Leading global technology provider for dry fermentation biogas & composting Eggersmann Group BEKON GmbH Feringastrasse 9 85774 Unterföhring Germany Phone: +49 (89) 90 77 959-38 Fax: +49 (89) 90 77 959-29 www.bekon.eu
Agenda 1 About us 2 References 3 BEKON Technology 4 Reference Han Bogrov Sofia 5 Our Partner in Bulgaria 2
1 Company BEKON is the dry fermentation branch of Eggersmann Group Key metrics 43 operating plants >4,500,000t waste treated > 1,800,000 operating hours 40 patents 2001: BEKON started developing biogas plants based on source separated organics (SSO) and municipal solid waste (MSW) Company history 2003: First reference project for The Munich Waste Services (AWM) entered operation 2016: BEKON became part of the Eggersmann group. Currently, 43 plants are in operation, 4 additional plants under construction, 9 new plants planned 3
1 Company BEKON belongs to the Eggersmann Group Headquarter Marienfeld Founded in: 1951 Number of employees: 680 Turnover 2015: ~ 140,7 Mio EUR Today, Eggersmann group is a network of independent companies engaged in the construction sector as well as the development and realization of environmental technologies on an international scale. www.f-e.de International locations 4
1 Company 5 pillars of Eggersmann group are Construction, Recycling Technology, Real Estate management, Composting and Additives Construction Recycling technology Real estate management Composting Additives 5
1 Company Our group offers a complete portfolio for waste treatment solutions Brand Products Illustration Conveyors (chain belt, heavy materials, sliding belt, throughed belt) Tunnel filling systems Windrow turners Lane turners Lift separators Lock-washer screens Trommel screens Windsifters Air belt separators Bale breakers Bag openers Ballistic separators Pre-crushers Shredders Dry fermentation biogas plants 6
Agenda 1 About us 2 References 3 BEKON Technology 4 Reference Han Bogrov Sofia 5 Our Partner in Bulgaria 7
2 References 43 plants in operation; 4 plants under construction; 9 plants in planning phase America Europe Asia In operation (construction) Planned / approval phase In operation (construction) Planned / approval phase In operation (construction) Planned / approval phase 4 2 1 1 26 (3) 3 (1) 1 1 1 6 3 1 1 1 8
Agenda 1 About us 2 References 3 BEKON Technology 4 Reference Han Bogrov Sofia 5 Our Partner in Bulgaria 9
3 Technology BEKON process generates revenues from gate fees, power / gas production, heat and compost 1 ton of waste BEKON process Revenue per t of waste Gate fee Organic fraction of municipal solid waste (MSW) + 220 kwh Electricity + or Green waste 230 kwh heat for heating/cooling + 50 L Diesel equivalent Source segregated biowaste or food waste 400 kg compost (quality depending on input) 10
3 Technology Simple and robust process requires no extensive pre-treatment Process scheme 11
3 Technology Fermenters and compost tunnels are made of concrete View on fermenter View on compost tunnel 12
3 Technology 5-step process transforms waste into energy and compost 1 2 3 4 5 Biowaste is dropped in storage area Fermenter is filled for anaerobic digestion. Material sits for 3 to 4 weeks. Digestate is put into compost tunnels Compost is moved to maturation area Compost is screened 13
3 Technology State-of-the-art process logic and control ensure >99% operational availability 5 key advantages of BEKON technology explained + Robust and simple process Contraries (plastics, stones, sand, batteries etc.) have no negative effects on gas production + Remote supervision by BEKON improves plant performance + Lack of moving parts and batch operation ensures simple handling and >99% operational availability + Thermophilic process guarantees high plant profitability and pathogen destruction X + High safety and emission standards 14
3 Technology New promotional film on our website - www.bekon.eu 15
Agenda 1 About us 2 References 3 BEKON Technology 4 Reference Han Bogrov Sofia 5 Our Partner in Bulgaria 16
4 Reference Han Bogrov Biogas plant Han Bogrov Plant Technology Input (total) Electrical power Process Technology Biowaste wet digestion & composting of digestate 20,000 tpa biowaste + 24,000 tpa green waste 855 kw Mechanical treatment, wet fermentation, closed composting tunnel system (8 tunnels) 17
4 Reference Han Bogrov Biogas plant Han Bogrov Employer Contractor Nov. 2012 - Sept. 2013: Oct. 2013 - Dec. 2013: since January 2014: Municipality of Sofia Consortium EGGERSMANN & CO: Eggersmann Anlagenbau (GER) Diana Commerce (BG) AT Engineering (BG) construction works cold commissioning in operation 18
4 Reference Han Bogrov Pre-treatment of biowaste Infeed Hopper Screw Mill Magnet for ferrous separation Star screen Rejects will be separated 19
4 Reference Han Bogrov Anaerobic treatment by digestion Digester with membrane roof: Volume 3450 m³ Retention time appr. 21 days Dry matter content: ~8%d.s. 20
4 Reference Han Bogrov Air management including treatment Biofilter fans: Approximately 33.000 m 3 /h exhaust air from halls together with exhaust air of process (annual average biowaste line) 21
Agenda 1 About us 2 References 3 BEKON Technology 4 Reference Han Bogrov Sofia 5 Our Partner in Bulgaria 22
5 Our Partner in Bulgaria Our Partner in Bulgaria Horst Schmidt Consulting Blvd. Bukara 3 1619 Sofia Fon: +35929570270 Cell: +359879135651 E-Mail: Schmidt@techno-link.com 23
Thank you for your kind attention.. BEKON GmbH Feringastrasse 9 85774 Unterföhring Germany Phone: +49 (89) 90 77 959-38 Fax: +49 (89) 90 77 959-29 www.bekon.eu