MIDLAND COUNTY ROAD COMMISSION

Similar documents
ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING

TECHNICAL SPECIFICATION

FULL DEPTH RECLAMATION

LAPEER COUNTY ROAD COMMISSION ANNUAL BID SLURRY SEAL SURFACE SPECIFICATIONS

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

CITY OF SAN ANGELO ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

COLD-IN-PLACE PAVEMENT RECYCLING

ITEM 223 LIME-FLY ASH STABILIZED SUBGRADE Description. Mix and compact water, lime and fly ash (LFA), and subgrade in the roadway.

610 - DOUBLE ASPHALT SURFACE TREATMENT SECTION 610 DOUBLE ASPHALT SURFACE TREATMENT

BASE CONSTRUCTION MATERIALS A Aggregate

610 - DOUBLE ASPHALT SURFACE TREATMENT SECTION 610 DOUBLE ASPHALT SURFACE TREATMENT

302 LIME TREATED SUBGRADE SECTION 302 LIME TREATED SUBGRADE

ITEM 260 LIME TREATMENT FOR MATERIALS USED AS SUBGRADE (ROAD MIXED)

ITEM 231 CEMENT STABILIZED CRUSHED AGGREGATE BASE COURSE

PAVING BIDS. Week of June 05th, 2017 Escanaba Daily Press. Bacco Construction Company, Inc. P.O. Box 458 Iron Mountain, MI 49801

ITEM 231 CEMENT STABILIZED CRUSHED AGGREGATE BASE COURSE

SPECIFICATIONS FOR ASPHALT-RUBBER SURFACE TREATMENT WITH AGGREGATE COVER

TECHNICAL SPECIFICATION

SECTION ASPHALT PAVING AND SURFACING

RECONSTRUCTION OF DISTRESSED PAVEMENTS Full-Depth Rehabilitation (FDR) (Portland cement)

Cement Stabilized Soil (CSS) (Portland cement)

Section 505. CHIP SEALS

SPECIAL SPECIFICATION 3157 Cold Processed - Recycled Paving Material (RPM) for Use as Aggregate Base Course

5-02 BITUMINOUS SURFACE TREATMENT

Town of Chebeague Island 192 North Road Chebeague Island, ME 04017

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LATEX MODIFIED EMULSION TREATMENT (MICRO-SURFACING)

BITUMINOUS MIXTURE # 13A BID SHEET

SECTION BITUMINOUS SURFACE TREATMENT

BID FOR SINGLE CHIP SEAL OVER ASPHALT & FOG SEAL General Information for Bidders

Cement Modified Recycled Base

Section 506 SLURRY SEAL Description. Prepare the surface and apply a properly proportioned slurry seal mixture.

SPECIAL SPECIFICATION 2093 LIME/CEMENT STABALIZED SUBGRADE

SPECIFICATIONS FOR NEW WORK CHIP SEAL

MIDLAND COUNTY ROAD COMMISSION BID FORM

Item 247 Flexible Base

Item 247 Flexible Base

SPECIAL SPECIFICATION. Item Micro-Surfacing (Polymer Modified)

INVITATION TO BID ON TOWN PAVING PROJECTS

Section 506. SLURRY SEAL

Construction Specification 28 Lime Treated Earthfill

SPECIFICATIONS FOR SAND SEAL

SECTION 301 SELECTED MATERIAL SUBBASE DESCRIPTION

SECTION 28 AGGREGATE BASE COURSE (FAA P-208) [For base course under runway and taxiway surfaces, use Section 29, FAA Item P-209.]

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR SUBGRADE STABILIZATION

Section 3 Specification 3.20 Slurry Seal TABLE OF CONTENTS

507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL SECTION 507 SLURRY SEAL AND MICRO-SURFACING

Special Provision Item P-152 Excavation and Embankment

SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG):

SECTION ASPHALT PAVING

DIVISION 300 BASES AND GRANULAR SURFACES SECTION 301 LIME TREATED SUBGRADE

SURFACINGS AND PAVEMENTS SECTION 37: BITUMINOUS SEALS 37-2 SLURRY SEAL

Section 508. CHIP SEALS Description. Prepare the surface and apply the specified single chip seal, double chip seal or shoulder chip seal.

SECTION PAVING AND SURFACING

4-07 Asphalt Treated Permeable Base (ATPB)

Draft Special Provision for. Asphalt Treated Permeable Base

SPECIAL PROVISIONS - SP2005BOOK Page 237 JUNE 30, 2006 Last Revision 4/16/08

Warm Mix Asphalt (WMA) Guide Specification for Highway Construction

Cement Stabilized Aggregate Base

SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE

SECTION ASPHALT PAVING

SPECIFICATIONS FOR DOUBLE CHIP SEAL

DIVISION 2100 SITEWORK

Section 409 of the Standard Specifications is hereby deleted and replaced with the following: DESCRIPTION

SECTION EMBANKMENT

S-1 (2356) BITUMINOUS SEAL COAT REVISED 9/26/07 SP Mn/DOT 2356 is deleted and replaced by the following:

Kalkaska County Road Commission 1049 Island Lake Road Kalkaska, MI Telephone: Facsimile:

1995 Metric CSJ SPECIAL SPECIFICATION ITEM Fly Ash Treatment of Materials

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PORTLAND CEMENT. Section PORTLAND CEMENT STABILIZED SUBGRADE

Item P-219 Recycled Concrete Aggregate Base Course

2004 Specifications CSJ SPECIAL SPECIFICATION 3250 Emulsified Asphalt Slurry Seal Surface Treatment

SAND SEAL SPECIFICATIONS. The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority.

CITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP

Midland County Road Commission. DATE: Thursday January 24, 2019 at 1:00 PM. Item No. 3 - HMA PAVING

1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas.

ITEM 247 FLEXIBLE BASE

SECTION FLEXIBLE PAVING

B. [LIST ANY SPECIAL CONDITIONS UNIQUE TO THIS PROJECT THAT DEAL WITH LIME-FLY ASH OR FLYASH STABILIZATION]

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS

A. Provide all labor, materials, and equipment as necessary to complete all work as indicated on the Drawings and specified herein.

CITY OF FARGO SPECIFICATIONS AGGREGATE BASES

Townline Road Middle Village Road then south 4800 feet.

1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas.

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR EMULSIFIED ASPHALT SLURRY SEAL

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION 14 EMBANKMENT

Section LIME-STABILIZED SUBGRADE. A. This Section includes foundation course of lime-stabilized subgrade material.

PLANT-MIXED ASPHALT PAVEMENT

SURFACINGS AND PAVEMENTS SECTION 37: BITUMINOUS SEALS 37-1 SEAL COATS

Construction. Provide safe and environmentally acceptable equipment that can produce a specification pavement.

Special Specification 3005 Scrub Seal Treatment

SPECIFICATIONS FOR BONDED WEARING COURSE

SECTION 315 ASPHALT CONCRETE PAVEMENT. Materials shall be furnished by the Contractor in accordance with Section 200.

Section 25 Aggregate Subbase

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method

City of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL

Transcription:

MIDLAND COUNTY ROAD COMMISSION BID FORM Sealed Proposals will be received at the office of the Board of Road Commissioners, County of Midland, at 2334 N. Meridian Road, Sanford, Michigan, 48657, until: DATE: Wednesday, April 15 th, 2015, at 2:00 p.m. Item No. 12 a. STABILIZATION/PULVERIZATION Estimated Quantity 55,000 SYDS DESCRIPTION This work shall consist of crushing existing bituminous pavement or seal coat. Additional aggregate will be placed by others prior to crushing. Aggregate added shall be mixed into the full crushed depth to obtain a reasonably uniform mixture. This mixture shall be compacted with a pneumatic-tired or sheep foot roller for the initial rolling. The finished grading and rolling will be provided by county forces. Section 305 of the 2012 MDOT specs shall apply. ITEM 1 Contractor to furnish all necessary equipment and appurtenance to pulverize up to 8 depth, grade and compact the existing bituminous pavement or seal coat. ITEM 2 Contractor to furnish all necessary equipment and appurtenances to pulverize a previous pulverized road. ITEM 3 Contractor to furnish all necessary equipment and appurtenance to pulverize up to 14 depth, grade and compact the existing bituminous pavement or seal coat. ITEM 4 Contractor to furnish all necessary equipment and appurtenance to pulverize up to 18 depth, grade and compact the existing bituminous pavement or seal coat.

Item No. 12 b. ASPHALT CEMENT STABILIZED BASE COURSE Estimated Quantity 30,000 SYDS DESCRIPTION This work shall consist of construction of crushing and shaping the existing asphalt surface into an aggregate base course. Some locations to also include stabilization. This work will include all necessary labor, equipment and material to perform the following: This work shall be accomplished in place and shall consist of crushing an existing bituminous or sealcoat surface to the depth specified, combining this crushed material with a portion of the underlying aggregate base and where specified, blending this combined material with hot asphalt cement, shaping to the proper elevation and slope then compacting to the proper density. Asphalt Cement Stabilized Base Course, 4 Asphalt Cement Binder Fog Seal /GAL. /GAL. MATERIALS The bituminous material shall be as follows: Asphalt Cement PG 52-28 (or equivalent) Fog Coat CSS-1h (Cationic) The bituminous material for stabilizing shall be applied at the rate as determined by the Engineer, so that the residual bitumen added will be between two (2) and five (5) percent by weight of the bituminous material. The temperature of the bituminous material for stabilizing shall be applied at a minimum of 350 F. CONSTRUCTION The proposal will specify crushing depth, crushing and shaping width and stabilization limits. The Road Commission will provide centerline offset stakes. Coordination between the Contractor and Road Commission shall be required to have all government corners witnessed, protected, and monument boxes removed prior to commencing work. EQUIPMENT 1. Crushing: The crushing machine shall be a self-propelled rotary reduction machine capable of crushing the pavement to the required size and mixing the crushed material with the underlying aggregate base to the required depth while mixing in additional aggregate, where required. 2. Grading: Final grading equipment shall include automatic cross slope (crown) control and an automated grade referencing system for longitudinal control unless otherwise approved by the Engineer. Tuscola County Road Commission to spot check final grading operation. Contractor to coordinate.

3. Compaction: Rollers must meet the requirements as specified under Roller, Section 501.03.A of Michigan Department of Transportation 2012 Standard Specifications for Construction. 4. Stabilizing Equipment: All equipment to be approved by the Engineer prior to beginning construction. The stabilizing plant shall be a single-pass, multi-drum, selfpropelled machine combining a cutter rotor, a blending rotor and two mixing rotors in the mixing chamber. The mixing chamber shall have a positive depth control to insure a uniform depth of stabilized material and must be capable of loosening the base materials to the depth called for without disturbing the subbase. The stabilizing plant shall add the asphalt in predetermined and accurately metered quantities, while maintaining a constant and fixed rate of forward motion, thoroughly blending the asphalt with the road materials, and spreading the mixture uniformly on the roadway. The spray bar shall have nozzles spaced at increments not to exceed six (6) inches and shall operate in such a manner that all asphalt will be uniformly applied throughout the mixing chamber at the time of injection. The asphalt additive system shall consist of a positive displacement pump and shall display the temperature, pressure, and flow rate to accurately check the rate of application of the asphalt at any time. Note: Full width processing is required to eliminate longitudinal joints in the stabilized material necessitating the use of two (2) or more stabilizing machines; depending on the width of road to be processed. A. Traffic Control. The Road Commission will install a detour route for thru traffic and Road Work Ahead signs at each intersection within the project limits. Any additional signing needed to protect the motoring public from situations that have occurred due to unfinished work Bump Sign W8-1, Pavement Ends W8-3, etc. will be the responsibility of the contractor to supply, sandbag, and maintain. All costs will be considered included in other items of work. B. Crushing and Grading. Unless otherwise specified, the longitudinal crushed grade shall be referenced from the existing pavement surface and the centerline offset stakes. Prior to crushing, the existing HMA or seal coat material on the shoulders may be bladed onto the mainline pavement to be processed into crushed material. Existing HMA pavement shall be uniformly crushed to the required width and depth, including a minimum of 2 inches of the aggregate base. After crushing, 95 percent of the crushed material shall have a maximum particle size of 1½ inch, with no particle size exceeding 4 inches. The crushed material shall be uniformly spread and compacted. When additional material is needed to attain the proper cross section, MCRC will provide densegraded aggregate. The Contractor shall spread added aggregate uniformly before crushing or place aggregate on the crushed surface and remix to the full crushed depth to obtain a uniform mixture. Midland County Road Commission to spot check final grading operation. Contractor to coordinate.

C. Dust Palliative and Water. When required to aid in compaction and/or dust control, dust palliative and/or water shall be uniformly applied by the Contractor as approved by the Engineer. Source of dust/palliative must be approved by the Engineer prior to crushing operation. D. Stabilized Base Course. Where stabilization is specified, the crushed base material shall be combined with the proper amount of liquid asphalt cement prior to compaction. The bituminous material shall be added through the mixer at a rate of 1.5 gallons per square yard or recommended optimal rate to fit site conditions. Shaping and compacting shall be done while the bituminous is in a workable state. E. Compacting and Shaping. The crushed material, at a moisture content not greater than optimum, shall be compacted to not less than 98 percent of the maximum unit weight as obtained by the Michigan Modified T 180 Test in the Density Control Handbook. F. Curing. Any areas showing instability, not caused by base problems, will be remixed, regarded, and compacted at no additional cost, prior to other work proceding. If the bituminous aggregate pavement is to be left unsurfaced for more than seven (7) days, a fog coat of CSS-1h shall be applied at the rate of 0.20-0.30 gallons per square yard. G. Excess Crushed Material. Excess crushed material (with proper gradation) shall be disposed of onsite as directed by the Engineer. Oversize material shall be properly disposed of offsite by the Contractor. This will be considered included in other items of work. H. Weather Limitations. HMA pavement shall not be crushed when anticipated precipitation may make the prepared base unstable. Seasonal requirements for crushing shall coincide with seasonal limitation for placing HMA mixture. I. Acceptance Criteria. The Engineer shall use the following criteria to accept the crush and shape work. 1. Crushed material meets particle size requirements. 2. After final shaping, the maximum allowable variance between the surface and a 10-foot straightedge (any two contacts with the surface), shall be ½ inch. 3. Just prior to paving, any undulations or variations from the criteria specified in subsections 305.03.B and 305.03.C of the Michigan Department of Transportation 2012 Standard Specifications for Construction have been corrected. 4. Required density shall be maintained until the material has been surfaced. HMA surface to be applied within 7 to 10 days of base acceptance. HMA surface by others. Contractor to coordinate.

MEASUREMENT AND PAYMENT Contract Item (Pay Item) Pay Unit HMA Base Crushing and Shaping and Compaction, inch min. Square Yard Water Unit Dust Palliative, Applied. Ton Asphalt Cement Stabilized Base Course, 4. Square Yard Asphalt Cement Binder. Gallon Fog Seal. Gallon A. Payment for HMA Base Crushing and Shaping and Compaction, 6 inch min. will be measured by completed width and length as stated in this specification. Includes the scarifying, crushing, grading, disposal of excess material, remixing, shaping, rolling and compacting of existing HMA surface course or portions thereof. Any unstable base caused by rain, over watering or the non-uniform application of water shall be repaired at the Contractor s expense. B. When Water is required, it will be paid for separately as Water, per Unit. Water shall be measured in 1,000 gallon increments(units). Payment includes all costs for pro-curing, hauling, and placing on the crushed surface. C. When Dust Palliative is required, it will be paid for separately as Dust Palliative, Applied, per Section 812 of the Michigan Department of Transportation 2012 Standard Specifications for Construction. D. Payment for Asphalt Cement Stabilized Base Course, 4 includes the furnishing, hauling, placing, mixing of the asphalt cement into the crushed base material, shaping and compacting the mixture. This item will be measured by completed width and length as stated in this specification. When additional aggregate is required, it will be hauled by the Midland County Road Commission. The Contractor shall coordinate and is responsible for placement and leveling of the material onsite. Payment will be considered included in other items of work. E. Payment for Asphalt Cement Binder shall be paid by the gallon applied to the base course. Load tickets shall be provided. LIABILITY: The Contractor shall at all times exercise extreme care and shall assume all liability for any damages resulting from his operations and shall hold the Midland County Road Commission harmless from any such claims or damages. The successful bidder must also furnish certificates or policies giving satisfactory evidence of insurance coverage to the minimum extent of $500,000.00 property damage and $1,000,000.00 personal liability to insure adequate payment for any damage caused by his operations.

The contractor shall, prior to the start of work, file with the Midland County Road Commission a certificate of Workmen s Compensation Insurance. The attached certificate of insurance is required for the successful bidder or bidders. NON-COMPLIANCE WITH PROJECT SPECIFICATION PROVISIONS Any variation from the specifications of the project herein without written approval from the Midland County Road Commission and/or its authorized representative may result in, at the discretion of the Road Commission, the voiding and/or canceling of the acceptance of any bid and/or contract, resulting from this project. The Board reserves the right to accept or reject any or all proposals and to re-advertise or to accept the proposal, which in their opinion, is in the best interest of Midland County. COMPANY BIDDING CONTACT PERSON ADDRESS PHONE/FAX AUTHORIZED SIGNATURE TITLE INDICATE ON ENVELOPE: Company Name, Item Number, Bid Item, Time and Date