Liverpool City Region Candidate Major Schemes April 2013

Similar documents
Civil Engineering Contractors Association Conference June 2018

Cheshire & Warrington Local Transport Body

Transport in the Liverpool City Region: Update for TravelWatch

Merseytravel s Tickets For Young People Aged 5-18

LIVEABLE CITIES TRANSPORT INFRASTRUCTURE - ENABLING SUSTAINABLE FUTURES NCE100 PRESENTATION - MERSEY GATEWAY 23 APRIL 2018

Merseytravel s Tickets For Adults (aged 19+)

For Sale / To Let. 3 Modern Factory / Warehouse Buildings 14,166 to 18,216 sq ft on 5.5 acres (with development land of 1.7 acres) RIVER MERSEY ENTER

IPSWICH NORTHERN ROUTES STUDY. Stage 1 Progress

THE MERSEY GATEWAY PROJECT

ENTER FOR SALE / TO LET REFURBISHED MODERN WAREHOUSE / INDUSTRIAL FACILITY 61,415 SQ FT (5, SQ M)

Local Transport Plan. Implementation Plan ( )

LIVERPOOL CITY REGION SUSTAINABLE URBAN DEVELOPMENT STRATEGY

campaigning by the Railway Development Society Limited

NON TECHNICAL SUMMARY

TONBRIDGE & MALLING BOROUGH COUNCIL. PLANNING and TRANSPORTATION ADVISORY BOARD. 15 November 2016

Swindon Joint Strategic Needs Assessment Bulletin

Merseyside Transport Partnership Annual Progress Report 2011/12 - A New Mobility Culture for Merseyside. Table of Contents

WIDER PAN-REGIONAL RESPONSE TO THE CREWE HUB CONSULTATION

Merseytravel s Guide to Season Tickets

Introduction The case for Strategic Infrastructure and connectivity David Land North East LEP Board

EXECUTIVE SUMMARY INTRODUCTION TACKLING CONGESTION AND NETWORK MANAGEMENT DUTIES 9

L ,000 sq ft industrial/logistics unit Liverpool International Business Park, L24 8RL Available now.

Liverpool City Region Combined Authority A Transport Plan for Growth

Executive Summary. Introduction

ELEMENT TO LET 3 NEW BUILD INDUSTRIAL / WAREHOUSE UNITS 22,900-45,450 SQ FT (2,127-4,222 SQ M) JUNCTION 4 M57

SWDP 4: Moving Around South Worcestershire. SWDP 4: Moving Around South Worcestershire. Managing Travel Demand

Consultation response. February 2014

Messrs Dyson Bell Martin Parliamentary and Public Affairs 1 Dean Farrar Street GTN CODE: LONDON SW1H 0DY. Dear Sirs

A Transport Strategy to Support the 2017 SEP

That will also contribute to achievement of a number of objectives and policies in the Regional Policy Statement.

WIRRAL GROWTH PLAN THE WIRRAL PARTNERSHIP

JANUARY 2018 STRATEGIC PLAN

L175 Liverpool International Business Park 176,000 SQ FT INDUSTRIAL/LOGISTICS UNIT Junction 6, M62, L24 8RL

Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018

Fishermans Bend Integrated Transport Plan Peer Review John Kiriakidis, GTA Consultants 28/03/2018

150Intr Transport and Strategic Regeneration Welsh Assembly Government New M4 Project Magor to Castleton WelTAG Appraisal Report Stage 1 DRAFT 3 WORKI

Niagara Region Transportation Master Plan Niagara-Hamilton Trade Corridor Technical Paper

South East Manchester Multi-Modal Strategy

Niagara s Transportation Strategy 1. Introduction:

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

Response to Network Rail s Merseyside Route Utilisation Strategy Draft for Consultation

Liverpool City Region. Multi-Area Agreement

A Better Connected South Hampshire

South East Transport Strategy

WELLINGTON NORTHERN CORRIDOR. Project Summary Statement 21 December 2009

Greater Cambridge City Deal Executive Board. A428/A1303 Better Bus Journeys Scheme Public Consultation Outcomes and Next Steps

Strategic Transport Plan Position Statement. June 2017

Redacted for publication

North Central Bedfordshire Growth Options Study Appendix 5 part 2

Project Appraisal Using PRISM Simon Hubbard 28 th September 2004

SOUTH WEST GROUP STRATEGIC PLAN to 2025 FINAL. 5 May South West Group Strategic Plan Final 5 May 2015 Page 1

Freight Transport a Modern Day Cinderella

Mega Projects at WSDOT

M56 Corridor Scoping Study. Final Report

6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS

Chapter 7 Route Window NE6 Goodmayes station. Transport for London

Update Update Christchurch Transport Strategic Plan. Michael Theelen, Chief Planning Officer

Greater Golden Horseshoe Transportation Plan

3. THE RANGE OF PROJECTS PROPOSED FOR EVALUATION

DRAFT Operational Traffic Management Plan

Long Term Rail Strategy Key Messages. Based on updated draft strategy January 2018

INDIANA S INTERMODAL MANAGEMENT SYSTEM Stephen C. Smith Planning Manager, Transportation Planning Division Indiana Department of Transportation

Pukekohe-Paerata Structure Plan. Growth Themes Background Paper -Transport

TRANSPORTATION RELATIONSHIP TO OTHER ELEMENTS OF THE PLAN AND COUNTY REGULATIONS VISION FOR TRANSPORTATION PLANNING ROAD NETWORK SECTION 7

Greater Newcastle Transport Plan

Freight Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland

LDF: Core Strategy, DPD s. Andrew Hall Environmental Regeneration Manager Built Environment Department Sefton Council

SECTOR ASSESSMENT (SUMMARY): URBAN TRANSPORT 1

The third Local Transport Plan for Merseyside

138,074 SQ FT MOORGATE POINT MOORGATE ROAD, KNOWSLEY, LIVERPOOL L33 7XW TO LET UNITS 2&3 WAREHOUSE / INDUSTRIAL UNITS ENTER

Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey

Regional Profile Blackpool. Cordant People Be Integral

Transport2025. Transport vision for a growing world city

Key Decision: Key. Accountable Head of Service: Ann Osola, Head of Transportation & Highways

Regional Transport Strategy. Delivery Plan 2018/ /21

University Site: Land Between Madingley Road and Huntingdon Road (Parcel A); and

The Victorian Transport Plan (Department of Transport, 2008).

1 Introduction 4. 2 Our vision 5. 3 Critical transport challenges 6. 4 Keeping it customer-focussed 10

ROAD TO GROWTH. The areas of research are acceptable but the conclusions drawn are unconvincing.

Passenger service for the Dudding Hill line: brief for feasibility study

Stakeholder Consultation Outcomes

Contents i Contents Page 1 A New Transportation Plan Community Involvement Goals and Objectives... 11

3 Planning and design of the transport network. Chapter State highway and local road networks

TfL Managing Adaptation to Climate Change

Apprenticeships Liverpool City Region Employer Engagement Strategy

Moorgate Road. For Sale. Industrial Investment Opportunity

Sustainable Transportation & Land Use Integration Study

Black Country LEP Assurance Framework Appendix 14 WEST MIDLANDS CROSS LEP STATEMENT ON TRANSPORT

ice.org.uk/ercc ROUNDTABLE INSIGHT: The River Thames: An Untapped Asset In Partnership #FutureProof

Long-term Plan Transport Proposal. 29 October 2014

Chapter 10 Goals, Objectives + Policies

Local Transport Plan 3 March Frank Baxter Travel and Transport Policy Manager Southampton City Council

Report of the Strategic Director Regeneration and Culture to the meeting of Executive to be held on 9 October AD

Transport Model for Scotland. Kevin Lumsden MVA

EXPLANATORY MEMORANDUM TO THE BARNSLEY, DONCASTER, ROTHERHAM AND SHEFFIELD COMBINED AUTHORITY ORDER No. 863

Vanguard House sci-tech daresbury

Q. Where are all the people to fill these jobs going to come from (local unemployment in the villages is very low)?

Fishermans Bend. Integrated Transport Plan Victorian Planning Panels. Cccc Eco City World Summit July Neal Giles, Fishermans Bend Taskforce

Leigh Area Rail Study

PART 9 - TRANSPORTATION

Transcription:

Region Candidate April 2013 Sponsoring Halton Borough Halton Borough Halton Borough Scheme Name: Detail: Estimated Silver Jubilee Bridge Major Maintenance M56 J11A Daresbury Enterprise Zone / East Runcorn The presence of the SJB provides an important contribution to the overall benefits which will be delivered by the Mersey Gateway project in the areas of safety, economy, integration, accessibility and environment. Restriction or closure of the SJB would significantly alter the distribution of traffic between the crossings and the primary objective is therefore to allow the key benefits of the MG project to be realised and maximised. The proposal is to widen the motorway and create an east-facing slip roads from the local highway network (A533/Whitehouse Expressway) at Murdishaw, would provide significant benefits by creating additional capacity on this section of the M56, which is known to suffer from congestion in both directions at peak times. Scheme will also increase accessibility to key areas of development in Runcorn, and to the Mersey Gateway To unlock land for employment and housing development within the Daresbury Enterprise Zone, and the surrounding Sandymoor Area April 3,300,000 4,500,000 19,440,000 21,600,000 5,798,700 6,443,000

Halton Borough Knowsley Knowsley Scheme Name: Detail: Estimated April Widnes Waterfront To improve access to employment sites 1,935,000 2,150,000 Economic Development Zone and Employment Access M57 Extension A5300 Knowsley Expressway - Access to Opportunity and Employment Knowsley Industrial Park Accessibility, Connectivity and Identity North Liverpool A565 and A5036 Corridor Improvement Scheme The primary objective is to reduce congestion, improve traffic flow and network resilience & support economic growth in the city region. The primary objective is to improve the accessibility of Knowsley Industrial Park to maximise economic development and regeneration and support growth across the Region. To unlock considerable development opportunity (most notably Liverpool Waters and Superport) in North Liverpool through improvements of key transport corridors. 3,969,000 4,969,000 5,600,000 6,625,000 13,250,000 15 million

Scheme Name: Detail: Estimated International Gateway / Airport Eastern Access Road Major Highway Scheme Creation of a new access road in the International Gateway area that will help resolve traffic flow concerns and link to new development opportunities including the Airport (Expansion) and the Estuary Business Park. April 12,600,000 14 million Speke Road- Junction Signalisation Estuary Roundabout Sandhills Lane Link Major Highway Scheme The primary objective of the scheme is to support development in the locality and along the Speke Road corridor by increasing capacity at the junction which forms the entrance to Speke Estuary Business Park. To improve freight movement accessing key distribution points such as the Port of Liverpool 2,950,000 3,300,000 6 million 6,600,000 Stonebridge Mayoral Development Zone - A580 East Lancashire Major Highway Scheme Strand Corridor - Great Streets Project To unlock development opportunities in North Liverpool within a Mayoral Development Zone through the improvement of a key transport corridor. Economic growth and job creation through strengthening the links between City Centre and Waterfront and by developing the strand to become a feature in itself with public realm and greening improvements. 7,350,000 8,200,000 5,350,000 6,600,000

Scheme Name: Detail: Estimated April Business growth and job creation. 33,300,000 37 million Centre Connectivity Programme Liverpool Waterfront Business Partnership Community Interest Company Canning Dock Project This project will assist in fulfilling the true potential for Liverpool's Waterfront as an economic driver, by addressing the gaps in the offer and completing the infrastructure connections. 3,600,000 4 million Sefton Sefton Southport Eastern Access Junction at M58 Junction 1 To provide sufficient capacity on the highway network to support the regeneration initiatives of the in their development of new housing and employment sites and into the Southport classic resort Town Centre as a major tourist and employment destination. The primary objective of the scheme is to improve the economy through new development facilitated by better transport facilities, creating new jobs and homes. 1,800,000 4,500,000 5,514,000 6,157,000

Scheme Name: Detail: Estimated A570 Southern Employment Corridor The aim of the scheme is to support the identified growth alone the corridor by both supporting improved sustainable access and also supporting business in improving highway capacity at the three roundabout junctions along the corridor which suffer from congestion at peak periods. The scheme will support development by removing highway constraints currently in place. April 3,500,000 3,395,000 St. Helens Road Bridge Package Haydock Industrial Estate Access St. Helens Town Centre Transport Access A580 Windle Island Junction Improvement Scheme To replace identified weak road over rail bridges for vehicular traffic. Scheme is to provide improved access to an industrial estate to unlock 90,834sqm development. To provide improved interchange facilities between bus and rail within Town Centre and remove the current congestion problems caused To increase capacity at the junction to current delays and congestion at the junction. 4,612,500 5,125,000 2,965,410 3,294,900 4,005,000 4,455,000 2,880,000 3,200,000 Wirral A41 Route improvements To improve access to central Birkenhead, Cammell Laird's, Hind Street development and the Wirral Waters site from the A41. The scheme will improve the economy through regeneration facilitated by better transport facilities creating new jobs and homes. Unknown Unknown

Wirral Scheme Name: Detail: Estimated Heron Road to West Kirby Access To improve safety and provide excellent highway access to facilitate economic regeneration of Wirral and the North West by unlocking land in need of remedial action. Unknown April Unknown Wirral Wirral Tower Road Bridges Replacement Poulton Swing Bridge Removal To replace life expired highway and docks assets to ensure that they are fit for purpose to support the economy and regeneration of Birkenhead and the Docklands areas. To replace a redundant highway and docks asset and replace with an alternative structure to ensure that it is fit for purpose to support the economy and regeneration of Birkenhead and the Docklands areas. Wirral Wirral Streetcar The primary objectives of the scheme are: To provide a catalyst to deliver the Wirral Waters major economic regeneration development; To provide a high degree of sustainable public transport accessibility to Wirral Waters; To accommodate future trip demands of the major regeneration scheme in a sustainable manner, encouraging a greater use of public transport compared to the car, reducing congestion, environmental impacts and accidents. 3,730,000 6,700,000 1,020,000 3,030,000 7.70 million 10.8 million

Scheme Name: Detail: Estimated Newton-le-Willows Interchange Maghull North Rail Station Carr Mill Rail Station Link (St Helens Central to Junction) The primary focus of the scheme is to provide a strategic transport hub which will link local transport (buses and park and ride) with strategic rail links across the country and will build on the electrification programme being taken forward by Network Rail. This will promote the development and use of public transport and encourage modal shift. To provide opportunities for railway journeys from the locality without the need to undertake car journeys. To promote the use of sustainable/ active modes of transport therefore reducing the number of car trips and encouraging mode shift. To provide opportunities for railway journeys from the locality without the need to undertake car journeys. To promote the use of sustainable/ active modes of transport therefore reducing the number of car trips and encouraging mode shift. To provide opportunities for railway journeys from the locality without the need to undertake car journeys. To promote the use of sustainable/ active modes of transport therefore reducing the number of car trips and encouraging mode shift. Halton Curve To provide people with the opportunity to use the railway to make a journey they couldn't otherwise make or as an alternative to the car. April 14.64 million 16.25 million 6,147,000 6.83 million 6,222,600 6,914,000 25,217,100 28,019,000 12,660,000 15,650,000

Scheme Name: Detail: Estimated Bootle Branch Passenger Rail Service To deliver a passenger rail service to north Liverpool, an area which currently doesn't have a rail service. This will increase the accessibility of employment, education, leisure and retail facilities for the local population. April 46,350,000 51.5 million Real Time Passenger Information - Merseyside Kirkby Headbolt Lane Rail Extension Merseytram Line 1 Replacement Scheme Prescot Rail Station A new approach to the provision of RTI based upon industry standards in order to enhance public transport service offer across the region and increase overall confidence of the network operation meeting the necessary service levels expected. To provide people with the opportunity to use the railway to make a journey they couldn't otherwise make or as an alternative to the car; increase the accessibility of the railway allowing people to make a more sustainable transport choice. To improve public transport facilities in a sector of Merseyside that has several areas of major deprivation in order to stimulate economic investment, Improve access to Prescot rail station and the local/national rail network for Prescot District Centre to all users 2,711,000 3,016,000 24,210,000 26.9 million 13.9 million 14.2 million 2,800,000 3,540,000 TOTAL ESTIMATES 311.03 million 364.46 million