TOTAL PRODUCTIVE MAINTENANCE, THE SIX BIG LOSSES, AND OVERALL EQUIPMENT EFFECTIVENESS AND THE TPM VISION

Similar documents
A Maintenance Philosophy. Asset Management: Phase II Total Productive Maintenance

Online Student Guide Total Productive Maintenance

APPLICATION OF LEAN MANUFACTURING IN DEVELOPING BEST PRACTICES FOR PRODUCTIVITY IMPROVEMENT IN AN AUTO- ASSEMBLY PLANT

Total Productive Maintenance OVERVIEW

Overall Equipment Efficiency (OEE)

DEVELOPMENT OF TPM IMPLEMENTATION PLAN IN SWITCHGEAR & ENGINEERING COMPANY

for higher reliability by lower costs

Integrating SPC and TPM

Available online at ScienceDirect. Procedia CIRP 57 (2016 )

UNCOVERING HIDDEN CAPACITY UTILIZING OEE N Riverview Drive No. 300 Anaheim, CA 92808, United States

USER MANUAL. Promotional copy. A product of:

USER MANUAL. A product of:

Theory of Constraints (TOC)

22 ways to get the most out of OEE and lean manufacturing disciplines

Goal of TPM BEKC 4883 ADVANCED MANUFACTURING SYSTEM. What is Total Productive Maintenance (TPM)? Founder/Pioneer of TPM

Enhancing Overall Equipment Effectiveness in Battery Industries through Total Productive Maintenance

ISSN: Volume 2, Issue 8, January 2016

Introducing The Reliable Maintenance Excellence Index

Only focused on production itself, not the infrastructure to support the production

Concept Business Excellence Pvt. Ltd. TOTAL PRODUCTIVE MAINTENANCE OVERVIEW

Improving Production Performance with Overall Equipment Effectiveness (OEE)

MAINTENANCE & LOGISTICS T.P.M TOTAL PRODUCTIVE MAINTENANCE

A Total Productive Maintenance (TPM) Approach to Improve Production Efficiency and Development of Loss Structure in a Pharmaceutical Industry

IMPLEMENTATION OF TOTAL PRODUCTIVE MAINTENANCE AND OVERALL EQUIPMENT EFFECTIVENESS EVALUATION

IT 470a Six Sigma Chapter X

WHITE PAPER. spencermetrics LLC Three Giffard Way, Melville, NY p:

Operational Analysis of Mining Equipment in Opencast Mine using Overall Equipment Effectiveness (OEE)

Assist in implementing a proactive maintenance strategy

Quantification of Machine Performance Through Overall Equipment Effectiveness

CASE STUDY BUSINESS PROCESS RE-ENGINEERING. GKN Division Launches Business Revolution

Idhammar OEE The Business Case

reasons to invest in a CMMS

Dependable production OEE, TPM, and RCM

Available online Journal of Scientific and Engineering Research, 2018, 5(4): Review Article

Manufacturing Operations Management. Software evolution for your manufacturing revolution

Dollarizing Maintenance

COPYRIGHTED MATERIAL OVERVIEW OF THE THEORY OF CONSTRAINTS DEFINITIONS FOR THE OPERATIONAL ASPECTS OF THE THEORY OF CONSTRAINTS

Milliken s Operational Excellence Journey

Implementation of TPM in cellular manufacture

RSA RELIABILITY & MAINTENANCE CONSULTANCY FIRM

MES for Metals Applications

Course Final. Case Study 12.2: Quality Costs. Running Head: Case Study 12.2 Quality Costs

Identification of Improvement Factors through Overall Equipment Effectiveness (OEE) Measurement in Manufacturing Company

ijcrb.webs.com INTERDISCIPLINARY JOURNAL OF CONTEMPORARY RESEARCH IN BUSINESS FEBRUARY 2012 VOL 3, NO 10

10 Steps to become a Lean Enterprise. Level 2 Lean Practitioner In Manufacturing Training Course. Step 1 - Part 2

OEE Evaluation of Long Life Food Product Line

An Epicor White Paper. All Downtime Is Not Equal

Research Article Special Issue

Chapter 1 The Manufacturing Plant as a Business System

Case Study. Shopfloor-Online provides clear downtime visibility for precision coating of films

Successful Lean Implementation Through Strategic Selection, Execution and Continuous Improvement. Martin Nazareth & Mark Keneipp

Making Continuous Improvement the Daily Work

LEAN MANUFACTURING & TPM.

Asset Care Management

World Class Manufacturing SMED. Single-Minute Exchange of Die

Overall Equipment Effectiveness Improvement of Annealing Furnace by Implementation of Total Productive Maintenance (TPM) - A Case Study

The software solution for improving production performance

Basics of TPM. Mahesh Mutthusamy

OVERALL EQUIPMENT EFFECTIVENESS (OEE)

The OEE Challenge. How productive are you? It takes a German worker four days to produce what we make in five

7 ways to improve your Production Planning using SAP Business One integration

JAN VAVRA JAN SUCHY ONDREJ SLEZAK MEASURING PRODUCTION EFFECTIVENESS: INDUSTRIAL CASE FROM ELECTRONIC INDUSTRY

How to Start Your Continuous Improvement Journey

ADDRESSING THE SIX BIG LOSSES

Close the Productivity Gap with Overall Equipment Effectiveness (OEE)

Leverage Data-Driven Manufacturing for Greater Productivity, Efficiency and Profits

Total Productive Maintenance Strategy in a Semiconductor Manufacturer: A Case Study

Aluminium & Non-Ferrous Production Optimization Fast, Reliable, Efficient

Time study is not rocket science, but it is possible to get in big-time trouble with incorrect application. Briefly,

Virtual Pull Systems. Don Guild, Synchronous Management INTRODUCTION

Case Study GTECH increases efficiencies in gaming machine manufacturing

Analysis of Performance by Overall Equipment Effectiveness of the Injection Moulding Section of an Automobile Industry

MES Increases Machine Availability for Mazak

Case study. berner foods. Berner Foods Leverages Factory MES to Increase OEE by 68%

Overall Equipment Effectiveness Solution Real-time Machine Availability Management for Maximizing Operational Excellence

WHITE PAPER. Optimizing the Bakery Industry with Software

Use of Spaghetti Diagram for Identification and Elimination of Waste Movements in Shop Floor for OEE Improvement: A Case Study

MES Increases Machine Availability for Mazak

Chetan Patel 1, Vivek Deshpande 2 1 Research Scholar, 2 Assistant Professor

Is Your Company Ready for Digital Transformation? Introducing the Digital Readiness Index

Lean Leader Manual. How to Manage Operations in a Lean Environment

IATF transition. Only 1 year to go for over 69,000 ISO/TS16949 certified organizations to transition to ISO9001: 2015 and IATF 16949: 2016.

ISSN XXXX XXXX 2018 IJESC

Reliability Tools. Why use the tool? Where to use the tool? What does the tool achieve? When to use the tool?

Operator Development Game Plan. Do you have a Game Plan for each Production Area for developing your Operators?

Production Performance Measurement

Production Performance Measurement

The 7 deadly sins of Overall Equipment Effectiveness (OEE)

Manufacturing & Production

Case Study. Cosma International improves systems through collaboration with Solarsoft. Customer Spotlight.

Improving maintenance by profit indicators

Let Us Be The Gauge Experts

Why Should You Invest in IQMS MES Tools: RealTime Production and Process Monitoring?

We are IntechOpen, the world s leading publisher of Open Access books Built by scientists, for scientists. International authors and editors

Ampla. Improving Plant Performance. Make the most of your energy SM

Total Productive Maintenance. Peter Willmott-OMAINTEC 2016 Jeddah December 2016

Why Should You Invest in IQMS MES Tools: RealTime Production and Process Monitoring?

MANUFACTURING PRODUCTIVITY IMPROVEMENT BASED ON OVERALL LINE EFFECTIVENESS

GUIDE Example for Reference Purposes

How Digitalization can save money for Plastic Industry

Transcription:

TOTAL PRODUCTIVE MAINTENANCE, THE SIX BIG LOSSES, AND OVERALL EQUIPMENT EFFECTIVENESS AND THE TPM VISION TOTAL PRODUCTIVE MAINTENANCE Total productive maintenance (TPM) was first defined in 1971 by the Japan Institute of Plant Maintenance (JIPM). TPM is a company wide strategy to increase the effectiveness of production environments, especially through methods for increasing the effectiveness of equipment. TPM became more broadly known in the Western world in the late 1980s when Productivity, Inc. published English editions of two books by JIPM expert Seiichi Nakajima: Introduction to TPM and TPM Development Program. TPM implementation involves applying continuous improvement methods to reduce losses. Because the actual process of adding value to products usually involves machines and equipment, TPM focuses its improvement activities on equipment-related losses. In an ideal factory, equipment would operate 100 percent of the time at 100 percent capacity, with an output of 100 percent good quality. In real life, however, this is rare. The difference between the ideal and the actual situation is due to losses. Equipment operators face the results of these losses on a daily basis. TPM gives them the tools to identify the losses and make improvements. A key strategy in TPM is identifying and reducing what we call the six big losses. THE SIX BIG LOSSES Looking at machine operation, we distinguish six types of waste we refer to as losses, because they reflect lost effectiveness of the equipment. These six big losses are grouped in three major categories: downtime, speed losses, and defect losses. Worldwide Business Solutions: ERP Optimisation 1

The Six Big Losses Loss Categories Downtime (Lost availability) Speed losses (Lost performance) Defect losses (Lost quality) The Six Big Losses Equipment failures Set-up and adjustments Idling and minor stoppages Reduced speed operation Scrap and rework Start-up losses (Currently, JIPM identifies cutting blade losses as a seventh loss. Since this is not a common loss to all machines, cutting blade losses should be categorized as either performance or downtime losses for the purpose of using the OEE Toolkit Downtime) Loss Category 1 - Downtime: - Refers to time when the machine should be running, but it stands still. Downtime includes two main types of loss: equipment failures, and set-up and adjustments. Equipment Failures Sudden and unexpected equipment failures, or breakdowns, are an obvious cause of loss, since a failure due to equipment means that the machine is not producing any output. Set-up and Adjustments Most machine changeovers require some period of shutdown so that internal tools can be exchanged. The time between the end of production of the last good part and the end of production of the next good part is downtime. This downtime loss often includes substantial time spent making adjustments until the machine gives acceptable quality on the new part. Worldwide Business Solutions: ERP Optimisation 2

Loss Category 2 - Speed Losses A speed loss means that the equipment is running, but it is not running at its maximum designed speed. Speed losses include two main types of loss: idling and minor stoppages, and reduced speed operation. Idling and Minor Stoppages When a machine is not running smoothly and at a stable speed, it will lose speed and obstruct a smooth flow. The idling and stoppages in this case are caused not by technical failures, but by small problems such as parts that block sensors or get caught in chutes. Although the operator can easily correct such problems when they occur, the frequent halts can dramatically reduce the effectiveness of the equipment. Reduced Speed Operation Reduced speed operation refers to the difference between the actual operating speed and the equipment s designed speed (also referred to as nameplate capacity). There is often a gap between what people believe is the "maximum" speed and the actual designed maximum speed. The goal is to eliminate the gap between the actual speed and the designed speed. Significant losses from reduced speed operation are often neglected or underestimated. Loss Category 3 - Defect Losses A defect loss means that the equipment is producing products that do not fully meet the specified quality characteristics. Defect losses include two major types of loss: scrap and rework, and start-up losses. Scrap and Rework Loss occurs when products do not meet quality specifications, even if they can be reworked to correct the problem. The goal should be zero defects to make the product right the first time and every time. Start-up Losses Start-up losses are yield losses that occur when production is not immediately stable at equipment start-up, so the first products do not meet specifications. This is a latent loss, often accepted as inevitable, and it can be surprisingly large. Worldwide Business Solutions: ERP Optimisation 3

OVERALL EQUIPMENT EFFECTIVENESS AND THE TPM VISION Implementing TPM means striving toward a vision of the ideal manufacturing situation, a vision that encompasses Zero breakdowns Zero abnormalities Zero defects Zero accidents The path to this ideal situation is a process of continuous improvement that requires the total commitment of everyone in the company, from operators to top management. In the West, the measure of whether an improvement process is succeeding often rests on the ultimate result of the process: the money it makes or loses. This seems rational, since making money is the ultimate goal of industry. The financial bottom line, however, provides little or no information about what is actually going on within the process; thus it gives little real feedback and focus to the things we actually need to do to improve the process. If there is a gap between our daily process and the ideal situation, it makes sense to focus on this gap and look for ways to eliminate it. TPM helps us do this by focusing on the six big losses the gaps to improve the effectiveness of the equipment. By applying a gauge that measures the six big losses, we can focus on improving the right things the losses we want to eliminate. THE OVERALL EQUIPMENT EFFECTIVENESS METRIC Most industries have some kind of gauge system on their equipment that measures quantities such as uptime, units produced, and sometimes even the production speed. These are appropriate things to look at if the focus is on what s coming out of the machine. TPM takes a slightly different approach. Besides what s coming out of the machine, we also want to know what could have come out, and where we are losing effectiveness. Overall equipment effectiveness, or OEE, offers a simple but powerful measurement tool to get inside information on what is actually happening. Worldwide Business Solutions: ERP Optimisation 4

The OEE calculation is a metric that gives us daily information about how effectively the machine is running and which of the six big losses we need to improve. Overall equipment effectiveness is not the only indicator to assess a production system, but it is certainly very important if our goal is improvement. THE ELEMENTS OF OVERALL EQUIPMENT EFFECTIVENESS The three main categories of equipment-related losses downtime, speed loss, and defect or quality loss are also the main ingredients for determining the overall equipment effectiveness. Overall equipment effectiveness is calculated by combining three factors that reflect these losses: the availability rate, the performance rate, and the quality rate. The availability rate is the time the equipment is really running, versus the time it could have been running. A low availability rate reflects downtime losses: Equipment failures Set-up and adjustments The performance rate is the quantity produced during the running time, versus the potential quantity, given the designed speed of the equipment. A low performance rate reflects speed losses: Idling and minor stoppages Reduced speed operation Worldwide Business Solutions: ERP Optimisation 5

The quality rate is the amount of good products versus the total amount of products produced. A low quality rate reflects defect losses: Scrap and rework Start-up losses To calculate OEE, we multiply the three factors together: OEE = Availability Rate x Performance Rate x Quality Rate Worldwide Business Solutions: ERP Optimisation 6

The inverted stair-step diagram above shows graphically how the losses in availability, performance, and quality work together to reduce the overall effectiveness of a machine. The top bar, total operating time, shows the total time a machine is available to make a product. This is usually considered to be 480 minutes per 8-hour shift. Bars A and B show availability. Bar A represents the net operating time, which is the time available for production after subtracting planned downtime (no scheduled production) such as a holiday, no orders, or no personnel. Bar B shows the actual running time after subtracting downtime losses such as equipment failures and set-up and adjustments. Bars C and D show performance. Bar C represents the Target Output of the machine during the running time, calculated at the designed speed of the machine. Below it, a Worldwide Business Solutions: ERP Optimisation 7

shorter fourth bar, D, represents the actual output, reflecting speed losses such as minor stoppages and reduced operating speed. Bars E and F show quality. As you can see, the actual output (E) is reduced by defect losses such as scrap and start-up losses, shown as the shaded portion of bar F. As this diagram shows, the bottom-line good output is only a fraction of what it could be if losses in availability, performance, and quality were reduced. The diagram also suggests that to maximize effectiveness to grow the good output on the bottom line you must reduce not only quality losses, but also availability and performance losses. The three factors work together, and the lowest percentage is usually the constraint that most needs addressing. THE GOAL AND BENEFITS OF OEE MEASUREMENT The goal of measuring OEE is to improve the effectiveness of your equipment. Since equipment effectiveness affects shop-floor employees more than any other group, it is appropriate for them to be involved in tracking OEE and in planning and implementing equipment improvements to reduce lost effectiveness. Let s look at some of the benefits of OEE measurement for operators and shift leaders or line managers. We recommend that the operator collect the daily data about the equipment for use in the OEE calculation. Collecting this data will Teach the operator about the equipment Focus the operator s attention on the losses Grow a feeling of ownership of the equipment The shift leader or line manager is often the one who will receive the daily operating data from the operator and process it to develop information about the OEE. Working hands on with the data will: Give the leader/manager basic facts and figures on the equipment Help the leader/manager give appropriate feedback to the operators and others involved in equipment improvement Allow the leader to keep management informed about equipment status and improvement results Worldwide Business Solutions: ERP Optimisation 8

For More Information Please Contact: Joseph Turnbull Copyright of: Worldwide Business Solutions: www.wwbsgroup.com The London Office 31, Candover Close Harmondsworth Middlesex, UB7 0BD Tel: +44 (0) 208 7599631 Fax: +44 (0) 208 7599632 turnbull.j@wwbsgroup.com Worldwide Business Solutions: ERP Optimisation 9