PROJECT PROFILE FOR MANUFACTURE OF AGRICULTURAL IMPLEMENTS

Similar documents
Automobile Silencer INTRODUCTION BASIS AND PRESUMPTIONS MARKET POTENTIAL

HDPE LUBE OIL CONTAINER 5 LTR. CAP.

WROUGHT IRON FURNITURE

Tumbler Locks INTRODUCTION MARKET POTENTIAL

PROJECT PROFILE ON MOSQUITO COIL STAND (ASICC) Value-Rs 46,80,000

PUFFED RICE Introduction Market Packaging Production capacity 5. Sales revenue 6. Production process outline.

Plastic Moulded Luggage

INDIVIDUAL QUICK FREEZING OF FRUITS AND VEGETABLES

SLOTTED ANGLES. Bureau of Indian standards has specified IS:513 specifications for Slotted angles.

PROJECT PROFILE ON HACKSAW BLADE MANUFACTURING

RICE CRISPIES Introduction Market Packaging Production capacity

PROJECT PROFILE. : Aluminium Fabrication : IS: IS: S.No. Description Qty. Value (Rs.in Lakhs)

Auto Tubes and Flaps

FLAKED CEREALS Introduction Market Packaging Production capacity Sales revenue Production process outline.

The demand for the bricks will increase in line with the demand for construction.

PAPADS Introduction Market Packaging Production capacity Sales revenue Production process outline.

AAMCHUR (DRIED MANGO POWDER)

BREAD AND BUNS Introduction Market Packaging Production capacity 5. Sales revenue

Cement Concrete Tiles and Paving Blocks

Full PVC Footwear. QUALITY AND STANDARDS : (1) PVC Sandals IS 2167:1972 (2) PVC Industrial Boots IS 12254:1993

WIRE DRAWING. Profile No.: 12 NIC Code: INTRODUCTION: 2. PRODUCT & ITS APPLICATION:

JAGGERY FROM SUGARCANE

TOOL ROOM FOR SHEET METAL DIES

Sugar Globules INTRODUCTION MARKET POTENTIAL IMPLEMENTATION SCHEDULE

WOOD SCREWS. Bureau of Indian Standards has laid down specifications for wood screws in IS-451

Production Code (NEC) : Quality and Standard : IS : 9815 (part-i)

PROJECT PROFILE HOT CASES PRODUCT : HOT CASE PRODUCTION CAPACITY : NOS. PREPARATION : MARCH,2011 PREPARED BY:

MINERAL GRINDING. NIC Code:.. Profile No.: INTRODUCTION 2. PRODUCTS AND ITS APPLICATION 3. DESIRED QUALIFICATION FOR PROMOTER

PROJECT PROFILE ON BISCUIT INDUSTRY

PROJECT PROFILE PRODUCT CODE , ASICC-44906

PLASTIC DOORS INTRODUCTION

COCONUT SHELL POWDER

2 FACTORIES LOCATIONS There are two factories of Dewan Cement Limited located as follows:

PROLECT PROFILE PRODUCT = INDUSTRIAL HAND GLOVES PRODUCTION CAPACITY = 75,000 PAIRS PER YEAR

DEWAN CEMENT LIMITED

Multilayer Film. 2 LL/HD/LL Industrial base food oil, backed confectionery, dry vegetables, dry unit, hydrogenated oil, lube oil

DRIP IRRIGATION PIPE

2.2 Availability of know-how and Compliances DFRL, Mysore, has successfully developed the technical know-how. Compliance with PFA Act is mandatory.

Profile No.: 57 NIC Code: PLASTIC CARRY BAGS

PRE PURPOSE OF. management. Prepared

Profile No.: 63 NIC Code: HDPE PIPES

STONE CRUSHER. Profile No.: 60 NIC Code: INTRODUCTION: 2. PRODUCT & ITS APPLICATION:

4. PROFILE ON GRANITE CUTTING

BLOW MOULDED CONTAINERS

BOPP SELF ADHESIVE TAPE

PROJECT PROFILE MEDICAL TRANSCRIPTION PRODUCT CODE : QUALITY STANDARDS : As per Customer s Specifications

KARAMCHA PROCESSING 1.0 PRODUCT AND ITS APPLICATIONS 2.0 MARKET POTENTIAL 3.0 BASIS AND PRESUMPTIONS 4.0 IMPLEMENTATION SCHEDULE 5.0 TECHNICAL ASPECTS

PRECAST CEMENT PRODUCTS

Profile No.: 32 NIC Code: CORRUGATED BOXES

Profile No.: 4 NIC Code: ELECTRICAL CABLES (SINGLE AND MULTICORE)

B. Com (Hons.) III Semester Paper Title: Cost Accounting Paper Code: AS-2620

PAPAIN 1.0 PRODUCT AND ITS APPLICATIONS 2.0 MARKET POTENTIAL 3.0 BASIS AND PRESUMPTIONS 4.0 IMPLEMENTATION SCHEDULE

PVC WIRE AND CABLE COATING

CAS-4 COST ACCOUNTING STANDARD ON COST OF PRODUCTION FOR CAPTIVE CONSUMPTION

GINGER & GARLIC PROCESSING

CEMENT PAINTS. Profile No.: 43 NIC Code: INTRODUCTION:

(ALL BATCHES) DATE: MAXIMUM MARKS: 100 TIMING: 3¼Hours

6-2 TABLE OF CONTENTS I. SUMMARY 6-3 II. PRODUCT DESCRIPTION 6-3 III. MARKET STUDY AND FARM CAPACITY 6-4 A. MARKET STUDY 6-4

COST OF GOODS MANUFACTURED & SOLD STATEMENT

Introduction to Cost Accounting. Samir K Mahajan

Introduction to Cost Accounting. Samir K Mahajan

DETERGENT POWDER & CAKE

PLASTIC BOTTLES (PET)

CE ENGINEERING ECONOMICS AND COST ANALYSIS UNIT 1 PART - A

PROJECT FOR A MODEL COPRA UNIT

Gold Plating on Metallic Optical Frames and Jewellery

Pre-Feasibility Study. (Injection Molding Plastic Products)

LOYOLA COLLEGE (AUTONOMOUS), CHENNAI

SOYA SAUCE. Soya sauce acts as a taste and flavour enhancer in many western and Chinese dishes and meat products.

COST SHEET. Samir K Mahajan

INTER CA MAY PAPER 3 : COST AND MANAGEMENT ACCOUTING Branch: Multiple Date: Page 1

Technical and Policy Track on Agricultural Mechanization in Uganda

Overheads/Job and Batch Costing. RST Ltd. has two production departments Machining and Finishing. There are three service

GRINDING MEDIA. Product Code (ASICC) : Quality & Standards : IS: Production Capacity : 360 MT per year

FLYASH BRICKS 1. INTRODUCTION 2. PRODUCTS AND ITS APPLICATION. Profile No.: 17 NIC Code: 23921

COST SHEET. Samir K Mahajan

TOMATO SAUCE, KETCHUP AND PUREE

a. Factory supplies used in the Morganton, North Carolina, engine parts plant:

Page 1 of 26 (

Metal Fabricators. Phone DAKA (3252) Fax Serving the Construction Industry and Manufacturers Since 1977

UNITERRUPTED POWER SUPPLY(UPS) REPAIRING & SERVICING ***

Introduction to Cost Accounting. Samir K Mahajan

DEHULLED SESAME SEED

Racking. Storage Solutions. Office Furniture

MANUFACTURING PROCESSES

PROJECT PROFILE HURRAICHI CHAPPALS & SANDALS. Product code : Quality & Standards : As per customer specification and standards

IPT 2016 Sales Tax Symposium Indianapolis, Indiana September Manufacturing

Tractor Agriculture is going to explain Secondary Tillage Implements today. Growing up in my ancestral village, I

Pre-Feasibility Study (Ferrocement Manhole Covers Developed Through R & D by CWHR)

SPRAY DRIED FOOD F&V POWDERS, FAT POWDERS

PRESENTATION - COOLSWAY

COST. Labour. Direct

THE COMPANY 3D CONCEPT TOOLING PVT.LTD

Model # 940S-P6-BB. 6/7/2017 Page 1 of 10

5 PRODUCTION COST ESTIMATION. PRODUCTION COST ESTIMATION : Instructional Objectives

Costing Group 1 Important Questions for IPCC November 2017 (Chapters 1 5)

Valid from 4. December Kiwa International Cert GmbH certifies that Peter Street Windsor, Ontario N9C 1J9 CANADA ISO 9001:2008

PRE-FEASIBILITY STUDY ON GROWTH PROMOTING FOLIAR SPRAY (GPFS)

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA 19107

PLASTIC COLLAPSIBLE TUBES

Transcription:

PROJECT PROFILE FOR MANUFACTURE OF AGRICULTURAL IMPLEMENTS Agricultural Implements NAME OF PRODUCT NIC Code(004) 9 Product Code(ASICC-000) 760 PRODUCTION CAPACITY 50 NOS QTY. & VALUE (PA) Rs.48 LACS MONTH & YEAR OF DECEMBER,00 PREPARATION MSMEDI, Digiana Industrial PREPARED BY Estate, JAMMU Ph-09-43077,43545

PROJECT REPORT FOR MANUFACTURE OF AGRICULTURAL IMPLEMENTS Section I PROJECT & ITS INTRODUCTION The proposed project is for establishment of an industrial unit for manufacture of Tractor drawn Agricultural Implements like Tillers/cultivators & Disc harrows etc. These implements are mainly employed for the preparation of soil bed for sowing & burial of organic substa nces as well as loosening & aerating the soil in the agricultural fields MARKET POTENTIAL The proposed products Tillers & Disc harrows are primarily the tractors drawn agricultural implements that are mainly employed for preparation of soil bed for sowing & burial of organic substances as well as loosening & aerating the soil in the agricultural fields. These are heavy duty & economical implements employed by the farmers all over the world for soil bed preparation. Since India is high in the Agriculture base there is a big demand of these implements in the entire country including Jammu & Kashmir particularly in the plain areas like districts Kathua, Jammu & Samba. Presently there is no organized manufacturer of these products in the sta te & there is a tremendous gap in demand & supply since most of the products are being supplied by the units in neighboring states-punjab & Haryana. Therefore there is a very good market potential for the production of the Agricultural implements. Section II MANUFACTURING PROCESS, TECHNICAL ASPECTS & BASIS The manufacturing of proposed products involve various manufacturing processes like cutting of steel sections, fabrication, welding, drilling, turning making sub assemblies, fitting & final assembly etc where steel sections & other parts/components like tynes, springs & fasteners be out sourced & purchased as per own design & specifications.. The manufacturing also involves inspections at various stages till they are finally assembled & packed as per their Quality assurance standards/plans.the following are the presumptions made while preparing this project report. The establishment of unit involves an electrical connection of 60 KW The viability calculations in the project are based on the 00% capacity utilization of the project.

While preparing the project, the following Annual production capacity has been considered PROPOSED ANNUAL PRODUCTION CAPACITY Name of Item Qty. Nos in Avg Rate (Rs in thousands ) Spring Type Tillers - 9 Tynes 00 0 0 Spring Type Tillers - Tynes 50 8 3 Rigid Type Tillers 9 Tynes 50 8 4 Rigid Type Tillers Tynes 00 9 9 5 Disc Harro ws Plane Discs 00 4 4 6 Disc Harro ws Plane 4 Discs 00 6 6 7 Disc Harro ws Plane 6 Discs 00 8 8 8 Disc Harro ws Trailed offset Discs 00 5 5 9 Disc Harro ws Trailed offset 4 Discs 00 7 7 0 Disc Harro ws Trailed offset 6 Discs 50 8 4 Mounted Offset Disc harrow - Discs 00 6 6 Mounted Offset Disc harrow -4 Discs 50 8 4 3 Mounted Offset Disc harrow -6 Discs 50 30 5 Total 48 Lacs Section III LAND, BUILDING & PROPOSED SECTIONS Land Plot of 500 Sq.Yd.( in any industrial Estate at its prevailing average price) of Rs. 558 per Sq.Yds. = Rs 3.37 Lacs Building Plot area to be covered for construction = 60% = 607 Sq. Mts. 3

Building to be constructed with following sections: Incoming, outsourced & BO items Stores Incoming Inspection area Workshops for Press section, Welding section, Machining section Paints & primer application shop Sub assemblies sections for Tillers & Disc harrows Final assembly section Design & development and Quality Control Section Marketing & Purchase Sections Office block, Accounts & Administrative Section Packaging Section Finished Goods Store Parking Area and open space Chowkidar room The estimated amount involved for construction of the sit e as per above plan is as below: Work Involved Area (Sq. Mts.) Rate per Sq. Mts. (in Rs.) (Rs. in Lacs) RCC Construction with Elect/Water/Sanitary fittings 50 4500.00 6.75 3 Sheds with asbestos/ other sheets roof Boundary Wall, Gates & lighting etc. 455.5 800.00 8.0 - -.00 Total Rs 5.95 Grand Total=Rs. 3.37 Lacs + Rs.5.95 Lacs = Rs. 39.3 L ac 4

Section IV MACHINERY, EQUIPMENTS & INFRASTRUCTURES Name of Machine A Production Machines/ Equipments Quantity (in Nos.) Cost inclusive of taxes, transportation, electrical motors & accessories etc. Power Press pillar type00 tons cap Power Press pillar type 50 tons cap 3 Lathe Machine 6 ft GOB type 4 Mig Welding Set 3 sets 5 Pillar type drilling machine 30 mm 6 Pillar type drilling machine 5 mm 7 Bench Grinders & Bench Drilling Machines each 8 Lathe machine light duty 4.5 ft no 7.00 lacs 3 Air compressor 00 PSIG 4 Paint booth cum Oven 5 Tools & Dies, Hand tools, Jigs & fixtures etc 6 Diesel Generator,50 KVA - B. Testing Machines & QC Equipments Inspection & measuring instruments, Jigs & Gauges - 0.30 Lacs Other Infrastructures Pre-Operative Expenses Name of Machine Quantity (in Nos.) Cost 5

Manpower/ Professionals - Conveyance & Communication Expenses 3 Miscellaneous Expenses - - 0.50 Installation & Electrification Expenses Activity Installation & Electrification Expenses for machines & equipments Quantity (in Nos.) Cost - 0.70 Office Equipments etc. Equipments Office equipments, gadgets, computers & furniture etc. Quantity (in Nos.) Cost -.50 Grand Total - Rs 0.00 Lac Section V HUMAN RESOURCE REQUIREMENT 7.0 Staff & Personnel per Month Designation Nos. / Salary per month Manager Marketing / Sales Executive 3 Supervisor/ Foreman 4 Accountant/ Computer Operator Rs.. 0 Lacs 5 Skilled Workers 9 6 Semi-Skilled Workers/ Helpers & Peon etc. 9 Perks/Welfare Expenses 0.5 Total.35 6

Section VI OTHER RECURRING EXPENSES & WORKING CAPITAL Raw Materials Requirement per Annum Item Steel sections, rods/bars, channels, angles, flats, forgings &CI castings etc Tynes, Springs, Discs, Fasteners Hardware, Bearings 3 Welding consumables, Chemicals, Primers, Paints etc 90.00 4 Packaging Materials Utilities per annum Item (Rs. in Lacs) Electricity expenses.30 Water expenses etc. 0.0 3 Diesel expenses 0.60 Total 3.00 Other expenses per annum Advertisement & Publicity Item (Rs. in Lacs) Repair & Maintenance 3 Selling Expenses 4 Telephone & Communication 5 Stationary & Postage etc..00 6 Insurance 7 POL & Consumables 8 Other Misc. Expenses Working Capital Requirement Total 7

Particulars Average Period Raw Materials in stock week 3.96 Salaries, Utilities & other expenses in stock months.70 3 Finished Goods in stock half week.58 4 Work in process week 4.44 5 Market/ Outstanding Debtors week 0.35 Total 4.03 Section VII PROJECT COST & MEANS OF FINANCE Total Capital Investment Item Land & Building 39.3 Cost of Machinery, Infrastructures and Pre - operatives 0.00 3 Working Capital Requirement 4.03 Total 83.35 Means of Finance A) Fixed Capital Item Term Loan on Land, Building, Machinery, Infrastructures & Pre-Operatives @ 75% from financial corporations/ bank 44.50 Own share/ equity @ 5% 4.8 B) Working Capital Total 59.3 Working Capital loan in the shape of working capital limit @ 75% from bank 8.00 Working Capital equity/ own share @ 5% 6.03 Total 4.03 8

Section VIII COST OF PRODUCTION & SALES REALIZATION Cost of Production per annum Item Cost of Raw Materials 90.00 Other recurring expenses i.e. salaries, other expenses and utilities.0 3 Interest on working capital loan @ 0% P.A.80 4 Interest on fixed capital @ 0% P.A 4.45 5 Depreciation on Machinery & Equipments @ 0% P.A averagely.00 6 Depreciation on building @ 5% P.A 0.80 Turnover & Sales Realization per annum Name of Item Total 0.5 Qty. Nos in Avg Rate (Rs in thousands ) Spring Type Tillers - 9 tynes 00 0 0 Spring Type Tillers - tynes 50 8 3 Rigid Type Tillers 9 tynes 00 8 6 4 Rigid Type Tillers tynes 00 0 0 5 Disc Harrows Plane Discs 00 4 4 6 Disc Harrows Plane 4 Discs 00 6 6 7 Disc Harrows Plane 6 Discs 00 8 8 8 Disc Harrows Trailed offset Discs 00 5 5 9 Disc Harrows Trailed offset 4 Discs 00 7 7 0 Disc Harrows Trailed offset 6 Discs 50 8 4 Mounted Offset Disc harrow - Discs 00 6 6 Mounted Offset Disc harrow -4 Discs 50 8 4 3 Mounted Offset Disc harrow -6 Discs 50 30 5 Total Rs. 48 Lacs 4 Scrap 8 Tons @ Rs.5000 per Ton Rs..00 Lacs 9

Grand Total Rs. 50.00 Lacs Section IX PROFITABILITY, FINANCIAL VIABILITY RATIOS & ANALYSIS Profitability per annum (before tax) Particulars Sales Realization 50.00 Less (Cost of Production) 0.7 Net Profit per annum before tax Rs. 9.73 Lacs Rate of Return on total Capital Investment 9.73 83.35 x 00 35.66% Rate of Return on Sales Realization 9.73 50.00 x 00.89% Break Even Analysis at 00% Capacity Utilization Fixed Cost per annum Particulars Interests 6.7 Depreciations.80 Insurance 0.4 40% Salaries, Other expenses & utilities except insurance 8.6 Total 7.47 B.E.P - 37.0 % 0