Initial Closure Plan Slag Pond. Nelson Dewey Generating Station. Wisconsin Power and Light Company. Prepared for:

Similar documents
Initial Closure Plan Phase 1 Module 1 Phase 1 Module 2 Phase 1 Module 3. Columbia Dry Ash Disposal Facility. Wisconsin Power and Light Company

CHOLLA POWER PLANT CLOSURE PLAN (b) BOTTOM ASH POND CH_ClosPlan_003_

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) DRY FLY ASH DISPOSAL AREA (DFADA) FC_ClosPlan_004_

CLOSURE PLAN. CFR (b) GERS Fly Ash Pond. Big Sandy Plant Louisa, Kentucky. October, Prepared for : Kentucky Power Big Sandy Plant

CLOSURE PLAN. CFR (b) Document No. GERS Stingy Run Flyash Pond. Gavin Plant Cheshire, Ohio. October, 2016

Closure Plan Brame Fly Ash Pond

Closure Plan Limited Purpose Landfill TransAlta Centralia Mine

CLOSURE AND POST-CLOSURE CARE PLAN JAMES RIVER POWER STATION UTILITY WASTE LANDFILL CITY UTILITIES OF SPRINGFIELD, MISSOURI

Closure Plan Ash Disposal Area PGE Boardman Power Plant

ALLIANT ENERGY WISCONSIN POWER AND LIGHT NELSON DEWEY GENERATING STATION CCR SURFACE IMPOUNDMENT ANNUAL INSPECTION REPORT.

Lansing Generating Station Project No Closure Plan for Existing CCR Revision: 1 TABLE OF CONTENTS

NAUGHTON POWER PLANT NORTH ASH POND INITIAL CLOSURE PLAN

Table of CONTENTS. ATTACHMENT A - Closure Plan from Existing Landfill Permit

TABLE OF CONTENTS LEGAL NOTICE

Ottumwa Generating Station Project No Closure Plan for Existing CCR Revision: 0 Surface Impoundments TABLE OF CONTENTS

Consulting Engineers and Scientists. Closure Plan. Submitted by: GEI Consultants, Inc Voyager Drive Green Bay, Wisconsin

CLOSURE PLAN ASH LANDFILL AREA SPRINGERVILLE GENERATING STATION SPRINGERVILLE, ARIZONA

Closure Plan Jeffrey Energy Center Fly Ash Landfill

ALLIANT ENERGY WISCONSIN POWER AND LIGHT COLUMBIA ENERGY CENTER CCR SURFACE IMPOUNDMENT ANNUAL INSPECTION REPORT. January 15, 2016

SIOUX ENERGY CENTER SCPB CCR IMPOUNDMENT CLOSURE PLAN

Written Closure Plan. Comanche Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

CLOSURE AND POST-CLOSURE PLAN

Technical Memo. Alex Bumgardner, Austin Utilities. Dave Parenteau, PE, Wenck Associates, Inc. Date: December 15, 2015

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

CCR COMPLIANCE BOTTOM ASH BASIN CLOSURE PLAN. Prepared for:

Written Closure Plan. Valmont Station - Boulder, Colorado Active CCR Landfill Public Service of Colorado (PSCo) Denver, Colorado

CLOSURE PLAN. Bremo Power Station CCR Surface Impoundment: North Ash Pond

Closure and Post-Closure Care Plan NRG Indian River Generating Station Indian River Landfill Phase II

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. WHITE BLUFF PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R3 AFIN:

CLOSURE PLAN. CFR (b) Fly Ash Reservoir 1 Landfill Cardinal Plant Brilliant, Ohio. September, 2016

INITIAL RUN-ON AND RUN-OFF CONTROL SYSTEM PLAN Sibley CCR Landfill Sibley Generating Station East Johnson Rd Sibley, Missouri

Brickhaven No.2 Mine Tract A Structural Fill

ALLIANT ENERGY INTERSTATE POWER AND LIGHT OTTUMWA GENERATING STATION CCR SURFACE IMPOUNDMENT ANNUAL INSPECTION REPORT.

Annual Landfill Inspection 2015

CCR Impoundment Closure: Reshaping your Ash! 2017 MWCC Technical Conference

CLOSURE PLAN ECONOMIZER ASH AND PYRITES PONDS AND WEST SLAG DISPOSAL POND

Pond Closure - Case Study[TP1]

LANDFILL CLOSURE PLAN PLUM POINT ENERGY STATION CLASS 3N CCR LANDFILL PERMIT NO S3N AFIN:

Liner Design Criteria Report Jeffrey Energy Center Inactive Bottom Ash Pond

NC2 ASH DISPOSAL AREA

Annual Inspection Report Jeffrey Energy Center Flue Gas Desulfurization (FGD) Landfill

CCR Rule Operating Criteria Closure Plan

0 TRC. Closure Plan for CCR Surface Impoundments. Clover Power Station, Clover, Virginia. October 2016

LANDFILL POST-CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

NRG BRANDYWINE ASH STORAGE SITE BRANDYWINE, MARYLAND 2015 ANNUAL CCR INSPECTION REPORT

Overview of the EPA RCRA Coal Ash Rule

CHOLLA POWER PLANT FLY ASH POND INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN CH_InflowFlood_002_

POST CLOSURE PLAN. CFR (d) GERS Landfill. Mitchell Power Plant Marshall County, West Virginia. October, 2016

CCR Certification: Initial Written Post-Closure Plan (d) for the East Ash Pond at the F.B. Culley Generating Station.

CCR COMPLIANCE BOTTOM ASH BASIN POST-CLOSURE PLAN. Prepared for:

1. Introduction Site Information Site Characteristics Hydrogeologic Setting... 2

2016 ANNUAL STRUCTURAL STABILITY INSPECTION REPORT

In Situ Solidification and Stabilization of Coal Combustion Residuals: Potential Applications and Cost Analysis

Consulting Engineers and Scientists. Post-Closure Plan. Submitted by: GEI Consultants, Inc Voyager Drive Green Bay, Wisconsin

D. B. Wilson Station CCR Landfill

NC1 ASH DISPOSAL AREA

POST CLOSURE PLAN. CFR (d) GERS Fly Ash Pond. Big Sandy Plant Louisa, Kentucky. October, 2016

INITIAL INSPECTION REPORT ASH LANDFILL AREA SPRINGERVILLE GENERATING STATION SPRINGERVILLE, ARIZONA

Coal Combustion Residuals Landfill Closure and Post-Closure Plans

CCR Certification: Initial Written Post-Closure Plan (d) for the Ash Pond at the A.B. Brown Generating Station. Revision 0

FUGITIVE DUST CONTROL PLAN

Ardaman & Associates, Inc. Geotechnical, Environmental, and Materials Consultants A Tetra Tech Company

FOUR CORNERS POWER PLANT POST-CLOSURE PLAN (d) DRY FLY ASH DISPOSAL AREA (DFADA) FC_PostClosPlan_004_

LANDFILL POST-CLOSURE PLAN ENTERGY ARKANSAS, INC. WHITE BLUFF PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R3 AFIN:

Active Coal Combustion Residuals Landfill Annual Inspection Escalante Generating Station

FOUR CORNERS POWER PLANT POST-CLOSURE PLAN (d) LINED ASH IMPOUNDMENT (LAI) FC_PostClosPlan_008_

FOUR CORNERS POWER PLANT POST-CLOSURE PLAN (d) LINED DECANT WATER POND (LDWP) FC_PostClosPlan_009_

2017 Annual Inspection Report

POST CLOSURE PLAN. CFR (d) GERS Landfill. Pirkey Plant Hallsville, Texas. October, 2016

Jim Bridger Power Plant

POST CLOSURE PLAN. CFR (d) Pond 1. Clinch Power Plant Russell County, West Virginia. November Prepared for: Appalachian Power Company

December 21, Mr. Jeff Pittman, PE Cooperative Energy P.O. Box Hattiesburg, MS 39402

WELSH POWER PLANT ASH LANDFILL. Run-on and Run-off Control System Plan

CCR COMPLIANCE LINER CERTIFICATION FLY ASH AND BOTTOM ASH BASINS. Prepared for:

2018 ANNUAL DUST CONTROL REPORT

Pleasants Power Station Landfill Coal Combustion Residual 2017 Annual Report

VISUAL SITE INSPECTION REPORT 2018

2017 Annual Landfill Inspection

POST CLOSURE PLAN. CFR (d) Bottom Ash Pond Complex. Cardinal Plant. Brilliant, Ohio. September, 2016

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

Inspection Report. Re: Keystone Ash Disposal Site Annual CCR Unit Inspection Report No. 1

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN:

Run-on and Run-off Control System Plan

CCR Dust Control Plan

SURFACE IMPOUNDMENT CLOSURE PLAN. Possum Point Power Station Ponds ABC and E Permit # 617

2017 Annual Landfill Inspection Report

Annual Inspection Report

Green CCR Landfill. Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2016 Annual Inspection Report

CCP Annual Inspection Report

Pond Closures: Solving a Complicated Puzzle

VIA . September 19, Mr. Jeffrey Maxted Alliant Energy Sr. Environmental Specialist 4902 North Biltmore Lane Madison, WI

ANNUAL INSPECTION REPORT EXISTING COAL COMBUSTION RESIDUE (CCR) LANDFILL MUSCATINE POWER & WATER

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

Gainesville Regional Utilities Deerhaven Generating Station

Limited Purpose Landfill Solid Waste Permit Application per WAC

On behalf of Green Meadow, LLC and Charah, Inc., HDR provides the enclosed Addendum 3 regarding the permit application entitled:

Coal Combustion Residuals (CCRs)

2017 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

LOCATION RESTRICTIONS SEISMIC IMPACT ZONES BASIN 6

2018 JRPS LANDFILL INSPECTION REPORT CITY UTILITIES OF SPRINGFIELD, MISSOURI

Transcription:

Initial Closure Plan Slag Pond Prepared for: Wisconsin Power and Light Company 11999 County Highway VV Cassville, Wisconsin 53806 Prepared by: SCS ENGINEERS 2830 Dairy Drive Madison, Wisconsin 53718-6751 (608) 224-2830 October 2016 File No. 25216054.00 Offices Nationwide www.scsengineers.com

Initial Closure Plan Slag Pond Prepared for: Wisconsin Power and Light Company 11999 County Highway VV Cassville, Wisconsin 53806 Prepared by: SCS ENGINEERS 2830 Dairy Drive Madison, Wisconsin 53718-6751 (608) 224-2830 October 2016 File No. 25216054.00

Table of Contents Section Page PE Certification... iii 1.0 Introduction and Project Summary... 1 2.0 Proposed Closure Plan Narrative... 2 3.0 Final Cover System and Performance... 2 4.0 Maximum Inventory of CCR... 4 5.0 Largest Area of CCR Unit Requiring Final Cover... 4 6.0 Schedule of Sequential Closure Activities... 5 7.0 Completion of Closure Activities... 5 8.0 Certification... 5 9.0 Recordkeeping and Reporting... 6 10.0 References... 6 List of Figures 1 Site Location Map 2 Site Plan Appendices A Closure Schedule I:\25216054.00\Deliverables\Slag Pond Initial Closure Report\WPL_NED-Slag Pond_Closure Plan_Final.docx Cassville, Wisconsin i October 2016

[This page left blank intentionally] Cassville, Wisconsin ii October 2016

[This page left blank intentionally] Cassville, Wisconsin iv October 2016

1.0 INTRODUCTION AND PROJECT SUMMARY On behalf of Wisconsin Power and Light Company (WPL), SCS Engineers (SCS) has prepared this Initial Closure Plan for the Slag Pond at the (NED) as required by 40 CFR 257.102(b). The NED facility includes three CCR units: Slag Pond The Slag Pond is an active, unlined coal combustion residual (CCR) surface impoundment. The Slag Pond is subject to the requirements of 40 CFR 257.102 and is the subject of this closure plan. Wisconsin Pollutant Discharge Elimination System (WPDES) Pond The WPDES Pond is an inactive, unlined CCR surface impoundment. The WPDES Pond is not the subject of this plan and is not discussed further herein. Closed CCR landfill The CCR landfill was closed prior to October 19, 2015, and is not subject to the rule requirements. The closure was approved by the Wisconsin Department of Natural Resources (WDNR). The NED facility ceased electric generating operations at the end of 2015. A Notification of Intent to Close the Slag Pond was placed in the facility s Operating Record on July 19, 2016, and submitted to the WDNR on July 22, 2016, as required by 40 CFR 257.102(g) and 257.106(i)(7). While the generating station was operating, the Slag Pond primarily received slag, but also received slag transport water, non-chemical boiler wash water, air heater wash (fly ash), steam grade water production wastewaters, storm water runoff from the plant grounds and landfill, slag handling runoff, coal pile runoff, water from plant floor drains, boiler blowdown (steam/water), and WPDES Pond discharge. 40 CFR 257.102(b) Written closure plan (1) Content of the plan. The owner or operator of a CCR unit must prepare a written closure plan that describes the steps necessary to close the CCR unit at any point during the active life of the CCR unit consistent with recognized and generally accepted good engineering practices. The written closure plan must include, at a minimum, the information specified in paragraphs (b)(1)(i) through (vi) of this section. The subject of this Initial Closure Plan is the Slag Pond. Figure 1 shows the site location, and Figure 2 shows the site layout and location of the Slag Pond. WPL intends to close the Slag Pond by leaving CCR in place and capping the pond with a final cover system that will meet the requirements of 40 CFR 257.102, as well as state requirements. WPL is currently in the process of developing design plans and obtaining permits/approvals from the State of Wisconsin to allow the closure of the Slag Pond with CCR left in place. This Initial Closure Plan was developed to document that the closure of the Slag Pond will, at a minimum, meet the requirements of 40 CFR 257.102. Cassville, Wisconsin 1 October 2016

2.0 PROPOSED CLOSURE PLAN NARRATIVE 40 CFR 257.102(b)(1)(i) A narrative description of how the CCR unit will be closed in accordance with this section. CCR will be consolidated within the Slag Pond and the area will be closed by covering the CCR with the final cover system described in Section 3.0. 3.0 FINAL COVER SYSTEM AND PERFORMANCE 40 CFR 257.102(b)(1)(iii). If closure of the CCR unit will be accomplished by leaving CCR in place, a description of the final cover system, designed in accordance with paragraph (d) of this section, and the methods and procedures to be used to install the final cover. The closure plan must also discuss how the final cover system will achieve the performance standards specified in paragraph (d) of this section. (d) Closure performance standard when leaving CCR in place. (1) The owner or operator of a CCR unit must ensure that, at a minimum, the CCR unit is closed in a manner that will: (i) Control, minimize or eliminate, to the maximum extent feasible, post-closure infiltration of liquids into the waste and releases of CCR, leachate, or contaminated run-off to the ground or surface waters or to the atmosphere; The final cover system design will minimize or eliminate infiltration, as further described below. (ii) Preclude the probability of future impoundment of water, sediment, or slurry; The final cover system will meet these criteria, as further described below. (iii) Include measures that provide for major slope stability to prevent the sloughing or movement of the final cover system during the closure and post-closure care period; The final cover system will be designed to provide slope stability and to prevent sloughing or movement during the closure and post-closure care period. Stability of the final cover system will be assessed as part of the final cover design for state approvals once state requirements for the final cover system are determined. (iv) Minimize the need for further maintenance of the CCR unit; and Maintenance of the final cover will be minimized by the establishment of vegetative cover and the erosion control systems, which are further described below. (v) Be completed in the shortest amount of time consistent with recognized and generally accepted good engineering practices. Cassville, Wisconsin 2 October 2016

All closure activities for the CCR unit will be completed within 5 years, as stated in Section 7.0 below. (2) Drainage and stabilization of CCR surface impoundments. The owner or operator of a CCR surface impoundment or any lateral expansion of a CCR surface impoundment must meet the requirements of paragraphs (d)(2)(i) and (ii) of this section prior to installing the final cover system required under paragraph (d)(3) of this section. (i) Free liquids must be eliminated by removing liquid wastes or solidifying the remaining wastes and waste residues. Free liquids will be dewatered from the pond and remaining waste will be mixed with dry CCR or otherwise adequately stabilized prior to final cover system placement. (ii) Remaining wastes must be stabilized sufficient to support the final cover system. The remaining wastes will be stabilized prior to final cover system placement. (3) Final cover system The final cover system (see Figure 3 for detail) for the Slag Pond will include the following, at a minimum, from the bottom up: Eighteen-inch thick soil infiltration layer (minimum permeability of 1x10-5 ) Six-inch thick vegetative soil layer This final cover will meet the minimum requirements of 40 CFR 257.102(d)(3)(i)(A) through (D) as follows: Per 257.102(d)(3)(i)(A), the Slag Pond final cover system will include an 18-inch soil layer with a permeability of 1x10-5 centimeters per second (cm/sec) or less. The permeability of the proposed final cover system is less than the permeability of the natural subsoils under the pond identified during facility design as documented in the March 1978 Final Design Engineering and Plan of Operation prepared by Warzyn Engineering, Inc., for the NED ash disposal facility. There is no liner system present in the Slag Pond. Per 257.102(d)(3)(i)(B), the cover system will provide at least 18 inches of earthen material to minimize infiltration. Per 257.102(d)(3)(i)(C), erosion of the final cover system will be minimized with a vegetative soil layer with a minimum of 6-inches of un-compacted rooting zone material. Cassville, Wisconsin 3 October 2016

Per 257.102(d)(3)(i)(D), the design of the final cover system will minimize disruptions to the final cover system. The stability of the final cover system will be assessed during final design once state requirements are determined. The design of the final cover will accommodate settling and subsidence of the CCR fill below the cover. The CCR will be placed and compacted prior to final cover placement. The final cover system will be designed with minimum and maximum slopes that will accommodate settlement and minimize disruptions to the cover. All final cover materials will be tested to confirm they meet the required specifications and construction will be overseen and documented by a licensed professional engineer. Final cover soil layers will be checked for thickness. All areas will be restored after final cover is placed. Vegetation will be monitored and maintained. 4.0 MAXIMUM INVENTORY OF CCR 40 CFR 257.102(b)(1)(iv). An estimate of the maximum inventory of CCR ever on-site over the active life of the CCR unit. The estimated maximum inventory of CCR ever on-site in the Slag Pond, over the active life of the Slag Pond, is approximately 75,000 cubic yards (cy). This estimate is based on the potential maximum volume of CCR that could accumulate in the pond if it were allowed to completely fill, or be filled, with CCR to the design top elevation, which is 620 feet. The estimate assumes that the bottom elevations in the Slag Pond generally follow the design contours depicted in the March 1978 Final Design Engineering and Plan of Operation prepared by Warzyn with the exception of the berm shown between the Coal Slag Basin and Settling/Infiltration Basin on the design plans is also CCR. The berm does not exist, so the volume of the berm is included as potential CCR volume. 5.0 LARGEST AREA OF CCR UNIT REQUIRING FINAL COVER 40 CFR 257.102(b)(1)(v). An estimate of the largest area of the CCR unit ever requiring a final cover as required by paragraph (d) of this section at any time during the CCR unit s active life. Based on the geometry of the Slag Pond described above, the estimated largest area of final cover required is approximately 4.8 acres, which is the area within the 620 foot contour shown on the Warzyn design plans. Cassville, Wisconsin 4 October 2016

6.0 SCHEDULE OF SEQUENTIAL CLOSURE ACTIVITIES 40 CFR 257.102(b)(1)(vi). A schedule for completing all activities necessary to satisfy the closure criteria in this section, including an estimate of the year in which all closure activities for the CCR unit will be completed. The preliminary schedule for closure of the Slag Pond is provided in Appendix A. 7.0 COMPLETION OF CLOSURE ACTIVITIES 40 CFR257.102((f)(1). Except as provided for in paragraph (f)(2) of this section, the owner or operator must complete closure of the CCR unit: (i) For existing and new CCR landfills and any lateral expansion of a CCR landfill, within six months of commencing closure activities. This does not apply to the Slag Pond CCR unit. (ii) For existing and new CCR impoundments and any lateral expansion of a CCR surface impoundment, within five years of commencing closure activities. Closure of the unit will be completed within 5 years of July 19, 2016, when the closure activities were commenced with the placement of the Notification of Intent to Close in the facility s Operating Record. 40 CFR 257.102(f)(3). Upon completion, the owner or operator of the CCR unit must obtain a certification from a qualified professional engineer verifying that closure has been completed in accordance with the closure plan specified in paragraph (b) of this section and the requirements of this section. A qualified professional engineer will oversee final cover construction. The engineer will verify final cover materials and methods, and oversee material testing. At the end of construction, the engineer will provide a report summarizing and documenting construction and will certify compliance with the requirements. 8.0 CERTIFICATION 40 CFR 257.102(b)(4) The owner or operator of the CCR unit must obtain a written certification from a qualified professional engineer that the initial and any amendment of the written closure plan meets the requirement of this section. Eric Nelson, PE, a licensed professional engineer in the State of Wisconsin has overseen the preparation of this Initial Closure Plan. A certification statement is provided on page iii of this plan. Cassville, Wisconsin 5 October 2016

40 CFR 257.102(d)(3)(iii). The owner or operator of the CCR unit must obtain a written certification from a qualified professional engineer that the design of the final cover system meets the requirement of this section. Eric Nelson, PE, a licensed professional engineer in the State of Wisconsin is of the opinion that the final cover system described in this written closure plan meets the requirements of 40 CFR 257.102(d)(3). A certification statement is provided on page iii of this plan. 9.0 RECORDKEEPING AND REPORTING 40 CFR 257.102(b)(vi)(2)(iii). The owner or operator has completed the written closure plan when the plan including the certification required by paragraph (b)(4) of this section, has been placed in the facility s operating record as required by Section 257.105(i)(4). The written closure plan will be placed in the facility s operating record and on Alliant Energy s CCR Rule Compliance Data and Information website. Amendments to the written closure plan will be done when there is a change in the operation of the CCR unit that affects the plan or when unanticipated events warrant revision to the written closure plan, as required by 40 CFR 102(b)(3), and when the final design is approved by the WDNR. WPL will provide notification as follows: Intent to initiate closure (notification submitted July 22, 2016) Closure completion Availability of the written Closure Plan and any amendments All notifications will be placed in the facility s operating record and on the website (40 CFR 257.105(i), 257.106(i), 257.107 (i)). 10.0 REFERENCES 1. Final Design Engineering and Plan of Operation - Ash Disposal Facility, Wisconsin Power and Light Company, Warzyn Engineering, Inc., March 29, 1978. 2. Notification of Intent to Close Coal Combustion Residual Surface Impoundment Slag Pond, Wisconsin Power and Light Company, July 19, 2016. Cassville, Wisconsin 6 October 2016

FIGURES 1 Site Location Map 2 Site Plan

I:\25216054.00\Drawings\Initital Closure Plan_Slag Pond\Site Location.dwg, 10/6/2016 1:27:05 PM

I:\25216054.00\Drawings\Initital Closure Plan_Slag Pond\Plan Sheet 2_Existing Conditions.dwg, 10/6/2016 1:44:15 PM

Appendix A Closure Schedule

ID Task Name Duration Start Finish Predecessors 1 Issue Notification of Intent to Initiate Closure 0 days Tue 7/19/16 Tue 7/19/16 Estimated Closure Schedule - Slag Pond Wisconsin Power and Light Company 2017 2018 2019 Jun Jul AugSep OctNovDec Jan FebMarAprMayJun Jul AugSep OctNovDec Jan FebMarAprMayJun Jul AugSep OctNovDec Jan Fe 7/19 2 Engineering 231 days Thu 6/23/16 Thu 5/11/17 3 Permitting 314 days Tue 7/12/16 Fri 9/22/17 4 Procurement 97 days Fri 5/12/17 Mon 9/25/17 5 Closure Construction 291 days Tue 9/26/17 Tue 11/6/18 6 Mobilization 5 days Tue 9/26/17 Mon 10/2/17 7 Dewatering and Stabilization 130 days Tue 10/3/17 Mon 4/2/18 8 Grading Fill Placement 9 days Tue 4/3/18 Fri 4/13/18 9 Final Cover Construction 147 days Mon 4/16/18 Tue 11/6/18 10 Prepare Closure Documentation Report 22 days Wed 11/7/18 Thu 12/6/18 11 Issue Notification of Closure Completion 0 days Fri 12/7/18 Fri 12/7/18 12/7 Page 1