Plant by production synthetic liquid fuel (SLF) of natural Gas Gas-To-Liquids (GTL), is proposed arrange in Iran, FEZ (Option 1) or in port (option 2) for shore Gulf. GTL is a fully integrated project, including the processing natural gas production and implementation end products. Performance plant will be 280,000 barrels synthetic liquid hydrocarbon products in day (gas oil, naphtha, kerosene, normal paraffins and basic oils), also ethane, liquefied oil gas (LPG) and condensate in volume of 240,000 barrels oil equivalent in night. Draft is of full production - sales Chains comprising synthesis liquid hydrocarbons and production end products, and also storage, transport and Marketing unique products GTL (gas-liquid conversion) as in very Iran so and by around world. Interest consumers to According to products partly due to Honours their of from Product obtained of crude oil well as Products GTL consist almost only of saturated paraffins. This such composition allows provide unique workers Specifications these products when their use in as fuel. addition This synthesis these products of net methane provides absence in them aromatic compounds, compounds sulfur and metals, so Products GTL burn cleaner with education smaller number of harmful compounds than Products processing crude oil such as gasoline, diesel fuel and Aviation kerosene.
Overall Information about GTL project Project «IRAN -GTL» proposed construction in Iran GTL plant capacity of 20 billion. 3 m for processing natural gas in year. According to concept implementation Project will held in two phase. On first stage provided construction first queue plant (GTL) capacity of 10 billion. m3 and also TPP terminals for Storage gas and motor fuels and product, railway and automotive filling Station, Products for feed in port and residential town. On second stage - construction second queue Plant (capacity of 10 billion. 3 m), the creation of related chemical productions.
Overall Information about GTL project Close from location GTL plant enough water Resources for it operation. Overall area land area for GTL plant will be approximately 750.0 hectares. Field gas (gas piping) must is on distance -50 = 100 km in within from complex. For basis for raw materials adopted natural gas and using two options: Option 1: with south - Western and central deposits (in that including passing gas). Option 2: with seaside deposits and deposits on Shelf Gas will do on GTL plant in existing or by again built domestic pipelines. summary volume pumping is: Stage 1-10 billion. m 3, Stage 2-10 billion. 3 m (in year)
Financial - economic Indicators Project «IRAN -GTL» Cost all Project GTL plant 20 billion. M3 processing gas in year can 10-12 billion. Dollars. USA. GTL plant coming on full Power will release Product on 8.0-10.0 billion. Dollars. USA in year, there are 10 million. tons oil Based on of preliminary calculations financial indicators project period Payback all complex be from 6 to 7 years.
Latest technology that will applied on new Plant GTL, allow work almost without loss that at the same time significantly increase efficiency production in whole. Plant with such technologies and quality Product in Asian region not. (except main competitor - Kuwait plant - but it construction cost too expensive) High reliability full Upload production capacity plant raw materials provided that GTL plant will is in close close to close deposits gas. Project «IRAN -GTL» today - it Software products consumers in Iran and by around world supply lubricants materials and Fuel for automotive and Aviation industries, raw materials for production plastics and detergents means. Given the that Products plant will fully match world standards by quality and significantly exceed by Environment standards PLANT BE HAVE GUARANTEED SALES - IN IRAN, THE CIS AND IN OTHER COUNTRIES WORLD.
Introducing Project - the world's largest plant for the production of synthetic fuel gas (GTL), c daily capacity of 280,000 barrels of GTL. In addition, the plant will produce 240,000 barrels of oil equivalent per day of natural gas liquids and ethane Location: Iran Owners and investors Operator: Cost of development: Product Performance: Total production: Main contractors: Production sharing agreement with a license that chtisle and extraction, or other form of cooperation with the Government of Iran. 100% financing is carried out so-state 20% and 80% of a consortium of investors according to the decision of investors Pula 10.0 billion. Dollars. USA - 12.0 billion. Dollars. USA 640,000 barr.u.t. / d of gas; Product: 280,000 barr.u.t. / day of synthetic fuel (2 lines) - 240,000 barr.u.t. / d of NGL and ethane 10 billion. Barr.u.t. natural gas for the expected life of the project according to the decision of investors Pula
On construction GTL plant possible employment More than 20,000 Iranian specialists. The total tonnage equipment and material, steel designs and pipes can make about 3.5 million. tons. Dispatching GTL plant will brain center the largest and complicated systems Management technological processes. The approximate only Equipment dispatcher plant be more than 2,000 cabinets Management computer 200 servers, provide transmitting 20000000 lines Text computer programs and will work More than 700 highly qualified Iranian engineers. System Management will related with all objects and sites plant kilometers Governors cables. Technology Method synthesis will main Technological process GTL plant with two technological lines. This technology developed by more three decades ago already tested in industrial scale in different countries world.
Markets Using World experience experience promotion on Markets Product GTL plant will ship on World Markets wide nomenclature Product Premium - class with plant «IRAN - GTL», including obtained by Technology SLF petrol diesel fuel, aviation kerosene, normal paraffins and main oil necessary when production lubricants materials. Ecology and Company When implementation Project will used technological solutions, allowing reduce impact on environmental environment. In framework problem by Prevention hit liquids with plant in environmental Wednesday project provides closed water cycle. Water treatment installation will be most effective in world installation by preparation, cleaning and re- Use technological water, and will have performance about 600,000 barrels water in day.
You can write and call directly: Author the Project: Cherkashyn Anatoliy Head of Projects E-mail: GAZCO.INC@gmail.com tel: + 38 097 383 98 80