PORT QASIM AUTHORITY. Port Handling Capacity / Challenges

Similar documents
PORT OF HOUSTON AUTHORITY

NAMPORT (NAMIBIAN PORTS AUTHORITY) N th ROAD PO Box 361 WALVIS BAY NAMIBIA

WEB BASED OPERATIONAL SYSTEM FOR OPTIMIZING SHIP TRAFFIC IN DEPTH CONSTRAINED PORTS by

PORT AND TERMINAL MANAGEMENT

HAMILTON PORT AUTHORITY Effective Date: March 01, 2018

Terminal & Cargo Operations Manual (Outline) Pakistan Gas Port Consortium Limited. Port Qasim Pakistan

CentrePort Limited General Tariff Effective 1 July 2008

B.C. TOWBOAT INDUSTRY CONFERENCE

Saldanha B2B Engagement MDS Execution Journey 11 February 2015

China Energy Demand vs. China LNG Fleet Development

SAINT JOHN PORT AUTHORITY TARIFF NOTICES. Effective: January 1, 2018

Port of Vancouver USA Clark College Business Advisory Committee May 9, 2017

ISSUE BRIEF CPEC: GWADAR PORT BECOMES OPERATIONAL FOR CONTAINER VESSELS. ISSI 2018 All Rights Reserved 1 P a g e

V International Seminar on Port Engineering, Concepción, Chile. Site Selection & Design of Marine Terminals

Hub port strategy positions Port of Tauranga for continued growth

PANAMA CANAL EXPANSION

Study on the Plan of Taipei Port

Key Issues for Port Sector Development in India. George Tharakan Mumbai, June 16-17, 17, 2005

EAST AFRICA BRANCH CERTIFICATE IN SHIPPING MANAGEMENT.

Industrial and Port Developments in East Port Said, Sokhna Port and the Surrounding area of the Suez Canal. East Port Said Port 3

Industrial Park And Processing Zone For Market Of 100 Millions

INVESTMENT POTENTIAL INVEST IN PORT TERMINALS AT THE PORT OF WALVIS BAY NORTH PORT PROGRAM DATE: 29 AUGUST 2016 REVISION: 1

CLEAR FREIGHT INTERNATIONAL. Corporate Profile

LONE STAR HARBOR SAFETY COMMITTEE Roger Guenther Executive Director Port of Houston Authority

The Concept of the Development of Turkmenbashi International Seaport and the Marine Merchant Fleet till Year 2020 was approved with Resolution of the

COUNTRY REPORT. Phnom Penh. Autonomous Port. Main infrastructures consist of -Area of Sihanoukville Port 975,000m 2 -Length of port berth

AMER BADAWI Vice President Columbia Grain, Inc.

GRINDROD LIMITED ADDITIONAL INFORMATION FOR ANALYSTS for the year ended 31 December 2016

Partnering with the Private Sector in Pakistan s Port Sector

MILFORD HAVEN PORT AUTHORITY. Approach to and use of Risk Assessments

Port Partnerships Strategic Opportunities for Gateway & Closer Market Ports to Work Together Presented by Rainer Lilienthal General Manager-Trade

PORT DEVELOPMENT PLAN

ENNORE PORT. Ennore Port - The one stop shop Logistics Services Provider

SCHEDULE OF PORT CHARGES

Seaborne trade CONTENTS. 1 Seaborne trade from/to Japan

Sustainable freight transport in support of the 2030 Agenda for Sustainable Development

Port of Algoma. Focal Point of the Great Lakes Region

Dalian the Nearest Port to the World in North China

Safety of LNG-Shipping around Ports and Terminals

Port Re-Development Look At Our Future Now. By Delfina Duarté October 24, 2006

AT A GLANCE. Cairns Shipping Development Project. Revised Draft Environmental Impact Statement Fact Sheet July 2017.

STRENGTHENING YOUR PORT S FINANCIAL STABILITY THROUGH DIVERSIFICATION

Iron Ore Shipping Market in 2011

Significant prevention measures in place for each LNG carrier *

Port Planning Texas City International Terminal. William L. Allen, PE, SE*; Christopher B. Cornell, PE, SE**; and Dr. Joseph Moseley, PE***

GWADAR PORT A CENTER-PIECE OF PAK-CHINA STRATEGIC CO-OPERATION MASTER PLAN & VISION FOR PORT DEVELOPMENT

"Your Preferred Partner in Liquid Tank Cleaning"

Mozambique. Port description

Illawarra Business Chamber/Illawarra First. Submission on NSW Draft Freight and Ports Plan

AMMENDMENT STATUS SHEET DATE SECTION PARA SUBJECT OF AMMENDMENT

NEW HAVEN HARBOR CONNECTICUT NAVIGATION IMPROVEMENT

Strategic Port Authority Leadership. May 8, 2006 Presented by Bernard S. Groseclose, Jr. President & CEO S.C. State Ports Authority

Statistics Data LOBITO PORT HANDLE 2.2 MILLION TONS. 83 Years

Managing Risk in a Connected World Managing Port Accumulation In a Connected World

SICAL Logistics Limited. Single Window for Integrated Logistics

Presentation to Investors

ESSAR VIZAG TERMINALS LIMITED

Development of port Infrastructure: Bangladesh Perspective FAHMIDA AKHTAR DEPUTY SECRETARY MINISTRY OF SHIPPING

Baltimore Harbor & Channels 50-Foot Project, MD & VA Notice of Intent to Prepare a Supplemental Environmental Impact Statement (SEIS)

For personal use only

Quadra Commodities. Anthony Diamante Director and Chartering Manager

Panama Canal Authority Toll Tariffs approved by Cabinet Council and published on the Official Gazzette Implementation: April 1, 2016

PORT OF NEWCASTLE CONTAINER TERMINAL PRESENTATION FEBRUARY 2018

INTRODUCTION. SW Shipping & Logistic that has operation in the field of Shipping, Forwarding, Trucking & Custom Clearance for the last five years.

Permitting Decision - Fraser Surrey Docks Direct Coal Transfer Facility

Multi-purpose port. I n t e r n a t i o n a l S h i p p i n g L a n e. Senai Airport

Freight Connection Pakistan (Pvt). Ltd. PROJECT DIVISION

Finding a Green Ship in a Blue Ocean

MICA October 10, 2018

Trieste Free Port Zone Unique among all Italian Ports

CASE STUDY: INDIAN RAILWAYS

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Karachi Port Improvement Project. KARACHI PORT TRUST Government of Pakistan Pakistan

Liquefied Natural Gas (LNG) Sector Overview March 2017

Louisiana Ports: The Industry that Drives all Others. Presented By: Paul G. Aucoin Executive Director, Port of South Louisiana

Pakistan Textile City

SECOND REGIONAL LATIN AMERICAN AND CARIBBEAN MEETING OF PORT LOGISTICS COMMUNITIES JULY 28 TH 2017

NOTICE N-2. Wharfage Fees Tariff

LNG Import Facility Infrastructure Options

LNG AS FUEL: THE TIPPING POINT?

May 2008 COMPANY OVERVIEW & UPDATE

Krishnapatnam Port Company Limited

Growth In Container Volumes

A STRONG TURNAROUND UNDER WAY

Shipping: Making the world smaller and economy bigger.

SCHEDULE OF CHARGES FOR USE OF ROLL-ON/ROLL-OFF BERTHS PURSUANT TO SECTIONS 26 AND 27 OF THE HARBOURS ACT 1964

TRANSPORT OF THE RUSSIAN FAR EAST AS A PART OF NEA REGIONAL TRANSPORTATION SYSTEM

BACKGROUNDER #6: Moving Goods & Services

State Smart Transportation Initiative

IBTTA s Transportation Policy. and Finance Summit

Aegis Logistics Limited

Port Saint John Facilities

Introduction to Yangshan Bonded Pore Area and Yangshan Customs

The PHA s desire to develop an implement an EMS was driver by the following factors: Potential to improve environmental performance

Presentation PIP LNG Seminar at PSO House. 11 th January, 2016

For personal use only

Deepening/Dredging Impact on Navigational Efficiency in the Delaware River Main Channel

Port NOLA Forward: Strategic Master Plan FAQs

House Select Committee on Strategic Transportation and Long Term Funding Solutions. November 6, 2017

Congo (D. R.) Ports description

A BRIEFING NOTE ON THE PORT SECTOR IN BANGLADESH. February 15, 2007

Transcription:

PORT QASIM AUTHORITY Port Handling Capacity / Challenges 11 th January-2016 1

PQA s Overview Port Qasim functions under PQA Act, 1973 on landlord concept with an attached industrial estate (13,700 acres) 08 dedicated state-of-the art Terminals on BOT/BOO through Private Sector IOCB-PSM & Marginal Wharves (public Sector) Catering over 40% seaborne cargo 2

PQA s Overview PQA contributes substantial revenue to national exchequer 45 Km Main Navigational Channel & Alternate Channel have immense opportunities for future port development 2-3 LNG Terminals can be accommodated Direct access to road & railway network 3

Notified Limits Karachi Port A Pak Steel E INDUSTRIAL COMPLEX B Bundal & Buddo OPERATIONAL COMPLEX D c 4

5

IOCB Port Operational Complex PIBT Coal FOTCO SSGC - LPG Pak Steel 6 EETPL- LNG EVTL FWQ-LCT Marginal Wharf PQEPCL Power Plant Grain & Fertilizer 1st QICT 2 nd QICT 6

Port Operational Complex Terminal Basis Capacity million tonnes Annual Utilized 2014-15 Cost (million) Year of Operation Iron Ore & Coal Berth (IOCB) Public 3.0 0.89 Rs. 415 1980 Marginal Wharf Sector 6-7 2.57 Rs.1362 1981 Fauji Oil Terminal (FOTCO) Qasim International Container Terminal (QICT) 9.0 8.15 US$ 97 1995 0.850 TEUs 0.54 US$ 100 1997 Liquid Chemical Terminal (EVTL) 4.0 1.28 US$ 76 1998 LPG Private Sector SSGC LPG Terminal BOT/BOO 2.0 0.01 US$ 50 2007 Liquid Cargo Terminal (LCT) 4.0 2.05 US$ 25 2009 Grain & Fertilizer Terminal(FAP) 4.0 2.09 US$ 135 2010 2 nd Container Terminal 1.175 TEUs 0.43 US$ 300 2011 EETPL LNG Terminal 3.0 0.31 US$ 120 2015 7

Million tonnes Cargo Handling 35 30 25 20 15 10 5 0 2012-13 2013-14 2014-2015 Imports (MT) 17.754 18.076 19.282 Exports (MT) 7.047 7.699 7.836 Total (MT) 24.801 25.775 30.013 No. of Ships 1055 1072 1281 8

PQA Contribution for LNG Project 4 LNG ASD compatible Tugs on 2 years lease term at a cost of US$ 25M. FBR levied duty US$ 15M USAID provided LNG Consultants to PQA Training of Pilots for LNG operation at Siport, Madrid SOPs as per best industry practice Successfully handled 17 LNG Carriers with capacity up to 151,000 cubic meters 9

Port Handling - Capacity / Challenges Engro LNG Terminal requires compliance of SIGTTO & PIANC as per Pakistan LNG Policy, 2011 Limited width and draught requires 5-6 hours suspension of other traffic during the passage of LNG carriers to meet the mandatory safety and security requirements Increase of LNGCs during current year, will delay Container & Bulk Carriers PQA major revenue depends on QICT, delay in berthing of container ships could result in revenue loss / litigation 10

Port Handling - Capacity / Challenges 3 passing bays urgently required in main navigational channel Dredging for deepening & widening may accommodate Q-Flex LNG Vessels according to SIGTTO Guidelines Pak Merchant Marine Policy may be implemented to ensure parity with regional ports 11

Deepening, Straightening & Widening of existing Navigation Channel Existing Navigation Channel Length - 45 km Width - 200 m Draught - 13 m Proposed Widening Width - 250 m Draught - 14 m Commissioning of altrnate Channel Commissioning of alternate Channel to manage two way traffic Length - 20 km Width - 250 m Draught - 14m 12

Duty/Taxes on 04 ASD LNG Tugs (Figures in million) Assessed Value Insurance (1%) US Dollar Landing Charges (1%) Total Value CD @ 20% ST 17% Pak Rupees Income Tax 5.5% Total Duty/Taxes 30.020 0.300 0.303 3,231 646 659 249 1,554 Rs. 258 million will be allowed as duty drawback after 2 years of leasing period 13

14

Comments of Chief Operating Officer, Commercial and Shipping Qatar Gas Thank you for PQA's valued assistance with the recent transit simulations at Siport21, Madrid. Qatar Gas would like to convey its deep appreciation of Capt. Nouman Hassan and his team for their commendable skill, leadership and support while defining procedures for the safe navigation and transit of our chartered Q Flex vessels. The good progress made at Siport was only possible with PQA's and your help and deeply appreciated" 15

Allotment Zone Wise DESCRIPTION NWIZ (acres) EIZ (acres) SWIZ (acres) LOW LYING NWIZ (acres) LOW LYING EIZ (acres) LOW LYING SWIZ (acres) Total Area 2950 8300 1000 415 1520 140 Reserved for 904 2661 94 - - 10 Services / ROW Area Available for Allotment 2046 5639 906 415 1520 130 Allotted Area 1959 5341 858 355 1364 25 Allotment Categories Commercial by auction, Industrial, Warehouse and LPG area Commercial by auction, Industrial and Warehouse Commercial by auction, Industrial, and Warehouse 16

SIGTTO Society of International Gas Tanker and Terminal Operators PIANC Permanent International Association of Navigation Congresses 17