIONED CONCRETE STRUCTURES.

MIDAS Civil 2016 v2.1 Release Webinar. PSC Composite Design Check / Load rating

PrestressedConcreteInvertedTeeBeamswithCFRPforBuildingStructures

Structural System Design

Strength Design of Reinforced Concrete Structures

SOME FRP STRENGTHENING PROJECTS IN AUSTRALIA

Design of Large Diameter Pre-Tensioned High Strength Concrete Pile Reinforced by In-Filled Concrete and Reinforcing Bars

Intermountain Section AWWA Conference - 2.0MG Layton Water Tank. Jake O Brien

Reinforced Concrete Column Design

Innovative Construction Technology

ULTIMATE LOAD-CARRYING CAPACITY OF SELF-ANCHORED CONCRETE SUSPENSION BRIDGE

Structural Option April 7 th, 2010

TAB.3 13 Post Tensioning Terminology (PTT)

Evaluation and Repair of Existing Post- Tensioned Buildings with Paper Wrapped Tendons Experiencing Corrosion Damage

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

FRP FOR SUSTAINABLE PRECAST CONCRETE STRUCTURES

SPECIAL SPECIFICATION 4584 Segmental Concrete Bridge Unit

TABLE OF CONTENTS DESIGN EXAMPLES NOTATION 9.0 INTRODUCTION

SPECIAL INSPECTION AGREEMENT

Prestressed Concrete

GLULAM BEAM REPAIR/REINFORCEMENT TINORA HIGH SCHOOL DEFIANCE, OHIO

PRESTRESSED CONCRETE STRUCTURES. Amlan K. Sengupta, PhD PE Department of Civil Engineering Indian Institute of Technology Madras

Principal Bridge Engineer Middle East & India Atkins Abu Dhabi, UAE

Seismic Analysis and Design of Berth 14 Extension Balboa, Panama. Way, WA ; PH (206) ;

ADAPT PT7 TUTORIAL FOR BEAM FRAME 1

Contents. Foreword 1 Introduction 1

ARCHITECTURAL ENGINEERING THE PENNSYLVANIA STATE UNIVERISITY THESIS PROJECT

EVALUATION & REPAIR OF CORROSION DAMAGED ROOF LIFT SLAB WITH WIRE POST-TENSIONING SYSTEM (BUTTON HEADS)

Introduction 17/05/2015. How prestressing force transmitted to concrete?

Fundamentals of Prestressed Concrete Bridge

Concept of Prestressing

ON DESIGN OF COMPOSITE BEAMS WITH CONCRETE CRACKING

ten reinforced concrete construction Concrete Concrete Materials Concrete Construction columns beams slabs domes footings

Table of Contents.2. Introduction...3 Gravity Loading and Deflections..4. Existing Structural System..8

IMPLEMENTATION OF DEFLECTION WITH ALLOWANCE FOR FLEXURAL CRACKING IN ADAPT-PT

EXPERIMENTAL RESULTS

2012 VIRGINIA TECH SCHEDULE OF SPECIAL INSPECTIONS

twenty two concrete construction: flat spanning systems, columns & frames Reinforced Concrete Design Reinforced Concrete Design

Study Trip Report on TOHOKU UNIVERSITY: INSPECTION OF DAMAGED BUILDING By: Sergio Sunley (E-Course)

SPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division. Project Address:

Erie on the Park. Timothy Moore Penn State University Architectural Engineering Structural Emphasis Advisor: Prof. Ali Memari

HYBRID MOMENT FRAMES AND UNBONDED PT SHEAR WALLS

twenty three Masonry Construction 1 APPLIED ARCHITECTURAL STRUCTURES: DR. ANNE NICHOLS FALL 2018 lecture STRUCTURAL ANALYSIS AND SYSTEMS ARCH 631

PRE-CONSTRUCTION INVESTIGATION FOR THE REHABILITATION OF A BRIDGE USING INTERNAL FRP TECHNOLOGIES

STRUCTURAL PRECAST CONCRETE

I2-0 LIST OF ACTIVE SSDs

twenty three Masonry Construction 1 APPLIED ARCHITECTURAL STRUCTURES: DR. ANNE NICHOLS SPRING 2018 lecture STRUCTURAL ANALYSIS AND SYSTEMS ARCH 631

twenty three Masonry Construction 1 APPLIED ARCHITECTURAL STRUCTURES: DR. ANNE NICHOLS SPRING 2019 lecture STRUCTURAL ANALYSIS AND SYSTEMS ARCH 631

HIGH PERFORMANCE CONCRETE. by John J. Roller CTLGroup

JORDAHL TECHNICAL INFORMATION JORDAHL JTA-RT High Capacity Anchor Channel

Mick Leso Structural Option 2006 Penn State AE Senior Thesis RESEARCH

Analysis of a Severely Skewed Prestressed Concrete Beam Bridge

Florida s Flexible Filler Experience. Dr. Natassia Brenkus, The Ohio State University

***************************************************************************************************************

Don Theobald, V.P., Gulf Coast Pre-Stress. Standardizing Existing Spliced Girder Systems

DS Attachments. Design Specifications

FLOOR STRUCTURES. Floor structures Building Construction I.

PRESTRESSED CONCRETE STRUCTURES. Amlan K. Sengupta, PhD PE Department of Civil Engineering Indian Institute of Technology Madras

US-131 Over the Muskegon River. Corey Rogers, P.E. Bridge Construction Engineer

Guidelines for the Design of Post-Tensioned Floors

DESIGN OF PC BEAM-COLUMN JOINT APPLIED X-BRACED BARS IN THE SEGMENTED STRUCTURAL SYSTEM

Masonry and Cold-Formed Steel Requirements

LIST OF ACTIVE STRUCTURAL STANDARD DRAWINGS (SSDs)

Title. Author(s)KIM, D. W.; SHIM, C. S. Issue Date Doc URL. Type. Note. File Information

Retrofit Measures for Superstructures, Bearings, and Seats

Transcription:

REPAIR OF PRECAST PRE-TENSIONED GIRDERS USING EXTERNAL POST-TENSIONING ASIT N. BAXI BAXI ENGINEERING MIGUEL FORERO SUNCOAST POST-TENSION

PROJECT INFORMATION Project name: Laketown Wharf Retrofit Location: Panama City Beach, Florida Owner: Laketown Wharf Marketing, LLC Retrofit designer & contractor: Suncoast Post-Tension, Ltd. Grouting subcontractor: Florida Lemark Corporation 2

KEY POINTS Project background Existing structure Analysis and design Structural details Retrofit pictures 3

PROJECT BACKGROUND LAKETOWN WHARF RETROFIT 4

PROJECT BACKGROUND Owner observed cracks in the bottom face of two precast pretensioned girders supporting the pool deck The owner s structural engineer reviewed the original design and found that the girders were not adequately reinforced to prevent cracking under full service loads Owner requested a retrofit proposal with a minimum effect on the building s architectural design 5

PROJECT BACKGROUND Suncoast Post-Tension (SCPT) submitted a retrofit proposal using external post-tensioning with ½-in. strands SCPT designed and executed the retrofit The design and the executed work were reviewed by the owner s structural engineer 6

EXISTING STRUCTURE LAKETOWN WHARF RETROFIT 7

EXISTING STRUCTURE GIRDER 7-8 GIRDER 6-7 GIRDER 5-6 8

EXISTING STRUCTURE 9

ANALYSIS AND DESIGN LAKETOWN WHARF RETROFIT 10

ANALYSIS AND DESIGN A load analysis was performed to determine the flexural moment and the shear along each girder A sectional analysis (M-φ) program was used to determine the strain and stress profile at critical locations along the girders (before and after the external post-tensioning) The program used was based on a layered model and accounted for the force due to the external post-tensioning 11

ANALYSIS AND DESIGN MODEL STRAIN STRESS ε t CONCRETE A i ε ci f ci PRESTRESSING STEEL A pk ε ck f pk CONVENTIONAL REBAR A sj REFERENCE ELEVATION ε cj ε b f sj NET AXIAL FORCE SECTIONAL ANALYSIS (M-φ) USING LAYERS 12

ANALYSIS AND DESIGN Based on the analysis results, six external tendons were used for girders 5-6 and 6-7, while three external tendons were used for girder 7-8 The external tendons were placed below the girders, at a constant elevation, instead of the side faces to minimize the impact on the architectural design The tendons were placed continuously between two bracket assemblies instead of staggering the tendons and using additional bracket assemblies 13

ANALYSIS AND DESIGN 7000 Girders 5-6 & 6-7: Moment-Curvature Response Long-Term Behavior Original Section Section with external post-tensioning (P = 168 kips) 6000 5000 M MAX 5-6 = 4300 ft*kip Moment (ft*kip) 4000 3000 2000 1000 0 M MAX 6-7 = 4130 ft*kip -1000-2000 -3000-4000 -80-60 -40-20 0 20 40 60 80 Curvature (10-6 rad/in) 14

ANALYSIS AND DESIGN Summary of Stress Analysis Girder 5-6 Loading Condition Location Moment (ft*kip) Concrete Stress (psi) Stress Limit (psi) Top Bottom Top Bottom Status / Comment Original section prior to external post-tensioning Immediately after external post-tensioning Long-term response after external post-tensioning Joist 5 4298-2534 - -3600 581 Concrete cracked on bottom face Joist 5 4298-1063 253-3600 581 OK Joist 5 4298-1007 286-3600 581 OK 15

ANALYSIS AND DESIGN Summary of Stress Analysis Girder 6-7 Loading Condition Location Moment (ft*kip) Concrete Stress (psi) Stress Limit (psi) Top Bottom Top Bottom Status / Comment Original section prior to external post-tensioning Immediately after external post-tensioning Long-term response after external post-tensioning Joist 5 4134-2111 - -3600 581 Concrete cracked on bottom face Joist 5 4134-877 132-3600 581 OK Joist 5 4134-874 194-3600 581 OK 16

ANALYSIS AND DESIGN Girder 7-8: Moment-Curvature Response Long-Term Behavior 7000 Original Section Section with external post-tensioning (P = 81 kips) 6000 5000 Moment (ft*kip) 4000 3000 2000 1000 0 M MAX 7-8 = 2560 ft*kip -1000-2000 -3000-4000 -80-60 -40-20 0 20 40 60 80 Curvature (10-6 rad/in) 17

ANALYSIS AND DESIGN Summary of Stress Analysis Girder 7-8 Loading Condition Location Moment (ft*kip) Concrete Stress (psi) Stress Limit (psi) Top Bottom Top Bottom Status / Comment Original section prior to external post-tensioning Immediately after external post-tensioning Long-term response after external post-tensioning Joist 4 2557-630 133-3600 581 Bottom face in tension Joist 4 2557-537 -115-3600 -3600 Bottom face in compression Joist 4 2557-537 -53-3600 -3600 Bottom face in compression 18

DESIGN DETAILS LAKETOWN WHARF RETROFIT 19

DESIGN DETAILS 20

DESIGN DETAILS 21

DESIGN DETAILS The bracket assemblies were located away from the end of the girders to avoid disturbing the transfer zone of the pretensioned strands The bolts used in the brackets were located to avoid interference with the conventional reinforcement and the pretensioned strands Barrel anchors were used and located as close as possible to the girder soffit to minimize the eccentricity 22

DESIGN DETAILS 23

DESIGN DETAILS 24

RETROFIT PICTURES LAKETOWN WHARF RETROFIT 25

RETROFIT PICTURES 26

RETROFIT PICTURES 27

RETROFIT PICTURES 28

RETROFIT PICTURES 29

RETROFIT PICTURES 30

RETROFIT PICTURES 31

RETROFIT PICTURES 32

THANK YOU ASIT N. BAXI BAXI ENGINEERING MIGUEL FORERO SUNCOAST POST-TENSION 33