Concepts Products Service DLZ Nautilus, Bern 1
Project Report DLZ Nautilus, Bern In summer 2011, Lindner was commissioned to provide the facade of a new service centre for the company Losinger Marazzi AG. Installation began in November and was completed in April 2012. The total area of Lindner facades installed on this office building is 4,800 m 2. Client: Losinger Marazzi AG Project Architect: Mlzd, Bienne Facade planning: Reba Fassadentechnik AG, Chur Completion date: 2012 Fotos: Pascal Meyer 2
Building new solutions. Lindner undertakes major projects worldwide in all areas of interior fit-out, insulation technology, industrial services and building facades. From pre-planning through to project completion Lindner is your partner of choice. The Company s extensive manufacturing capability enables quality to be strictly maintained whilst allowing maximum flexibility to meet individual project requirements. Environmental considerations are fundamental to all Lindner s business principles. Through partnerships with clients Lindner turns concepts into reality. 3
Scope of works Facade types and scope - 4,800 m 2 bespoke Lindner facade, surface powder coated - 900 individual facade elements including sunblinds - Rain screens - Ceiling area - Maximum sound insulation performance of R w = 46 db - Overall facade U-value (U cw ) of 1.0 W/m 2 K - 180 kg vent-opening elements with non-visible hinges 4
Technical details In order to provide sufficient stability against the vibrations caused by passing trains, the sunblinds were innovatively integrated into the facade profile. Sunblind Facade profile 5
Technical details As cleaning from the outside adjacent to the railway is not permitted, every element is openable for cleaning purposes, with the hinges being cleverly hidden in the element. 6
Technical details Vertical section 7
Technical details As well as the standard facade bracket, customised brackets were also designed to avoid clashing with the building s columns. 8
Technical details Vertical section of ceiling detail Ceiling detail 9
Installation The panels at the ends of the building are fully glazed black enameled panels. 10
Installation Installation of elements started in January 2012 and was completed in April 2012, with work continuing uninterrupted during the coldest months in temperatures below -10 C. 11
PR_F_DLZ/E/1.0 We can do it all for you. Lindner Concepts: - Airports and Railways - Clean Rooms and Operating Theatres - Cruise Liner and Ship Fit-out - General Contracting - Hotels and Resorts - Insulation and Industrial Service - Interior Fit-out and Furnishings - Special-Purpose Constructions and Stadiums - Studios and Concert Halls - System Buildings Lindner Products: - Ceiling Systems - Doors - Dry Lining Systems - Facades - Floor Systems - Heating and Cooling Technologies - Lights and Lighting Systems - Partition Systems - Roofing Systems - Steel & Glass Lindner Service: - Clearance of Harmful Substances - Construction Management and Project Development - Deconstruction and Interior Demolition - General Planning - Global Product Supplies - Green Building - Industrial Scaffolding - Installation and Building Services - Research and Development Lindner Fassaden GmbH Georgstrasse 2 94424 Arnstorf Germany Phone +49 (0)8723/20-35 00 Fax + 49 (0)8723/20-35 35 Lindner-Fassaden@Lindner-Group.com www.lindner-group.com Lindner Facades Limited Lindner House 317 Putney Bridge Road London SW15 2PG United Kingdom Phone +44 (0)20 8246 6300 Fax +44 (0)20 8246 6301 Lindner-Facades@Lindner-Group.com www.lindner-group.com This document is the intellectual property of Lindner, Arnstorf (Germany). All the information contained in this brochure agrees with the information available at the time of its printing and only serves as advance information. Any possible colour deviations there might be from the original product are caused by printing-related reasons. Lindner is the sole and exclusive owner of the copyrights as well as the ancillary copyright. All use, and in particular 12 any distribution, reprinting, exploitation or adaptation of this document shall only be allowed with express, written approval by Lindner.