VIII. BUILDING DEPARTMENT SCHEDULE & CHECKLIST OF INSPECTIONS

Similar documents
RESIDENTIAL BUILDING REQUIREMENTS

Permit Posting and Inspection Procedures

2003 International Residential Building Code

Lonsdale Building Inspections Department 415 Central Street W. PO Box 357 Lonsdale, MN (507) fax (507)

2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

Contractor/Owner initials are verification that items #1 and #2 and items (a) thru (g) above are included in the submitted plan/drawing.

Pulaski County, Virginia

DEPARTMENT OF PLANNING SERVICES BUILDING INSPECTION DIVISION 1555 N 17 TH AVENUE, GREELEY, CO (970)

CODE COMPLIANCE GUIDELINE GENERAL BUILDING

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)

Typical Finished Basement Details

RESIDENTIAL BASEMENT ALTERATIONS GUIDE

Basic Requirements for Residential Electrical Installations

APPLICATION FOR FINISHED BASEMENT PERMIT

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

City of Santa Monica Building and Safety Division

Homeowner electrical wiring guide. Including the 2015 Canadian Electrical Code amendments

RESIDENTIAL BUILDING PLAN REQUIREMENTS

* RESIDENTIAL PLAN REVIEW *

Fairfax County, Virginia

HUMBOLDT COUNTY BUILDING & SAFETY DEPARTMENT CITY OF WINNEMUCCA BUILDING DEPARTMENT

Elko County Building & Safety Division

EFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp,

Residential Building Plans

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS

Basement Finish. City of New Prague Building Inspections Department 118 Central Ave N New Prague, MN (952) Fax (952)

TOWN OF HAGUE GUIDELINES FOR PERMIT APPLICATION

One and Two Family Additions

The Inspection Process. Waxhaw N.C.

Re-inspections due to failed work or jobs that are not accessible cost both contractors and city inspectors time and money.

RENTAL INSPECTION CHECKLIST. Helpful Definitions: Egress: the free and unobstructed access to the exterior of a habitable space.

1 & 2 Family Garage/Shed Permits City of Oshkosh Inspection Services Division

CITY OF FATE SINGLE FAMILY BUILDING PERMIT PACKET. Adopted Codes:

FRAMING INSPECTION GENERAL

Oregon Building Officials Association

Repair or replace section of driveway, approach, or sidewalk that are a trip hazard.

Residential Accessory Structures & Room Additions

Section numbers refer to the 2018 International Residential Code (IRC), as modified, unless otherwise noted. Revised Effective Sept.

FINISHED BASEMENT REQUIREMENT GUIDE

CITY OF OAK CREEK SINGLE FAMILY & TWO-FAMILY CONSTRUCTION/PERMIT REQUIREMENTS

HOMEOWNER PERMITS AND ELECTRICAL WIRING GUIDE

Town of Chili. building department 3333 chili avenue, Rochester, ny (585) fax: (585)

Pulaski County, Virginia Typical Carport Enclosure Details Based on the 2012 International Residential Code

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING

BUILDING DIVISION 120 Malabar Road, S.E., Palm Bay, FL Phone: (321) Fax: (321)

Basement Build-Out Guidelines

St. Clair County Electrical Code Regulations

CITY OF GRANDE PRAIRIE

INFORMATIONAL HANDOUT FOR FINISHING A BASEMENT

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings

ADDENDUM A CONSTRUCTION SPECIFICATIONS

1 AND 2 FAMILY DWELLING REQUIREMENTS

Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage

Residential Building Inspections

ADDITIONS BUILDING AND ZONING REQUIREMENTS (REVISED 4/22/2008)

City of Santa Monica Building and Safety Division

GENERAL BUILDING CODE AND ZONING REQUIREMENTS: Post and spread footings shall be designed and constructed below the minimum frost depth of 42 inches

Administrative Changes

Inspection Report. Property Address:

Applying for Permits to build a new house in Linn County

Minimum Requirements for Residential Occupancy Codes and FAQs

General Requirements for Mobile Homes

COMMERCIAL / INDUSTRIAL GENERAL INFORMATION FOR TENANT SPACE ALTERATION & REMODELING

Home Inspection Report

The Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits

RESIDENTIAL PLAN CHECK LIST

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX

UCC Permit Application Procedures

PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT. Construction requirements for LOWER LEVEL DEVELOPMENT. in residential dwellings

TOWN OF PERINTON 1350 TURK HILL ROAD. FAIRPORT, NEW YORK (585) , Fax: (585) ,

FINISHED BASEMENT REQUIREMENT GUIDE

REO Client Safety Hazard Requirements

THE FLORIDA BUILDING CODE

HARPER WOODS BUILDING DEPARTMENT PROCEDURES FOR OBTAINING CERTIFICATE OF OCCUPANCY

The Home Doctor, Inc.

EFFECTIVE DATE: July 1, 2008, unless a later date is cited at the end of a section. [ NMAC - Rp,

SCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC Permit Requirements

R vertical and horizontal.

Rental Inspection Checklist

2012 Code Update Training

Building Permit Application

Residential Deck Safety, Construction and Repair. Juneau Permit Center, 4 th Floor Marine View Center,(907) February 2016

$ Plan Review Fee when Permit Application is submitted BASEMENT REMODEL BUILDING PERMIT APPLICATION. Status Sticker OFFICIAL USE ONLY

PENNSAFE BUILDING INSPECTION SERVICES LLC Deck and Roof Cross Section Submittal

SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE:

BROCHURE # 108 CONSTRUCTION PLAN COMPONENTS

Typical Finished Basement Details

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

Table of Contents. Page Title

BUILDING CONSTRUCTION PERMIT PERMIT CONDITIONS AND INSPECTIONS

Inspection Report. Prepared for: Gil Turiel. Property Address: 545 Briar Run Court Loganville, GA Date: July 17, 2011

IMPORTANT CODE UPDATE ENFORCEMENT DATE FOR NEW NATIONAL ELECTRIC CODE IS SET FOR MAY 1, 2013

NORTHEASTERN REMC ELECTRIC STANDARDS MANUAL

ROUTT COUNTY REGIONAL BUILDING DEPARTMENT 136 * P.O.

RESIDENTIAL REMODELING AND BASEMENT FINISH

One & Two Family Residential ADDITIONS

SFR SUBMITTAL REQUIREMENTS

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

TOWN OF FRANCESTOWN BUILDING/CODE ENFORCEMENT 27 MAIN STREET P.O. BOX 5 FRANCESTOWN, NEW HAMPSHIRE Building Permit Application Guide

Transcription:

VIII. BUILDING DEPARTMENT SCHEDULE & CHECKLIST OF INSPECTIONS

BUILDING INSPECTIONS (719) 687-3048 Inspectors are available to answer questions from 7:30 a.m. to 8:30 a.m. Monday through Friday Conference at any other time will need to be scheduled with the individual inspector. Inspections are done on a first come, first served basis. Cut off time for Inspections is 3:00 p.m. the previous business day. We do have a 24-hour voicemail system, which enables you to call in your inspection after hours. We cannot guarantee a morning or afternoon inspection. Our inspectors set their own schedules and must take the most expeditious route. If the property is behind a locked gate, please provide a key or gate combination. If the property cannot be accessed by the inspector a $42.00 reinspection fee will be charged. Keys can be securely kept at the Building Department and can be picked up after final inspections have been passed. INSPECTIONS THAT ARE CANCELLED AFTER 9:00 A.M. WILL REQUIRE A REINSPECTION FEE OF $42.00 Only the contractors listed as performing the work can call for those inspections. Any change in contractors must be provided to the Building Department as soon as possible. If an inspection is called in for and there is a discrepancy with the contractor of record, the inspection will not be scheduled. PLEASE NOTE: The following inspections are not included in a standard residential or commercial permit and will require an additional $42.00 each: Additional Partial Pre-Frame Pre-Final The structure cannot be occupied before the final inspections have been passed and the Certificate of Occupancy has been issued.

CHECK LIST OF INSPECTIONS Health Building PLUMBING Pre-Site Footing Base Septic System Final Foundation Top Out & Supply Frame Final Final Mechanical Electrical Other Vents Temporary Log Moisture Gas piping Inside & Outside Rough Wood Stove/Fireplace Heat Final Permanent Service Solar Final Driveway Final Well if applicable SEQUENCE OF INSPECTIONS FOR GENERAL RESIDENTIAL CONSTRUCTION 1. Building Footing Electrical Temporary (if applicable) 2. Building Foundation 3. Plumbing Base 4. Plumbing Top Out & Supply Electrical - Rough Frame Mechanical Vent, Gas piping, Woodstove Deck Piers 5. Electrical Final Must be passed before any other finals can be inspected. 6. Heat Final Plumbing Final Building Final The structure cannot be occupied before the final inspections have been completed and the Certificate of Occupancy has been issued. Applicable to City of Woodland Park: City Water and Sewer Utility Connection Contact City Public Work Department at (719) 687-9244 or (719) 687-6547 Applicable to City of County: Aquila Natural Gas: 1-800-303-0752 Customer Service Intermountain Rural Electric: (719) 687-9277 for application

FOOTING AND FOUNDATION CHECKLIST This checklist is intended as a guide only. All references are to the 1997 Uniform Building Code unless otherwise noted. ADDRESS NUMBER TO BE POSTED PLAINLY AT THE ROAD PRIOR TO FIRST INSPECTION. THE FOUNDATION ENGINEERING MUST BE ON THE JOB SITE FOR THESE INSPECTIONS. APPROVED SET OF PLANS AND PERMIT ON JOB SITE THRU FINAL INSPECTIONS. Footing Inspection: 1. Property corners and property lines must be marked with states that are taller than the Vegetation and snow. 2. Portable toilet must be on the construction site unless bathrooms are immediately available On the construction site. 3. Layout of forms as per plans. 4. Check plans for steel requirements. 5. Sec. 2107.2.2 Check reinforcing steel (overlaps, size, grade, location) as per design. 6. Check frost depth (30 minimum), soil at bottom firm (no snow, mud, etc.) 7. Table 18-I-C 8 X 16 minimum size in non-engineered foundation. Foundation Concrete: 1. Check location, height, frost depth, thickness, and steel requirements as per design. 2. Check reinforcing steel (size, grad, location, overlaps) as per design. 3. Anchor bolts (1/2 X10 ) 1 from end of plate, 6 maximum distance between or per Engineering. 4. Sill of redwood or pressure treated wood, if installed. 5. 8 minimum thickness. 6. Beam pockets (if required). Block Before Pouring: Pier: 1. Check location, height and thickness. 2. Check vertical and horizontal reinforcing (size, grade, spacing) as per design. 3. Sills of redwood or pressure treated wood. 4. Check anchor bolts. 1. Check Location, size, depth. 2. No Debris in sono-tubes or forms. 3. Minimum 30 frost penetration. 4. Reinforcement as per design.

FRAME CHECK LIST Residential only This checklist is intended as a guide only. All references are to the 1997 Uniform Building Code unless otherwise noted 1. Sec. 1505.3 Attic ventilation 2. Sec. 1003.3.1.3 Exit Requirements, exit door size( one exit door 3 X 6 8 ). 3. Sec. 509 & 1003.3.3 (See Section for Commercial), Residential as follows: Rise 8 maximum Run 9 minimum Headroom 6 8 minimum Width 36 minimum Handrails required with 4 or more risers Height 34 to 38 above nosing of treads including carpet Guardrail required over 30 above grade height 30 minimum including carpet Intermediate railings 4 spacing maximum 4. Sec 2320 Floor system span and grade of joists, joist hangers, bridging, blocking and spacing. 5. Sec. 1806.6 & 2306.4 Fastening and type of foundation plates and sills. 6. Sec.2320.9.1 Installation of sub-flooring 7. Sec. 2320.11.6 Header mailed into studs, check for size, spacing, bearing, alignment and nailing of exterior and interior wall studs, headers, trimmers, and cripples. 8. Table 23-IV-B Size, height, and spacing of wood studs. 9. Sec. 2320.11.3 Corner wind bracing of walls, 4 X 8 plywood sheets or cut-in 1 X 4 45 to 60 degrees. 10. Sec. 2320.11.2 Three studs at corner of exterior wall. 11. Sec. 1402.1 Weather resistive barrier on all exposed surfaces. 12. Sec. 310.4 Egress windows from bedrooms and basement Sill 44 maximum height from floor Open window area 5.7 sq. ft. minimum (821 sq. in.) Open height 24 minimum Open width 20 minimum 13. Sec. 310.0 Smoke alarm installation. 14. Sec. 2320.8 & 11 Straps and nailing where joists, studs, and plates notched. 15. Sec. 310.6.1 Ceiling height; habitable space 7 6 ; kitchen, hall, bathroom 7. 16. Sec. 1505.1 Attic access 22 X 30. 17. Sec. 1605 Truss and rafter ties. 18. Sec. 1203.3 Ventilation. 19. Sec. 2306.3 Crawl space access, 18 X 24. 20. Sec. 708.1 and Chapter 31 Wood stove installation, fire stops, chimney height. 21. Sec. 2306.4 Plates, sills, and sleepers of treated wood or foundation redwood. 22. Sec. 2306.3 Maximum distance of untreated wood to exposed ground: Joists- 18 Girders 12 Siding 6 23. Sec. 2306.7 Foundation ventilation, 1 sq ft. for each 150 sq. ft of area. 24. Sec. 302.1 One-hour occupancy separation between residence and garage. 25. Sec. 2320.11.6 Headers, two pieces of 2 inch framing lumber mounted vertically, supported by two (2) trimmers, over openings in bearing walls, or any opening over 4. 26. Sec. 2320.12.8 Vertical solid blocking on top plate between roof trusses.

PLUMBING CHECK LIST This checklist is intended as a guide only. All references are to the 1997 Uniform Plumbing Code Unless otherwise noted. Base: 1. Sec. 202.0 (Building) Proper material to 2 feet outside building. 2. Sec. 718.1 ¼ per footfall. 3. Sec. 718.2 Firm bed support. 4. Sec. 706.0 Directional flow fitting. 5. Table 7-3 Minimum trap size. a) 2 floor drain b) 2 shower c) 1 ½ tub 6. Sec 906.2 Horizontal vents. 7. Sec. 712.0 Inspection Test 10 feet - water 5 lbs. - air 8. Table 7-5 Proper sizing for total load. 9. Sec. 701-2 Cement joints not allowed on ABS to PVC. Top Out and Supply: Waste and Vents 1. Sec 701 Proper material 2. Table 7-3 Proper sizing (D F U ) 3. Sec 314 Support properly. 4. Chapter 9 and Table 7-5 correct venting. 5. Sec. 707 Clean outs. 6. Table 7-3 Minimum size of traps and trap arms. 7. Sec 712.0 Inspection Test 8. Sec. 705.0 Joints and connections Water Pipe: 1. Table 6-4 and 6-5 Proper size. 2. Sec. 314 Supported properly. 3. Sec. 604 Approved material. Final: 1. Sec. 401 and Table 14-1 Approved fixtures. 2. Chapter 10, Sec. 603.2.1 Air gaps. 3. Sec. 1001 All fixtures trapped. 4. Hot and cold water to appliances and fixtures. 5. Sec. 608.3 and 608.4 Temperature and pressure on hot water heater.

GAS PIPING CHECK LIST This checklist is intended as a guide only. All references are to the 1997 Uniform Plumbing / Mechanical Code. Unless otherwise noted. 1. Check demand (total BTU/hr.) for each appliance. 2. Check type of gas. 3. Sec. 1216.4 Minimum pipe size. 4. Sec. 1211.5 18 trench. 5. Sec. 1211.16 Tracer wire. 6. Sec. 1211.5 Metal risers. 7. Sec. 1211.3 No piping on ground under building. 8. Table 12-2 Pipe supports. 9. Sec. 1204.3.2 10 PSI/15 min.; Welded pipe 60 PSI/30 min. 10. Table 12-3 & 12-4, Sec. 1211.13, Sec. 1212 Length and size of connector. 11. Sec. 1211.15 Location of approved shut offs for appliances. 12. Sec. 1211.10 Type of fittings for concealed locations. 13. Sec. 1213.3 Location of outside building shut-off. 14. LP Detector and Solenoid shut off for LP appliances below the first floor.

FINAL CHECK LIST This Checklist is intended as a guide only. All references are to the 1997 Uniform Building Code Unless otherwise noted. Minimum Requirements to Obtain a Certificate of Occupancy 1. At least one (1) complete, working bathroom. This is to include a toilet, lavatory, a bathtub or tub/shower combination). 2. A door on the bathroom. 3. All electrical fixtures installed or covered by a blank plate. 4. Hot and cold running water. 5. Kitchen sink installed, sealed and functioning. 6. Functioning heat system. 7. All safety features in place (guardrails/handrails, smoke detectors, etc.). 8. Permanent Address numbers ( 5 tall with ½ stroke, visible from the road from both directions). 9. Final inspection passed on Driveway permit and driveway accessible. 10. Final inspection passed on Septic permit and system functioning. 11. Final Grading completed (sloping away from foundation, etc.) Note: Paint, interior trim and floor coverings (as long as stair heights, etc. can be determined) are not required to be completed to obtain a Certificate of Occupancy.

ELECTRICAL CHECKLIST This checklist is intended as a guide only. All references are to the 2003 National Electric Code; all prerequisites of the Company supplying power shall apply. A directive guideline for the installation of temporary or permanent service equipment is available at Intermountain Rural Electric Association or Aquila. A. Temporary Service: 1. The minimum size of a temporary service shall be 60 Amperes per Article 230.79 (D). All other services shall be not less than 60 Amperes. 2. The Temporary Service must include a120 volt receptacle controlled by a ground fault circuit interrupter. 3. All other outlets in a temporary service must be wired with the proper size wire, over-current protection, and must be G.F.I. protected for personnel per Article 627.6 (A). 4. All components of a temporary service shall be housed in rainproof or NEMA 3R enclosure. B. Load Calculations: Load Calculations Required only if residence is to be heated electrically (i.e. electric baseboard heat, electric forced air furnace, electric boiler, fixed electric heating panels). Use: III Optional calculations for computing feeder and service loads 220.30 optional calculation Dwelling unit, plus: 220.15 fixed electric space heating. Doing these calculations will assure that the correctly sized service, and service feeders are installed at this time, future provisions should be addressed if additional power is to be required (i.e. outbuildings, barn, detached garages to be fed from the main dwelling service). C. Permanent Service: 1, The smallest size permanent service allowed is 100 Amperes Article 230. 2. Wire size shall be calculated based on Article 310.15 (B) (6) conductor types and sizes for 120/240 volt, single phase, 3 wire dwelling services and feeders. 3. Permanent Service for overhead to underground applications must be mounted securely to an REA meter pole. 4. Second Services on an existing meter pole allowed only if the following conditions are met: a) Proper utility easement has been obtained and recorded. b) Service is stood away from the pole a minimum of 4 inches at a 90-degree angle to existing service. c) Pole is bucket accessible. d) With Special Permission from I.R.E.A. (Intermountain Rural Electric Assoc.) 5. If the Service is mounted to the dwelling and the service mast protrudes through the soffit and roof, then the service riser shall be of 2 inch rigid, (GRC) conduit regardless of size, 100 or 200 Amperes. Point of attachment know must be installed @ 12 inches below weather head.

A minimum of 36 inches of feeder conductor to extend from the weather head with the grounded conductor clearly marked with a continuous yellow line, or a minimum of 6 inches of white phase, or marking tape. 6. If the Service drop has adequate ground clearance and it does not penetrate the soffit or roof, then Thinwall (EMT) electro-metallic tubing is allowed. REA furnishes the eyebolt, which must penetrate through a framing member in the exterior wall, adjacent to the weather head. All other conditions above apply. 7. Required clearances from the ground are as follows: Minimum of 12 feet from finished grade or residential driveways Minimum of 10 feet from top of attached deck or porch Minimum of 3 feet lateral clearance from an openable window Minimum of 15 feet if voltage exceeds 300 volts to ground Minimum of 18 feet over public streets, alley, roads, parking lots, areas subject to truck traffic, driveways other than residential (i.e. cultivated land, grazing, forest or orchard land). Overhead conductors cannot cross more than 3 linear feet of roofline. **For more detailed information regarding number 7, see Articles 230.24 and 230.9. 8. The Service disconnect (Main Breaker) shall be bonded and grounded in accordance with Article 250. All service entrance conduits shall be bonded in accordance with Article 250. 9. Required Grounding for Service disconnect (2 required) a) Eufer (footer) ground (steel tied to reinforcing steel in footer, and protruding from the footer) Connect w/ #4Bare Copper b) 2 each 5/8 x 8 ground rods driven a minimum of 6 feet apart connected with #6 bare copper at meter pole and house c) Water pipe ground (only if metal pipe entering structure minimum of 10 linear feet in ground d) 12 X 12 X 1/8 ground plate (copper) e) Ground Ring (minimum of 20 #4 bare copper in ground 30 inches deep f) Made electrodes per Article 250 10. Required Bonding for Service Disconnect a) All Metal piping in structure (i.e. water, gas (if black pipe?) b) Service Entrance conduits (if metal) Note: ALL grounding connections must be and remain accessible and unspliced 100 Ampere Service = #6 Copper 200 Ampere Service = #4 Copper 11. Service Disconnect cannot be located in a bathroom or a closet. 12. Any and all sub-panels beyond the service disconnect shall be 4 wire, (2 hot, 1 neutral, 1 ground) connections separate neutral and ground bars required.

D. Article 210-52 Requirements for dwelling unit receptacles. Table 220.33 (A) 1. General Lighting and receptacle loads shall be computed at 3 VA (watts/)ft2 Example: 1) Living Room 15 X 20 = 300 2) Family Room 10 X 15 = 150 Total 450 ft2 x 3 VA = 1350VA 15 amp circuit at 100% = 1800va X.8 = 1440 VA allowed. Therefore: These two rooms (all lighting and receptacles) are allowed to be served by one15 ampere branch circuit. 2. Location of Receptacles is as follows: See Article 210 for more details. d) 6 feet from each door opening, then no more than 12 feet there after, around room, in each habitable room. e) 1 receptacle in hallways longer than 10 feet is required. f) 2 receptacles on outside of residence: 1 in front and 1 in back of structure within 6 feet 6 inches of finished grade (GFI required) g) On Kitchen countertops required every 4 feet on counter spaces greater than 12 long (GFI required) h) 1 receptacle required in each peninsula or island with less than 6 inches of counter overhand. (GFI required) i) 1 receptacle required within 36 inches of each bathroom sink (GFI required). j) 1 receptacle in unfinished basement (GFI required) k) 1 receptacle in garage (GFI required) l) 1 receptacle within 25 feet of equipment (i.e. furnace, water heater, etc.) GFI required. 3. Each habitable room, unfinished basement, garage and storage areas shall have means by which to operate at least 1 light opening (light fixture, or switched receptacle). See Article 210 for more details. 4.Illumination is required at each man door (egress lighting) for the purpose of escape in the event of fire. See Article 210 for more details. 5. Require Circuits a) 2 each kitchen appliance (counter-top) circuits 20 Ampere b) 1 each Laundry (washer) circuit 20 Ampere c) 1 each Bathroom receptacle circuit 20 Ampere d) 1 each Disposal/Dishwasher circuit (20 A for both) 20 Ampere This feed can also consist of 2 each 15-Ampere circuits e) 1 each Microwave circuit (only if microwave built in) 20 Ampere f) 1 each Heat (boiler or furnace) circuit 15 Ampere g) 1 each Water Heater circuit (if electric) 30 Ampere h) 1 each Dryer Circuit(if electric) 30 Ampere i) 1 each Well circuit (must be adequate for Pump) 20 or 30 Ampere j) 1 each Jacuzzi Tub circuit 20 Ampere

There circuits are required to serve the above-mentioned items only. There are two exceptions for (B) Laundry circuits; items can serve additional receptacles in the laundry room, but cannot leave it. Exception to (A) kitchen appliance circuit; are allowed to serve the dining room receptacles if there are a low number of kitchen counter receptacles. The balance of the dwelling is required to have only the number of additional circuits per the load calculation done, based on the square footage of the dwelling. 6. Special Protection: New for 2002: Arc fault interrupter circuits. See Article 210.12. These devices are intended to sense faults know as arcing, and are designed to de- Energize the circuit if this occurs. All bedroom openings (i.e. lighting openings, receptacles, and smoke detectors (throughout the entire house) must be served by Arc- Fault Interrupting Breakers. 7. Ground Fault Interuptor (GFCI) required locations. See Article 210.8 for more details. 1. Bathrooms 2. Garages (storage areas) 3. Outdoor Receptacles 4. Crawl Spaces 5. Un-Finished basements 6. Kitchens (counter-top receptacles) 7. Wet Bar Sinks (any receptacle located within 6 feet of outside edge of the wet bar sink) 8. Boathouses Smoke detectors for dwelling units must be located per plan review drawings and must be interconnected throughout the entire dwelling (3 wire). They must be powered both with 120 volts AC current, and must be backed up with batteries in the event of a power failure. E. Wiring Methods 1) Wiring of dwelling may not begin until the structure is effectively dried in. This means all doors and windows installed, and a minimum of at least tarpaper on the roof. It is also highly recommended that mechanical, plumbing, and other sub-contract trades have their portions of work already completed. 2) Drilling of Holes: Holes in which to pull NM-B wires may be drilled anywhere in walls, however if there is less than 1 ¼ of wood remaining between the stud-fact and the hole, then a 16 gauge nail plate (notch plate) is to be installed to prevent damage to wire by dry wall nails or screws. 3) Wire must be supported (stapled) every 4 ½ per Article 334.30. At entry to every box the wire must be stapled no more than 12 away. At least ¼ of the outside sheating but no more than ¾ must be installed inside the box. Sizes of required outlet boxes can be found in Article 314. This Article also explains how wire-fill is to be calculated for each outlet box. A minimum of 6 of wire must be left in the box from the point of where it emerges from its raceway in the box. See Article 300.14 for more details. All wiring

within the junction boxes must be joined physically (wire nuts or compression barrels for grounds). Any and all metallic boxes are to be grounded (bonded) by 10-32 ground screws, or other approved methods for grounding. Any outlet box that is used for the purpose of joining wires (not containing devices or lighting fixtures) is to remain accessible (cannot be covered in walls). All wiring located within 7 feet of attic access holes must be protected from physical damage, either by stapling to the side of roof truss, or nailing protective strips 2 X 4 on edge next to conductors. If garage walls remain unfinished, wiring must run vertically up walls to a height of 8 feet before running horizontal to be considered not subject to physical damage. Please make note of the following amendments to the Teller County Building Code: Article VII Amend section 300-5.4 and add paragraph: 300-5.4(F) Protection from Damage of Riser on Unfused Service Laterals. Direct buried conductors (Unfused Service Laterals) shall be buried at a depth of no less than 30 inches, and shall have a yellow warning ribbon placed at least 12 inches above the underground electrical installation. Protection from physical damage shall be provided with the installation of Galvanized Rigid Conduit Rigid Metal Conduit only. Amend Article 250.24 and add paragraph: (B)(4). Reduced Neutrals 1. The reduction of neutral feeder wire, URD (Underground Rated feeder wire), shall not be allowed. 2. The reduction of neutrals for service feeders shall not be allowed.