APPLICATION OF GRAPH-BASED METHOD FOR MANUFACTURING LAYOUT EVALUATION

Similar documents
INVENTORY MANAGEMENT AND CONTROL AT AN IN-FLIGHT CATERING COMPANY NOR LIAWATI BINTI ABU OTHMAN

COMBINED EMPIRICAL MODE DECOMPOSITION AND DYNAMIC REGRESSION MODEL FOR FORECASTING ELECTRICITY LOAD DEMAND NURAMIRAH BINTI AKROM

DESIGN A LOW COST TABLE FAN USING DFMA ANALYSIS NURUL FARMIRA BINTI ZAKARIA UNIVERSITI TEKNIKAL MALAYSIA MELAKA

PARAMETER OPTIMIZATION SIMULATION OF HIGH POWER YTTERBIUM DOPED DOUBLE-CLAD FIBER LASER KHAIROL BARIYAH BINTI MAAMUR

MINIMIZING CONFLICTS DURING CONSTRUCTION STAGE BY USING BUILDING INFORMATION MODELING MOHD FAIZ BIN SHAPIAI

REORGANIZING DISPATCHING LAYOUT TO MINIMIZE DISPATCHING TIME AT APPAREL INDUSTRY

DESIGN AND DEVELOPMENT OF LOW-COST FRICTION STIR WELDING AHMAD SYAZNI BIN ZAKARIA

PROPERTIES OF ASPHALTIC CONCRETE AC14 CONTAINING COCONUT SHELL AS COARSE AGGREGATE SITI NUR AMIERA BINTI JEFFRY

MASOUD GHEISARI A WEB BASED ENVIRONMENT FOR BUILDINGS LIFE CYCLE COST ANALYSIS 2007/2009

OPTIMUM UTILIZATION OF QUARRY DUST AS PARTIAL REPLACEMENT OF SAND IN GREEN CONCRETE

AN EFFICIENT MICROCONTROLLER-BASED ELECTRONIC BALLAST FOR HIGH PRESSURE SODIUM LAMPS USED IN STREET LIGHTING MOHD HAMIZAN BIN OMAR

ANALYSIS OF QUALITY PRODUCT BY USING QFD METHOD AND SATISFACTION CRITERIA ON CONSUMER PRODUCT

Panel name : MISS SITINOR WARDATULAINA BT. MOHD YUSSOF

A SENSOR ARRAY BASED ON PLANAR ELECTROMAGNETIC SENSORS FOR AGRO-ENVIRONMENTAL MONITORING SYAHRUL HISHAM BIN ABD. RAHMAN

COMPARISON BETWEEN CANLITE STABILIZED LATERITE AND PROBASE STABILIZED LATERITE NG TECK WEI

BUSINESS PROCESS IMPROVEMENT (BPI) IN AN ENTERPRISE COMPANY NORASIKIN BINTI SALIM. A project report submitted in partial fulfilment of the

MATHEMATICAL MODELLING FOR DEGRADATION OF WATER POLLUTION BY EFFECTIVE MICROORGANISM (EM) IN RIVER

APPLICATION OF THE TRAVEL COST METHOD TO URBAN FORESTS IN JOHOR BAHRU NURUL SHAHIRAWATI BINTI MOHAMED ROSLI UNIVERSITI TEKNOLOGI MALAYSIA

Line Balancing Optimization for Single Model Assembly Line

ACCURACY ASSESSMENT OF HEIGHT COORDINATE USING UNMANNED AERIAL VEHICLE IMAGES BASED ON ORTHOMETRIC HEIGHT SYAMSUL ANUAR BIN ABU KASIM

PARTIAL DISCHARGE CHARACTERISTICS ON EPOXY-BORON NITRIDE NANOCOMPOSITE DUE TO AGEING TIME UNDER HIGH VOLTAGE STRESS NOOR ALIAA BINTI AWANG

DESIGN AND FABRICATE WELDING MACHINE CART ZULFADLI ADHA BIN NADZRI. Report submitted in partial fulfillment of the requirements for the award of the

SOIL SUCTION PROFILE DUE TO TREE INDUCED SUCTION FARAH FARHANA BINTI SULAIMAN

FLOOD DAMAGE ASSESSMENT MODEL USING COST-BENEFIT ANALYSIS NOR AZLIZA BINTI AKBAR

FEASIBILITY STUDY ON EFFECTIVENESS LARGE SURFACE AREA OF ELECTRODE FOR EARTH BATTERY MUHAMMAD IZZUDDEEN BIN KHAZALI

WIND EFFECTS ON SYMMETRICAL MULTIPLE CORE WALL SYSTEM OF HIGH-RISE BUILDING HAZWANI BINTI SAMSUDIN

CHARACTERIZATION OF FIBER OPTIC SENSOR FOR LIQUID REFRACTIVE INDEX MONITORING DIANAY SHAFINA BINTI SHAFEI UNIVERSITI TEKNOLOGI MALAYSIA

MODIFIED TEST ASSEMBLY FOR WATER TREE STUDY ON POLYMERIC INSULATING MATERIALS CHE NURU SANIYYATI BINTI CHE MOHAMAD SHUKRI

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

THE INFLUENCE OF PERSONALITY TRAITS TOWARDS JOB PERFORMANCE AMONG SECONDARY SCHOOL TEACHERS NORAINI BINTI RUSBADROL

RELATIONSHIP BETWEEN INTERNATIONAL ROUGHNESS INDEX (IRI) AND PRESENT SERVICEABILITY INDEX (PSI)

STUDY ON IRON AND MANGANESE REMOVAL IN RIVER WATER FOR TEXTILES INDUSTRY USAGE ZAITON BIN SAMAD UNIVERSITI TEKNOLOGI MALAYSIA

DOSIMETRIC PROPERTIES OF Al 2 O 3 :C, Mg EXPOSED TO EXTERNAL COBALT-60 GAMMA IRRADIATION

LIFE CYCLE ASSESSMENT OF AN INTEGRATED SOLID WASTE MANAGEMENT SYSTEM IN JOHOR BAHRU SITI NADZIRAH BINTI OTHMAN UNIVERSITI TEKNOLOGI MALAYSIA

EFFECTIVENESS OF CRM SYSTEM FOR CUSTOMER SERVICE REPRESENTATIVES (CSR) TRAINING AT TELEKOM MALAYSIA

PRODUCT DESIGN IMPROVEMENT THROUGH DESIGN FOR MANUFACTURE AND ASSEMBLY (DFMA) AND THEORY OF INVENTIVE PROBLEM SOLVING (TRIZ) AFZAN BINTI ROZALI

IMPROVING THE PROCESS OF CAPTURING CLIENTS NEEDS FAIZAH BINTI IBRAHIM

DEFLECTION MONITORING OF CAST IN-SITU BALANCED CANTILEVER PRESTRESSED CONCRETE BOX GIRDER BRIDGE MOHD KHAIRUL AZMAN BIN HAMBALI

ESTIMATING THE ENVIRONMENTAL IMPACTS OF CARBON EMISSIONS FROM FUEL CONSUMPTION DURING CONSTRUCTION ACTIVITIES PEZHMAN SHAHID

ENERGY EFFICIENT RESIDENTIAL BUILDINGS ASSESSMENT USING BUILDING INFORMATION MODELING AMIN FAKHKHAR ZADEH

A MATHEMATICAL MODEL FOR WATER AND ENERGY NETWORKS MOHAMMAD REZA ABBASI UNIVERSITI TEKNOLOGI MALAYSIA

MULTI-OBJECTIVES OPTIMIZATION OF POWER CONSUMPTION OF A BUILDING TOWARDS ENERGY SAVING MHD ISWANDI BIN KATUTU

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

IMPROVE MATERIAL HANDLING SYSTEM IN HIROTAKO ACOUSTIC SDN.BHD S LOGISTIC DEPARTMENT AREA LINGENTHIRAN A/L SAMYLINGAM

ASSESSMENT OF KETCHUP COMPANIES PERFORMANCE IN MALAYSIA AFAGH MALEK UNIVERSITI TEKNOLOGI MALAYSIA

WEAR DEBRIS DETECTION AND ANALYSIS OF AUTOMOTIVE ENGINE LUBRICATING OIL

UNIVERSITI TEKNIKAL MALAYSIA MELAKA OPTIMIZING OPERATOR CYCLE TIME IN A SEMICONDUCTOR COMPANY

A STUDY ON ATTITUDE TOWARDS USAGE OF AUTOMATED PUSHER BOX TECHNOLOGY USE BEHAVIOR IN FELDA RUBBER INDUSTRY

AVAILABLE TRANSFER CAPABILITY BASED ON RANDOMLY GENERATED PROBABILISTIC DISTRIBUTION FUNCTION OF WIND SPEED USING MONTE CARLO SIMULATION

THICKNESS EFFECT ON THE PERFORMANCE OF COMPOSITE TUBE ABDULLAH OMAR BIN ABDUL AZIZ UNIVERSITI MALAYSIA PAHANG

THE RELATIONSHIP BETWEEN INNOVATION CAPABILITY AND INNOVATION PERFORMANCE IN SERVICE FIRMS AMIR PARNIAN UNIVERSITI TEKNOLOGI MALAYSIA

THE EFFECTS OF CATTLE MANURE AND NPK FERTILIZERS ON SOIL PHYSICAL PROPERTIES AND GROWTH PERFORMANCE OF Zea mays cv.

ENHANCE THE CUSTOMER BUYING BEHAVIOR THROUGH MARKETING STRATEGY ON PURCHASING A HOUSE : SRI PENGKALAN BINAAN IN MELAKA MUHAMMAD KHIDHR BIN MOHD FAUZI

SUSTAINABLE ATTRIBUTES IN PROJECT FEASIBILITY STUDY TOWARDS IMPLEMENTATION OF SUSTAINABLE CONSTRUCTION TAN KAH LING UNIVERSITI TEKNOLOGI MALAYSIA

SIMULATION OF LNAPL MIGRATION AND REMEDITION AT A PETROLEUM REFINERY SITE NOR FARINA NADZIF

STUDY OF MICRO PITS ON BILLET EXPERIMENTAL SURFACE IN EXTRUSION PROCESS MAK KAM WONG

DETERMINANTS OF AUCTION SUCCESS AND AUCTION PRICE PREMIUM HEW LI CHYI UNIVERSITI TEKNOLOGI MALAYSIA

SIMULATION PERFORMANCE OF LOW DAMAGE BASE CONNECTION ON ABAQUS MAHDI HATAMI

WORKPLACE LEARNING AND COMPETENCE ACQUISITION: A SINGLE CASE STUDY OF GITN SDN BERHAD SALES TEAM

PERFORMANCE OF INTEGRATED TREATMENT SYSTEM OF PHOTO- FENTON AND MEMBRANE BIOREACTOR FOR SYNTHETIC SPENT CAUSTIC WASTEWATER

DEVELOPING SYSTEM INFORMATION TECHNOLOGY ON PLANNING DEMAND AND SUPPLY FITRA LESTARI

LIGNIN BIODEGRADATION BY Thermomyces lanuginosus EFB2 AND Aspergillus flavus EFB4 CO-CULTURE AND PURE CULTURE IN SOLID STATE FERMENTATION

ORGANIZATIONAL STRUCTURE IMPACTS ON PROJECT PERFORMANCE AMONG WORKER AT OIL AND GAS INDUSTRY

Faculty of Built Environment University Technology Malaysia

THE EFFECT OF MARKET AND LEARNING ORIENTATIONS ON ORGANIZATIONAL PERFORMANCE OF MANUFACTURING SMALL AND MEDIUM SIZED ENTERPRISES IN PAKISTAN

OPTIMIZATION OF A MULTI-OBJECTIVE-MULTI-PERIOD TRAVELING SALESMAN PROBLEM WITH PICKUP AND DELIVERY USING GENETIC ALGORITHM SEYED POURYA POURHEJAZY

MODIFICATION OF ASPHALT BINDER WITH VARIOUS PERCENTAGES OF CRUMB RUBBER IN FLEXIBLE PAVEMENT ZOHAIR AHMED ALTIEB AHMED UNIVERSITI TEKNOLOGI MALAYSIA

ESTIMATION IN SPOT WELDING PARAMETERS USING GENETIC ALGORITHM HAFIZI BIM LUKMAN

SUPERVISOR VALIDATION

MODELLING AND SIMULATION OF FLEXIBLE PRODUCTION LINE FOR COIL WINDING ASSEMBLY HAZIMAH BINTI ABDUL RAHIM

QUANTITY SURVEYOR S LIABILITY DURING PRE TENDER STAGE ASMAH ALIA BT MOHAMAD BOHARI UNIVERSITI TEKNOLOGI MALAYSIA

GENDER PREFERENCES AND INSTAGRAM HASHTAG USAGE ON #MALAYSIANFOOD ZHANG YE

THE ROLE AND IMPACT OF INFORMATION TECHNOLOGY TOWARDS THE UNEMPLOYMENT RATE OF HUMAN RESOURCE MANAGEMENT

DESIGN AND FABRICATE MINI BIOGAS DIGESTER AHMAD AIZAD BIN JAMIL (MB08044) UNIVERSITI MALAYSIA PAHANG

THE BEST PRACTICE OF VENDOR PERFORMANCE EVALUATION FOR THE FISHING REEL MANUFACTURING INDUSTRY CONNIE TING

OPTIMAL DESIGN OF WATER NETWORK WITH IMPOVED OPERABILITY MOHAMMADREZA DEHGHANI UNIVERSITI TEKNOLOGI MALAYSIA

FUGITIVE EMISSION ESTIMATION FROM STORAGE TANK AND WASTEWATER TREATMENT UNITS JOHNATHAN HAR SEAN HOU UNIVERSITI TEKNOLOGI MALAYSIA

PARASITIC MOMENT EFFECT FOR THE THREE SPANS CONTINUOUS PRESTRESSED CONCRETE BRIDGE SITI SARAH SALIM

SUBCRITICAL WATER EXTRACTION WITH COMPACTED NATURAL CALCIUM CARBONATE COLUMN FOR THE EXTRACTION OF NATURAL PRODUCTS

UNIVERSITI TEKNIKAL MALAYSIA MELAKA SIMULATION OF AUTOMATION OF PEN CAPPING PROCESS FOR EK300 AT SPARKLE PRESCISION SDN. BHD.

EFFECT OF AERATION SYSTEM IN RECREATIONAL LAKE IN UTeM MAIN CAMPUS MUHAMMAD FAEZ BIN ABD RAHMAN UNIVERSITI TEKNIKAL MALAYSIA MELAKA

POTENTIAL OF SOLAR FARM DEVELOPMENT AT UTM CAMPUS FOR GENERATING GREEN ENERGY SHAHRUL NIZAM BIN MOHAMMAD

Faculty of Manufacturing Engineering

A STUDY OF MT-DNA HYPERVARIABLE REGION 1 (HVI) SEQUENCE POLYMORPHISM ON RESIDENTS OF JOHOR IN MALAYSIA ALIREZA LARI UNIVERSITI TEKNOLOGI MALAYSIA

PRODUCTIVITY IMPROVEMENT THROUGH LINE BALANCING TECHNIQUE IN A SMALL MEDIUM ENTERPRISE (SUE) MANUFACTURING PLANT SHAHFIRAN BIN SARIFUDDIN

THE EFFECT OF MARKETING MIX ON GUEST SATISFACTION AND GUEST RETENTION IN FIVE STAR HOTELS RONAK RAEESI

CARBON EMISSION STRATEGY FOR MALAYSIA (GREEN BUILDING COMMERCIAL) TINA ZAHANI ZAINUDDIN

MAINTENANCE MANAGEMENT ASSESSMENT IN A LOCAL MANUFACTURING COMPANY MOHAMMAD ANNUAR BIN MD SALLEH

USER RESISTANCE FACTORS IN POST ERP IMPLEMENTATION SAYEED HAIDER SALIH MAHMOUD

SEISMIC BEHAVIOUR OF LOW-DUCTILE MOMENT RESISTANCE FRAME UNDER FAR FIELD EARTHQUAKE EXCITATIONS CONSIDERING SOFT-STOREY PHENOMENON

EFFECT OF CARBON BLACK ON THE PROPERTIES OF GRAPHITE- EPOXY COMPOSITE FOR BIPOLAR PLATE

INTEGRATING SOCIAL CUSTOMER RELATIONSHIP MANAGEMENT INTO CUSTOMER RELATIONSHIP MANAGEMENT PROCESSES IN ACADEMIC LIBRARY FARIMA ALILOU

PAYMENT CULTURE IN MALAYSIAN CONSTRUCTION INDUSTRY MOHD KHAIRUL ANAS BIN MOHD BADROLDIN UNIVERSITI TEKNOLOGI MALAYSIA

FORECASTING MUAR RIVER WATER QUALITY USING RADIAL BASIS FUNCTION NEURAL NETWORK MOHD RAZI BIN ABD JALAL

THE RELATIONSHIP BETWEEN JOB SATISFACTION AND EMPLOYEE LOYALTY IN THE MANUFACTURING INDUSTRY OF CHINA SHI HE

THE EFFECT OF AGING HEAT TREATMENT ON HARDNESS AND MECHANICAL PROPERTIES OF ALUMINIUM ALLOY NOOR MUHAMMAD JAMALLUDDIN BIN JUSOH

STRUCTURAL SYSTEM ANALYSIS AND DESIGN FOR SAFE HOUSE. Mohammad Rezaeianpakizeh

IDENTIFICATION OF PUBLIC PLACE ATTRIBUTES USING MEAN-END CHAIN RESEARCH MODEL BENTALHODA FOOLADIVANDA UNIVERSITI TEKNOLOGI MALAYSIA


SIZING OF ENERGY STORAGE BASED ON LOSS OF LOAD PROBABILITY OF STANDALONE PHOTOVOLTAIC SYSTEMS RAZMAN BIN AYOP UNIVERSITI TEKNOLOGI MALAYSIA

Transcription:

APPLICATION OF GRAPH-BASED METHOD FOR MANUFACTURING LAYOUT EVALUATION WAN NURUL EFFAH BINTI W ROSLAN B051110190 UNIVERSITI TEKNIKAL MALAYSIA MELAKA 2015

UNIVERSITI TEKNIKAL MALAYSIA MELAKA APPLICATION OF GRAPH-BASED METHOD FOR MANUFACTURING LAYOUT EVALUATION This report submitted in accordance with requirement of the Universiti Teknikal Malaysia Melaka (UTeM) for the Bachelor Degree of Manufacturing Engineering (Manufacturing Management) (Hons.) By WAN NURUL EFFAH BINTI W ROSLAN B051110190 920109-03-5840 FACULTY OF MANUFACTURING ENGINEERING 2015

DECLARATION I hereby, declared this report entitled Application of Graph-based Method for Manufacturing Layout Evaluation is the results of my own research except as cited in the references. Signature :... Author s Name : Wan Nurul Effah Binti W Roslan Date : 23 rd June 2015

APPROVAL This report is submitted to the Faculty of Manufacturing Engineering of UTeM as a partial fulfillment of the requirements for the degree of Bachelor of Manufacturing Engineering (Manufacturing Management) with Honours. The member of the supervisory committee is as follow:.... (Profesor Dr. Adi Saptari)

ABSTRACT One of the key elements to improve efficiency in manufacturing operations is facility layout. This study was conducted in Coraza systems Malaysia, Penang. The company produces industrial parts. Based on the observation and interview sessions, it was identified that there were found inefficiency on manufacturing facilities layout. It total travels distance was high. The objectives of this study are to investigate the current layout in production area and to propose an improved layout to minimize the travel distance by using Graph-Based Method. The dimension of layout were measured by using a measuring tape and the travel distance of current layout were generated by using Pythagoras Theorem to find the total of travel distance. The Graph-Based Method applied to rearrange the layout. The results show that final layout was arranged with same areas for each department but different arrangement and shape of layout. The result of proposed layout and current layout were compared. The proposed layout was proved better than the current layout with 36% reduced the travel distance between departments. i

ABSTRAK Salah satu elemen penting untuk meningkatkan kecekapan dalam operasi pembuatan adalah susun atur kemudahan. Kajian ini dijalankan di Coraza sistem Malaysia, Pulau Pinang. Syarikat ini mengeluarkan bahan-bahan industri. Berdasarkan pemerhatian dan temu duga telah dikenal pasti bahawa terdapat ketidakcekapan kepada susun atur kemudahan pengeluaran dengam jumlah jarak perjalanan adalah tinggi. Objektif kajian ini adalah untuk menyiasat susun atur semasa di kawasan pengeluaran dan cadangan susun atur yang lebih baik untuk mengurangkan jarak perjalanan dengan menggunakan Kaedah Graf Tani. Susun atur diukur dimensi dengan menggunakan pita pengukur dan jarak perjalanan susun atur semasa telah dijana dengan menggunakan Teorem Pythagoras untuk mencari jumlah jarak perjalanan. Kaedah Graf Berasaskan digunakan untuk menyusun semula susun atur. Keputusan menunjukkan susun atur akhir telah diatur dengan kawasan yang sama bagi setiap jabatan tetapi susunan dan bentuk susun atur yang berbeza Hasil daripada cadangan susun atur dan susun atur semasa berbanding. Susun atur yang dicadangkan telah terbukti lebih baik daripada susun atur semasa dengan 36% mengurangkan jarak perjalanan di antara jabatan-jabatan. ii

DEDICATION For my beloved father and mother MR. W ROSLAN BIN W MAHMOOD MDM. FARIDAH BINTI AWANG And for my Supervisor, family and friends. Thank you for their loves and supports iii

ACKNOWLEDGEMENT Alhamdulillah, all my praise to Allah S.W.T for the bless that been given to complete Project Sarjana Muda 1 (PSM 1) and Project Sarjana Muda 2 (PSM 2) successfully. In this good opportunity, I would like to thank you to all people that involved directly or indirectly in completing this technical report. Firstly, I would like to thank to my supervisor, Profesor Dr.Adi Saptari, for his guidance, advices, ideas and support all of the way through the execution of this project. Not forgotten, my appreciation also goes to all lecturers from the Faculty of Manufacturing Engineering (FKP) for all the supports, contribution and cooperation during my investigation and completing my project. Finally, I would like to thanks to my family, especially to my parent and siblings for their love and support from behind. Not forget to all of my colleagues and members that help and give their opinions for completing this project and report either directly or indirectly. iv

TABLE OF CONTENT Abstract Abstrak Acknowledgement Table of content List of Figures List of Tables i ii iv v ix xi CHAPTER 1: INTRODUCTION 1 1.1 Background 1 1.2 Problem Statement 3 1.3 Objective 4 1.4 Scope and Limitations 4 1.5 Organization of Thesis 4 CHAPTER 2: LITERATURE REVIEW 6 2.1 Introduction 6 2.2 Layout in Manufacturing Industry 6 2.3 Type of Layout 7 2.3.1 Product Layout 7 2.3.2 Process Layout 8 2.3.3 Fixed-Position Layout 9 2.4 Relation Layout and Productivity 10 v

2.5 Activities Impact on Layout 11 2.5.1 Products Variety and Volume 11 2.5.2 Facility Shapes and Dimensions 11 2.5.3 Material Handling System 12 2.5.4 Multi Floor Layout 13 2.5.5 Backtracking and Bypassing 14 2.5.6 Pick-up and Drop-off Location 14 2.6 Layout Procedures 14 2.7 Technique for Layout Plant 17 2.7.1 Relationship Diagramming 17 2.7.2 Pair-wise Exchange Method 19 2.7.3 Graph-Based Method 19 2.8 Summary 21 CHAPTER 3 : METHODOLOGY 23 3.1 Introduction Of Methodology 23 3.2 Evaluation of Current Layout 25 3.2.1 Input Data and Activities 25 3.2.1.1 Interview Session 25 3.2.1.2 Visual Observation 26 3.2.1.3 Measurement of Current Layout 27 3.3 Graph-based Method 29 3.3.1 Flow of Material 29 3.3.2 From-to Chart 30 3.3.3 Activity Relationship 30 vi

3.3.4 Relationship Diagram 3.3.5 Space Relationship Diagram 3.3.6 Graph-Based Method Calculation 3.3.7 Arrangement of New Layout 3.3.8 Evaluation of New Layout 3.4 Summary 31 32 32 34 34 34 CHAPTER 4 : RESULTS AND DISCUSSION 36 4.1 Introduction 36 4.2 Data Collected 36 4.3 Analyzed Result of Current Layout 41 4.4 Application of Graph-Based Method 44 4.4.1 Flows of Materials 44 4.4.2 From-to Chart and Activity Relationship 45 4.4.3 Relationship Diagram 48 4.4.4 Calculation by Using the Application of Graph- Based Method 49 4.4.5 Arrangement the New Layout 53 4.5 Analyzed Result of New Layout 55 4.6 Comparison and Improvement of Current and New Layout 56 CHAPTER 5 : CONCLUSIONS 60 5.1 Conclusions 60 5.2 Recommendation 61 vii

REFERENCE 62 APPENDIX A 67 APPENDIX B 70 APPENDIX C 76 APPENDIX D 81 APPENDIX E 88 viii

LIST OF FIGURES 1.0 : Work areas in Coraza System Malaysia 3 2.0 : Production line product departments 8 2.1 : Process departments 9 2.2 : Fixed-position departments 9 2.3 : Regular and irregular facility shapes 12 2.4 : Layout design considering material handling 13 2.5 : Layout planning chart 16 2.6 : Systematic layout planning 16 2.7 : Activity relationship chart 18 2.8 : Relationship diagram 18 2.9 : Space relationship diagram and alternative block layout 19 2.10: The matching adjacency graph property using the block layout 20 2.11 : Relationship chart and diagram for graph 21 3.0 : Flow chart of case study 24 3.1 : Measuring tape 27 3.2 : Activity relationship 31 3.3 : Relationship diagram 31 3.4 : Space 32 3.5 : Space relationship diagram 32 3.6 : Graph-Based Method Procedures 33 3.7 : The efficiency of new layout 34 ix

4.0 : Layout in production area 39 4.1 : The Pythagorean theorem 42 4.2 : The coordinate of each section for the current layout 42 4.3 : Coordinate for each section of process flow 43 4.4 : The travel distance and total of process flow 44 4.5: The Relationship in the production area 48 4.6 : Simplify of relationship diagram in the production area 48 4.7 : The relationship diagram between departments O and S 49 4.8 : Relationship flow between department O and S with D 50 4.9 : Relationship flow between department K with departments O, S and D 51 4.10 : Placing the department N in the face of S, K and D 53 4.11 : Final diagram of new layout 54 4.12 : Construct a new layout 54 4.13 : The coordinates of each department for the new layout 55 4.14 : The coordinate for each department of process flow 56 4.15: The dimensions of process flow and the total distance 56 4.16: Current Layout 57 4.17 : New layout 58 4.18: The percentage of efficiency of new layout 59 x

LIST OF TABLES 2.0 : Productivity effect on work process 10 2.1 : Apple s Plant Layout Procedure 15 2.2 : Reed s Plant Layout Procedure 15 3.0 : Interview session 26 3.1 : Visual Observation 26 3.2 : Dimension production area 28 3.3 : Flows of materials 30 3.4 : From-To chart 30 4.0 : Interview session 37 4.1 : The name and areas for the departments in the production areas 39 4.2 : Visual observation 40 4.3 : Flows of materials 45 4.4 : From-to chart 46 4.5 : Activity relationship 47 4.6 : The best total are departments between O and S with D 50 4.7 : The best total are departments between O, S and D with departments K 51 4.8 : The best total are departments between O, S,D and K with department N 52 4.9: The best total is face S-K-D 52 4.10 : Total Distance of Current Layout 57 4.11: Total Distance of New Layout 58 xi

CHAPTER 1 INTRODUCTION 1.1 Background Today, in manufacturing industry a good placement and arrangement of facilities contributes to the overall efficiency of operations and can minimize until 50% the total operating expenses (Tompkins et al., 2010). A facility layout is an alignment of everything required for production of goods or transportation of services. A facility is an something that facilitates the performance of any activity. It may be a machine tool, a work place, a manufacturing cell, a machine shop, a department or section, a warehouse, etc. (Heragu, 2008). In addition, the facility layout or working environment has a crucial full force on employment, maintenance, productivity and also on the organization's potentiality to target it business strategy (Gensler, 2005). One of the important aspect in design of manufacturing layout is using for the implementing the material flows and physical relationship between activities. In a layout development project the layout should be structured first and then that the material handling system should be established. Later, material handling decisions can have a major impact on the efficiency of a layout. There are four primitive of layout types which are fixed material location departments, production line departments, product family departments and process departments. A number of varied styles have been developed to serve the facilities planner in evolving layout selections. These procedures can be classified into two major groups which is 1

construction type and improvement type. Construction layout method generally involves the designing of new layout from scratch and improvement procedures is producing layout alternatives by looking for improvements in a current layout. On the other hand, improvement methods were expound for formal procedure that can assist the layout analyst develop or upgrade a layout and at the same time contribute with objective criteria to enable the evaluation of a variety of layout alternatives that emerge in the process. There are three algorithm classification which are relationship diagramming of new layout, pair wise exchange method, and graph based method. For this study, the evaluation of layout is applying the graph based method. There are relationship between layout and lean manufacturing to maximize customer value while minimizing wastes which is simply creating more values for customers with fewer resources. By practice of the principle of lean thinking is identifying the wastes of waiting, inventory, transportation and motion can lead to evaluate the layout for improvement. Usually, the waste of waiting occurs due to the transportation and motion that need to eliminate to improve layout by application of Graph Based Method. This study is taken place at Coraza System Malaysia (CSM) that is a international trader of high meticulousness sheet metal fabrication and joining. The company major in provision from beginning product concept and design, through manufacturing prototypes to finish production, assembly and integration. The company coordination services includes of punching, portable, stamping, sanding, spot welding, welding (TIG/MIG), clinching, riveting, CNC turning, CNC milling and assembly and also secondary processes such as of plating and anodizing, painting (wet paint, powder coat) and silkscreening. Coraza Systems Malaysia developed several small medium businesses to advance their capabilities and improve their business and they opened the doors to their new accommodations in 2005. In this three-acre area, 74,000 square feet of the 96,000 square feet built up area is developing to their production floor to serve customers satisfied. The application of graph based method is to improve the layout at Coraza System Malaysia by reducing space and cost of the manufacturing. 2

1.2 Problem Statement Coraza System Malaysia Sdn Bhd is a US manufacturer for supply the metal sheet such as AG-DTL, Jambil, Keysight and so on. However, they are facing problems that related to the layout. This study will focussed in the production line department of Coraza System Malaysia Sdn Bhd. Based on the interview with Coraza engineers it has found that there are some problems faced. Among them are: 1. Based on the interview with supervisor of machining department and also observation at the company, it was found that the company layout arrangement were not organized. For instance, this material of metal part can expose of injury or harm to workers and damage to the materials. So, the Coraza need more space for placing the machine to avoid any facilitates flow of traffic during doing the work and prevent the injury from been happen. Figure 1.0 below shows the some of environment in Coraza. 2. Coraza faced the problem of longer time for transporting raw material, parts tools and finished goods between the departments, it was observed that the layout arrangement may be the cause. Hence, its need a smooth flow of process to reduce the waiting time. Figure 1.0: Work areas in Coraza System Malaysia. 3

1.3 Objectives The objectives in this study as follow: 1) To investigate the current production layout. 2) To propose a new layout that minimize the travel distance by using Graph-Based Construction Method. 1.4 Scope and Limitation This study is to analyze the problem faced by Coraza System Malaysia Sdn Bhd. However, there are some limitations in the area that this study is made. This study is only concentrate on making the improvement for the production line department that involved the departments of CNC machine, level machine, grinding machine, clinching machine, laser machine, bending, power press, WIP area, stamping machine, sanding machine, laser welding, welding, spot weld, storage for shipping, shipping, machine room, storage for carton and quality assurance. Other departments in Coraza are not in the consideration of this study Current layout is used for making analysis of the evaluation of layout. Proposed layout improves the layout by using Graph-based Method and the other method such as relationship diagramming and pair wise exchange method are all not in the scope of this study. 1.5 Organization of Thesis The organization for this thesis according to the format in Projek Sarjana Muda 1 and 2 stated as below so that it can roughly shows the content in this case study. 4

Chapter 1: Introduction This chapter includes the background of relevant topic, problem statement, objectives, and scope and limitation. Chapter 2: Literature review First of all, this chapter begins in explanation of the history of how the productivity can be related to the layout, following by explanation of application of graph based method in manufacturing layout evaluation. Besides, the findings in journal and articles are stated in a table. Chapter 3: Methodology Generally, this chapter stated the flow chart that carried out for the whole process of the methodology. Next the data collection that includes the primary resources and secondary resources that obtained from production department of Coraza is showed to help in the problem analysis. Chapter 4: Result and Discussion Again, this chapter covers the company background and the operation process chart for metal sheet process. Then, the data collections are done based on the layout evaluation of the metal sheet process for each product operator. For the discussion, involve about the discussion of the data analysis based on the evaluation obtain in chapter 4. The data of flow process of 5 products at CSM, the schedule of customer order, the quantity of product, material handling and the distance between spaces are used as the main tools for the improvement of productivity. Further explanation is discussed in this chapter. Chapter 5: Conclusion Lastly, this chapter concluded the main findings for the thesis. Besides, the suggestions for the further improvement of layout that are related to application of graph based method are also stated in this part. 5

CHAPTER 2 LITERATURE REVIEW 2.1 Introduction In this chapter, the research review is focused on several main sections, for explanation of the history of how the productivity can be related to the layout, following by explanation of application of graph based method in manufacturing layout evaluation This information is useful so that appropriate layout in manufacturing industry can be chosen by using the graph based method. 2.2 Layout in Manufacturing Industry A facility layout is an alignment of everything required for manufactures of goods or transit of amenity. A facility is a something that facilities the performance of any activity. It may be a machine tools, a work place, a manufacturing cell, a machine shop, a department or section, a storeroom ( Heragu, 1997). According to Liggett (2000), the problems of layout that related in the design, rearrangement and allocation of space in a new production area lead to the evaluation of layout by testing alternative options for production area. The layout evaluation also considers for reuse and rearrangement of space. Plant can be applied to determine such things as the optimal number of floors, perimeter of the plans, etc of the layout that respect to the better use of space. To solve the problem of space management, layout tool can be applied. Since the early 1960s, computer programs have been developed for the solution of the problems of layout. 6

Computer science/ engineering have been research about the problems of production layout and also the architects and interior designers suggest to design and develop of facilities area such as in manufacturing industry. Before the evaluation of layout in manufacturing industry, the researcher needs to identify the floor plan layout, dimensions of plan layout and the physical arrangement of space on a plan. The allocation of problems is identifying used to generate, compare and evaluate solution of plan layout. 2.3 Types of Layout There are important in design of new facility layout due to design a layout that will upgrade the process flow and reduce wasted spot. Furthermore, the planning efficiency layout also can reduce the distance travel between the department or process, reducing cost and functionality. Usually, the new layout will be developing through experiences of the planner layout and the technical knowledge. Although, experienced person is important by using the skills in developing new layout, but the knowledge also essential due to the technical knowledge such the material handling, process flow and forecast of future needs. A capable understanding of the tools to reduce wasted space and motion however is readily educated and provides good fundamentals from which to start a facility layout (Stevenson, 2002). There are three main types of layout which are the product layout, the process layout and the fixed-position layout. 2.3.1 Product Layout The product layout is commonly less flexible and required more basic appliances cost, but minimize process cycle time and increase equipment usage. This product of layout usually is used in the production area, where service or process are standardized and minimum variation is applied, for instance assembly line. The time for one to transfer through the workstation has almost the equal of cycle time due to the process in the 7

proper line. If one workstation uses much longer time than the next, then the second workstation is seemingly to spend much more time waiting for parts from the first workstation. Conversely, if the second workstation used longer than the first, then the first is like as not to spend much more time waiting to transfer parts to the second (Stevenson, 2002). Based on Figure 2.0 below shows the example flow of product layout. Figure 2.0: Production line product departments (Collins, 2012). 2.3.2 Process Layout Process layout is group type of process which is the areas, equipment and so on, jointly to present the most flexibility. The process layout tool in Figure 2.1 is involved in design by using the quantitative and qualitative factors in determine which departments should be closer or neighbourhood with each other. Qualitative factors are simply analyzed in a closeness rating chart create by Richard Muther knowing as Systematic Planning Layout (SLP). The codes take these elements into considerations: Similar tools or facilities are used Sharing the similar items, records and interaction Arrangement of workflow Risky or unpleasant conditions 8

Figure 2.1: Process Department (Sheldon, 2014). 2.3.3 Fixed-position Layout The fixed-position layout is a fixed service position where personnel and material simultaneously responsible to perform the service. Developing a fixed-position layout is more difficult due to problems about the space constraint and even timing has to determined. The layout of the fixed material location department as shown in Figure 2.2 also involves the ordering, assigned and location of variable of workstations around the material or product. Figure 2.2: Fixed- position departments (SCRIGROUP, 2014). 9