INSTALLATION INSTRUCTIONS

Similar documents
Installation Instructions for SuperFast Hurricane

INSTALLATION INSTRUCTIONS FOR WICANDERS 5G-C FLOORS

INSTALLATION INSTRUCTIONS FOR WICANDERS 2G FLOORS

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING

INSTALLATION INSTRUCTIONS LAMINATE

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING

INSTALLATION INSTRUCTIONS

Installation instruction

INSTALLATION GUIDE. Please read all the instructions before you begin the installation. Improper installation will void warranty.

General and Installation Instructions Laminate - 2G + 2G

Installation Procedure of Floating floors

Mega Clic Laminate Floor Installation Instructions

Installation. Installation Instructions - Laminate Flooring with Drop lock. I. Before you start. Subfloors with radiant heat. Floating installation

TARKETT EASIUM. Instrucciones de Instalación & Mantenimiento

Concrete 1,8 2,0 Anidrite 0,3 0,5

Mohawk SolidTech. SolidTech Installation Guidelines. Preparation

INSTALLATION INSTRUCTIONS FOR WICANDERS HYDROCORK

VESDURA VINYL PLANKS 7.5MM WPC CLICK LOCK - AMERICANA COLLECTION

VESDURA VINYL PLANKS 5.5MM WPC CLICK LOCK - AMERICANA COLLECTION

Rigid Core Installation & Maintenance Instructions

INSTALLATION INSTRUCTIONS - Please read before installation

premium click optimum click

premium click optimum click

Laminate Flooring Charlestowne Collection

INSTALLATION INSTRUCTION BJOORN PARQUET PARALLEL ROWS

INSTALLATION INSTRUCTIONS

1. PREPARATION 2. INSTALLATION 3. FINISHING 4. MAINTENANCE

Solid Click-Lock Bamboo Product Installation Instructions

optimum glue Preparation INSTALLATION INFORMATION We recommend to order all panels for the same commercial flooring project at the same time.

INSTALLATION INSTRUCTION

DeZignCore Ultra Luxury Vinyl Planks

Verify colour and finish before installation. Once the floor is installed, it is deemed to have been inspected, approved and accepted.

INSTALLATION INSTRUCTION

Use a special underlay above 45 C. Click-it! Never use a hammer or tapping block. Keep indoor climate conditions above 0 C.

For more information, call PERGO

Maintenance Guide Runners and Rugs Blinds and Curtains Felt pads Scratch cover products Ventilation and climate control

PARKAY XPR Installation Instructions (Architect Collection)

IN ORDER TO OBTAIN A GOOD RESULT, WE ADVISE TO FOLLOW ALL GIVEN INSTRUCTIONS CAREFULLY.

PURE INSTALLATION MANUAL

PURE INSTALLATION MANUAL

HYBRID. Pre-Laying Checks

Home Legend Uniclic Cork Product Installation Instructions

STANDARDS LAMINATE FLOORING (UNILIN A2A) Installation Instructions

PARKAY LAMINATE FLOORING (UNILIN DROP) Installation Instructions

USA USA USA PURE CLICK

SOLID HARDWOOD FLOORS INSTALLING WITH CLIPS

hüma PARKETTSYSTEM GmbH INSTALLATION GUIDE

Lock Installation Instructions for BT Strand Lock, BT Strand Engineered & BT Bamboo Engineered

DeZign Enduracore Water Resistant Laminate Planks

Life. Home. In Harmony.

General Commercial Installation Guide LAMINATE

Quick Step TIMBER Multifit installation instructions

Installation and Maintenance instructions

14mm LOC Engineered Oak Fitting Guide & Warranty Information

Instructions for laying Parmate Engineered Flooring

For more information, call PERGO

INDOOR RUBBER FLOORING INTERLOCKING INSTALLATION / MAINTENANCE GUIDELINES MARATHON SERIES. Four-Side Interlock Loose Lay Installation

QUICK STEP READYFLOR MULTIFIT INSTALLATION INSTRUCTIONS

14mm LOC Engineered Oak with 5G Fitting Guide & Warranty Information

Grand Mesa Plus. 27yr Residential Warranty. 5yr Lt. Commercial Warranty

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

WPC Vinyl Floor Installation Guide

Quick Step Studio Laminate Flooring Installation Instructions

premium rigid click optimum rigid click

VESDURA ENGINEERED VINYL PLANK INSTALLATION GUIDE

COMPOSITE (WPC) ENGINEERED VINYL FLOORING INSTALLATION

IVC US Residential Installation Guide - Laminate. Leading the Way

premium click optimum click

Luxury Vinyl Plank (LVP) Flooring Installation Guide For Assistance call

CenterStone Collection Installation Guide

INSTALLATION METHODS ENGINEERED FLOORING FLOATING, GLUED-DOWN OR NAILED INSTALLATION METHODS

Rigid Core (White Label) Planks with Interlocking Joints (Glueless) Installation Instructions

L. W. Mountain, Inc. Floating Glue Installation Instructions *For use with engineered floors only*

WATER TUFF VINYL FLOORING ATTENTION! READ BEFORE INSTALLING! Angle-Tap Installation Instructions

5G Click Floating Floor Installation Instructions

INSTRUCTIONS FOR INSTALLATION

Luxury Vinyl Planks with Interlocking Joints (Glueless) Installation Instructions

ALL DRAWINGS/ILLUSTRATIONS ARE LOCATED AT THE END OF THE INSTRUCTIONS.

SELECT SURFACES LAMINATE FLOORING INSTALLATION GUIDE DRIFTWOOD

RESIDENTIAL 15 YEARS W A RRANTY

Berkshires Glueless and Full Spread Installation Instructions

STONE PRODUCT COMPOSITE (SPC) FLOORING INSTALLATION INSTRUCTIONS

HDWPC Flooring Installation Guidelines

aquapanel InstallatIon GuIde

Wellmade En VogueTM Engineered Vinyl Plank Installation Guide

Installation instruction

INSTALLATION INSTRUCTIONS

ATTENTION! READ BEFORE INSTALLING!

WPC VINYL PLANK INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS FOR HYDROCORK AS GLUE DOWN

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

1) Understanding how the floor will look once installed the installer and owner must meet prior to installation to review:

Color/graining - do certain dark/light pieces or wild grained planks need to be graded out to meet the owners expectations?

INSTALLATION. The no mess, fast and easy, Peel & Stick flooring underlay and installation system... Quick Glance - Features and Benefits

STEP BY STEP D.I.Y INSTRUCTION MANUAL

PURE INSTALLATION MANUAL

SPECTRA CLICK RESILIENT VINYL PLANK INSTALLATION GUIDELINES

HIGUERA HARDWOODS SOLID STRAND WOVEN FLOORING PRE-INSTALLATION JOBSITE REQUIREMENTS

Transcription:

1 of 6 INSTALLATION INSTRUCTIONS IMPORTANT! Store the floorboards at room temperature for at least 48 hours, still in their packaging, prior to commencing installation. Ideal room temperature is 18-22 C at a RH of 40-60 %. If the indoor climate over a longer time is not within mentioned ideal climate then the flooring can shrink/expand which can result in warping/openings. Alloc Commercial must be installed as a floating flooring, which means that: The floorboards are not be screwed or glued to the subfloor or tacked to any fixed constructions. Kitchen cabinets are not to be installed on the flooring! Use a compressible filler (Alloc FillerTwine, art.no. 180001) as termination towards edges prior use of silicone! Leave a 4-6 mm expansion to walls and other fixed constructions so that the flooring can move. In doorways, in areas which do not join symmetrically and when the room length or width exceeds 15 m, the flooring has to be divided with expansion profiles. Adapt the thickness of the wall base based on the indoor climate and room size. We advise that the end joints are staggered 1/3 of a floorboard (min. 30 cm) when installing the floorboards. Alloc Commercial can be installed on most hard subfloors, e.g. chip/plasterboards, PVC or concrete (be sure that the existing subfloor construction is fixed). Soft material like a wall-to-wall carpet needs to be removed. The subfloor has to be even (max 4 mm per 2 m), dry and cleaned. Sharp unevenness must be rubbed down and any holes filled. If the subfloor doesn t comply with the specified requirements for flatness you can experience squeaking noises in the flooring. The subfloor must be totally dry when installing: Wooden and wood based material, max. 50 % relative humidity Concrete and light concrete floor, max. 2,0 CM % (1,8 CM % if floor heating) Plaster and plaster based floor, max. 0,5 CM % (0,3 CM % if floor heating) All types of concrete/light concrete subfloors, ceramictiles and underfloor heating construction in general must have a moisture barrier. This is also required for subfloors with integrated moisture barrier. Use a nonageing PE-foil with the thickness of min. 0,20 mm. Apply with a joint overlap of min. 20 cm, taped and turned up against the walls. Clean-cut the foil when floor installation is finished.

2 of 6 NB: Do not use any additional underlayment due to that this can result in a soft subfloor which can lead to squeaking noises, joint openings and/or separation of the locking mechanism. UNDERFLOOR HEATING Prior to installation of Alloc Commercial a moisture barrier with a minimum thickness of 0.20 mm must be installed. All heating elements must be turned off during installation and the temperature of the subfloor must be between 18 and 20 C. The maximum allowed surface temperature of Alloc Commercial is 27 C. Keep in mind that loose rugs may function as heat accumulators and raise the temperature to more than the tolerated maximum surface temperature. Heated and non-heated flooring areas must be separated by expansion profiles. The effect of the heating elements must not exceed: Heating element: 60 W/m 2 (PE-foil shall be installed directly under the Alloc floorboards) Water-borne heating: Incoming/outgoing water temperature must be regulated so that the system power doesn t give surface temperatures above 27 C. IR sensor is recommended! (PE-foil shall be installed directly under the Alloc floorboards) Regulation of the temperature after installation, or if the system has been turned off for a period of time: 1. The first week the heating should be left on low temperature, 18-22 C. 2. The second week the heating may be adjusted according to the above. Kindly visit our website www.alloc.cn for further information about underfloor heating. INSTALLATION IMPORTANT! Please read all instructions before you start. Check that the floorboards to be installed have no defective surfaces, or other visible defects. The floor-layer is responsible for not installing defective floorboards! Remove old skirting and measure the width of the room for being able to check if the last floorboard row will be at least 5 cm wide. If it s less than 5 cm, then also cut the first floorboard row in width. We advise that the end joints are staggered 1/3 of a floorboard (min. 30 cm) when installing the floorboards. Use spacers and for example an electrical jigsaw/fine-tooth handsaw during installation. Please be in contact if the floorboards are to be installed indoors in very low humidity and temperature.

3 of 6 The flooring looks at its best if it s installed in parallel with the incoming light from the windows. On existing wooden floor Alloc Commercial is to be installed across the old floorboards. We recommend that a non-curing transparent silicone (ClickGuard, art.no. 180012) is used in areas under water stress (see separate installation instruction on our website www.alloc.cn). NB: There might be a clicking noise in newly installed flooring. This is due to that the flooring has to be stabilized. The noise will disappear after awhile. Tiny white edges on the floorboard will also disappear after awhile. Gloss differences, that only can be seen from certain angles is no ground for claim. The locking list of aluminium is of such nature that if it under any circumstances should be deformed or bent down, its horizontal position can easily be corrected by bending it back. 1. GETTING STARTED 1a. Start in the left corner. Place the floorboard with the aluminium locking strips facing the room and install towards right. Leave a gap of 4-6 mm between the short side and the wall (use spacers - included in the Alloc Startkit, art.no. 180000). The gap between the long side and the wall can be adjusted when 3 rows have been installed. 1b. Place the next floorboard into the short side of the first one as shown in the illustration. Ensure that you ve a tight short side connection between the floorboards. 1a 1b Continue in the same way with the next floorboards in the same row.

4 of 6 2. ENDING THE ROW Place the final floorboard faced down (aluminium locking strip towards the wall) with the short side positioned 4-6 mm from the wall (use spacers). Mark the place where the floorboard is to be cut. Place the floorboard faced down (when using a jigsaw) on the work surface and cut to size. Start with the aluminium strip. Make as rightangled cut as possible. You can also use a handsaw (fine-tooth type) or a mitre saw. Remember then to place the floorboard faced up. Turn the cut piece (A) around and connect it to the short side of the previous floorboard as described in step 1b. 2 3. STARTING THE SECOND ROW Use, when suitable, the cut piece of floorboard (B) from the previous row to start the next row. We advise that the end joints are staggered 1/3 of a floorboard (min. 30 cm). If the piece is too short, start with a new floorboard cut in half. 3 Place the floorboard in an angle of roughly 20 and press the long side into the aluminium locking strip of the previous row while you fold the floorboard gently down. 4. INSTALLING THE NEXT FLOORBOARD Place the next floorboard in the same way. When placing the next floorboard, ensure that the short side is positioned approx. 5 mm from the end of the previous floorboard (above its aluminium locking strip). Press the floorboard gently down towards the floor. Use the Alloc Tapping Block (art.no. 180003) to gently knock the floorboard into locking position on the short sides. To install the last floorboard in each row (from the 2 nd row) you need an angle iron (included in the Alloc Startkit, art.no. 180000). For procedure see step 6b. 4 5. ALIGNING AGAINST THE WALL 5a. After installing 3 complete rows, slide the floor towards the wall, leaving a gap of 4-6 mm. Use spacers! 5a 5b. If the wall is uneven, the floorboards in the first row must be adapted to its contours (see illustration). Remove the first row (for procedure se step 7). Cut the floorboards as required and re-install them by sliding them in an angle into the second row. 5b

5 of 6 6. THE LAST ROW 6a The last row must be more than 5 cm wide. Measure the width of the missing row. Remember to leave a gap of 4-6 mm to the wall. Cut off the unneeded part (lengthwise) of the floorboard. NB: It is the lengthwise part with the locking strip of aluminium that should be cut off. Install the cut floorboard. Continue in the same way with the next floorboards. 6b. Use to install the last floorboard an angle iron (included in the Alloc Startkit) which is placed as shown in the illustration with the felt pads turned towards the flooring surface. Gently knock on the iron so that the last floorboard moves into locking position on the short side. 6a 6b 7. DISMANTLING THE FLOOR 7a If you wish to remove the floor, just lift the floorboards a few centimetres and tap along the joint. This will release the floorboard row which can now be pulled out and placed on top of the flooring. NB: Always bend the row of floorboards upwards to avoid damages in the aluminium locking. 7a 7b When the whole row is loose then the floorboards are taken apart by lifting them as shown in the illustration. 7b 8. PIPES: Drill holes into the floorboard for heating pipes or screws to fix something to the subfloor. Measure the diameter of the pipes/screws and mark the position on the floorboard. Drill the holes (the diameter of the holes to be drilled must be 10-12 mm wider than the diameter of the pipes/screws) and saw (for pipes) necessary piece in an angle of 45, as shown in the illustration. Glue the sawn piece into the right position after the floorboard has been installed. The holes are then covered with pipe sleeves. 8

6 of 6 9. TERMINATION TOWARDS AN EDGE OR A DOOR OPENING The floor must not be fixed to the subfloor. If you need to use silicone towards an edge or a door opening then you must combine it with a compressible filler (Alloc FillerTwine, art.no. 180001) in the bottom of the gap (see illustrations). Alloc FillerTwine is placed in the gap and covered on top with a thin layer of silicone in a matching colour. This solution allows the flooring to move (expand/shrink). 9 CLEANING AND USE After installation the floor will normally be dirty. Therefore, first remove all larger pieces of loose dirt with a soft brush or a vacuum cleaner. The floor can then be cleaned with a well wrung-out, slightly damp cloth or mop. To protect the floor from water penetration all edges are impregnated. If there is remainder of impregnation on top of the boards, it can easily be removed by approved solvents (e.g. white spirit). Clean the floor regularly with a vacuum cleaner or a dry mop. If required the floor may be cleaned with a well wrung-out slightly damp cloth and a synthetic detergent (Alloc Cleaner, art.no. 180011). Avoid using too much water. Spillages of water should be wiped off immediately. Cleaning machines can be used, but only approved ones (kindly visit our website www.alloc.cn). Furniture and heavy objects should be equipped with felt pads. Always place a doormat of good quality inside any external doors to absorb dirt and/or moisture. Protective (clear plastic) mats should be used under castor chairs with hard material 1). 1) Machined surfaces (i.e. Stone structure) requires protective mats under castor chairs no matter wheel-quality. For further information, kindly see care & maintenance instructions on our website www.alloc.cn. WARRANTY Warranty conditions are found on our website www.alloc.cn.