GUIDANCE NOTES FOR BUILDING CONTROL CHARGES

Similar documents
CIVIC CENTRE HIGH STREET GUIDANCE NOTES. ESHER NEW DWELLINGS (Table A) SURREY, KT10 9SD

APPENDIX B. Building Notice Charge. Inspection Charge. Any domestic extension floor area not exceeding 10m

SCHEME OF BUILDING REGULATION CHARGES AND ASSOCIATED MATTERS FOR South Cambridgeshire District Council

FEES FOR BUILDING REGULATION APPLICATIONS

Domestic Enquiry Form

I want to build an extension or conservatory

A Guide to Building Permits for Home Owners / Renovators

HOW TO OBTAIN A BUILDING PERMIT

The effect of Building Regulations (Part L1 2002) on existing dwellings

Building Control. A Guide to Compliance When Designing Domestic Extensions

INTRODUCTION. A complete application will allow the building 10 business days for most single family dwelling projects).

Permitted Development for Householders: Guidance from Communities and Local Government. March 2010 Department for Communities and Local Government

When is a building permit required? Practice Notes Issued January This updates the previous Practice Note issued June 2006.

Householder Alterations Local Development Order

Schedule B to By-law

District of Ucluelet Building Permit Guide

BUILDING PERMIT INFORMATION PLEASE READ CAREFULLY AS IT MAY AFFECT APPROVAL OF YOUR BUILDING PERMIT

CITY OF WINTER PARK SETBACK/COVERAGE WORKSHEET GUIDE FOR SINGLE FAMILY ZONING

Planning & Infrastructure TYPE OF REVENUE/USER UNIT/DESCR 2016 RATE (NO TAX)

New Construction. Part 9 National Building Code. Application Checklist & Submission Package

The Building Regulations 2010

Complying Development Checklist for Alterations (not Additions) to Dwellings & Ancillary Development. under the NSW Housing Alterations Code

Residential Building Permits

Reference: 17/0150/HSE Received: 11th January 2017 Accepted: 11th January 2017 Ward: West Finchley Expiry 8th March 2017

South Africa. Building Code Implementation - Country Summary. Section I: Code Development. History

Residential Building Design Approval Procedure

Postcode: Tel: Fax: 4. Proposed work Description (see note 4):

RESIDENTIAL HMO 1,784 SQ FT ( SQ M) 4a Sylvan Hill, London, SE19 2QF FOR SALE

LAUTOKA CITY COUNCIL

APPENDIX 17 GUIDELINES FOR RESIDENTIAL EXTENSIONS

TOWN OF ECKVILLE BYLAW 638/02 BUILDING PERMIT BYLAW

Application for a Permit to Construct or Demolish This form is authorized under section 8(1.1) of the Building Code Act

This notice cancels and replaces Notice 708/6 (August 2006). Details of changes to the previous version can be found in paragraph 1.3.

AUGUSTA Series - Starting at $70, sq ft

Building Height and Cellars, Basements and Crawl Spaces

Supalite tiled roof system incorporating PIR or EPS insulation, provided by Supalite Tiled Roof Systems Ltd

Building in the Residential 3 Zone PROPOSED. Invercargill City DISTRICT PLAN Building in the Residential 3 Zone 1

Township of Georgian Bluffs. Building Permit Information

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992

Township of Otonabee-South Monaghan

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

Zoning Department DECK PERMITS. Checklist

8 TH ANNUAL INTERNATIONAL CONSTRUCTION MANAGEMENT Building Regulations What Next. By Eamonn Smyth Advisor Building Standards Section

The effect of Building Regulations (Part L1 2002) on existing dwellings

9 Glan y Mor GLAN CONWY Conwy LL28 5TA

ARCHITECTURAL DESIGN GUIDELINES RESIDENTIAL SECTOR

Report to: Development Management Section Head. Date of Committee: 10 th May 2017

Detached Garage Construction Information

TOWNSHIP OF DRUMMOND/NORTH ELMSLEY. Deck/Porch Guide & Permit

Energy Performance Certificate

Design Guidelines. 1. INTRODUCTION 2. SECTION SPECIFICATIONS 3. HOUSE DESIGN RULES

meters (16 Inches) Transportation (T)

VILLAGE OF CHAGRIN FALLS Zoning / ARB APPLICATION

CHAPTER 13: Sustainability

Electrical safety Dwellings

PLANNING COMMITTEE REPORT

Electrical safety Dwellings

NB Power s Home Insulation Energy Savings Program as of August 1, PROGRAM INTRODUCTION PROGRAM OVERVIEW ELIGIBILITY...

Glass and Building Regulations: Thermal Insulation and Energy Efficiency.

Amendments to the Approved Documents

Energy Performance Certificate

Development Services Department. Building Division Handout San Pablo, CA Ph: (510)

Amendments to the Approved Documents

SAFETY CODES FEES (Effective February 1, 2012)

Instructions to Building Permit Applicants

Overview of Energy Codes in Alberta IAMA Workshop February 8, 2017 Tom Lauder BSc SCO V05

Energy Performance Certificate

Section 7 Green Building Regulations

Effective Date: April 25, 2016 Revised: November 7, 2017

Building Standards Department. Guide to Building Permits Understanding the Different Building Permit Types and their Submission Requirements

Will the development be within the existing curtilage of the dwelling? (curtilage means the enclosed land around your property, normally the garden)

ARTICLE 1. FIRE LIMITS AND BUILDING REGULATIONS

Exhibit A. Submittal Basis PR / OTC. Fee Basis Sq-Ft / Ea. Fee Code Size in Sq-Ft 1-1, $ $ $8.59

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

Township Of Blandford-Blenheim Permit Guide

THE CORPORATION OF THE UNITED TOWNSHIPS OF DYSART, DUDLEY, HARCOURT, GUILFORD, HARBURN, BRUTON, HAVELOCK, EYRE AND CLYDE BY-LAW NO.

Homes. Plan Review Input Form. Office Use: P l an Rev iew Contro l Nu mb er

HOUSES OTHER CONSTRUCTION TYPE PRODUCTS A C D E H F G J L ON-SITE CONSTRUCTION. Park Model. Recreational. Panelized Homes.

PERMITS REQUIRED BEFORE OBTAINING A PERMIT

160.F1 PROPERTY INSPECTION REPORT 6 Vitoria St, Sebastopol, 3356 INSPECTION DETAILS Registered Practitioners Signature:

The BIG Energy Upgrade Energy Innovation for Retrofitting Deprived Community Housing in the UK

UNIFORM CONSTRUCTION CODE (UCC) BUILDING PERMIT APPLICATION RESIDENTIAL NEW CONSTRUCTION AND/OR IMPROVEMENTS

Harnett House The Old Post Office NEBO Conwy LL26 0TB

GUIDE TO THE COMPLYING DEVELOPMENT CHECKLIST

Fees and Permit requirements are regulated by the Township s Building By-law

HALIFAX REGIONAL MUNICIPALITY BY-LAW NUMBER B-201 RESPECTING THE BUILDING CODE

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

Get in front of the Q SBD and Approved Document Q

Building Typology Brochure England September 2014

ENERGY EFFICIENCY NATIONAL BUILDING REGULATIONS. Development Management Department 1 of 47

FRAMING INSPECTION GENERAL

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

BUILDING A NEW HOME. Construction Permit Tips For Home Owners

11 Middleton Road London NW11 7NR

RETAIL SHOP AND BASEMENT PLUS 2 UPPER FLOORS TO LET 1300 SQ FT ( SQ M)

HOW TO OBTAIN A BUILDING PERMIT

BALMORAL Glastonbury, CT

Top actions you can take to save money and make your home more efficient

Top actions you can take to save money and make your home more efficient

Transcription:

GUIDANCE NOTES FOR BUILDING CONTROL CHARGES Effective from 5 June 2017 SOUTHERN BUILDING CONTROL PARTNERSHIP PARTNERSHIP OFFICES: EAST HUB Council Offices 8 Station Road East Oxted RH8 0BT WEST HUB Council Offices Pippbrook Dorking RH 1SJ CONTACT: TEL: 0330 02 9355 E-MAIL: theteam@southernbcp.co.uk www.southernbcp.co.uk Please visit our website at www.southernbcp.co.uk to find out how to make an online application.

THE BUILDING (LOCAL AUTHORITY CHARGES) REGULATIONS 2010 BUILDING CONTROL CHARGES GUIDANCE NOTES (Effective 5 June 2017) 1. GENERAL Before you carry out building work to which the Building Regulations apply you or your agent must either deposit a Full Plans or Building Notice application together with the appropriate fee (and in the case of a Full Plans application, any relevant plans/calculations). The fee payable is dependent on the type of work carried out and can be determined by reference to the following notes and schedules. You can make an application (including payment) online by visiting www.southernbcp.co.uk 2. CHARGES ARE PAYABLE AS FOLLOWS Plan : Should you submit a Full Plans application you will generally pay a plan charge at the time of submission to cover the plan check elements of the application. : With Full Plans applications, for most types of work, an inspection charge covering all necessary site visits will be payable after we have made our first inspection. If applicable, you will be sent an invoice for this charge. Building Notice : If you submit a Building Notice application the appropriate building notice charge is payable at the time of submission and covers all necessary checks and site visits in relation to the work described in the notice. Regularisation : Should you apply for a regularisation certificate in respect of unauthorised building work, commenced on or after 11 November 1985, you will pay a regularisation charge to cover the cost of assessing your application and all inspections. The charge is equivalent to the Building Notice charge (ex VAT) plus 50% (No VAT is payable on a regularisation charge.) Applications cancelled by the applicant or agent: If you choose to cancel the application more than 2 hours after submission we may need to charge you an administration fee for work already carried out to your application. Our minimum charge 89.00 + VAT. VAT: is payable at the standard rate for all charges with the exception of regularisation applications. Standard s: The charges have been set on the basis that the design and building work is undertaken by a person or company that is competent to carry out the relevant design and building works in the standard charges table. If the conditions specified above are not met, supplementary charges may apply.

NEW BUILD DWELLING(S) & FLAT(S) Are applicable for up to 5 dwellings where the total internal floor area of each dwelling (excluding any garage or carport) does not exceed 300 m 2. (The charge also includes erection of a garage up to 0m 2.) Table A No. of dwellings Plan Building Notice 1 353.00 706.00 1059.00 2 78.00 956.00 13.00 3 589.00 1178.00 1767.00 696.00 1392.00 2088.00 5 792.00 158.00 2376.00 The regularisation charge will be 150% of the ex VAT Building Notice charge. For electrical work not covered under a Competent Person Scheme please contact us for a quote.

DOMESTIC EXTENSIONS TO A SINGLE BUILDING 1. Single storey extensions up to 100m 2 internal floor area 2. Two storey extensions up to 200m 2 internal floor area 3. Loft conversions up to 60m 2 internal floor area. Attached or detached single storey garages or carports up to 100m 2 internal floor area 5. Garage conversions up to 0m 2. 6. Alterations to extend or create a basement. NB If you are carrying out work from Table C (categories 1-2) at the same time as work from Table B there will be a 25% reduction in the Table C charge. Table B Category Description Plan Building Notice 1 # Single storey extension - floor area up to 10m 2 159.00 318.00 77.00 2 # Single storey extension - floor exceeding 10m 2 but not exceeding 0 m 2 232.00 6.00 696.00 3 # Single storey extension - floor area exceeding 0m 2 but not exceeding 100m 2 307.00 61.00 921.00 5 6 7 Two storey extension - floor area not exceeding 0 m 2 257.00 51.00 771.00 Two storey extension to a dwelling house - floor area exceeding 0 m 2 but not exceeding 100m 2 331.00 662.00 993.00 Two storey extension to a dwelling house - floor area exceeding 100 m 2 but not exceeding 200m 2 512.00 102.00 1536.00 Loft conversion not inc alterations to roof line or construction of a dormer - floor area up to 60m 2 217.00 3.00 651.00 8 9 10 11 Loft conversion inc alterations to roof line /construction of a dormer - floor area up to 60m 2 Erection/extension of non-exempt detached single storey domestic garage /carport - floor area up to 100m 2 Erection of non-exempt attached single storey extension of domestic garage/carport - floor area up to 100m 2 Conversion of garage up to 0m 2 to habitable room(s) 26.00 92.00 738.00 15.00 290.00 35.00 158.00 316.00 7.00 150.00 300.00 50.00 12 Works to basement - floor area up to 100m 2 308.00 616.00 92.00 # Single storey means one storey at any floor level * For electrical work not covered under a Competent Persons Scheme an additional charge of 356.00 inc VAT/project will apply.

GENERAL DOMESTIC ALTERATIONS 1. Renovation of a thermal element to a single dwelling 2. Internal alterations, installation of fittings and/or structural alterations up to a value of 100,000 3. The replacement of up to 20 existing windows and doors glazed with more than 50% glass. Electrical work up to 8 circuits (unless the work is carried out by a member of the Competent Person Scheme). Table C Category of Work Basis of Plan Building Notice 1 Renovation of thermal element to single dwelling. (New roof/wall/floor) Fixed price 197.00 Inc in plan charge 197.00 Fixed price based on estimated cost Less than 5,000 295.00 Inc in plan charge 295.00 2 Alterations, installation of fittings (not electrical) and/or, structural alterations. Exceeding 5,000 up to 25,000 Exceeding 25,001 up to 50,000 180.00 360.00 50.00 236.00 72.00 708.00 Exceeding 50,001 up to 100,000 358.00 716.00 107.00 3 Window/door replacement (installer not competent persons scheme registered). Fixed price Per installation up to 20 windows 218.00 Electrical work (not competent persons scheme registered). Fixed price up to 8 circuits 356.00 NB If you are carrying out work from Tables B and C at the same time there is a 25% reduction in the Table C charge (categories 1 and 2 above only).

NON-DOMESTIC EXTENSION/NEW-BUILD 1. Non-domestic extensions and new build up to 200m 2 internal floor area. 2. Industrial and storage buildings up to 200m 2 internal floor area Table D Industrial & Storage usage All Other use Classes* Description Plan Plan 1 Floor area not exceeding 10m 2 157.00 31.00 238.00 76.00 2 Floor area exceeding 10m 2 but not exceeding 0m 2 237.00 7.00 335.00 670.00 3 Floor area exceeding 0m 2 but not exceeding 100m 2 355.00 710.00 1.00 882.00 Floor area exceeding 100m 2 but not exceeding 200m 2 39.00 788.00 630.00 1260.00 NB The amount of time to carry out the building regulations functions varies, dependent on the different use categories of buildings. The amount of time to check and inspect a building used for industrial and storage use is less than that for other use, same size buildings and the charge for an assembly use building is higher due to the additional time in respect of this type of work. The use of a building is different under the provisions of the Building Regulations 2010. * All other classes includes other residential (institution and other) and assembly and recreational use. The regularisation charge will be 150% of the plan and inspection charge added together, excluding VAT.

ALL OTHER NON-DOMESTIC WORK ALTERATIONS 1. Replacement of up to 50 existing windows 2. Installation of a new shop front 3. Renovation of a thermal element up to a value of 250,000. Alterations not described elsewhere including installation of fittings & structural alterations up to 150,000 5. Installation of a mezzanine floor up to 500m 2 floor area. 6. The fitting out of a shop or office up to 2,000m 2 floor area. Table E Category of Work Basis of Plan 1 Window/door replacement (non- competent person scheme) Fixed price grouped by numbers of windows. Per installation up to 20 windows 218.00 Per installation over 20 windows up to 50 windows. 355.00 2 New shop front(s) 326.00 Included in plan charge Included in plan charge 3 5 6 Renovation of a thermal element (roof/wall/floor) Alterations not described elsewhere including structural alterations & installation of controlled fittings Installation of Mezzanine floor up to 500m 2 Office/shop fit out Estimated cost up to 50,000 88.00 176.00 Estimated cost 50,000-100,000 130.00 260.00 Estimated cost 100,000-250,000 177.00 35.00 Estimated cost up to 5,000 99.00 198.00 Estimated cost 5,000-25,00 177.00 35.00 Estimated cost 25,000-50,000 237.00 7.00 Estimated cost 50,000-100,000 355.00 710.00 Estimated cost 100,000-150,000 35.00 870.00 296.00 592.00 Fixed price based on floor area bands 177.00 35.00 Floor up to 500m 2 500m 2 to 1000m 2 237.00 7.00 The regularisation charge will be 150% of the ex VAT plan and inspection charge added together.