UNDERSLAB OPTION

Similar documents
PLATON FOUNDATION WRAP

Installation. Guide. Installation. Foundation Preparation

PLATON RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS AND FLOORING DRY ADVANCED TECHNOLOGY EASY INSTALLATION

Installation Manual. Foundations. Version 2

Installation Manual. Foundations. Version 4.3ᵠ

DMX AG AIR-GAP MEMBRANE. Section Damproofing and Waterproofing

PART 1 GENERAL 1.1 SECTION INCLUDES. A. Below grade waterproofing and dampproofing 1.2 RELATED SECTIONS 1.3 REFERENCES

Installation Guidelines VBC Products

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage.

FirstEnergy Program Overview

INSTALLING WATER-RESISTIVE BARRIERS & FLASHING

Reflective Insulation Specification & Application Guide for Post Frame and Metal Building Construction

BRANZ Appraisal Certificate # 461 (2010) Internal wet areas.

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

ULTRA FLO STORM SEWER PIPE

Insulation. First Revison October DC14 Drainage Mat INSTALLATION GUIDE FOR RESIDENTIAL & COMMERCIAL APPLICATIONS

ITEM 458 WATERPROOFING FOR STRUCTURES

WeatherSmart Air Barrier Installation Guide

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage.

RADIANT PANEL SYSTEM PLANNING & INSTALLATION. Roth Radiant Heating Systems

SECTION SELF-ADHERING SHEET MEMBRANE WATERPROOFING

HouseWrap Applications System R-Value: R-4.17 Horizontal Heat Flow Only

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage.

Student Services & Classroom Addition

When I started tiling, we didn t do our own shower pans that BATHS

SECTION FLUID-APPLIED WATERPROOFING

84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 protecting Membranes 90 System Components.

Tensile ASTM D1970 MD = 939 psi / CD = 1252 psi Self Sealability / water penetration resistance around nails. ASTM D1970 Section 7.

SECTION SELF-ADHERING SHEET FLASHING

ALLNEX DAMP PROOF AND TANKING MEMBRANES. Product. Scope. Appraisal No. 805 [2013] Appraisal No. 805 (2013) Amended 26 January 2018.

Genesis Panel Systems LLC Dura-Max Brick Panel Siding Installation Instructions

PROCOR Composite Waterproofing System

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

2.18 INTERIOR & EXTERIOR FINISHES VAPOR & AIR BARRIERS

MODIFIED BITUMINOUS SHEET AIR / VAPOUR BARRIERS SELF ADHESIVE

Insulated Concrete Forms (ICFs)

FLUID APPLIED WATERPROOFING

Installation Guide Sto RapidGuard

A. The work of this section includes, but is not limited to, the following:

84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes System Components.

Laminate Flooring Charlestowne Collection

SECTION FLEXIBLE FLASHING SYSTEM FOR MASONRY VENEER

WATERPROOFING TAMKOWATERPROOFING.COM

WE International, Inc.

SECTION TW-60 Self-Adhering Sheet Waterproofing Membrane

The better way to build TM. Installation Manual NAILBASE PANELS

PART 4 - SELF ADHERING WATERPROOFING

1 PVC or ABS drain with strainer

Light-Metal Roof Edge, Raised

SECTION SELF-ADHERING SHEET WATERPROOFING CCW-711

Installation Guide Wall Panels

Spec Master 5/7/ For each product requiring color and texture selection, provide full size samples.

EVOH PENETRATIONS INSTALLATION GUIDELINES PERMINATOR PLACEMENT

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Roof

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Seal

BITUTHENE 3000 and BITUTHENE Low Temperature Below-Grade

DuPont Tyvek Wall Underlay Install Guide

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

TUFF-TAC TM BRIDGE MEMBRANE INSTALLATION GUIDE

SECTION MODIFIED BITUMINOUS SHEET WATERPROOFING

PLYWOOD FLOATING FLOOR

WATERPROOFING TAMKOWATERPROOFING.COM

Perm-A-Barrier NPS (Non Permeable Sheet)

ROOFING EPDM ELASTOMERIC SHEET ROOFING FULLY ADHERED- CONVENTIONAL

GUIDE SPECIFICATION FOR MEL-ROL : ROLLED, SELF-ADHERING WATERPROOFING MEMBRANE

Chapter 14 - Air Sealing

NCMA TEK TEK 19-5A FLASHING DETAILS FOR CONCRETE MASONRY WALLS

SECTION mil thickness REINFORCED LIQUID-APPLIED WATERPROOFING

A Design Review of Waterproofing Codes

PERM-A-BARRIER NPS Detail Membrane

ROOFING CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION

WATERPROOFING TAMKOWATERPROOFING.COM

A. Product Data: Submit manufacturer s product data, with complete general and specific installation instructions, recommendations, and limitations.

SECTION mil thickness COLD FLUID-APPLIED WATERPROOFING

SECTION (07100) - DAMPPROOFING AND WATERPROOFING

SECTION mil thickness REINFORCED LIQUID-APPLIED WATERPROOFING

1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards.

Features. Specifications. VersaShield MBX slashes up to half the total cost with a quick and effective concrete moisture mitigation up to 99.5% RH.

DESIGN TIPS TECHNICAL BULLETIN #47 FLASHING, WEEP HOLES AND RELATED ANCHORAGE [1 of 8]

TABLE OF CONTENTS. 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers

.2 Flashings at grade to extents shown on the Drawings. .3 Membrane and polyethylene slip sheets at perimeter of walls.

TOTAL FLOW Soil Sheet Drain

INSULATION OWENS CORNING INSULATION PRODUCTS IN THIS SECTION:

MAKING IT STICK: Nails and screws, adhesives and compounds... today contractors have a wide variety of choices.

Groundwater Seepage. Causes of Basement Seepage and Leaks Hydrostatic Pressure

In addition to performing as an interior vapor retarder, MemBrain the Smart Vapor Retarder may be installed as a continuous, interior

Technical Data Sheet

INSTALLATION CHECKLIST 2 ND EDITION. Fox Blocks Abbott Drive Omaha, NE

Gas Protection System Components

PROTECTOWALL DPM MEMBRANE. Product. Scope. Building Regulations. Appraisal No. 517 [2013]

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT

Product Brochure. Masonry Drainage and Ventilation Products

Weatherproofing & Sealing Systems

The Freudenberg Politex Group

Encapsulated, Sealed & Closed Crawlspace Installation Manual

TABLE OF CONTENTS HALO INSTALLATION GUIDE. THE ADVANCED RIGID INSULATION ENVELOPE PRINTED 2017

New Home Warranty Handbook

Aussie Skin 550. Heavy Duty Below Grade, Blind-Side, Under-Slab Waterproofing Membrane. Delivery, Storage, and Handling

4.16. APPLICATION INSTRUCTIONS Construction Joints & Details

Transcription:

www.systemplaton.com WATER WALL MOISTURE AIR GAP Introduction Platon is a uniquely dimpled, 24-mil high density polyethylene membrane, performance proven since 1991 to solve basement leakage problems. Platon features: Double leakage protection (Holds wet soil away from the wall, provides drainage) Allows the wall to dry Easily bridges 1/4 cracks Keeps working even if the wall cracks or shifts Works on any type of foundation, old or new, regardless of wall condition Installs in any kind of weather Double Dimple design provides a smooth, low drag, soil side surface. Easily installed with concrete nails (use screws on ICF and PWF foundations) No other wall treatment is required Excellent protection board for other types of waterproofing (Triple leakage protection) 30 Year Manufacturers Limited Product Leakage Warranty (Foundation use) DRAIN UNDERSLAB OPTION Environmentally Responsible: High recycled content (± 85%) Chemically Inert No by-products contaminate soil or air All manufacturing waste is recycled It is imperative, as with all waterproofing systems, that foundation drainage is in place and functioning properly to ensure that water and moisture drained by Platon can be removed. PLATON FOUNDATION PROTECTOR DON T BUILD WITHOUT IT 1

Material Requirements Platon Membrane One roll for every 62 lineal feet of foundation (allows for joint overlap) Roll Height = Finished grade to top of footing (If wall height exceeds available roll height overlap 2 sections by 6") Platon Speedclips 65 per roll of membrane OR Platon Speedstrips 16 per roll of membrane Notes: Speedclips secure the membrane and press the smooth tab tight to the wall. Caulking is required unless Platon molding is used along the top of the smooth tab. Speedstrips secure the membrane and provide a continuous seal along the top of the membrane no caulking required. Platon Molding 6'6" lengths - Typically 5 strips per job (Molding seals open edges of the membrane) Molding can also be used to provide a continuous seal along the top of the membrane when using Speedclips no caulking required - 10 strips per roll of membrane. Caulking (Not required with Speedclip/Molding or Speedstrip installations) Minimum 2 tubes per roll Silicone, latex or polyurethane caulk does not stick to polyethylene. For concrete or wood foundations, use asphalt based roof mastic or butyl rubber caulking. For ICF s use foam panel adhesive. Fasteners For concrete, use 1-1/4" concrete nails. (For production work consider a gas-activated concrete nailer) For ICF s & wood foundations, use 1-5/8" drywall or corrosion resistant deck screws. (For production work consider a collated screw gun) Notes: Green concrete can be hand nailed. Block and cured concrete is power nailed. Use screws for ICF and wood foundations. Speedclips Platon Molding Speedstrips 2

Installation Foundation Preparation Break off form ties and sharp points Clear stone and debris from footing Patch round tie rod holes Parge or dampproof the lowest course of block foundations Determine finished grade and mark with a chalk line When using Speedclips, caulking is used between the smooth tab and wall to prevent dirt from getting behind the membrane and clogging the air gap. Either run a bead of caulking 1 below the chalk line before installing the Platon OR, after Platon is installed, caulk along the top of the Platon to seal any open gaps. When using Speedstrips or Speedclips and Platon Molding, caulking is not required. Begin Installation Unroll Platon, working from left to right, dimples toward the wall. Smooth tab at the top follows the chalk line. Nail one Speedclip to act as a pivot, unroll a 10 length of Platon, pull the smooth tab tight, tack with another Speedclip and continue until the foundation is wrapped. Fold and crease Platon at corners to get the best fit NOTE: Overlap vertical joints by 20 (if water enters the seam it will flow to the footing before it reaches the wall) Notes Platon membrane must extend from finished grade (chalk line) to the top of the footing. Platon can be sawn to height while rolled up. Standing the roll on the footing when unrolling Platon is easiest. Excess membrane (if any) may be folded out and cut even with the footing edge. Crease the Platon sharply at the footing/wall corner and lay flat on the footing to prevent pull-down. Where finished grade slopes (e.g. walkout basements) install tapered sections first. 3

Continue installation After the Platon is tacked up Secure with Speedclips 12 OC (8 between clips). Speedclips mesh the top 2 rows of dimples and the offset presses the smooth tab to the wall. OR Install Speedstrips Speedstrips mesh the top row and a half of dimples and press the smooth tab to the wall. Nail through the small holes in the "Fastening Area" beginning at the middle of the Speedstrip and working toward each end. There will be a 1/4" gap between Speedstrips. On ICF s, screw through the "Fastening Area" into the ICF webs (fastening points marked by the ICF manufacturer) 6" or 8" centers. Heavy Clay Soil (Roll heights greater than 6 9 ) Install a second row of Speedclips 24 OC half way up the wall. Backfill carefully in 3 or more lifts Tip When installing 10 Platon tack the roll 6 up from the footer using Speedclips 24 OC, then use a ladder to reach and finish the top with Speedclips or Speedstrips 4

Windows Cut Platon membrane flush with the sides and 3 lower than the bottom of the opening If using Speedstrips, mesh and fasten a Speedstrip to seal the lower cut opening If using Speedclips, use the cut out piece to seal the lower edge (mesh the dimples secure with Speedclips) Window Wells Platon is sandwiched between the window-well and the foundation. Trim exposed Platon inside the window-well along the sides. Platon Molding 1 1/2" x 1/4" L shaped strip 6'6" long Used to seal open air-gap areas of Platon where dirt could enter and clog the air gap (EG. Beginning and end points of installation) Also used to provide a continuous seal along the top of the membrane when using Speedclips no caulking required 5

Gradual Change in Grade Measure grade change chalk line length, add 20 for joint overlap and cut that length of Platon membrane. Follow the chalk line with the smooth tab and fasten with Speedclips or Speedstrips Cut surplus membrane at the wall/footing junction. Surplus membrane without a smooth tab can be used if the top gap is sealed with Speedstrips or Speedclips and molding. The factory cut edge should follow the grade chalk line so Speedstrips will mesh. Steep Change in Grade Cut membrane to proposed finished grade Fasten with Speedclips and use molding to seal the cut edge OR Use Speedstrips nail both the fastening area and the top edge of the Speedstrip using a W pattern enough dimples will engage to hold the Platon in place. Tall Walls Platon is overlapped horizontally when the distance from the footing to finished grade exceeds the roll height. Cut a section of Platon into predetermined widths (trim off the smooth tab) and install along the bottom using Speedclips The full height roll (with a smooth tab) is then installed to overlap the strip by at least 6 Alternatively, the full height roll can be installed first using Speedclips (trim off the smooth tab). Then install the strip - Speedclips and molding or Speedstrips must be used to cover the air gap along the top of the strip. 6

Jump Walls E.G. A 4' frost wall joins an 8 basement foundation Extend Platon 24 along the frost wall as shown Cut Platon horizontally, flush with the bottom of the frost wall Secure the top section to the frost wall and the lower section to the basement wall Repeat the procedure on the other side of the frost wall, overlapping the Platon below the frost wall. Cap vertical open gaps on the frost wall with Platon Molding Caulk gap at the frost wall/foundation wall junction Pipe Projections (Pipe must be sealed to foundation with hydraulic cement) Split Platon membrane vertically from the pipe to either top or bottom Cut Platon snug around the pipe Apply a 24 wide patch over the split Mesh the dimples Speedclip the top, tape sides, caulk Platon at pipe Tear Repair Caulk around the tear Cut a piece of Platon 12 larger than the tear to be repaired Place over the tear, meshing the dimples, Speedclip top, tape edges Flood Boot A flood boot must be installed prior to installing Platon membrane if: 1. A high water table is encountered 2. Footing drain is unable to take away water drained by Platon 3. Footing drain is placed on top of the footing 4. Floor slab is poured level with, rather than on top of the footing 5. It s a concrete block foundation (parge or dampproof the 1st course of block to prevent wicking ) Apply a peel and stick membrane or rubberised asphalt waterproofing to cover the footing and wall to a point one foot higher than the anticipated water table. Follow product manufacturers instructions 7

Insulation Best practice - EPS foam is typically installed OVER Platon Use vertical insulation panels - stand on the footing Platon and the air gap do not detract from the R value of the insulation. If installing Platon over foam use Speedstrips and concrete nails long enough to penetrate 1" into the concrete Footing Drainage A working footing drain is imperative with all foundation waterproofing systems. Follow local building codes in your area Backfilling Clean stone must be placed over the footing drain and up the wall as per local building code. Do not permit machinery, large rocks or frozen clumps to impact the Platon Backfill carefully using 2 or 3 lifts of backfill. Compacting each lift will reduce excessive settling later. 8

Platon is IDEAL on Insulated Concrete Forms Performance proven since 1994 with zero Platon related leaks reported Stand alone system Easily installed over oxidised, wet or dirty block Bridges 1/4" gaps No temperature or weather restrictions Follow instructions for concrete foundations Caulk must be foam compatible E.G. Foam panel adhesive Screw into the ICF web or fastening point instead of using concrete nails Speedclips - use the fastening hole that best lines up with the ICF web. Speedstrips can be screwed into each web anywhere in the Fastening Area. (Tip A collated screw gun speeds installation) Finished Grade Wire Lath Mortar To transition from Platon to exposed foam: Apply galvanized metal lath - screw into the ICF webs Lath covers exposed foam and extends 2 or more over the Platon Parge lath with mortar mix typically used on foundations Dirt can not get behind the Platon so caulk is not required Brick ledges on ICF foundations usually protrude from the foundation. Fasten Platon to the vertical wall below the brick ledge protrusion. Apply a peel and stick waterproofing membrane to cover the protrusion and horizontal brick ledge, extending both up the wall behind the brick and over the top of the Platon Follow peel and stick manufacturers instructions for surface preparation and temperature restrictions It is nearly impossible to find a leak in an ICF foundation without destroying the foam do it right the first time with Platon 9

PLATON SUBFLOOR SYSTEM Lifts the floor off damp, cold concrete and allows the concrete to breathe SEAMLESS HDPE barrier protects floor coverings from slab moisture for a floor that is comfortable, healthy, warm and dry. Its like having an above grade floor! Step 1 Remove existing floor coverings Level low areas if required Clear organic debris Step 2 Unroll first strip of Platon DIMPLES DOWN Cut to length Cut off smooth tab Step 3 Install second strip of Platon Smooth tab overlaps 2 rows of dimples on adjacent strip. Tape seam with housewrap tape Step 4 Laminate underpad and flooring is installed directly over Platon Outperforms dampproof underpad Follow Laminate manufacturers instructions Step 4 - B Other floor coverings require a load spreading sheet or subfloor (Minimum 7/16 OSB) Fit and lay the subfloor panels on the Platon Fasten to the concrete around room perimeter Also fasten where there is vertical movement Notes Fasten with concrete screws or masonry nails Non load bearing walls may be framed on the subfloor Install your choice of floor covering following manufacturers above grade instructions 10

Permanent Underslab or Between-slab Dampproofing Platon, a tough, dimpled, 24 mil High-Density Polyethylene membrane, is impervious to both moisture and the high alkaline environment presented by concrete. With Platon as the dampproofing membrane, ground moisture is sealed off, giving total protection against damp damage and complete freedom of choice in floor coverings. Commonly used builders polyethylene is easily damaged during concrete placement and has relatively low water vapor resistance. In the high alkaline environment created by concrete and moisture, non-stabilized builders polyethylene becomes brittle and soon ceases to perform as dampproofing. For permanent ground moisture protection, use Platon under slab on new construction, or over an existing slab in retrofit applications (the air gap between the new and existing slab is drained to a floor drain). Installation Platon membrane is installed with the dimples down. Joints are sealed with butyl rubber Roof and Gutter caulk. Housewrap tape can be used to hold joints together until the floor is poured. At walls, the edge of Platon membrane can be turned up so it is higher than the proposed floor thickness. It can be trimmed flush with the floor later if desired. Reinforcing mesh and concrete are placed over the Platon membrane using standard placement procedures. For radiantly heated floors, EPS foam is placed OVER the Platon membrane before the floor is poured. The membrane is tough enough to walk on without puncturing it, but plank walkways should be used if transporting concrete over the membrane. 33 Centennial Rd., Orangeville, ON L9W 1R1 www.systemplaton.com USA (only) - 1-800-265-7622 Sales Offices: Nanaimo, Prince George, Langley, Edmonton, Calgary, Lethbridge, Saskatoon, Winnipeg, Thunder Bay, Sudbury, Guelph, Toronto, Peterborough, Chesterville, Forest, Orangeville, Comber, Montreal, Quebec City, St. Clet, Sackville, New Glasgow, Bloomfield, Bishop's Falls, and St. John's. IG/15C/BP/1105

Installation Guide

SPEEDSTRIP THE ULTIMATE IN PLATON WATERPROOFING INSTALLATION Fast Strong Secure NO CAULKING REQUIRED!!! Chalk a line at finished grade. (Please read general instructions included in every roll) Unroll Platon, dimples toward the wall, smooth tab following the chalk line. Tack the Platon in place with a fastener* in the third row of dimples every 10. Overlap vertical seams by 20 and continue until the foundation is wrapped. Mesh the Speedstrip into the top row and a half of Platon dimples using the half-moon marks as a guide. (Speedstrips do not butt tightly - there will be a small gap between each Speedstrip) Secure with fasteners* through the small holes in the fastening area marked on the Speedstrip. (on ICF s - stay in the fastening area and screw into the ICF webs - 6 or 8 apart) Windows - cut Platon flush with the sides and 3 lower than the window opening. Install a Speedstrip across the bottom of the window, install the window well over the Platon. Gradual change in grade - Measure length of sloping chalk line, add 20 for overlap, cut that length of Platon & install with the smooth tab following the chalk line. Cut off surplus membrane at the bottom. Steep change in grade - Cut membrane to proposed finished grade, exposing the air gap. Nail Speedstrips to secure the Platon and close off the air gap. Nail in both the fastening area and offset area in a W pattern. * Fasteners - Use 1 1/4 concrete nails - 1 5/8 screws on ICF or wood foundations. Call Toll Free 1-800-265-7622