EGLINTON CROSSTOWN LIGHT RAIL TRANSIT

Similar documents
Transit Project Assessment Process

407 TRANSITWAY. Planning & Preliminary Design

TORONTO TRANSIT COMMISSION REPORT NO.

New. Stations. Public Information Centre

Welcome to the Online Consultation

3.6 Construction Methods

Factor Potential Effects Mitigation Measures

UP Express Electrification Transit Project Assessment

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

Appendix M. Criteria, Measures and Indicators for Effects Assessment

407 TRANSITWAY WEST OF HURONTARIO STREET TO EAST OF HIGHWAY 400 MINISTRY OF TRANSPORTATION - CENTRAL REGION

South Landfill Annual Cover Rate Screening Criteria Checklist

TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit Initiative

407 TRANSITWAY - KENNEDY ROAD TO BROCK ROAD MINISTRY OF TRANSPORTATION - CENTRAL REGION

Town of Whitchurch-Stouffville Bethesda Side Road Reconstruction

WELCOME LOCAL SEGMENT PUBLIC MEETING SUMMARY OF PRELIMINARY RESULTS CORRIDOR EVALUATION

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

Introduction. 1.3 Study Overview and Purpose. 1.1 Overview of Environmental Project Report. 1.2 Overview of Environmental Project Report

Table of Contents. List of Tables. 11. Advantages and Disadvantages

Welcome. Public Information Event. Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study

Eglinton Crosstown LRT Construction Liaison Committee

APPENDIX A. CEAA Scoping Document

WELCOME. QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street. Public Information Centre Round #1 October 2017

Facilities Environmental Protection Plan: Burnaby Terminal

Washington Dulles International Airport EXECUTIVE SUMMARY

Date: Time: Location: Thursday, March 15, :00 p.m. to 8:00 p.m. Nobleton Arena Programs Room 15 Old King Road Nobleton, ON

Chapter 10 Commitments to Future Action

Activities that may Require Permit/Approval. Permit/Approval Required Electrical Safety Authority. Approval (CAA) process.

3.1 Conservation Authorities Act

T a b l e o f C o n t e n t s

Preferred Elevated Tank Site

Public Information Centre

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF APRIL 11, 2018

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS

5.0 PRELIMINARY ENVIRONMENTAL REVIEW

Join the Conversation!

RECOMMENDATION. (b) that the Shift Communications Plan, attached hereto as Appendix B, BE RECEIVED;

Appendix C - Highway 400 Widening and Interchange Evaluation Summary Tables

UP Express Electrification Transit Project Assessment. Executive Summary. Introduction

Waste Management of Canada Corporation (WM) is pleased to welcome you to Public Open House #2 for the. Twin Creeks Landfill Environmental Screening

APPENDIX 2. Nova Scotia Department of Environment and Labour Environmental Assessment Terms and Conditions for Environmental Assessment Approval

Work Breakdown Structure Element Dictionary Preliminary Engineering

PUBLIC INFORMATION CENTRE Class Environmental Assessment For. Black Creek Flood Management

10 Summary and Conclusion

The Halifax Harbour Solutions Project Provision of Sewage Treatment

APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT

Town of Perth Landfill Expansion Environmental Screening

Imperial s Sarnia Products Pipeline

Ottawa-Trussler Area Sewage Facility Class Environmental Assessment

Chapter 4. Airport Authority Governance, Statutes and Policies

Assessment of Landfill Footprint Alternatives West Carleton Environmental Centre. Option #4 Impact on Agriculture

Background Information & Mitigation Guidelines MANURE STORAGE IMPROVEMENTS and MORTALITY MANAGEMENT

Lynnwood Link Extension 2013 Draft EIS Comments and Responses

TOWN OF INNISFIL 7 TH Line Improvements Municipal Class Environmental Assessment Schedule C PUBLIC OPEN HOUSE NO. 2

Environmental Assessment Derry Road and Argentia Road Intersection

CATEGORY a protection of the natural environment, its ecosystems and biodiversity.

Golf Course and Recreational Facilities Best Management Guidelines. Regional Official Plan Guidelines

Design-Build for Improvements to the Amherst Island Ferry Docks Public Information Centre April 2017 Please Sign In

TRANSIT PROJECT ASSESSMENT PHASE CORRESPONDENCE

CHAPTER 2 DESIGN REFINEMENTS

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited

Georgetown Water Storage Class Environmental Assessment Study

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement.

2

EXECUTIVE SUMMARY. Figure 1 - Rail Deck Park Study Area. Executive Summary Rail Deck Park Engineering & Costing Study Report Page 1 of 10

Natural Systems Planning Primer

Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach. October 2017

City of Mississauga Environmental Impact Studies Terms of Reference 2002

Lynnwood Link Extension 2013 Draft EIS Comments and Responses. Page 275

The following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act:

Carolyn Woodland, Senior Director, Planning, Greenspace and Communications

Table of Contents. Green Line Extension Project. Draft Environmental Impact Report/Environmental Assessment and Draft Section 4(f) Evaluation

Public Information Centre September 19 th, 2017

Construction Environmental Management Plan (CEMP) for Potash Overland Conveyor

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS

PROPOSED PIPELINES TO SERVE THE COMMUNITY OF FENELON FALLS: ENVIRONMENTAL REPORT

The following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act:

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION

Section 3.11: Hazardous Materials

Draft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report

Draft Noise Abatement Guidelines

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

18 Cumulative Impacts and Interaction of Effects

ELECTRICAL TRANSMISSION LINES & SUBSTATIONS

Airport Road from 1 km North of Mayfield Road to 0.6 km North of King Street Public Information Centre #1

RIPARIAN AREAS REGULATION

SCRCA SECTION 28 WETLAND POLICY

Please complete the sign-in sheet and review display materials.

TECHNICAL MEMORANDUM

TERMS OF REFERENCE PROJECT EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD

LAKESHORE EAST RAIL CORRIDOR EXPANSION GUILDWOOD TO PICKERING PROJECT ENVIRONMENTAL PROJECT REPORT

APPENDIX O COMPREHENSIVE ALTERNATIVES ASSESSMENT TABLES. RAINY RIVER PROJECT Final Environmental Assessment Report

Lynnwood Link Extension 2013 Draft EIS Comments and Responses. Page 945

Municipal Class EA Process

APPENDIX H: SFEIS FLOODPLAIN IMPACT ANALYSIS SECTION

Design Specifications & Requirements Manual

2 HIGHWAY 50/HIGHWAY 427 EXTENSION AREA ARTERIAL NETWORK STUDY

1. Introduction. 1.1 Project Background. E n v i r o n m e n t a l A s s e s s m e n t chapter 1. introduction

WELCOME! Please sign in so we can keep you updated on the study

Noise Abatement Guidelines. Regional Official Plan Guidelines

Transcription:

EGLINTON CROSSTOWN LIGHT RAIL TRANSIT Jane Street to Keelesdale Park and Black Creek Maintenance and Storage Facility October 2013

EGLINTON CROSSTOWN LIGHT RAIL TRANSIT Jane Street to Keelesdale Park Eglinton Black Creek Maintenance and Storage Facility October 2013

TABLE OF CONTENTS Page EXECUTIVE SUMMARY 1. INTRODUCTION... 1-1 1.1 Purpose of the Document... 1-1 1.2 Background: The Original Project... 1-2 1.3 The Changes to the Project... 1-3 1.3.1 Study Area... 1-4 1.3.2 Updated Project Description Results in Significant Changes... 1-4 1.3.3 Studies Prepared in Support of the ECLRT TPAP Addendum... 1-4 1.4 Other Relevant Planning Policies, Studies, and Documents... 1-7 1.4.1 City of Toronto Planning Policies... 1-7 1.4.2 Province of Ontario Planning Policies... 1-7 1.5 TPAP Addendum Process... 1-13 1.5.1 Content of the EPR Addendum Relative to Section 15 of O. Reg 231/08... 1-14 1.5.2 EPR Addendum Approval Process... 1-14 1.6 Consultation Program Overview... 1-15 1.7 Study Team... 1-15 2. FEASIBILITY STUDIES AND MAJOR FUNCTIONAL DESIGN OPTIONS... 2-1 2.1 ECLRT Alignment... 2-1 2.1.1 Reason for Change... 2-1 2.1.2 Key Challenges and Constraints... 2-2 2.1.3 Alternative Design Methods Considered... 2-2 2.1.4 Evaluation... 2-8 2.1.5 Recommendation... 2-16 2.2 Mount Dennis Bus Terminal... 2-19 2.2.1 Reason for Change... 2-19 2.2.2 Key Challenges and Constraints... 2-19 2.2.3 Alternative Design Methods Considered... 2-21 2.2.4 Evaluation... 2-25 2.2.5 Recommendation... 2-26 2.3 Black Creek Maintenance and Storage Facility... 2-28 2.3.1 Reason for Change... 2-28 2.3.2 Key Challenges and Constraints... 2-28 2.3.3 Alternative Design Methods Considered... 2-29 2.3.4 Recommendation... 2-29 3. UPDATE OF THE PROJECT DESCRIPTION... 3-1 3.1 Guiding Principles... 3-1 3.1.1 Design Principles... 3-1 3.1.2 Operations Plan... 3-1 3.2 Design Elements (Including Typical Criteria)... 3-6 3.2.1 Transit Elements... 3-6 3.2.2 Road Elements... 3-6 3.2.3 Typical Runningway... 3-6 3.2.4 Stations... 3-8 MMM Group October 2013 Page i

3.2.5 Special Trackwork... 3-11 3.3 Revised LRT Design... 3-11 3.3.1 Alignment... 3-11 3.3.2 Stops and Stations... 3-12 3.3.3 Mount Dennis Bus Terminal... 3-12 3.3.4 Passenger Pick-Up/Drop-Off... 3-13 3.3.5 Road Modifications and Traffic Management... 3-24 3.3.6 Structures... 3-25 3.3.7 Special Track Work... 3-26 3.3.8 Emergency Exit Buildings... 3-26 3.3.9 Proposed Maintenance and Storage Facility... 3-26 3.4 Eglinton Avenue... 3-29 3.5 Construction Methods... 3-29 3.5.1 Surface Construction... 3-29 3.5.2 Below-Grade Construction... 3-30 3.5.3 Maintenance and Storage Facility Construction... 3-30 4. EXISTING CONDITIONS... 4-1 4.1 Natural Environment... 4-1 4.1.1 Groundwater... 4-1 4.1.2 Surface Water... 4-1 4.1.3 Fish and Fish Habitat... 4-2 4.1.4 Vegetation and Vegetation Communities... 4-2 4.1.5 Wildlife and Wildlife Habitat... 4-7 4.1.6 Designated Natural Areas and Parks... 4-8 4.1.7 Air Quality... 4-8 4.1.8 Contamination... 4-10 4.2 Socio-Economic Environment... 4-11 4.2.1 Noise and Vibration... 4-11 4.2.2 Land Use... 4-13 4.2.3 Utilities... 4-14 4.3 Cultural Environment... 4-16 4.3.1 Archaeology... 4-16 4.3.2 Built Heritage and Cultural Heritage Landscapes... 4-16 4.4 Transportation... 4-20 4.4.1 Transit System... 4-20 4.4.2 Pedestrian and Cycling Network... 4-20 4.4.3 Road Network... 4-21 4.4.4 Navigable Watercourses... 4-22 4.4.5 Rail Network... 4-22 5. IMPACT ASSESSMENT, MITIGATION, AND MONITORING... 5-1 5.1 Range of Potential Impacts... 5-1 5.2 Monitoring... 5-9 5.2.1 Baseline Monitoring... 5-9 5.2.2 Implementation Monitoring... 5-9 5.2.3 Effectiveness Monitoring... 5-9 5.2.4 Compliance Monitoring... 5-10 5.3 Natural Environment... 5-10 MMM Group October 2013 Page ii

5.3.1 Groundwater... 5-10 5.3.2 Surface Water... 5-12 5.3.3 Fish and Fish Habitat... 5-16 5.3.4 Vegetation and Vegetation Communities... 5-17 5.3.5 Wildlife and Wildlife Habitat... 5-23 5.3.6 Designated Natural Areas and Parks... 5-24 5.3.7 Air Quality... 5-26 5.3.8 Potential Contamination... 5-30 5.4 Socio-Economic Environment... 5-34 5.4.1 Property... 5-34 5.4.2 Noise and Vibration... 5-39 5.4.3 Land Use... 5-45 5.4.4 Utilities... 5-47 5.5 Cultural Environment... 5-48 5.5.1 Archaeology... 5-48 5.5.2 Built Heritage and Cultural Landscapes... 5-49 5.6 Transportation... 5-54 5.6.1 Public Transit... 5-54 5.6.2 Pedestrian and Cycling Network... 5-55 5.6.3 Road Network... 5-56 5.6.4 Navigable Waters... 5-59 5.6.5 Rail Network... 5-59 5.7 Other Potential Impacts... 5-60 5.7.1 Electromagnetic Interference... 5-60 5.7.2 Stray Current... 5-60 5.8 Beneficial Effects... 5-62 5.9 Summary of Potential Impacts, Proposed Mitigation Measures, Monitoring, and Future Work... 5-63 6. CONSULTATION PROCESS... 6-1 6.1 Overview of Consultation Approach... 6-1 6.2 Public Open Houses and Online Consultation... 6-4 6.2.1 Public Open House and Online Consultation #1... 6-4 6.2.2 Public Open House and Online Consultation #2... 6-6 6.3 Additional Consultation re: 1151 Weston Road (Scotiabank)... 6-8 6.4 Additional Consultation re: Maintenance and Storage Facility... 6-8 6.4.1 Overview of Consultation Process... 6-8 6.4.2 Summary of Comments Received... 6-9 6.4.3 Commitment to Future Consultation... 6-11 6.5 Impacted Property Owners... 6-11 6.6 Technical Advisory Committee and Supplemental Meetings... 6-12 6.6.1 Toronto and Region Conservation Authority... 6-12 6.6.2 City of Toronto... 6-12 6.6.3 Toronto Transit Commission... 6-13 6.6.4 Canadian Pacific Railway... 6-13 6.7 Ministry of the Environment... 6-13 6.8 Aboriginal Communities... 6-13 6.9 Elected Officials... 6-13 6.10 Circulation of Draft... 6-16 MMM Group October 2013 Page iii

6.11 Review of the... 6-16 7. COMMITMENTS TO FUTURE WORK... 7-1 7.1 Consultation... 7-1 7.2 Property Acquisition... 7-1 7.3 Planning and Design Initiatives... 7-2 7.4 Construction Issues... 7-3 7.5 Permits and Approvals... 7-5 7.6 Noise and Vibration Protocols... 7-6 7.7 Canadian Environmental Assessment Act (CEAA)... 7-6 7.8 Mechanism for Changes to the Approved Plan... 7-6 7.8.1 Design Refinements... 7-6 7.8.2 TPAP Addendum Process... 7-6 LIST OF TABLES Table 2-1: Summary of Comparative Assessment of LRT Alignment Options... 2-15 Table 2-2: Assessment of Bus Terminal Alternatives... 2-27 Table 3-1: Bus Services at Mount Dennis Bus Terminal... 3-4 Table 4-1: Contaminants of Interest... 4-9 Table 4-2: Statistical Summary of Background Concentrations... 4-10 Table 4-3: Identified Cultural Heritage Landscapes (CHL) and Built Heritage Resources (BHR)... 4-18 Table 5-1: Interactions Matrix... 5-5 Table 5-2: Updated Property Impact Summary... 5-35 Table 5-3: Impacts and Mitigation for Built Heritage Resources and Cultural Heritage Landscapes... 5-50 Table 5-4: Construction Impacts and Mitigation for Built Heritage Resources (BHRs) and Cultural Heritage Landscapes (CHLs)... 5-53 Table 5-5: Summary of Potential Impacts, Mitigation Measures, Future Work, and Contingencies... 5-64 Table 6-1: Overview of Consultation Approaches... 6-3 Table 6-2: MSF-Related Development Principles... 6-9 Table 6-3: Meetings with the Technical Advisory Committee... 6-12 Table 6-4: Meetings with the Toronto and Region Conservation Authority... 6-12 Table 6-5: Meetings with the City of Toronto... 6-12 Table 6-6: Meetings with the Toronto Transit Commission... 6-13 Table 6-7: Meetings with the Canadian Pacific Railway... 6-13 Table 6-8: Meetings with the Ministry of the Environment... 6-13 Table 6-9: Meetings with the Elected Officials... 6-13 Table 6-10: Toronto City Council Motions and Responses... 6-14 LIST OF FIGURES Figure 1-1: Toronto Transit City 2007 Light Rail Transit Plan... 1-3 Figure 1-2: West Section and MSF Study Area... 1-5 Figure 1-3: Project Implementation Phasing... 1-6 Figure 1-4: The Greater Toronto and Hamilton Area... 1-10 Figure 1-5: Metrolinx Big Move 15 Year Plan... 1-11 MMM Group October 2013 Page iv

Figure 1-6: Approved Toronto Transit Projects... 1-12 Figure 2-1: LRT - West Section Alignment Options 1-4... 2-11 Figure 2-2: LRT - West Section Alignment Options 5-7... 2-12 Figure 2-3: LRT - West Section Alignment Options 8-9A... 2-13 Figure 2-4: LRT - West Section Alignment Options 10-11... 2-14 Figure 2-5: Comparison of Previously-Approved and Current LRT Alignments... 2-17 Figure 2-6: Candidate Sites for Bus Terminal... 2-20 Figure 2-7: Bus Terminal Design Concept 1a MSF Site... 2-22 Figure 2-8: Bus Terminal Design Concept 1b MSF Site w/ Kodak Building 9... 2-23 Figure 2-9: Bus Terminal Design Concept 2a South Side, Single-Level Terminal.. 2-24 Figure 2-10: Bus Terminal Design Concept 2b South Side, Two-Level Terminal... 2-25 Figure 3-1: Conceptual Bus Routing Mount Dennis Bus Terminal... 3-5 Figure 3-2: Typical LRT Runningway At Surface... 3-7 Figure 3-3: Typical LRT Runningway Below Grade... 3-8 Figure 3-4: Typical Station Cross Section... 3-9 Figure 3-5: Typical Station Plan... 3-10 Figure 3-6: Secondary Entrance (Example)... 3-10 Figure 3-7: LRT West Section Proposed Alignment... 3-15 Figure 3-8: Cross-Section at Mount Dennis LRT Station... 3-23 Figure 3-9: Proposed Signalized Intersection at No-Frills Site... 3-25 Figure 3-10: Conceptual Construction Staging West of Mount Dennis Station... 3-31 Figure 4-1: Vegetation Community Mapping, LRT Alignment... 4-5 Figure 4-2: Vegetation Community Mapping, Black Creek MSF... 4-6 Figure 4-3: Official Plan (2010) Land Use Designations... 4-14 Figure 4-4: TTC Bus Routes along Eglinton Avenue between Jane Street and Keele Street... 4-20 Figure 4-5: Toronto Bike Plan... 4-21 Figure 5-1: Black Creek MSF Vegetation Removals... 5-21 Figure 5-2: Worst-Case Sensitive Receptors (Construction Activities)... 5-27 Figure 5-3: APECs, Including the Black Creek MSF Site... 5-33 APPENDICES APPENDIX A: Stormwater Management and Hydraulic Analysis APPENDIX B: Natural Environment Assessment APPENDIX C: Air Quality Assessment APPENDIX D: Noise and Vibration Impact Assessment APPENDIX E: Contamination Overview Study APPENDIX F: Stage 1-2 Archaeological Assessment APPENDIX G: Cultural Heritage Documentation APPENDIX H: Comparative Traffic Assessment Memorandum APPENDIX I: Public Consultation Report Public Information Centre #1 APPENDIX J: Public Consultation Report Public Information Centre #2 APPENDIX K: Record of Circulation of Draft EPR, Comments, and Responses MMM Group October 2013 Page v

GLOSSARY OF TERMS AFP ANSI APEC ATO BHF CEAA CHAR CHER CHDR CHL COS CWS DFO EA EEB ECLRT EMI EPR ESA GTHA HADD HVAC HIA IO LRT LRV MBCA MNR MOE MSF MTCS MTO NFPA OPSS PHC PPUDO PSW PTTW RT SAR SARA SWM TBM TPAP TRCA TTC Alternative Financing and Procurement Area of Natural and Scientific Interest Areas of Potential Environmental Concern Automated Train Operation Built Heritage Features Canadian Environmental Assessment Act Cultural Heritage Assessment Report Cultural Heritage Evaluation Report Cultural Heritage Documentation Report Cultural Heritage Landscapes Contaminant Overview Study Canada-Wide Standards Department of Fisheries and Oceans Canada Environmental Assessment Emergency Exit Building Electromagnetic Interference Environmental Project Report Endangered Species Act Greater Toronto and Hamilton Area Harmful Alternative, Disruption, or Destruction Heating, Ventilation, and Air Conditioning Heritage Impact Assessment Infrastructure Ontario Light Rail Transit Light Rail Vehicle Migratory Birds Convention Act Ministry of Natural Resources Ministry of the Environment Maintenance and Storage Facility Ministry of Tourism, Culture, and Sport Ministry of Transportation National Fire Protection Association Ontario Provincial Standard Specification Petroleum Hydrocarbons Passenger Pick-Up/Drop-Off Provincially Significant Wetland Permit to Take Water Rapid Transit Species at Risk Species at Risk Act Stormwater Management Tunnel Boring Machine Toronto and Region Conservation Authority Toronto Transit Commission MMM Group October 2013 Page vi

EXECUTIVE SUMMARY E.1 Introduction On May 17, 2010, the Minister of the Environment for the Province of Ontario issued a Notice to Proceed to the Toronto Transit Commission (TTC) and the City of Toronto for the Eglinton Crosstown Light Rail Transit (ECLRT) Project (the Project), a 33-kilometre electrically-powered Light Rail Transit (LRT) line extending from the Lester B. Pearson International Airport in the City of Mississauga to Kennedy Station in the City of Toronto (see Figure E-1). The basis for that Notice was the Environmental Project Report prepared in 2010 (2010 EPR) under the (TPAP) found in Ontario Regulation 231/08 (O. Reg. 231/08) to assess potential environmental impacts associated with the project, identify measures to mitigate those impacts, and to develop systems to monitor the progress of implementing those mitigation measures. Subsequently, a Statement of Completion was issued by the TTC and the City that signified the completion of the TPAP. Figure E-1: Toronto Transit City 2007 Light Rail Transit Plan The 2010 EPR was undertaken by the City of Toronto and the TTC as coproponents of the Project. Subsequently, in 2012, Metrolinx assumed management responsibility for the Project and has become the sole proponent MMM Group October 2013 Page E-1

for this Addendum. Metrolinx advised the Ministry of the Environment (MOE) of the change in proponents through a letter dated December 13 th, 2012. The 2010 EPR identified an alignment for the Project that consisted of LRT technology in the following configuration: On-surface between Pearson International Airport and Keelesdale Park within the centre of Silver Dart Drive, Commerce Boulevard and Eglinton Avenue West (including a new bridge over Highway 401) with passenger access via surface stops; On-surface within the centre of Eglinton Avenue East from east of Brentcliffe Road to Kennedy Station, also with passenger access via surface stops; and Underground between Keelesdale Park and Brentcliffe Road due to the narrow right-of-way width of Eglinton Avenue in this section, with passenger access via underground stations with vertical connections to the surface. Between Jane Street and Keelesdale Park, the Project was proposed to be in the centre of Eglinton Avenue West, with surface stops at Weston Road and Black Creek Drive. The 2010 EPR indicated a future connection to an MSF at the former Kodak property, with at-grade access from Eglinton Avenue West. The impacts of the MSF were to be assessed at a later time and were not covered in the 2010 EPR. E.2 Reason for Change The 2010 ECLRT TPAP ultimately recommended a surface median LRT facility on Eglinton Avenue with stops at Jane Street, Weston Road, and Black Creek Drive, at-grade intersections with Weston Road and Black Creek Drive and an atgrade connection to the proposed Black Creek MSF (requiring LRT vehicles to cross the westbound general traffic lanes in order to access the facility). Subsequent to the 2010 EPR, Metrolinx has subsequently identified a need to implement an Automated Train Operation (ATO) system for trains leaving the Black Creek MSF site in order to achieve the desired service frequency and reliability along the line. However, the ATO system can only be used where the LRT is in a protected right-of-way, and there is now a need to grade-separate the LRT from general traffic at the Black Creek MSF site access. Further, in light of a future GO Rail station at Mount Dennis, as envisioned in the the Georgetown South Service Expansion and Union-Pearson Rail Link Environmental Project Report (Metrolinx, 2009), relocation and redesign of the Weston LRT Stop to a full station under the rail corridor would allow for a fullyintegrated LRT/GO Rail station. Under the 2010 EPR, the proposed western terminus of the Eglinton LRT facility was to be at Toronto Pearson International Airport. While this remains the ultimate terminus in the west, the current phased implementation approach will result in an interim western terminus at the Mount Dennis LRT Station. As such, Eglinton Avenue west of Mount Dennis will continue to be served by buses in the interim, until such a time when funding allows for the westerly extension of the MMM Group October 2013 Page E-2

LRT. These bus services will require an interface with the Mount Dennis LRT Station in order to facilitate passenger transfer between the buses and the LRT system. E.3 The Revised Project In addition to the change of proponents discussed in Section E.1, this Addendum focuses only on changes to the 2010 EPR proposed in the section between Jane Street and Keelesdale Park. The following is a summary of the components of the proposed configuration of the ECLRT that differ from those recommended in the 2010 EPR: Revised LRT alignment between Jane Street and Keelesdale Park from surface LRT with surface stops as shown in the 2010 EPR to a completely grade-separated LRT alignment with an underground station at Mt. Dennis; Revised track alignment connecting the LRT mainline and the proposed Black Creek Maintenance and Storage Facility from an at-grade connection as shown in the 2010 EPR to a grade-separated connection; Consolidation of the Weston Stop and the Black Creek Stop (both surface stops shown in the 2010 EPR) into one new underground Mount Dennis LRT Station located at the GO Transit Kitchener Rail corridor; New passenger tunnel connection under the GO Transit Kitchener Rail and Canadian Pacific Railway (CPR) corridors; Proposed Black Creek Maintenance and Storage Facility at Mount Dennis; and Proposed 15-bay bus terminal and Passenger Pick Up and Drop off at the Mount Dennis LRT station. These changes to the Project, which are described in more detail in this Addendum, were determined to be inconsistent with the 2010 EPR. As described in Section 15 of Ontario Regulation 231/08, any change that is inconsistent with a previously approved EPR requires a reassessment of the impacts associated with the project, the identification of potentially new mitigation measures, and potentially new monitoring systems in an Addendum to the previously approved EPR. E.4 Study Area The Addendum study area is divided into two major areas along the approved ECLRT alignment where the physical changes are proposed (see Figure E-2). The study limits for each section are as follows: LRT - West Section: The study area extends generally 30m from the Eglinton Avenue West centreline from Jane Street to Municipal Drive, just east of Keelesdale Park. The Study Area also incorporates the lands for the proposed bus terminal and Passenger Pick Up and Drop Off associated with the Mount Dennis Station. MMM Group October 2013 Page E-3

Black Creek Maintenance and Storage Facility (MSF): The study area for the Black Creek MSF includes the former Kodak property north of Eglinton Avenue West to Ray Avenue, generally between the railway corridor to the west and Black Creek Drive to the east. The existing environmental conditions in the Study Area described in the 2010 EPR were reviewed for applicability to conditions at the time of this Addendum (2013). The updated Study Area conditions formed the basis for the Impact Assessment carried out under this EPR Addendum. The following is a list of studies that were conducted to identify Study Area conditions and potential project impacts, in support of this Addendum report: Stormwater Management and Hydraulic Analysis; Natural Environment Inventory and Impact Assessment; Air Quality Assessment; Noise and Vibration Assessment; Contaminant Overview Study; Archaeological (Stage 1-2 Archaeological Assessment Report); Heritage (Cultural Heritage Assessment Report, Cultural Heritage Evaluation Reports, Technical Evaluation and Analysis Memo); and Comparative Traffic Assessment. MMM Group October 2013 Page E-4

n Ro a MSF Study Area ve Jane Street d i reek Dr to Black C W es ue n ve A y Ra LRT Alignment Study Area t s venue We A n o t n li g E Bicknell Drive i Ra or rid or lc Lambton Avenue OCTOBER 2013 NOT TO SCALE WEST SECTION AND MSF STUDY AREA E-2

This page intentionally left blank. MMM Group October 2013 Page E-6

E.5 UPDATE OF THE PROJECT DESCRIPTION The following describes the revised Project within the defined Addendum study area. ECLRT Alignment: The Project will tie into the previously approved design at the west launch shaft, approximately 150 metres east of Black Creek. From that point and proceeding westerly, the Project will rise on the north side of Eglinton Avenue, passing over Black Creek and Black Creek Drive on new bridges. The LRT mainline will connect to the MSF service tracks before it entering into the Mount Dennis LRT Station under the rail corridor. West of the station, the LRT will continue below-grade until emerging from a portal in the centre of Eglinton Avenue approximately 100m east of the Jane Street. West of the portal, the LRT will continue as an at-grade centremedian LRT as previously approved. Stops and Stations: The previous centre median at-grade stop at Weston Road has been relocated and redesigned as an underground station with a direct passenger connection under the GO Transit and CP Railway corridors to a GO Station north of Eglinton Avenue. Underground pedestrian tunnel connections will be provided to facilitate passenger transfer between the proposed Mount Dennis Bus Terminal, PPUDO, Mount Dennis LRT Station, and protect for connections to the future Mount Dennis GO Station. The Secondary entrance on the north side of Eglinton Avenue at the east end of the station will provide access for passengers destined to the Community Centre as well as pedestrians along Eglinton Avenue access to Kodak Building #9 and the bus terminal. The entrance building will be located under the new Photography Drive bridge over Eglinton Avenue. The previously proposed Black Creek stop has been removed, as the horizontal and vertical geometry of the Project at Black Creek Drive are not compatible with the requirements of an elevated station that would be necessary for passenger access at this location under the new alignment. Bus Terminal Layout: The bus terminal will be situated on lands within the Black Creek MSF property. The terminal is comprised of two island bus platforms immediately east of the existing Kodak Building #9, north of the proposed LRT alignment. Vehicles within the site would circulate only in a clockwise direction. Passenger Pick-Up/Drop-Off: In order to facilitate passenger drop-off to the Mount Dennis Station, bus terminal, and future GO Rail Station, a small Passenger Pick-Up/Drop-Off (PPUDO) area is proposed on the Black Creek MSF site, on the west side of Kodak Building #9. Access to the PPUDO and bus terminal will be via the new Photography Drive bridge which is located to align with a possible future extension to Todd Baylis Boulevard when the bus terminal is down sized in the future when the LRT is extended beyond Mount Dennis Station. Proposed MSF Site Layout: This EPR Addendum addresses the potential impacts and mitigating measures associated with an ultimate 162-vehicle MMM Group October 2013 Page E-7

Maintenance and Storage Facility on the former Kodak property. The conceptual yard layout has been configured to accommodate the maximum possible fleet size at the Black Creek MSF, as well as a carhouse building where the vehicles will be maintained, a repair shop/ facility, a Maintenance of Way building, work vehicles and storage, traction power substation, employee parking, and storm water management ponds. Eglinton Avenue: Consistent with the 2010 EPR, Eglinton Avenue will be reconstructed with four (4) general purpose lanes between Weston Road and Black Creek Drive. Per the objectives of the City of Toronto s Eglinton Connects study (currently underway, see: http://www.toronto.ca/eglinton/) and the Metrolinx Mount Dennis Mobility Hub study, the road right-of-way in this section will be re-allocated to introduce additional pedestrian, cyclist, and streetscaping features. The revised project through this section is illustrated in Figure E-3. MMM Group October 2013 Page E-8

OCTOBER 2013 E-3a

OCTOBER 2013 E-3b

OCTOBER 2013 E-3c

OCTOBER 2013 E-3d

OCTOBER 2013 E-3e

OCTOBER 2013 E-3f

OCTOBER 2013 E-3g

This page intentionally left blank. MMM Group October 2013 Page E-16

E.6 Impacts and Mitigation Measures Following the above-noted update of existing conditions in the Study Area, the Project Team reviewed anticipated impacts, identified mitigation measures to address those impacts, and recommended monitoring activities as presented in the 2010 EPR were reviewed to identify changes to the potential impacts, mitigation, and monitoring that result from the new configuration of the Project. The impact assessment suggests that the construction and operational impacts of the Project will have limited impacts on the natural, socio-economic, and built environments. Conflicts with major utilities in the area have been avoided. The established construction monitoring procedures are considered sufficient to mitigate the short-term implications of construction. The proposed monitoring plans for the Project are considered preliminary and subject to refinements during design in consultation with regulatory agencies and the public. Metrolinx is committed to incorporating appropriate mitigation measures in the design and construction documents and to monitoring these proposed mitigation measures during construction. MMM Group October 2013 Page E-17

Table E-1: Summary of Potential Impacts, Mitigation Measures, Future Work, and Contingencies Factor Environmental Issue / Concern Effect / Impact (During Construction; During Operations) Mitigation Measures Monitoring / Future Work / Contingency Natural Environment Groundwater Impacts to groundwater during construction and operation of the ECLRT. It is anticipated that ECLRT facilities will not interrupt existing groundwater migration pathways and permanent groundwater dewatering systems will not be used. Groundwater will be managed in accordance with provincial legislation and regulations including Soil, Ground Water and Sediment Standards for Use under Part XV.1 of the Environmental Protection Act, dated April 15, 2011. This may include management within the right-of-way depending on circumstances Further investigation to determine the radius of influence of any required dewatering will be necessary to fully consider the impacts to nearby structures and infrastructure. These studies are also needed to support the Ministry of the Environment s Permit to Take Water (PTTW) applications Further mitigation plans will be developed prior to construction. A Soil and Groundwater Management Strategy will be developed prior to construction. Groundwater monitoring wells will be installed prior to construction. For excavations or property acquisitions in areas of known or high potential for environmental impacts, additional environmental investigations will be conducted in accordance with provincial regulatory requirements. Contaminated groundwater will be managed in accordance with provincial legislation and regulations including MOE Guidelines for Use at Contaminated Sites in Ontario (1997). Obtain PTTW from MOE and water disposal permit from the City of Toronto, where appropriate, as determined in the detailed design phase of the project. A contingency plan will be developed prior to construction MMM Group October 2013 Page E-18

Factor Environmental Issue / Concern Effect / Impact (During Construction; During Operations) Mitigation Measures Monitoring / Future Work / Contingency where appropriate. Surface Water Impacts to drainage and stormwater systems from the ECLRT. Fuel spills, due to accidents during construction refueling and accidents during operation. Impacts to quality and quantity of surface water. The general direction of roadway overland flow routes and drainage patterns will not be altered. There will be no significant changes to peak flow as a result of the implementation of the proposed changes to the ECLRT design. At the MSF, the overall site will be highly impervious. Construction activities could result in increased rates of erosion and sedimentation within and adjacent to the site area and tributaries to major watersheds. The stormwater management system will be designed to achieve an Enhanced Level of water quality treatment, as per the Ministry of the Environment s Stormwater Management Planning and Design Manual (2003). A storm water drainage and management system (SWM) is required at the MSF site, which will be consistent with the Toronto Green Development Standard. In order to prevent and minimize the release of sediment to watercourses, the sediment and erosion control measures discussed in Section 5.3.2 will be implemented during ECLRT construction. Prior to construction, the contractor will submit a comprehensive environmental controls and methods plan to address, among other elements, effluent (water) control. Environmental inspections of the construction site will be conducted to assess the performance of erosion and sedimentation control measures and identify any required maintenance. Fish and Fish Habitat Potential impacts to fish and fish habitat (Black Creek). At Black Creek the proposed bridge structure will span the bed and banks of the watercourse with no encroachment in the wetted portion of the channel. Direct impacts to fish and fish habitat are not anticipated. Implement mitigation measures as identified for Surface Water. Implement best management practices identified in the 2010 EPR during construction to reduce the potential for impacts to fish and fish habitat. All works will be completed in Any additional mitigation measures, monitoring and commitments agreed to in consultation with provincial and federal agencies will be complied with. Implement monitoring and contingency plans as identified for MMM Group October 2013 Page E-19

Factor Environmental Issue / Concern Effect / Impact (During Construction; During Operations) Mitigation Measures Monitoring / Future Work / Contingency accordance with the Fisheries Act, the Endangered Species Act, and the Species at Risk Act. Surface Water. The Humber River floodplain and crossing of Black Creek are within the regulated areas of the City of Toronto s Ravine and Natural Feature Protection Bylaw and TRCA s Ontario Regulation 166/06, and a permit will be needed before the project works can be initiated. The TRCA will also review the project as it relates to Fish Habitat under their Level III agreement with Fisheries and Oceans Canada (DFO) to determine whether there is a potential for the proposed works to result in a Harmful Alteration Disruption or Destruction (HADD) of fish habitat. As the proposed elevated LRT bridge structure will span the bed and banks of the watercourse with no encroachment in the wetted portion of the channel, it is anticipated that a HADD will not result from the proposed works and the TRCA will issue a Letter of Advice (LoA) accordingly. Vegetation and Vegetation Direct and indirect impacts to vegetation If not properly protected vegetation not impacted by the footprint of the ECLRT may be Under the Ravine and Natural Feature Protection Bylaw, a permit is required to dump fill or Implement monitoring and contingency plans as identified for MMM Group October 2013 Page E-20

Factor Environmental Issue / Concern Effect / Impact (During Construction; During Operations) Mitigation Measures Monitoring / Future Work / Contingency Communities during construction. directly impacted during construction. Potential indirect impacts to vegetation include exposure to sediment and contaminant runoff from construction activities. refuse, or alter the grade, or injure or destroy any tree, in specified protected areas. There are other City of Toronto bylaws that give the same tree protection to park trees, street trees and certain trees on private land. On private land, trees that have a diameter at breast height of 30 cm or more are protected, and smaller trees are protected if they are part of a registered site plan agreement. Direction for adhering to the tree protection bylaws, including minimum protection zones, is provided in the City of Toronto s Tree Protection Policy and Specification for Construction Near Trees. The project works may impact trees in protected areas, in parks, on the road allowance and/or on private land. In support of the bylaws, a tree inventory will be required for the locations where trees are likely to be impacted. Mitigation, restoration or compensation measures (including potential for plantings within the Keelesdale Drive area) will be identified following the tree inventory and will be based on detailed site assessments undertaken during Surface Water. It is possible that additional mitigation measures, monitoring, and commitments may be identified in consultation with relevant provincial and federal agencies. Any additional mitigation measures, monitoring and commitments agreed to will be complied with. MMM Group October 2013 Page E-21

Factor Environmental Issue / Concern Effect / Impact (During Construction; During Operations) Mitigation Measures Monitoring / Future Work / Contingency the detail design phase, refined to the satisfaction of the issuer of the permit. Erosion and sediment control will be addressed as part of a comprehensive strategy for the entire ECLRT project. Where the City of Toronto does not have authority to issue tree permits (i.e., where there is provincial or federal interest), all works must be completed in accordance with applicable legislation including, but not necessarily limited to, the Fisheries Act, Migratory Birds Convention Act, Endangered Species Act and Species at Risk Act. Implement mitigation measures as identified for Surface Water. Wildlife and Wildlife Habitat Habitat loss due to the preferred ECLRT alignment and construction of the MSF (see Vegetation and Vegetation Communities). Disturbance from construction noise and vibration. Wildlife using the Black Creek wildlife corridor may be disturbed by noise and vibration associated with construction of the elevated LRT bridge. Barn Swallows may nest under the Black Creek bridge as they have in previous years. Northern Rough-winged Swallow and three other species considered probable nesters may be nesting near the bridge. Recent rail corridor construction The nests of most bird species are protected by the Migratory Birds Convention Act. Lands impacted by the project works should be monitored between May 1 st and August 31 st for active nests of bird species, and if they are observed it is recommended that they be monitored by a wildlife specialist to ensure that nesting activity continues. Potential disturbance It is possible that additional mitigation measures, monitoring and commitments may be identified in consultation with relevant provincial and federal agencies. Any additional mitigation measures, monitoring and commitments agreed to will be complied with. MMM Group October 2013 Page E-22

Factor Environmental Issue / Concern Effect / Impact (During Construction; During Operations) works in the vicinity of the bridge may deter nesting. At the MSF site, wildlife habitat may be eliminated or rendered unsuitable through construction of the MSF. Mitigation Measures Monitoring / Future Work / Contingency may be sufficient to warrant the prevention of nesting under Black Creek bridge and the erection of alternative nesting structures. Caution should be exercised near Black Creek to avoid disturbing wildlife using this wildlife corridor. This is particularly important if Barn Swallows are nesting under the bridge. Implementation of mitigation measures may be sufficient such that a permit under the ESA will not be required for Barn Swallow, Chimney Swift and/or Milksnake. Requirements associated with the ESA are to be confirmed in consultation with MNR prior to construction commencing. All works must be completed in accordance with applicable legislation including, but not necessarily limited to, the Fisheries Act, Migratory Birds Convention Act, Endangered Species Act and Species at Risk Act. Designated Natural Areas and Parks Impacts to Keelesdale Park Coronation Park, and Pearan Park The proposed location for the west temporary work site is on the south side of Eglinton Avenue, 200 m east of Black The ECLRT facilities will be positioned and configured to minimize intrusion into the parks to the extent possible. The A monitoring and contingency plan will be developed prior to construction where appropriate. MMM Group October 2013 Page E-23

Factor Environmental Issue / Concern Effect / Impact (During Construction; During Operations) Creek Drive. The area is locally known as Keelesdale Park and the present land use consists of baseball diamonds, an indoor hockey arena and a grass soccer pitch. The soccer pitch is located adjacent to but separated from Eglinton Avenue by a cultural woodlot (CUW1), and is bordered by a small deciduous forest parcel (FOD2-1) to the east and a parking lot to the south. The majority of the work zone will be established on the soccer pitch, but will also require removal of approximately 0.105 ha. of cultural woodlot to accommodate the northern boundary of the work zone and the open shaft access to the portal. The FOD2-1 vegetation community will not be affected. The soccer pitch will also be used as the tunnel boring machine launch site and as temporary material stockpiling and heavy equipment operations site resulting in temporary impacts to its recreational use. Construction of relocating Eglinton Avenue West and elevated guideway in the along the ECLRT corridor will result in minor encroachment at three parks: Coronation Park, Mitigation Measures Monitoring / Future Work / Contingency ECLRT facilities will be designed to blend into their surroundings using a context sensitive solution. Metrolinx will consult with City of Toronto Parks, Forestry and Recreation Division during detailed design to mitigate impacts on City of Toronto parks located along Eglinton Avenue. To ensure that the forested area remains undisturbed, the entire FOD2-1 vegetation community will be separated and isolated with a barrier to prevent encroachment by any construction related activity. Upon completion of the project, the soccer pitch will be reinstated to its present condition. The cultural woodlot (CUW-1) will also be restored to its preconstruction state as it will be replanted with suitable native species. MMM Group October 2013 Page E-24

Factor Environmental Issue / Concern Effect / Impact (During Construction; During Operations) Keelesdale Park and Pearen Park. The LRT facilities proposed at each park are presented below. Coronation Park: Foundations for Elevated Guideway Keelsedale Park: Grading for Realignment of Eglinton Avenue West Pearan Park: Bicycle Pathway (see below for additional details) Mitigation Measures Monitoring / Future Work / Contingency Air Quality Impacts to air quality during construction. Impacts on air quality due to implementation of the ECLRT. Construction activities may result in temporary, localized impacts to air quality. The two major sources of construction impacts to air quality are dust and exhaust emissions from construction equipment. Overall emissions are expected to decrease with ECLRT implementation. Best management practices will be implemented to prevent the potential release of dust and other airborne pollutants offsite. A dust management plan will be developed by the contractor, and will incorporate the following mitigation techniques: Material wetting or chemical suppressants; Construction of barriers; Limiting exposed areas; and Equipment washing. Different levels of mitigation may be required at different As committed to in the 2010 EPR, air monitoring of crystalline silica, total dusts and other contaminants (as applicable) will be conducted as a check on the effectiveness on dust control measures. In particular, air quality monitoring will be conducted prior to, during or following construction as follows: When construction and/or demolition activities are likely to cause dust emission, air monitoring must be conducted prior to beginning activities to establish a baseline value for the quantity of suspended particulate matter in the air. MMM Group October 2013 Page E-25

Factor Environmental Issue / Concern Effect / Impact (During Construction; During Operations) Mitigation Measures Monitoring / Future Work / Contingency construction phases. The focus of the mitigation plan is to reduce the dust emissions from the material processing activities, the major contributor to total dust emissions, and not to reduce vehicle emissions. Environment Canada s Best Practices for the Reduction of Air Emissions from Construction and Demolition Activities document will be followed for mitigation techniques, not only for dust but for other pollutants such as carbon monoxide and oxides of nitrogen as well (Environment Canada, 2005). These types of controls aid in minimizing impacts to the environment during the construction phase. Night time construction activities will also be considered in order to reduce the higher emissions from vehicles that are slowed down by the reduced existing road capacity during the day. It is recommended that only water be used as a dust suppressant. As noted in the 2010 EPR, reductions in greenhouse gases associated with the use of the ECLRT will far outweigh any short term increase in During construction and/or demolition operations where dust is being created, air quality monitoring must be conducted to establish the level of particulate matter in the air. Following construction and/or demolition operations where dust was created, confirmatory tests must be conducted to quantify the level of particulate matter in the air. Construction Borne Particulate Matter within Existing Buildings In instances where works are necessary to connect new works to existing buildings and stations and activities, such as sawcutting are required. Monitoring of airborne contaminants such as crystalline silica will be required to show that these contaminants are below their respective time weighted average exposure values as indicated in Regulation 833. Appropriate adaptive management will be undertaken in response to findings from air quality MMM Group October 2013 Page E-26

Factor Environmental Issue / Concern Effect / Impact (During Construction; During Operations) Mitigation Measures Monitoring / Future Work / Contingency greenhouse gas emissions that are associated with construction activities. monitoring. As warranted, a contingency plan will be developed prior to maintenance activities. Potential Contamination Impacts to areas of high, moderate, and low potential for contamination present within the study area. As noted in the 2010 EPR, the overall Project will result in the displacement of approximately 1.8 million m 3 of surplus excavated material generated by tunnelling and cut-and-cover construction at the portals, tunnel and stations. The extension of the underground section between Mount Dennis Station and the Jane Street portal will result in approximately 75,000 m 3 of additional surplus excavated material. The Black Creek MSF will be designed to minimize the generation of surplus excavated material. On busy urban streets such as Eglinton Avenue and the major north-south arterials that already carry a large proportion of truck traffic, the addition of trucks to remove the excavated material is considered a negligible increase in truck traffic. Truck haul routes will be identified during detail design as part of traffic management plans. As documented in the 2010 EPR, excess soil will require waste classifications in accordance with applicable regulatory requirements. Regulatory requirements in place at the time of construction and excess materials management guidelines and specifications (e.g. OPSS 180) will be used when developing an excess materials management plan. A Soil and Groundwater Management Strategy will be developed prior to construction. Generally, where impacts are anticipated to all or portions of properties with high or moderate potential for contamination, further environmental investigations will be completed for these properties (or portions thereof) that would be directly impacted by construction activities (i.e. tunneling): Prior to construction, a Risk A monitoring program will be included in the Soil and Groundwater Management Strategy which will be developed prior to construction. A contingency plan will be developed prior to construction where appropriate. Baseline monitoring will be undertaken as outlined in the 2010 EPR in accordance with the Ontario Environmental Protection Act and will be documented in the Geotechnical Baseline Report and other environmental reports, which will provide the necessary information for the handling and disposing of excess soil. The disposal of contaminated materials will be directed to an MOE approved soil treatment site or waste disposal site. The monitoring of these facilities is the jurisdiction of the MOE. Prior to construction, Metrolinx will require the contractor to submit the name, location and type of license of the designated soil MMM Group October 2013 Page E-27

Factor Environmental Issue / Concern Effect / Impact (During Construction; During Operations) Mitigation Measures Monitoring / Future Work / Contingency Contamination-related impacts associated with construction activities are limited to potential spills associated with construction equipment or during handling of contaminated materials. Assessment will be prepared covering the former Kodak lands (MSF lands) with regard to the handling of contaminated materials located at the site. The purpose of the Risk Assessment is to describe and estimate the likelihood of adverse effects to human health and the environment resulting from exposure to contaminants and to develop property-specific environmental standards that will protect the people and the environment at the site. The Risk Assessment is intended to support the filing of a Record of Site Condition in accordance with O.Reg. 153/04, as amended; disposal sites (as issued by MOE). For other properties (or portions thereof) are to be acquired for the ECLRT construction, Phase I and Phase II Environmental Site Assessments will be conducted in accordance with O.Reg. 153/04 (i.e. to CSA standards), as amended. If a Record of Site Condition is required MMM Group October 2013 Page E-28

Factor Environmental Issue / Concern Effect / Impact (During Construction; During Operations) Mitigation Measures Monitoring / Future Work / Contingency for a property the corresponding studies will be completed in accordance with O.Reg. 153/04, as amended; For areas where spills were documented to have occurred within the study area, during construction of the ECLRT, soil testing for petroleum hydrocarbons (PHCs) will be completed along the road right-of-way where removal of soil from the road shoulders and road right of ways (i.e. excess materials) is required. If presence of PHCs is confirmed, appropriate contaminated soils management will be determined and implemented. Since the former waste disposal site (southeast corner of Black Creek Drive and Eglinton Avenue) was closed more than 25 years ago, no ministerial approvals are required. No additional environmental investigations are required for APECs with low potential for contamination. MMM Group October 2013 Page E-29

Factor Environmental Issue / Concern Effect / Impact (During Construction; During Operations) Mitigation Measures Monitoring / Future Work / Contingency For the study area, trucks hauling materials associated with the ECLRT will be restricted from entering residential areas through contract provisions to the extent feasible. An excess materials management plan will be implemented in accordance to regulatory requirements during construction. Management of contaminated material encountered will follow MOE Standards, Ontario Regulation 153/04 and Ontario Provincial Standards Specification 180 General Specification for the Management and Disposal of Excess Material. Socio-Economic Environment Property Full or partial loss of property for the construction of the ECLRT. Partial property takings required include underground easements and surface facilities such as station entrances. Total of 12 properties required for EPR Addendum study area: Four full acquisitions and eight partial acquisitions are required. Three of the acquisitions are privately-owned, and the remaining are public properties. Property impacts associated with the ECLRT beyond the limits of the EPR Addendum study areas Compensation for residential and commercial impacts will be provided for temporary and permanent property requirements. Where properties to be displaced form a continuous development of retail / business streetscape, the displacement facility will ensure the Metrolinx will conduct a Property Protection Study during the detailed design phase of the project to confirm detailed property requirements and construction easements. Metrolinx will negotiate temporary construction easements with property owners on a case-bycase basis following the MMM Group October 2013 Page E-30

Factor Environmental Issue / Concern Effect / Impact (During Construction; During Operations) Mitigation Measures Monitoring / Future Work / Contingency are addressed in the 2010 EPR. Construction activities (e.g. excavation) may result in potential for ground settlement, and corresponding impacts to existing adjacent buildings and structures. continuation of the existing street wall (with respect to height setback and general architectural characteristics). Any brownfield sites will be managed in accordance with the Ontario Regulation 153/04 as amended. A Designated Substances Surveys for any buildings or structures which require demolition will be undertaken during the design phase. procedures described in Section 5.4.1. Following construction, Metrolinx will reinstate lands to pre-construction conditions. A contingency plan will be developed prior to construction where appropriate. To combat potential settlement of land on adjacent properties during excavation activities, prior to the commencement of construction operations, separate instrumentation readings will be taken to provide a pre-condition survey for all buildings to assess current conditions. Monitoring during construction will include ground settlement measurements, inclinometers and surface monitoring points for structures. Monitoring is undertaken on a weekly basis during active excavation. This monitoring schedule is reduced to every three months for up to a year following backfilling. The monitoring program will include review wand alert levels. If instrument readings exceed review levels, Metrolinx and its contractor will jointly assess the necessity of altering the method, rate or sequence of construction. MMM Group October 2013 Page E-31