Bucharest Wastewater Treatment Plant, Glina

Similar documents
SUMMARY OF OPERATION EVALUATION. A wind farm. November 2013 EBRD EVALUATION DEPARTMENT

From ISPA to Cohesion Fund

A Telecommunications Company

European Investment Bank (EIB) Guidelines for the Climate Change Technical Assistance Facility (CCTAF) Operations

South Africa s Sub-National Debt legal framework, implementation and reforms. Intergovernmental Relations October 2018

ab0cd Private Road Network Management Project Poland January 2006 Operation Performance Evaluation Review (A Technical Cooperation Operation)

Wastewater System Financial Plan. For the Corporation of the City of Thunder Bay

Template for ToR for Transaction Advisory Services

APPROACH PAPER. Private sector participation in municipal operations. ab0cd. May 2013 EBRD EVALUATION DEPARTMENT

BOSKOV MOST HYDROPOWER PROJECT: PCM COMPLIANCE REVIEW REPORT MANAGEMENT ACTION PLAN

PROJECT INFORMATION FORM - WATER Part A General Information

14. Vietnam: Study on Past Investments

Mid-Size Sustainable Energy Financing Facility

RAJA Constanta - opportunities for performance based contract

EXPORT-IMPORT BANK OF THE UNITED STATES

Survey of IFI experience in mainstreaming Gender

The Integrated Support and Assurance Process (ISAP): detailed guidance on assuring novel and complex contracts

Type of Review: Annual Review. Project Title: WaterAid PPA Annual Report 2011/2012. Date started: 1 April 2011 Date review undertaken: 31 May 2012

ASSESSMENT AND DEVELOPMENT OF MUNICIPAL WATER AND WASTEWATER TARIFFS AND EFFLUENT CHARGES IN THE DANUBE RIVER BASIN.

Public-private partnerships (PPPs) in Bulgaria: legislative initiatives and experience

BOSKOV MOST HYDRO POWER, REQUEST NUMBER: 2011/05

EBRD CLIMATE FINANCE GLOBAL PARTNERSHIPS. Accelerating the response to climate change in 2015

The government has adopted a new legal framework for public-private partnership (PPP)

Guidance Note for CLA members

Case Study Brasov, Romania

Telecommunication Expansion Project (II)

Procurement May 2018

Asset management for environmental infrastructure

UNITED KINGDOM Intercity Express Programme SUMMARY

EIB Procurement Policy

Country strategies an initial review

Public Private Partnerships: Airwave

Ex-ante Evaluation - 1 -

Renewable Heat Incentive: proposals for a domestic scheme. Community Housing Cymru Group response

Review of Operations and Activities: Listing Rule Guidance Note 10. Introduction. Issued: March 2003

HISTORY

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INTEGRATED SANITATION & SEWERAGE INFRASTRUCTURE PROJECT (LOAN 7512 EGT) March 20, 2008

CARIBBEAN EXAMINATIONS COUNCIL

The EBRD in the Western Balkans. February 2018

Altain Khuder. Management Action Plan REQUEST NUMBER:

E1/92. D.C. Water & Sewer Authority Series 2017 A Senior Lien Revenue Bonds. Green Evaluation. Transaction Overview. Green Evaluation Overview

Infrastructure and Capital Projects

Efficiency in water resource management

CONTRIBUTION TO PFPPP DEFINITION

Queen Alia International Airport Expansion

REPORT 2014/014. Audit of the implementation of the Murex system in the Investment Management Division of the United Nations Joint Staff Pension Fund

COMMENTS ON GREEN PAPER ON PPP AND COMMUNITY LAW ON PUBLIC CONTRACTS AND CONCESSIONS

Probity, governance and procurement

Geothermal Financing and Risk Transfer Facility

REPORT 2015/007 INTERNAL AUDIT DIVISION

Policy, legal and regulatory frameworks for successful PPPs

ZSIC GROUP OF COMPANIES PROCUREMENT PLAN EXCEL VERSION

20 YEARS OF EIB FINANCING FOR A CLEANER BALTIC SEA

Partnership working. 1. Partnership assessment

TECHNICAL ASSISTANCE REQUEST. MicroLoan Foundation, Malawi

CRIS Number: 2002/

Energy Efficiencies Practices for European Smart Cities. Athens, February 2018

Gwynedd Council Report by the Auditor General for Wales. Preliminary Corporate Assessment September 2010

Independent Regulators Group Rail. IRG Rail

EBRD requirements and lessons to date

UPP Bond 1 Issuer plc

NOTICE CONCERNING COPYRIGHT RESTRICTIONS

Implementation Evaluation of the PEACE IV Programme and INTERREG VA Programme EXECUTIVE SUMMARY

of Lviv (LVK): Mr. Sulipa, Director, Lviv Vodokanal City of Lviv Council 1 Rynok Square Lviv, Ukraine Fax

TERMS OF REFERENCE KAZAKHSTAN: ASTANA WATER - FEASIBILITY STUDY

NABUCCO Why? - When? - Some Myths and Facts

REQUEST FOR COUNCIL ACTION

LEVEL 3 CERTIFICATE AND DIPLOMA IN PROCUREMENT AND SUPPLY UNITS AND RULE OF COMBINATION

Water Supply and Sewerage

Commercial Property Climate Bonds

Public Private Partnership PPP & The Egyptian Experience

The Act on Public Contracts, EU state aid rules, and funding granted by Innovation Funding Agency Business Finland

EIB Project Cycle and Procurement Tegucigalpa, 1-2 June 2017

Progress since the 2004 White Paper on services of general interest

CHALLENGES IN THE DEVELOPMENT OF GEOTHERMAL POWER TO MEET INDUSTRIALISATION NEEDS OF KENYA

Annex II of the Memorandum of Understanding of the Central and South-Eastern European Gas Connectivity (CESEC) High Level Group.

Performance Requirements

Ward Affected: All Wards ITEM 15 CABINET 9 NOVEMBER 2015

Advisory: helping our clients enhance value, build trust and communicate with the market place.* *connectedthinking

Modernization of Street Lighting Systems Megan Meyer (WB) and Luiz Maurer (IFC)

Casework Technical Support (Social Welfare - Project Management)

The BBC s management of its Digital Media Initiative

TERMS OF REFERENCE. For. The Design of a Monitoring & Evaluation System to track the Progress of the CARIFORUM-EU EPA Implementation

8 Upper York Sewage Solutions Individual Environmental Assessment Approval Status Update

We do not receive any funding, or any other financial support, from the Welsh or UK Governments.

REPORT 2014/095 INTERNAL AUDIT DIVISION. Audit of the United Nations Office for West Africa and the Cameroon-Nigeria Mixed Commission

INTEGRATED WASTE MANAGEMENT. APPROACH AND IMPLEMENTATION IN ROMANIA. Silvian IONESCU 1

Power Generation What can EIB offer?

Privatisation & Public Private Partnership Review 2012/13

Public-Private Partnerships in the Airport Sector Structured Guidelines for PPP Implementation

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION STAFF WORKING DOCUMENT. Annex to the

NOTICE 1019 OF 2013 DEPARTMENT OF TRADE AND INDUSTRY

SERVICE PLAN. February 2018

NORTHERN GAZA EMERGENCY SEWAGE TREATMENT (NGEST) PROJECT APPROVED ON SEPTEMBER 7, 2004 PALESTINIAN LIBERATION ORGANIZATION

CITY OF YUBA CITY STAFF REPORT. Honorable Mayor & Members of the City Council. Diana Langley, Public Works Director. Water and Wastewater Rate Study

SENATE, No STATE OF NEW JERSEY 216th LEGISLATURE

Status Report on Enhancing Portfolio Management (Background Paper #2)

Policy,Legal and Regulatory Frameworks

ab0cd ENVIRONMENTAL AND SOCIAL PROCEDURES

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. ) PJM Settlement, Inc. ) Docket No. ES )

Transcription:

OPERATION EVALUATION SUMMARY Bucharest Wastewater Treatment Plant, Glina Romania August 2013 EBRD EVALUATION DEPARTMENT

Operation Evaluation Summary Bucharest Wastewater Treatment Plant, Glina, Romania August 2013 The Evaluation Department (EvD) at the EBRD reports directly to the Board of Directors, and is independent from the Bank s Management. This independence ensures that it can perform two critical functions, reinforcing institutional accountability for the achievement of results; and, providing objective analysis and relevant findings to inform operational choices and to improve performance over time. EvD evaluates the performance of the Bank s completed projects and programmes relative to objectives. Whilst EvD considers Management s views in preparing evaluations, it makes the final decisions about the content of its reports. This report was prepared by Dr Arthur Dennis Long, Senior Environmental Evaluation Manager of the Evaluation department at the EBRD.

Operation Evaluation Summary Bucharest Wastewater Treatment Plant, Glina, Romania August 2013 Industry: MEI Portfolio: Public/non sovereign Disbursement: 21 June 2007 Investment type: Debt Environmental category: B/1 Total amount: 108.3 million Board approval: 29 November 2005 EBRD amount: 10 million 1 Executive summary In 2005, the Board approved a loan of 10 million to co-finance construction of the Bucharest Wastewater Treatment Plant (WWTP). This was a public non-sovereign loan to the City of Bucharest with a 15-year maturity and a four-year grace period. Co-financing included a 73.3 million sovereign grant from EU ISPA (Instrument for Structural Policies for Pre-Accession) and a 25 million sovereign loan from the EIB (European Investment Bank). The completed plant is to be operated by Apa Nova, an international engineering firm, under a concession agreement and is intended to bring Bucharest into full compliance with the EU Wastewater Treatment Directive. The project comprised the first of two investment phases, each planned to treat 50 per cent of the projected wastewater load. Phase I (this project) was designed to treat 50 per cent of the projected wastewater load. Phase II will treat the remaining 50 per cent. Phase II is to be co-financed with EU Cohesion Funds beginning in 2013. Negotiations for the EBRD's participation are underway. The operation team s self-assessment (Operation Performance Assessment or OPA ) acknowledges that without the EBRD s loan the project would have gone forward as a sovereign only project. The EBRD's presence, via a loan to the City, gave the City a much greater role. The EBRD put emphasis on the need to establish a wastewater treatment tax and required the City to provide financial reporting against international standards to support improved financial discipline. It also brought greater transparency by requiring monitoring of construction and operating arrangements; development of a tariff structure that covers WWTP operations and maintenance (O&M) costs; as well as repayment of the debt through a special account. The EU-ISPA appreciated the EBRD s involvement in the financing as the EBRD brought experience in promoting cost recovery for wastewater projects. Findings Complex concession contracts and debt service The project required that a new wastewater tax be implemented prior to first disbursement. The City was responsible for raising the wastewater tax but needed to agree with Apa Nova on how the tax would be collected, which required an amendment to Apa Nova's existing concession agreement. Although it seemed straightforward, Apa Nova used this as an opportunity to clarify with the City how funds would be allocated in the event customers did not pay the full amount. The company s management wanted this clear in the concession agreement as Apa Nova is responsible for collecting the tax. The revised amendment was also an opportunity to address other factors outside the remit of this project which in turn resulted in delays in implementing the tax.

Operation Evaluation Summary: Bucharest Wastewater Treatment Plant, Glina, Romania 2 / 9 Compliance with EU Environmental Standards The project was expected to be designed in line with the EU environmental standards for urban wastewater treatment. The initial EU project approval was not specific regarding the level of treatment required by the WWTP. Given the uncertainties associated with a project of this scale and magnitude, the EU decision initially provided for a two-phased WWTP, split in two equal lines, and therefore only half of the wastewater generated by the City of Bucharest would comply with national and EU standards at the end of this project. In fact, the preliminary design prepared in 2004 indicated a total capacity one-third larger than the eventual 2008 detailed design. This had a significant impact on the design of line 1 and subsequent phasing approach. As the plant (Stage I and II) was only designed to treat half 1990 s design load, it remains unclear if this plant will achieve full EU compliance. This can now only be achieved by expanding line 2. Population growth also needs to be anticipated. The plant was initially designed based on conditions from 30 years ago. The Bank experienced the same issue with the Saint Petersburg Southwest Wastewater Treatment plant, which has also been built based on an old design. Population growth projections and changes in environmental standards must be anticipated for the countries that are EU candidates, prior to their integration into the EU. Use of a Public Private Partnership (PPP) The operator of this project is an international engineering firm with extensive sector experience in in Romania and elsewhere. The Bank has supported PPP in the water supply sector and, through this project, is supporting PPP in wastewater via a restructuring of the initial PPP contract. Experience on these two projects highlighted several generic points regarding PPPs the need for an adequate legal framework and the benefits of partnering with appropriate technology, management skills and know-how.

Operation Evaluation Summary: Bucharest Wastewater Treatment Plant, Glina, Romania 3 / 9 2 What were the project ratings? Table 1. Summary of ratings Relevance Additionality (Fully verified, largely verified, partly verified, not verified) Largely verified Effectiveness Achievement of operation objectives Project financial performance Efficiency Bank handling Bank investment performance Impact and sustainability Transition impact Environmental and social performance Extent of environmental and social change (Outstanding, substantial, some, none/negative) Overall performance rating (Highly successful, successful, partly successful, unsuccessful) Some Successful

Operation Evaluation Summary: Bucharest Wastewater Treatment Plant, Glina, Romania 4 / 9 3 How relevant was this project to the EBRD s mandate? 3.1 What was the rationale behind this project? The project was consistent with the MEI sector policy and the Romania country strategy at the time. The country strategy looked to investments in the MEI sector and collaboration with EU ISPA on wastewater projects. It also anticipated working closely with EIB. 3.2 What was the Bank's additionality in the project? Table 2. Additionality ratings Additionality (Fully verified, largely verified, partly verified, not verified) Largely verified At appraisal, the Bank was considered additional for the added value brought to the transaction that differed from the role played by EU-ISPA and EIB. The Bank s loan supported an innovative projectfinance structure based on ISPA grant co-financing. EU-ISPA provided technical assistance to ensure appropriate institutional capacity at the municipal level. This was particularly important for a complex project which was to be financed in two phases, with the second phase financed under EU Cohesion Funds. The Bank s involvement in the project during Phase I helped leverage both EU-ISAP and EIB financing. EU-ISPA supported the EBRD s involvement, as the EBRD was able to assist with implementation issues which the EU-ISPA, as a granting agency, could not easily address. In addition, the Bank s tenor of 15 years was longer than the tenor of Bucharest's Eurobond. The OPA acknowledges that without the EBRD loan the project would have gone forward as a sovereign only project. The EBRD's presence, via a loan to the City, gave the City a much greater role. The EBRD put greater emphasis on the need to establish a wastewater treatment tax, required the City to provide financial reporting against international standards and improved financial discipline. It also brought greater transparency by requiring monitoring of construction and operating arrangements, and development of a tariff structure that covers WWTP operations and maintenance (O&M) costs, as well as repayment of the debt through a special account. The EU felt that the EBRD s involvement in the financing, given its experience in promoting cost recovery in water projects, as well as its role in financing PPPs such as the Apa Nova PPP, helped to ensure that the project would be sustainable and implemented in a cost-efficient manner over the long-term.

Operation Evaluation Summary: Bucharest Wastewater Treatment Plant, Glina, Romania 5 / 9 4 How effectively were project objectives met? Table 3. Rating of objectives Achievement of objectives Company financial performance Project financial performance 4.1 What were the objectives and to what extent were they achieved? Construction of the Glina WWTP (line 1) - Achieved The Glina WWTP is designed to treat the wastewater flow from the City of Bucharest. Bucharest is listed as major pollution hot-spot along the Danube and was one of the few European capitals without wastewater treatment. Completion of the Glina WWTP is therefore seen as the most important environmental project in Romania and is critical to achieving Romania s commitments to the EU. The initial design for the treatment of Bucharest s wastewater was developed in 1983 85 and construction commenced in 1985. However, following the overthrow of former dictator Nicolae Ceaușescu and a subsequent ecological accident, the project was abandoned. Discussions with EU-ISPA began in 2000 to restart it and a number of options were considered for the rehabilitation of the wastewater treatment plant as part of a detailed cost-benefit analysis. The Romanian authorities, along with the EU, chose to maximise the use of existing assets. In addition, the City population had grown leading to a larger pollution load, thus requiring a larger plant than the 1983 design. A two-phased approach to construction was selected to allow certain design parameters to be adjusted, thus line 2 will now need to have a larger capacity than line 1. Design and tendering for the new/rebuild line 1 took place under EU-ISPA procurement procedures. The EBRD was not involved in the review of the Environmental Impact Assessment (EIA), approved in 2004, nor in the decisions regarding the design of the plant. However, it was involved in the tendering process, working with the other lenders on the award and on monitoring construction of the plant. Completion was achieved in April 2011. Stage 1 includes primary treatment for the total input flow; secondary biological treatment (including nitrogen and phosphorus removal) for 50 per cent of the flow; sludge drying; and treatment facility (including anaerobic digesters) for both lines. While line 2 can be designed to handle the additional load, it is unclear if and how the primary treatment facility and the sludge drying plant will be expanded. The treated portion meets EU environmental standards but more than 50 per cent remains untreated, pending Stage 2.

Operation Evaluation Summary: Bucharest Wastewater Treatment Plant, Glina, Romania 6 / 9 4.2 How did the project/company perform financially? The City of Bucharest, as the borrower, is covered in the OPA under project financial performance. The City has maintained a strong financial balance throughout the life of the project, with growth in revenues and budget surplus well above the Board paper projections. Romania and Bucharest have been negatively impacted by the global financial crisis but through 2011, the ratio for current surplus to current revenues was maintained at 26 per cent. In 2005, the City issued a 500 million bond, due payable in 2015. The City also has a 51.5 million district heating loan from EIB and the EBRD ( 15 million from the Bank's account) disbursed in 2002 which is currently being repaid. With respect to the water and wastewater sector, as discussed below, tariffs have increased and collection rates remain high. ANB, as operator of the water and wastewater systems, has constantly performed above appraisal estimates. ANB is not only responsible for water treatment and distribution and the wastewater collection system under their existing PPP, but, via this project, is now responsible for O&M for Glina. ANB anticipated this and has had several years to plan for its role as operator of Glina WWTP. In 2010 the wastewater tariff (including VAT) increased to 0.70 per cubic meter and the combined water and wastewater tariff is now 1.30 per cubic meter, thus the cost of water and wastewater is almost equal. By comparison, in 2011-12, Thames Water in the UK charged 1.17 per cubic meter for water and 0.59 for wastewater. The economic internal rate of return (EIRR) for this project is estimated at 6.07 per cent, an increase over the appraisal estimate of 3 per cent, which reflects the positive socio-economic benefits accruing from this project. While the financial internal rate of return (FIRR) without the EU grant component is negative (negative 0.39 per cent), it is estimated at 12.44 per cent with the grant, also an increase above the appraisal. 5 How efficiently was the project handled? Table 4. Efficiency ratings Bank handling Bank investment performance 5.1 How well did the Banking team handle the project? Project due diligence The Banking team worked with the City, EU-ISPA and EIB to structure the project to achieve the expected outcomes. The utility is owned by the City who therefore has a direct interest in the project. The EBRD's decision to loan directly to the City was also politically important. The National and City governments have,

Operation Evaluation Summary: Bucharest Wastewater Treatment Plant, Glina, Romania 7 / 9 at times, been headed by different political parties which has led to different approaches to project implementation. By bringing the City directly into the financing structure, this potential friction was reduced. The City is the beneficiary of the loan and, as owner of the utility, was responsible for the project design and construction phase. By assuming responsibility for investments in the wastewater sector, the City was able to blend grant financing with its PPP. ANB took over the operation of the WWTP once commissioned under the terms of the revised concession contract. Thus the PPP objective was met. ANB was involved in the decision process throughout all stages of the project Project monitoring Reporting on project monitoring was completed biannually through 2009 and annually thereafter. The most recent completion report notes that the wastewater treatment plant is now fully operational; tariff receipts fully cover operational expenditure and debt service requirements; an escrow agreement is in place for collections; and the concession with ANB has been amended to enable collection of the tariff. Bank handling environment The EU-ISPA provided TC to support preparation of an EIA prior to the EBRD's involvement in the project. Its project information sheet states that: "The rehabilitation of the Bucharest Wastewater treatment Plant at Glina falls under Annex I of the Environmental Impact Assessment (EIA) Directive 85/337/EEC (as amended by 97/11/EC). The EIA process has been completed in 2004 with the issuing of the environmental permit in June 2004 by the competent authority, the Ilfov Environment Protection Agency. Public consultation has been undertaken." EIB has stated similarly in its public disclosure document. Appendix 1 of the Bank's 2003 Environmental Policy states that greenfield wastewater treatments plants with a capacity exceeding 150,000 population equivalent should be screened Category A. Nevertheless, the project was screened Category B/1. The Board was not informed that there had been an EIA nor of the decisions of EU-ISPA or EIB. There would have been little value in further consultation and disclosure but the Bank could have simply accepted the approved EIA, screened the project Category A/1 consistent with the Bank's Policy, posted the PSD for 60 days and then proceeded. The only additional burden would have been the longer period for posting the PSD. This was a missed opportunity to support other EU institutions in promoting EIA best practice. 5.2 How well did the Bank s investment perform? This is a municipal loan and has fully disbursed. A special tariff was established to repay the loan via an escrow account. The tariff is collected by ANB and the account is administered by the City of Bucharest. The loan is repaying on schedule.

Operation Evaluation Summary: Bucharest Wastewater Treatment Plant, Glina, Romania 8 / 9 6 What impact did the project have and was it sustainable? Table 5. Transition and environmental impact ratings Realised transition impact (Excellent, good, satisfactory, marginal, unsatisfactory, negative) Potential transition impact (Excellent, good, satisfactory, marginal, unsatisfactory, highly unsatisfactory) Risk to potential transition impact (Excessive, high, medium, negligible, low) Overall transition impact (Excellent, good, satisfactory, marginal, unsatisfactory, highly unsatisfactory) Environmental and social performance (Excellent, good, satisfactory, marginal, unsatisfactory, highly unsatisfactory) Environmental and social change (Outstanding, substantial, some, none/negative) OPA Low Some EvD Low Some 6.1 Were the expectations for transition realised? Table 6. Transition impact benchmarks Objective 1. Commercialisation Benchmark 1.1. Tariffs set to cover debt service and operating costs of WWTP Status (achieved, partly achieved, not achieved) Delayed 2. Private sector involvement 3. Transfer and dispersion of skills 2.1. ANB to operate the WWTP On track 3.1 Implementation of project management TC Achieved 3.2. Transparent procurement in the turnkey contract Achieved 4. Demonstration effect 5. Setting standards for corporate governance 4.1 Effective project management: timely and cost completion of WWTP 5.1 Transparent operating arrangements between ANB and Municipality (including amendments to the concession contract.) Partially achieved Partially achieved

Operation Evaluation Summary: Bucharest Wastewater Treatment Plant, Glina, Romania 9 / 9 6.2 What was the impact on the environment? This project was screened Category B/1 under the Bank's 2003 Environmental Policy. A Category A/1 rating would have been consistent with national requirements and with EU-ISPA and EIB screening (see section 5.1.3); however, at the point that the EBRD entered the project, site selection and design decisions had been made and therefore screening the project B/1 reflected the level of further environmental due diligence the EBRD could undertake. With support from EU-ISPA, an EIA was prepared in 2004, went through public consultation and was approved by the component authorities. Unfortunately, this EIA is not part of the Bank's electronic records nor is it readily available on the web. Stage II is clearly a Category A-level project and will require a new EIA. The existing project was an opportunity to collect baseline data for the follow-on EIA. For a plant (Stage II) that is meant to be designed and built in the next three years, this lack of data could result in a costly delay. Environmental and social performance The sponsor has submitted annual updates on implementation of the Environmental Action Plan (EAP) although the last available update via Project Link was posted in 2010 for 2009. The initial EAP focused on construction related concerns. The Environment and Sustainability Department (ESD) conducted a site visit in 2010 during which the EAP was updated, closing out many of the construction related tasks. The updated EAP addressed operation of the plant and recommended a programme to monitor industrial pollution. This is an ambitious undertaking and it is not clear how the Bank will monitor effectiveness of this programme without regular reporting. Extent of environmental and social change The Board paper and the OPA define the key environmental benefit to be a reduction of pollution entering the Dambovita River, which flows into the Arges River, which will result in less pollution entering the Danube river (approximately 73 kilometres away) and the Black Sea (approximately 400 kilometres downriver). The volume of flow from the Arges River is less than 10 per cent of the flow in the Danube. It is reasonable to assume that Glina will have a positive impact but the project design did not include any data collection on downstream biodiversity or river quality, nor did it include modelling of impacts. This is a missed opportunity to tell a positive story.

European Bank for Reconstruction and Development One Exchange Square London EC2A 2JN United Kingdom Web site: www.ebrd.com All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, including photocopying and recording, without the written permission of the copyright holder. Such written permission must also be obtained before any part of this publication is stored in a retrieval system of any nature.