Sub-construction for longlight

Similar documents
Sub-construction for ridgelight

Sub-construction for Wall-mounted Longlight

Sub-construction for Atrium Ridgelight

VELUX Modular Skylights

MOUNTING SYSTEMS APPLICATIONS OVERVIEW

mounting systems applications overview

Radiant Solar Tripod Planning and Installation Guide V1.2 With Australia AS/NZS1170.2

COMP ONENT CATA LO GUE FOR INDUSTRIAL BUILDINGS

Product Information Bulletin

VELUX Modular Skylights

Alisply Circular Headquarters - Spain Alsina USA - Chicago Alsina USA - Miami

DICTATOR Lift Shaft System

INSTALLATION GUIDE DUOFUSE DECKING

RUUKKI FAÇADE SYSTEMS

Prescriptive Design for Pole Barns Using the Larimer County Prescriptive Handout

WALL SYSTEMS ( Ref: The Building Illustrated, Ching, Francis DK )

STRUCTURAL REPORT. Magerack Series 101 PV Mounting System. 130 mph Wind, Exposure B & C. California DESIGNER OF RECORD

Rosette Modular Scaffolding System

RUUKKI FORMA DESIGN INSTRUCTION

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM

SECURE. UNIVERSAL. MOUNTING. Tilt Kit Installation Manual

WHAT IS CANTILEVER RACK?

KEEP YOUR FAMILY SAFER FROM EARTHQUAKES AND TYPHOONS BY MAKING SURE YOUR HOUSE FOLLOWS THESE 6 BASIC PRINCIPLES

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 1 of 10 Building Construction Roof Types Revised

The Finnish Quality Since 1960

assembly an open space between the roof and ceiling of a building attic balloon frame a joist constructed of steel with bars in the verticle web space

ThermaSteel Corporation ASSEMBLY MANUAL

Original Scandinavian rainwater system

6x5. Assembly Manual CAUTION. Sharp Edges PATENTS ARE PENDING. Building Dimensions. Approximate Size. Storage Area. Interior Dimensions

La Escandella La Escandella La Escandella

technical drawings Cutted roof tile Levelling batten Plasma roof tile Plasma eave tile (without ribs on the lower side) C Metalic batten Linkage tile

GENERAL FRAME INFORMATION

tracks for building maintenance units (BMU)

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

FREESTAND ROOF GUARDRAIL. Lockinex. ea i, ea u i

TECHNICAL INFORMATION SHEET NUMBER 1a

ANCILLARY STEEL STRUCTURES FOR INDUSTRIAL AND CIVILIAN BUILDINGS. a r c h i t e c t u r e m a d e o f s t e e l STEEL INOX

Power IT Compact Secondary Substations, CSS. Technical catalogue for sheet steel substations

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

MANUAL. landscape orientation. portrait orientation. metal roof mounting system for solar panels METAL ROOF MOUNTING SYSTEM. Rev

THE DESIGN AND INSTALLATION OF A FIVE-STORY NEW TIMBER BUILDING IN JAPAN

ConSole, ConSole+ Flat-roof mounting system for PV-modules and -laminates. From visions to solutions

CONSTRUCTION IMPORTANT TERMS AND FACTS CHAPTER 15

Stone and Masonry Veneer

Note. Floor beams can also be made from wooden beams put through the holes in the longitudinal beam and boards nailed to it.

AEROFOILS 200AF-450AF. Sun Control Systems

SECTION SPECIFICATIONS Adjustable Louvered Roof Pergola Awnings Patio Covers and Pergola Awnings Section (10530)

Installation Guidelines INOFIN FR

ValkPitched - Clamp. Installation manual. Van der Valk Solar Systems. Solar Mounting Systems. Version 17 EN

HelioFix Solar mounting Systems

METALWORKS RH215 Faceted Custom Hook-on Panels

FREQUENT QUESTIONS AND QUERIES AND TROUBLE SHOOTING

Technical and Dimensional Data. Saf-T Vent SC

Title: Building Construction for the Fire Service. Time: 3 hours. Teaching Materials: White board Building Construction for the Fire Service (PDF)

Construction Details 5-37

Product overview:

Point-Supported Glazing

Northlights using VELUX Modular Skylights

ASSEMBLY INSTRUCTIONS RESIDENTIAL SOLUTION CROSSRAIL GROUND MOUNT SYSTEM USA

Insulation Fastener Guide IKO Ener-Air & IKO Enerfoil Wall Insulation

ORDINANCE NO BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BOULDER, COLORADO: CHAPTER 98 - Baled Straw Structures SECTION PURPOSE

EasySHED. Easy... in every way 5 STEP ASSEMBLY INNOVATIVE COLOURS RANGE OF OPTIONAL EXTRAS AUSTRALIAN OWNED & MADE

30 X 40 POLE BARN 12 HIGH SIDE WALLS 2-12 WIDE X 10 HIGH SECTIONAL GARAGE DOORS OPTIONAL WINDOWS DETAILS INCLUDED

Installation guide Thermory decking

Office of the Fire Commissioner Building and Fire Safety Section

AS The External Waterproofing Membranes Standard

Installation manual Pitched Roof Insert System

VELUX INTEGRA VCM/VCE VELUX INTEGRA Solar VCS

Façade Cladding systems overview Angle standing seam

Solcellspaket - Poly (4.2 kwp Jinko 265W Poly) System Plan. Created with Solar-Planit by Mikael Johansson Futura Energi AB in Simrishamn.

BARRIER BARRIER. quick installation. high quality collective side protection. ideal for escape routes. pleasing, unobtrusively design

INSTALLATION MANUAL KOCH

MOUNTING SYSTEMS FOR TRAPEZOIDAL SHEET AND CORRUGATED SHEET ROOFS

Fundamentals of Insulated Panel Installation. MBCEA 2016 Clearwater, FL

Conergy SolarFamulus II

Insulating systems used in agricultural and industrial buildings

HELIOSTAR 252, 218 VERTICAL, FREE INSTALLATION

Dynamic Bonding Systems B.V. A division of Dutch Bonding Group B.V.

SHEET METAL ROOF TEST REPORT

Schöck Isokorb type CVB Design

FSR - Roof Guardrail with Rubber Counterweights. Fold down option available. Lockinex. ea i, ea u i R2_11/17

Leading in integration for partial- and full roofs: Photovoltaic in-roof mounting system Solrif by Schweizer.

Roofing and Cladding systems overview Prefabricated zinc tiles

Design of Long Span Exhibition Hall of Steel Structure

ifix INSTALLATION MANUAL PV flat roof installation system Version

Fall Protection Solutions

Contents DESIGNER S STRUCTURAL PRODUCTS GUIDE. Tegral Purlins & Rails

Why compromise when you can have Windows for Life?

INSTALLATION GUIDE.

SUSPENSION REQUIREMENTS SEE DETAIL B1.2 TYPICAL SYSTEM SECTION SEE DETAIL 'A' THIS SHEET 2" MODULE. SPECIFICATIONS (unless noted otherwise)

BISOL EasyMount Structures

INSTALLATION GUIDE Sika SolarMount 1 Exposition East West

PREFA Aluminiumprodukte GmbH Page 1 of 21

Façade claddings. Sandwich panel SPA, SPB W, SP2D W

POST AND FRAME STRUCTURES (Pole Barns)

Chapter 4 Test. Directions: Write the correct letter on the blank before each question.

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

1 Exam Prep Architectural Sheet Metal Manual Tabs and Highlights

Rack-in-a-BoxTM INSTALLATION MANUAL

CombiSite Temporary Stairways

Transcription:

modular skylights Sub-construction for longlight Sub-construction for longlight at 5-25 pitch modular skylights installed in a longlight solution are build on a sub-construction made of wood, steel or concrete. The subconstruction raises the modules above the roof surface, protecting the construction against water and drifting snow, and provides the supporting base for the modular skylights. The sub-construction is not included in the delivery. The sub-construction as shown in the drawing only represents general principles and must be designed and dimensioned to fit the specific building project, local architectural style and practice, and the directions of other building suppliers.

2 Axonometric A: Opening width B: Opening lenght C: Sub-construction width D: Sub-construction length O: Difference in height of sub-construction Minimum length of steel profiles is equal to opening length (B) C ± 5 A 210 ± 5mm 210 ± 5mm O min 200mm 210 ± 5mm D ± 5 B 210 ± 5mm

3 Building site measurements Plan A: Opening width B: Opening lenght C: Sub-construction width D: Sub-construction length O: Difference in height of sub-construction Lenght of steel profiles is equal to opening length (B) A C ± 5mm B D ± 5mm Cross section min 200mm 210 ± 5 B D ± 5mm 5mm 210 ± 5 O min 200mm 210 ± 5 A C ± 5 210 ± 5

4 Sub-construction variants Cross section Options of sub-constructions for longlight solutions. Please note that the width stated indicates the distance from the exterior of the roofing material to the interior edge of the wood/steel profile. Wood with flat steel Wood with wooden batten Steel with steel profile Concrete with steel profile Concrete with flat steel

5 Longitudinal section In the gable construction for longlight at 5-25 pitch, the height of the sub-construction must be at least at the front of the skylight modules. Securing modular skylights to the sub-construction Using steel profile The sub-construction can be finished at the top with steel profile or steel flat bar, which provides a level and stable surface for the skylight modules and forms a base for fitting installation brackets with clamps. The number and size of fixings for securing the steel profile to the sub-construction must be dimensioned by others to fit each project. 15 mm 8-11 mm The following standard steel profiles are suited for installation of modular skylights in longlight solutions: EU steel beams: INP 220 IPE 200 HE100A HE100B British steel beams: UB 178 x 102 x 19 UB 203 x 102 x 23 UB 254 x 102 x 22 UB 254 x 102 x 25 UB 305 x 102 x 25 UB 305 x 102 x 28 UB 305 x 102 x 33 Wood or steel construction with steel profile In case a stronger construction is needed, the steel profile can be replaced with a stronger profile. In this case, a different size installation bolt must be ordered separately from Company Ltd. The following profiles can be used: 15 mm 8-11 mm EU steel beams: INP 240, 260, 280 IPE 220, 240 HE120A HE120B British steel beams: UB 305 x 127 x 37 UB 305 x 127 x 42 UB 356 x 127 x 33 235 mm Concrete construction with steel profile

6 Straightness of steel profile Requirements as to the straightness of the steel profile are 2 mm per 2 meters. 2 mm / 2 m 2 mm / 2 m Using flat steel When mounting the modular skylights on flat steel, the steel must be in width and 8-11 mm in height. In addition there must be at least 15 mm free space underneath the steel both vertically and horizontally to give room for the clamps. The number and size of fixings for securing the steel profile to the building must be dimensioned by others to fit each project. Requirements as to use flat steel: ½ ½ The blocking-up of the steel must be for the full length of the flat steel profile The steel can be secured using screws along the middle of the profile Connection of steel profiles must not collide with clamps 15 mm 8-11 mm 15 mm 8-11 mm 15 mm 15 mm 235 mm Steel or wood construction with flat steel Concrete construction with flat steel

7 Straightness of flat steel Requirements as to the straightness of the flat steel are 2 mm per 2 meters. 2 mm / 2 m 2 mm / 2 m Using wooden battens The sub-construction for the longlight can also be finished off using a wooden batten on which the bottom shoes of the modular skylight can be secured directly, without having to use the installation brackets with clamps. The skylight modules are mounted on the batten using screws through the bottom shoes. These screws are not included in the delivery, and the correct dimensions must be ensured by the customer. There are 4 holes in each shoe, 2 x ø5 and 2 x ø8.5. Wood construction with wooden batten

8 Connecting to the roof The surface on which roofing felt is laid must be prepared according to applicable standards for roofing materials and best building practice. The roofing felt must be applied to the outside of the sub-construction before mounting the skylight modules.

9 Sub-construction dimensioning requirements The roof construction is exposed to deformations after installation of the skylight modules. These deformations include subsequent roof covering, various building installations and external loads such as snow and wind etc. The sub-construction must be designed to withstand all these loads and the deformations must be limited to 1/400 x the full length of the sub-construction in downward and outward directions. After completing the sub-construction, it must be secured against water penetrating the roof construction and insulation. For load capacities of the skylight modules, please refer to http://modularskylights.velux.co.uk/. 1/400 x L 1/400 x L V-455267 2011 GROUP., THE RED LOGO AND io-homecontrol ARE REGISTERED TRADEMARKS USED UNDER LICENSE BY THE GROUP. Company Ltd Woodside Way Glenrothes Fife KY7 4ND Tel: 01592 778 916 Email: vms@velux.co.uk