Project: Stage Curtain Replacement Addendum No. 1 Cape Fear High School 4/25/2017

NOTE TO THE SPECIFYING ARCHITECT REGARDING SECTION STAGE EQUIPMENT (TWO PROSCENIUMS)

NOTE TO SPECIFYING ARCHITECT REGARDING SECTION CONTOUR CURTAIN AND MOTOR

SECTION STAGE CURTAINS POLYESTER

TRUMAN STATE UNIVERSITY OPHELIA PARRISH FINE ARTS CENTER ACOUSTICAL RENOVATIONS

NOTE TO SPECIFYING ARCHITECT REGARDING SECTION STAGE EQUIPMENT (INCLUDING DRAPERY REPLACEMENT AND HARDWARE RENOVATION)

City of Jonesboro Invitation to Bid - Not an Order P.O. Box South Church St. Room 421 (72401) Purchasing Office Jonesboro, Arkansas 72403

Addendum 4 RFI Questions and Answers

Project Address Applicant: (Please Print) Plan review Engineer: Phone: Date

April 11, 2017 INVITATION TO TENDER ITT No. PS CONTRACTOR FOR MARPOLE PLACE RESTORATION. ADDENDUM No. 5

MATERIAL ALLOWANCES AND UNIT PRICES

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

NOTE TO SPECIFYING ARCHITECT REGARDING SECTION THEATRE RIGGING AND EQUIPMENT (PARTIAL FLY RIGGING-PARTIAL FIXED RIGGING)

DATE: January 22, 2016 PBS Project No.: Eugene School District 4J ITB No.:

SECTION STAGE FIRE CURTAIN AND RIGGING

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN AND CONSTRUCTION ADDENDUM NO. 1

Colorado River Aqueduct Pumping Plants 230 kv Disconnect Switches Replacement

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW

SECTION TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS. ADD the following sections: Commissioning Requirements...

ADDENDUM NUMBER 01 TO THE BID DOCUMENTS. BID NUMBER: SJCC Parking Garage LED Lighting Retrofit EVERGREEN VALLEY COLLEGE

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1 SECTION SUPPORTING DEVICES

City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax

PLAN SUBMITTAL REQUIREMENTS - ARCHITECTURAL

This Addendum forms a part of the Contract Documents and modifies the Drawings and Project Manual as hereinafter indicated.

Metropolitan Park District of Tacoma Point Defiance Park Boat Lift Improvements Bid# J ADDENDUM TO BID

Pinky Lewis Recreation Centre Interior Renovations in the City of Hamilton

SIGN AND ATTACH A COPY OF THIS ADDENDUM COVER TO YOUR BID

Hillsborough City School District Window Covering Projects At 6 District Sites. Bid #19-01 ADDENDUM NO. 1

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS

Michael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School

INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1

KEARNEY REGIONAL AIRPORT NEW HANGAR KEARNEY, NEBRASKA 1238

S.E.D. # Project # 1522 S.E.D. DWT # July 1, 2016 SECTION ADDENDUM NUMBER 1

Contractor/Owner initials are verification that items #1 and #2 and items (a) thru (g) above are included in the submitted plan/drawing.

TELEPHONE: (215) Addendum No. 1

SECTION COPPER/ SOLDERED RF SYSTEM SPECIFICATIONS

ADDENDUM 2 TECHNICAL SPECIFICATIONS REMOVAL OF HAZARDOUS MATERIALS PROJECT NEON DEMOLITION PACKAGE C LAS VEGAS, NEVADA

CLARIFICATIONS. Item 3. Specification Sections and A. All finish wood shall have sealer coat and two coats of finish material REVISIONS

SOLICITATION ADDENDUM NO. 1 RFP THE FOLLOWING CHANGES TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED.

NOTICE TO BIDDERS FOR THE

COMMERCIAL OR RESIDENTIAL NEW BUILDINGS, REMODELS AND ADDITIONS

All electrical equipment must be tagged and tested by a professional and must not create any hazards to others when installed.

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT. The Carnegie Mellon University School of Drama Presents. by August Wilson

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

MSA MOORE & SPENCE ARCHITECTS, P.A.

Owen County School District

SPOKANE INTERNATIONAL AIRPORT BUSINESS PARK AND FELTS FIELD. SPENT ADF RECOVERY MAINTENANCE SERVICES Project # Addendum No. 1.

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Soundmaster & Modernfold TECHNICAL DATA

1. Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

SECTION NON-STRUCTURAL METAL FRAMING

Rigging Requirements

ENGINEERING & CONSTRUCTION MANAGEMENT RESIDENTIAL PERMIT APPLICATION CHECKLIST

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:

Refer to Section Proposal Form/All Trades (issued) a. Revised Alternate No. 2 b. Added Alternate No. 3

City of Omaha Plans and Permits Commercial Alterations and Conversions Building Permit Submittal Checklist

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

COUNCIL ROCK SCHOOL DISTRICT ADMINISTRATION & BUSINESS OFFICES The Chancellor Center 30 North Chancellor Street Newtown, PA ADDENDA No.

The addendum consists of six (6) pages of 8½ x 11 text and three (3) 30 x 42 drawings*. End of Addendum 1

SECTION ADDENDUM NUMBER 1

Parish of Ascension Project Management ADDENDUM #1 NOTICE TO BIDDERS/ QUOTE

INSTALLATION MANUAL. FOOTWALL/SINKWALL (floor mount)

1. Section , Gas and Vacuum systems for Laboratory and Healthcare Facilities

FORM FOOTWALL. FORM FOOTWALL (floating) (floating) Installation Manual

Proud of its Heritage, Preparing for its Future

B. Related Requirements: 1. Division 05 Section "Decorative Formed Metal" for drapery pockets.

SECTION SEISMIC CONTROL OSHPD

Item # 1: Attached are the revised Table of Contents and Specifications added: Section Cabinets and Vanities

New York City RS 6.1 Photoluminescent Exit Path Markings

Angio to Cath. Lab Renovation ADDENDUM #2 12/29/2017

CONTENTS. B. System Design and Performance Requirements

PATHWAYS FOR COMMUNICATIONS SYSTEMS

ADDENDUM TO THE CONTRACT. for the. Eaglecrest Learning Center Contract No. E ADDENDUM NO.: ONE CURRENT DEADLINE FOR BIDS: December 17, 2013

REQUEST FOR BIDDER QUALIFICATIONS

NOTICE TO BIDDERS FOR THE

603 Summit Avenue, Suite 102 Greensboro, N.C Voice/FAX (336)

BUILDING CODE COMMISSION

All subcontractor bidders are responsible for assuring that their subcontractors and vendors are properly apprised of the contents of this Addendum.

MODERNFOLD GWS 100SR-G MOVEABLE GLASS WALLS

PeachStone Capital, Inc. Atlanta s Hard Money Lender When timing is everything, we close! Hard Money Loan Property Worksheet Checklist

Project # 570-CSI-001. Expand Mental Health Center, Building 27 SCOPE OF WORK

J~e~~r Senior Director of Construction Services Facilities Design and Construction UNIVERSITY OF CALIFORNIA, SAN DIEGO.

CITY OF FORTUNA, CALIFORNIA

Junior High Science Upgrades Phase II Puyallup School District #3 Project #07661

ADDENDUM NO. 1. Revised Bid Receipt/Opening Date, Question/Answer, Additional Information, and Revised Drawings

ARNOLD ELEMENTARY SCHOOL ADDENDUM NO. 7 REPLACEMENT JANUARY 11, CHURCH ROAD PAGE 1 OF 3 ARNOLD, MARYLAND 21012

SECTION CHAIN LINK FENCING

CITY OF OAK CREEK SINGLE FAMILY & TWO-FAMILY CONSTRUCTION/PERMIT REQUIREMENTS

RIGGING SSGRB

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

We will need to keep a minimum of 6-0 wide pathway.

HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

2. Clarification: The notice to proceed construction period of 60 days will begin after the Contractor receives all materials and equipment.

SECTION ACOUSTICAL CEILINGS (CEMENTITIOUS WOOD FIBER CEILINGS)

BORTOLOTTO ADDENDUM #2

Transcription:

HMR A R C H I T E C T S Addendum 1 To: From: cc: Bidding Contractors Kim Demongey, HMR Architects Jeff Bozeman, SCUSD Kim Teague, SCUSD Wayne Sjolund, PMG Date: April 8, 2015 Re: Theater Drape Replacement Projects Various Sites Please note the following changes and/or additions/deletions to the Plans and Specifications for the above noted project. Any item explained under a specific heading and affecting other trades and branches of work shall be construed to apply to all such other trades and branches also. All work shall be installed complete and operational, complying with all applicable local, State, and Federal building codes or regulations. All work shall comply with both State and Local Fire District requirements. All items in this Addendum override and take precedent over originally issued plans and specifications and be part of the base bid. All work completed under this Addendum shall meet best industry standards which apply to the specific trades herein. The following is a list of addendum items. All drawing items are clouded and tagged with a Delta #1. There are a total of _23_ items included in this addendum. General 1. The bids are due Friday, April 17, 2015, at 2pm at 3051 Redding Avenue, Sacramento, CA 95820. 2. All drape sizes are approximate and shall be field verified by the contractor prior to manufacturing. Page 1 of 4 2130 21 s t Street Sacramento, CA 95818 T - 916 736 2724 www.hmrarchitects.com

HMR A R C H I T E C T S Hiram Johnson High School 1. Sheet 7 Keynote P4 (Response to RFI) The masking traveler drape shall be attached to an H&H Specialties 300 series track with ceiling hangers. Provide a shim to lower the track below the exposed conduit. The path of the traveler shall be behind the ceiling fixture, smoke detector and exit sign. Provide a 6 high valance in the same fabric as the drape for the length of the track to mask the track. The valance shall be direct hung. P4 occurs in two locations 2. Sheet 7 Keynote P6 Include in the leg hardware a 21-0 long 1-1/2 diameter schedule 40 strongback pipe, battens and beam clamps for attachment of new steel track for legs. In lieu of operating line provide a ½ diameter tow chord. 3. Sheet 7 Keynote P7 (Response to RFI) Provide a ¾ diameter schedule 40 stretch pipe at the bottom of the cyclorama. Attach the bottom pipe of the cyclorama to the bottom pipe of the existing back drop with a 48 trimmer trip chain to allow the cyclorama to fly off of the stage. 4. Sheet 8 Keynote P11 Split drape to accommodate speakers. Luther Burbank High School 1. Sheet 5 Floor Plan The legs should be designated P6 instead of P5. 2. Sheet 6 Keynote P1 (Response to RFI) The main traveler is two drapes 29-6 high by 43-0 wide for a stage width of 84 feet. 3. Sheet 6 Keynote P4 (Response to RFI) Provide H&H Specialties model #466VS-1 variable speed drum style 1 hp motor or equivalent. See also the specifications section 11060 2.03 B. 4. Sheet 7 Keynote P5 Provide four border drapes instead of only three at existing locations. 5. Sheet 7 Keynote P7 (Response to RFI) Drape P7 shall be a masking drape instead of a cyclorama. Provide two 24-0 high by 40-0 wide traveler drapes in black 22 ounce IFR Encore velour with 50% fullness; webbing grommets and S-hooks; 2 side hem and chain pocket bottom. Page 2 of 4 2130 21 s t Street Sacramento, CA 95818 T - 916 736 2724 www.hmrarchitects.com

HMR A R C H I T E C T S California Middle School 1. Sheet 5 Floor Plan (Response to RFI) Provide an additional P6 and P7 at the north end of the room to cover the clerestory windows on existing hardware. 2. Sheet 6 Keynote P1 (response to RFI) The main traveler is two drapes 14-6 high by 17-0 wide for a stage width of 32 feet. John F. Kennedy High School 1. Sheet 6 Keynote D1 (Response to RFI) There is no motor demolition or replacement for this project. The listing of the motor in the keynote can be disregarded. 2. Sheet 6 Keynote D2 (Response to RFI) The track and brackets shall be removed for the house drapes. 3. Sheet 6 Keynote P1 (Response to RFI) The main traveler is two drapes 12-0 high by 18-0 wide for a stage width of 34 feet. 4. Sheet 7 Keynote P6 (Response to RFI) Remove the existing track and install a new H&H Specialties Series 100 track. The drape shall travel in one direction and stack at the stage end. Provide an 18 high valance the length of the track to mask the track. 5. Sheet 7 Keynote P7 (Response to RFI) The drape is two 6-2 high by 7-6 wide travelers for a total width of 13-0. Remove the existing track and install a new H&H Specialties Series 100 track. Provide an 18 long valance the length of the track to mask the track. Sacramento High School 1. Sheet 5 Floor Plan Keynote P3 valance should point to the front drape and P4 traveler should point to the back drape. 2. Sheet 6 Keynote P1 (Response to RFI) The main traveler is two drapes 13-6 high by 27-6 wide for a stage width of 53 feet. Repair track per discussion at bid walk. Page 3 of 4 2130 21 s t Street Sacramento, CA 95818 T - 916 736 2724 www.hmrarchitects.com

HMR A R C H I T E C T S 3. Sheet 6 Keynote P4 The side traveler is two drapes 16-6 high by 15-0 wide for a stage width of 28 feet. Repair track per discussion at bid walk. 4. Sheet 7 Keynote P5 (Response to RFI) The drape is a one way drop in lieu of a two way traveler. 5. Sheet 7 Keynote P7 (Response to RFI) Drape P7 shall be a masking drape instead of a cyclorama. Provide two 14-0 high by 23-0 wide traveler drapes in black 22 ounce IFR Encore velour with 50% fullness; webbing grommets and S-hooks; 2 side hem and chain pocket bottom. Re-use existing hangers. Provide overlapping master carriers, single carriers and pull chords. End of Addendum 1 If you have any questions, call or e-mail me. Kim Demongey Senior Project Architect kimd@hmrarchitects.com Page 4 of 4 2130 21 s t Street Sacramento, CA 95818 T - 916 736 2724 www.hmrarchitects.com