Note: The definition of "photochemically reactive material" is based upon OAC rule (C)(5).

Similar documents
SUPPLEMENT TO PERMIT NO Connolly North America, Inc Oakland Park Boulevard Highland Park, Michigan August 10, 2000

(a) All primary coatings applied to the following: (i) New automobile or new light-duty truck bodies.

(a) All primary coatings applied to the following: (i) New automobile or new light-duty truck bodies.

State of New Hampshire Department of Environmental Services Air Resources Division. Temporary Permit

ADEQ MINOR SOURCE AIR PERMIT

Certified Mail 5/16/2012. Rainer Ingmann MB MANUFACTURING CORPORATION 2904 Symmes Road Fairfield, OH 45014

State of New Hampshire Department of Environmental Services Air Resources Division. Temporary Permit

RULE Federally Enforceable Limits on Potential to Emit - Adopted 1/25/96

"LIST AND CRITERIA" INDEX INTRODUCTION Section 1 - General Application Information... 5

A. The New Hampshire Code of Administrative Rules Env-A 100 et seq., New Hampshire Rules Governing the Control of Air Pollution; and

RULE Federally Enforceable Limits on Potential to Emit - Adopted 1/25/96, Amended 1/12/12 (Effective 3/8/12)

EMISSIONS ACTIVITY CATEGORY FORM SURFACE COATING OPERATIONS

LEGAL NOTICE OF INTENT TO ISSUE GENERAL AIR CONTAMINANT DISCHARGE PERMIT AQGP-003 (AQGP-003)

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Existing Wood Coating Operations

General Permit (GP-016A) for Manufacturing and Materials Handling Equipment

SUNY Westchester Community College Air Emissions Permit Program Latest Revision Date January 2, 2016 Previous Revision Date June 12, 2015.

RULE 441 ORGANIC SOLVENTS Adopted INDEX

ADEQ MINOR SOURCE AIR PERMIT

Control of volatile organic compound emissions from offset lithographic printing and letterpress printing facilities.

Citations from CRF as required in WV DEP's 45CSR24

2018 Compliance Assistance Conference. Introduction to Air Permitting and Reporting Part 1

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. October 6, NEW SOURCE REVIEW PERMIT TO INSTALL No

Engineering Guide #87: Guidance Concerning Rule Citations for the <10 tons/yr BAT Exemption

"De Minimis" air contaminant source exemption. (A) For purposes of this rule, the following definitions apply:

NSPS for Dc Boilers Burning Residual Oil

Permit-by-Rule Notification Form Gas-fired Boiler and Heater

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. January 26, NEW SOURCE REVIEW PERMIT TO INSTALL No.

B. Use welding process variations (e.g., pulsed current GMAW), which can reduce fume generation rates; or

Miscellaneous industrial adhesives and sealants. (2) Paragraphs (C)(1), (D) and (E) of this rule shall not apply to the following:

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. April 17, 2018 PERMIT TO INSTALL B. ISSUED TO Motus Integrated Technologies

ADEQ NON-CRITERIA POLLUTANT CONTROL STRATEGY Revised April 2015

Technical Contact. Edward Sievers Plant Manager (828) P. O. Box 2029 Hickory, NC 28603

Control of volatile organic compound emissions from industrial solvent cleaning operations.

Technical Contact. Conrad Carter, Jr., P.E. President (704) PO Box 1760 Albemarle, NC

AIR QUALITY PERMIT. Anthony Forest Products Company, LLC

A. Federally-Enforceable: All limitations and conditions which are directly enforceable by U.S. EPA, including:

POTENTIAL TO EMIT LIMITATIONS FOR PART 70 SOURCES. (Adopted 6/15/1995, revised 1/18/2001 and 1/20/2011)

Authority to Construct Application Review Motor Vehicle and Mobile Equipment Coating (with unheated booth)

AIR QUALITY PERMIT Issued under 401 KAR 52: Wolohan Drive, Suite 1 Ashland

A.4.2 Minn. R. for Fiberglass Operations placed in operation on or after July 9, 1969

August 31, Will Filbeck Instafab Company, Inc E 2nd Street Vancouver, WA Final Approval for Metal Fabrication Facility.

Iron and Steel Foundry Area Source Final Rule Summary

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. March 17, 2004 NEW SOURCE REVIEW PERMIT TO INSTALL

SUBPART EE Check-OFF FORM July 11, 2005

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT

ROP - CAM EXAMPLE TABLE NOTE: THIS TEMPLATE IS NOT AN OUTLINE FOR A CAM PLAN

ENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. January 10, 2018 PERMIT TO INSTALL 89-99G. ISSUED TO Pollard Banknote Limited

AIR EMISSION PERMIT NO IS ISSUED TO. Arctic Cat, Inc.

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. November 8, PERMIT TO INSTALL No A

PERMIT APPLICATION REVIEW SUMMARY

STATEMENT OF BASIS Mannington Mills, Inc. dba Mannington Wood Floors Epes, Sumter County, Alabama Facility/Permit No

TITLE V COMMERCIAL PRINTING FACILITIES What is Title V?

Attachment 1A Athol Corp. - CAM Plan

MICHIGAN DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENT AIR QUALITY DIVISION. March 31, PERMIT TO INSTALL No A

metrovancouver SERVICES AND SOLUTIONS FOR A LIVABLE REGION

15A NCAC 02Q.0102 is amended with changes as published in 30:07 NCR as follows:

Agency. 12/07/01 CERTIFIED MAIL RE: Final Chapter Permit To Operate

The provisions of this rule apply to any person who manufactures, supplies, uses, or specifies the use of wood products coatings for commercial use.

MISCELLANEOUS SURFACE COATING OPERATIONS AND OTHER PROCESSES EMITTING VOLATILE ORGANIC COMPOUNDS (Adopted 2/24/10)

Air Permitting for Major Sources/Title V (Part 2)

Facility Name: Dolco Packaging City: Lawrenceville County: Gwinnett AIRS #:

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. November 19, 2009 PERMIT TO INSTALL B. ISSUED TO Musashi Auto Parts MI, Inc.

RULE 452 CAN COATING Adopted (Amended , , , , , ) INDEX

Authority to Construct Application Review Motor Vehicle and Mobile Equipment Coating (without paint booth)

Guidance for Portable Electrochemical Analyzer Testing Used for Compliance Monitoring

PERMIT TO INSTALL. Table of Contents

AIR QUALITY PERMITTING CRITERIA INCLUDING BEST AVAILABLE TECHNOLOGY CRITERIA FOR HEATSET WEB OFFSET LITHOGRAPHIC PRESSES

Coating Processes. Internal Use Only App# APCD2015 APP

Southwest Clean Air Agency Page 1 of NE 99 th Street, Suite 1294, Vancouver, WA Voice: (360) Fax: (360)

Introduction. Q2/ 11 Performance Summary

PERMIT GVA1OG4. located at Avenue, Surrey, BC V3S 7X1. Issued: August 07, 2013 Kathy Preston, Ph.D, PEng. Assistant District Director

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

Marquette General Health System December 11, 2001 Permit No B Page 1 of 8. Table of Contents

AIR EMISSION PERMIT NO IS ISSUED TO. COLD SPRING GRANITE COMPANY 202 South 3rd Avenue Cold Spring, Stearns County, MN 56320

PERMIT GVA0574. metrovancouver. Mettle Canada Ltd. Pagelofs. Pursuant to

STATEMENT OF BASIS. NAICS Description: All Other Miscellaneous Chemical Product and Preparation Manufacturing NAICS Code:

AIR EMISSION PERMIT NO IS ISSUED TO. ConAgra Flour Milling Company P.O. Box 3500 Omaha, NE For

Facility Name: KIMOTO TECH, Inc. City: Cedartown County: Polk AIRS #:

ASA Bloomingburg, LLC. Air permit-to-install (PTI) number Public Hearing Date April 18, 2006 Comment Period End Date April 25, 2006

Oregon Rubber Company, DBA Oregon Tread Rubber & Wyatt s Tire Company Page 2 of 12 Permit No Expiration Date: February 15, 2024

Division of Air Pollution Control (DAPC) Response to Comments

Enclosed is a minor source permit issued pursuant to our review of your application (Approval Nos & 1990).

This Rule is applicable to all graphic arts printing operations as defined in Section II. of this Rule.

Technical Manual Guideline on Air Quality Impact Modeling Analysis

AIR EMISSION PERMIT NO IS ISSUED TO. ConAgra Flour Milling Company P.O. Box 3500 Omaha, NE For

EMISSIONS ACTIVITY CATEGORY FORM GALVANIZING OPERATIONS

AIR EMISSION PERMIT NO Administrative Amendment IS ISSUED TO. ConAgra Food Ingredients Co

STATEMENT OF BASIS. Cheney Lime & Cement Company Landmark Plant Alabaster, Alabama Shelby County Facility No

AIR EMISSION PERMIT NO IS ISSUED TO. CUMMINS POWER GENERATION, INC rd Avenue Northeast Fridley, Anoka County, MN 55432

Technical Contact. Jeff Hardin SH&E Manager (704) Rocky River Road North Monroe, NC 28110

TITLE V OPERATING PERMIT STATEMENT OF BASIS

A.6 Boilers. A.6.1 New and Existing Boilers located within AQCR 131

EC-09 Printing Operations Calculation Form

STATEMENT OF BASIS. For the issuance of Draft Air Permit # 1987-AOP-R4 AFIN:

BACT Determination Information

AIR EMISSION PERMIT NO IS ISSUED TO. Tennant Co

AIR EMISSION PERMIT NO IS ISSUED TO. Plymouth Foam Products 1800 Sunset Drive Plymouth, Wisconsin FOR

DRAFT. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Pan O Gold Baking Co

Transcription:

ADDITIONAL TERMS AND CONDITIONS 1. VISIBLE EMISSION LIMIT Visible particulate emissions from any stack shall not exceed 20 per cent opacity, as a 6-minute average, except for a period of 6 consecutive minutes in any 60 minutes. Visible particulate emissions shall not exceed 60 percent opacity, as a 6-minute average, at any time. 2. COATING LIMIT FOR THE FLAT LINE To avoid the emission limitations/control requirements contained in OAC rule 3745-21-07(G)(2), no photochemically reactive materials (i.e., as coatings or cleanup materials) shall be employed in R001. Note: The definition of "photochemically reactive material" is based upon OAC rule 3745-21-01(C)(5). 3. CLARIFICATION OF DRYING OVENS The ovens associated with R001 and R002 are not subject to the emission limitations/control requirements contained in OAC rule 3745-21-07(G)(1) because no baking or heat curing of the coatings occurs in the flashoff and drying oven. 4. OPERATIONAL RESTRICTION The total quantity of OC applied (emitted) in R001, R002, and R003 shall not exceed 64.6 tons per rolling, 12-month period. 5. COMPLIANCE WITH THE AIR TOXICS POLICY This permit allows the use of the coatings and cleanup materials specified by the permittee in the application for PTI number 06-5635. In conjunction with the best available technology requirements of OAC rule 3745-31-05, the xylene, ethanol, and butyl acetate emission limitations specified in this permit for combined emissions units R001, R002, and R003 were established in accordance with the Ohio EPA's "Air Toxics Policy" and are based on both the coating and cleanup material formulation data and the design parameters of the emissions units' exhaust system, as specified in the application. Compliance with the Ohio EPA's "Air Toxics Policy" was demonstrated for each pollutant based on the SCREEN3 model and a comparison of the predicted 1-hour maximum ground-level concentration to the MAGLC. The following summarizes the results of the modeling for each pollutant: Pollutant: Xylene TLV (ug/m3): 434,000

Maximum Hourly Emission Rate (lbs/hr): 6.0 Fenceline (ug/m3): 2292 10333 Pollutant: Ethanol TLV (ug/m3): 188,000 Maximum Hourly Emission Rate (lbs/hr): 58.96 Fenceline (ug/m3): 9640 44762 Pollutant: Butyl Acetate TLV (ug/m3): 713,000 Maximum Hourly Emission Rate (lbs/hr): 1.7 Fenceline (ug/m3): 2000 16976 As long as the application of the "Air Toxics Policy" continues to show compliance with the applicable MAGLC, the permittee may implement any of the following changes with prior notification to and approval from the appropriate Ohio EPA District Office or local air agency: i. any changes in the composition of the coatings or solvents, or the use of new coatings or solvents, that would result in the emission of a compound with a lower Threshold Limit Value (TLV), as indicated in the most recent version of the handbook entitled "American Conference of Governmental Industrial Hygienists (ACGIH)," than the lowest TLV value specified in the above table; any change to the emissions unit or its exhaust parameters (e.g., increased emission rate, reduction of exhaust gas flow rate, and decreased stack height); i any change in the composition of the coatings or cleanup materials, or use of new coatings or cleanup materials, that would result in the emission of any of the exempted organic compounds included in the definition of "OC" [OAC rule 3745-21-01(B)(6)]; and any change in the composition of the coatings or cleanup materials, or use of new coatings or cleanup materials, that would result in an increase

in emissions of any "Hazardous Air Pollutants" (HAPS) as defined in OAC rule 3745-77-01(V). For any change to the emissions unit or its method of operation that would either require an increase in the emission limitation(s) established by this permit or would otherwise be considered a "modification" as defined in OAC rule 3745-31-01, the permittee shall obtain a permit to install prior to the change. 6. MONITORING AND RECORDKEEPING REQUIREMENTS The permittee shall collect and record the following information each month for R001, R002, and R003 separately: i. The name and identification number of each coating, thinner, and cleanup material and a statement as to whether or not each is a "photochemically reactive material". The OC content of each coating, thinner, and cleanup material, in pounds per gallon. i The number of gallons of each coating, thinner, and cleanup material employed. The total OC emissions (OC applied) from all coatings, thinners, and cleanup materials employed [the sum of (6.ii times 6.iii) for all coatings, thinners, and cleanup materials], in pounds or tons. v. The rolling, 12-month summation of the total OC emissions for R001, R002, and R003 combined. In addition, the permittee shall collect and record the following information each month for R002, and R003 separately: vi. For each day during which a photochemically reactive material is employed, the total organic compound emission rate for all coatings and photochemically reactive cleanup materials, in pounds per day. v For each day during which a photochemically reactive material is employed, the total number of hours the emissions unit was in operation. vi For each day during which a photochemically reactive material is employed, the average hourly organic compound emission rate for all coatings and photochemically reactive cleanup materials, i.e., (6.vi divided by 6.vii), in pounds per hour

(average). [Note: The coating information must be for the coatings as employed, including any thinning solvents added at the emissions unit. Also, the definitions of "photochemically reactive" and "nonphotochemically reactive" are based upon OAC rule 3745-21-01(C)(5).] 7. REPORTING REQUIREMENTS i. The permittee shall submit quarterly reports which include the total OC emissions from the coatings, thinners, and cleanup materials employed in R001, R002, and R003, in tons, for each calendar month. These reports shall be submitted by January 31, April 30, July 31, and October 31 of each year and shall include information for each month during the previous calendar quarter. The permittee shall submit deviation (excursion) reports that identify all periods of time when a photochemically reactive material is employed in R001. These reports shall be submitted within 30 days after the occurrence. i The permittee shall submit deviation (excursion) reports for R002 and/or R003, within 30 days after the occurrence, which include the following information: a. For the days during which a photochemically reactive material was employed, an identification of each day during which the average hourly organic compound emissions from the coatings and photochemically reactive cleanup materials exceeded 8 pounds per hour, and the actual average hourly organic compound emissions for each such day. b. For the days during which a photochemically reactive material was employed, an identification of each day during which the organic compound emissions from the coatings and photochemically reactive cleanup materials exceeded 40 pounds per day, and the actual organic compound emissions for each such day. 8. COMPLIANCE DETERMINATIONS i. Compliance with the pounds OC per hour emission limit for R001 shall be demonstrated by multiplying the maximum number of gallons of coating that can theoretically be applied per hour (based on the maximum design capacities of the booths) times the highest OC content coating. No additional record keeping is necessary to demonstrate compliance with this limit because the limit cannot be exceeded under current conditions.

Compliance with the emission limitations of 8 pounds OC per hour and 40 pounds of OC per day for R002 and R003 shall be based upon the recordkeeping specified in 6.viii and 6.vi respectively. Compliance with the air toxics requirements have been determined by modeling the maximum total combined emission rates for R001-R003 to determine the predicted 1-hour maximum ground-level concentration at the fenceline. Therefore, the hourly emission rates can not be exceeded under current conditions. As required above and by OAC rule 3745-31-02, any change in the coatings used or in the operation of the emissions units which would increase the emission rate of any individual air toxic would require a new permit to install. i Compliance with the rolling, 12-month emission limitations and usage restrictions above for OC shall be determined in accordance with the following method: Formulation data or USEPA Method 24 shall be used to determine the OC content of the coatings, thinners, and cleanup materials. The OC emission rate and usage restrictions for each coating, thinner, and cleanup material shall be calculated by multiplying the volume of material employed by the appropriate OC content determined for that material. The OC emission rate and usage rate for each month shall be calculated by adding the emission rates and usage rates for all coatings, thinners, and cleanup materials employed during the month. The rolling, 12-month summations for total OC shall be calculated each month by adding the OC emission rate for that month to the OC emission rate for the previous 11 calendar months (this same method shall be used to calculate rolling, 12-month usage). Compliance with the visible particulate emission limit shall be determined in accordance with OAC rule 3745-17-03. v. Compliance with the particulate matter emission limit of of 0.551 pound per hour shall be determined based on emission testing conducted in accordance with OAC rule 3745-17-03. Emission testing is not specifically required to demonstrate compliance with this emission limit, but, if appropriate, may be requested pursuant to OAC rule 3745-15-04(A). vi. Compliance with the annual particulate matter emission limit shall be determined by multiplying the tested particulate matter emission rate, in pound(s) per hour, by the actual hours of operation per year.