STDF PROJECT PROGRESS REPORT

Similar documents
STDF PROJECT PROGRESS REPORT

THIRD AND FOURTH PROGRESS REPORT (1 JANUARY 31 DECEMBER 2012)

Report of the End Project Meeting Le Meridien Hotel, Kota Kinabalu, Sabah, Malaysia 2-4 February 2016

FOOD SAFETY & HACCP Jeremy Ngim,

Assessing pesticide use in cocoa

MAIN REPORT of SOCIO ECONOMIC BASELINE SURVEY (SEBS) AND PARTICIPATORY RURAL APPRAISAL (PRA)

HOW TO SUSTAIN COCOA PRODUCTION FROM MALAYSIA S PERSPECTIVE

Draft Project Proposal. CocoaSafe : Capacity Building and Knowledge Sharing in SPS in Cocoa in South East Asia

COMPLETION OF THE REPORT ON COCOA PRODUCTIVITY AND QUALITY IMPROVEMENT: A PARTICIPATORY APPROCH SUMMARY OF THE PROJECT COMPLETION REPORT (PCR)

Economic and Social Council

The Outlook for Agriculture and Fertilizer Demand for Urea, Compound and Organic in Indonesia

4 Better Rice Initiative Asia-Monthly Update. Better Rice Initiative Indonesia

COORDINATING MINISTRY FOR ECONOMIC AFFAIRS REPUBLIC OF INDONESIA. Musdhalifah Machmud Assistant Deputy of Plantation and Horticulture

WAN NORMAH WAN ISMAIL DIRECTOR OF CROP PROTECTION AND PLANT QUARANTINE DIVISION, DEPARTMENT OF AGRICULTURE (DOA) 8 JULY 2011

TERMS OF REFERENCE FOR INDIVIDUAL CONSULTANT

PUBLIC SECTOR ROLE IN SUSTAINABLE WORLD COCOA ECONOMY: MALAYSIAN EXPERIENCE

We are a leading global not-for-profit organisation specialising in sustainable solutions for agricultural and environmental problems

PROJECT PREPARATION GRANT (PPG) PROJECT TYPE: Full-sized Project TYPE OF TRUST FUND: GEF Trust Fund

Building a Sustainable Cocoa Economy

THE WAYS TOWARDS SUSTAINABILITY OF COCOA INDUSTRY IN MALAYSIA

PNPM Rural Supervision and Monitoring

Session 2: Regional TCP Overview and Work Plan

INTRODUCTION

Regional Project in Africa

Call for concept notes

Landschaftsökologie und Umweltforschung 38 p Braunschweig 2002

27 th Session of the Asia and Pacific Plant Protection Commission

TECHNICAL ASSISTANCE

TERMS OF REFERENCE International Consultant to Design and Conduct Baseline for Intervention to Prevent Genderbased Violence in Indonesia

GLOBAL STRATEGY. to improve agricultural and rural statistics in ASIA PACIFIC

REDD Readiness Progress Fact Sheet COUNTRY: Indonesia May 2013

Session 1: The Need for Developing National E-agriculture Strategy Papua New Guinea E-Agriculture Strategy

Call for concept notes

CABI and Cocoa. Dennis Rangi, Executive Director International Development March 2012

International Trade Centre Update. Marcos Vaena Chief, Sector and Enterprise Competitiveness Section, ITC

TRANSFERRING TECHNOLOGY TO COCOA SMALLHOLDERS: Sharing Experience from Sulawesi,, Indonesia. Halim A. Razak Indonesian Cocoa Association

Canadian Co-operative Association ( CCA ) Request for Proposals Value Chain Assessment Consultancy

Indonesian Cocoa Workshop Global grindings versus production INTERNATIONAL COCOA ORGANIZATION. Laurent Pipitone

Sustainable Cocoa Economy

BENEFITS OF PROMOTING SSNM: EXPERIENCE FROM INDONESIA

Asia-Africa Africa Knowledge Co- Creation Program (AAKCP)

Asia and Pacific Commission on Agricultural Statistics

Proposed development of training in BMPs (Better Management Practices) for smallholders producing oil palm in Sumatra

UNCTAD GLOBAL COMMODITIES FORUM 2013 Recommitting to commodity sector development as an engine of economic growth and poverty reduction

Technical Specialist, Agricultural Landscapes. Application Pack. Innovative conservation since 1903

Session 3: Questionnaire on Policy, Laws and Regulations and National Policy Dialogue Plan

Terms of Reference for National Consultant for Project Formulation Policy Framework Capacity and Conservation Needs Assessment (National)

REDD Readiness Progress Fact Sheet COUNTRY: Indonesia October 2013

Evaluation of UTZ in the Indonesian cocoa sector

Asia and Pacific Commission on Agricultural Statistics

2.1 Specific objectives of the evaluation The specific evaluation objectives are:

Technical Assistance Report

Call for concept notes

For: Approval. Note to Executive Board representatives. Document: EB 2018/LOT/G.11 Date: 22 November Focal points:

LINKING FARMERS TO MARKETS IN AFRICA

Direct partnership on cocoa processing in Papua Island, Indonesia For improving farmers access to Japan market

UNICEF/EAPRO, Bangkok

THEORY INTO PRACTICES DELIVERING A SUSTAINABLE COCOA SUPPLY CHAIN: MALAYSIA S EXPERIENCE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2501. Date ISDS Prepared/Updated: 03/01/2007 I. BASIC INFORMATION. A. Basic Project Data

QUARTERLY PROGRESS REPORT (from 1 April to 30 June 2017)

INDONESIA. A Quick Scan on Improving the Economic Viability of Coffee Farming A QUICK SCAN ON IMPROVING THE ECONOMIC VIABILITY OF COFFEE FARMING

NATIONAL EXPORT STRATEGY

Call for concept notes

Version: 23 December Preparation and Scoping. RSS 2.a Risk Assessment (Pillar 1) RSS 2.b Needs Assessment (Pillar 2) Developing an Action Plan

Summary. Project Title: Regional Development Policies for Local Government

PACIFIC AGRICULTURE POLICY DIGEST Issue No. 03 October December 2015

Proposed Results-Based Loan Republic of Indonesia: Integrated Participatory Development and Management of Irrigation Program

Rural Implementation Support

A I D E M E M O I R E THE AFRICAN E-LEADERSHIP MEETING. Dar es Salaam, Tanzania, June, 2011 (Draft of April 2011)

Develop a Network for Cross-Country Technology Verification and Transfer, and to Build Mechanization Capacity among End Users and Service Providers

4R Nutrient Stewardship

Impact Measurement Case Study

Fairtrade International Monitoring Evaluation and Learning Programme ISEAL Impacts Code Public System Report January Executive Summary 2

Summary of the Results of Evaluation Study

Farmer Field Schools: Beyond Agriculture and Rural Development By Alma Linda. C. Morales-Abubakar

Indonesia: Integrated Pest Management for Smallholder Estate Crops Project

Managing cocoa pests and diseases within Vision for Change project in CI

PROPOSAL. Strengthening Compliance Assistance Efforts through Established Environmental Compliance Assistance Centers

TRAINING OF MASTER FACILITATORS (TOMF)

RSPO Smallholder Support Fund (RSSF) Governance Policy

Indonesian Excellent

Cocoa Sustainability Fall 2011

AFRICAN DEVELOPMENT BANK

The Future of the World Cocoa Economy: Boom or Bust?

Case Study: Institution-Based Information Systems Kenya Agricultural Information Network (KAINet) Planning and Strategy Building EXECUTIVE SUMMARY

Technical Assistance Islamic Republic of Afghanistan: Preparing the Commercial Agriculture Development Project

Implementation Status & Results Indonesia Aceh-Nias Livelihoods and Economic Development Program (LEDP) (P110635)

GAP IMPLEMENTATION IN CAMBODIA AND NATIONAL ROADMAP FOR CAMBODIAN GOOD AGRICULTURAL PRACTICES (CamGAP )

Terms of Reference Development and Rollout of MEAL System for the Indonesia Climate and Disaster Resilient Communities (ICDRC) Project

June 2016 Newsletter. APEC Food Safety Cooperation Forum (FSCF) Partnership Training Institute Network (PTIN)

UNITED NATIONS DEVELOPMENT PROGRAMME JOB DESCRIPTION

Call for concept notes

Feed Africa Agriculture and Agroindustry

COMMITTEE ON COMMODITY PROBLEMS

Notes of the Workshop

Thematic global evaluation of the EC support to agricultural commodities in "Fiche Contradictoire"

Feed the Future Innovation Lab for Small-Scale Irrigation Cooperative Agreement No. AID-OAA-A

Special Indonesian Issue

GUIDELINES FOR INCEPTION REPORTS

DETAILED TERMS OF REFERENCE FOR CONSULTANTS

Transcription:

STDF/PG/:381 DATE: 31 OCTOBER 2014 STDF PROJECT PROGRESS REPORT PROJECT TITLE: COCOASAFE : CAPACITY BUILDING AND KNOWLEDGE SHARING IN SPS IN COCOA IN SOUTH EAST ASIA PROJECT PROGRESS REPORT: 1st X 2nd 3rd 4th 5th PROJECT START AND END DATES From: NOV 2013 To: OCT 2015 PERIOD COVERED BY THIS REPORT: From: MAY 2014 To: OCTOBER 2014 IMPLEMENTING AGENCY: CABI SOUTH EAST ASIA OFFICE CONTACT PERSON: Name: Dr. Soetikno S. Sastroutomo Title: Senior Scientist & Project Coordinator Tel: +60389432921 E-mail: s.soetikno@cabi.org OVERVIEW: Briefly describe: (i) the objective of the project; (ii) progress in project implementation to date; (iii) any particular issues faced and/or results achieved during this reporting period. (I) Project Objective(s) The overall development objective of this project is to produce and trade cocoa that meets food safety and international SPS standards. The immediate objective of the project is to increase awareness of SPS issues among supply chain stakeholders through innovative knowledge dissemination. The specific objectives of the project are: 1. Improving the quality of cocoa through capacity building in SPS; 2. Promoting and facilitating knowledge sharing between stakeholder groups participating in the project, and; 3. Raising awareness among cocoa stakeholders beyond the project s immediate reach on food safety concerns in the whole supply chain (and how to address them). (II) Progress in Project Implementation to Date Project implementation has continued in the participating countries as described in the work plan. In Indonesia, Training of Master Facilitators (TOMF) was conducted in September following the period of Ramadan. The TOMF for Indonesia was held at the Indonesian Coffee and Cocoa Research institute (ICCRI) from 15-26 September 2014. Prior to the organization of the training, the Indonesia National Steering Committee (NSC) reviewed and agreed the syllabus for the TOMF. The syllabus was adapted to include issues related to local conditions in Indonesia such as locally developed planting material, shade management, crop diversification, soil fertility and health, pest and disease management, cocoa safety 1

and quality standards for exported beans (see training manual attached). Participants including local extension agents, nursery workers, farmers leaders and junior scientist from ICCRI were selected by the NSC to participate in the training session and also recommended by the local extension service agency for estate crops. A list of the participants, including their age, gender, education background and occupation is attached to this report. The TOMF was divided into three modules covering theory, practical and group discussion. The first two modules were carried out at the beginning of the TOMF. The topics covered during these modules were cocoa sustainability, cocoa (food) safety and cocoa production as a business. Once the first two modules were delivered, participants were divided into groups and discussion and exchange of ideas was encouraged by the facilitators. This module was very successful as it allowed participants to share major threats and issues affecting cocoa (food) safety and identify common problems, leading to more sound and participatory recommendations. In Malaysia, the project carried on activities with the implementation of Training of Facilitators (TOF) for local extension staff (Activity 1.3), farmers groups/cooperative leaders (Activity 1.4) and for agrodealers (Activity 1.5). Activities 1.3 and 1.4 were carried out in four different locations in Malaysia: Sabah, Sarawak, Perak and Pahang. The training for extension staff from the Malaysia Cocoa Board (MCB) and farmers group leaders covered topics on SPS, Good Agricultural Practices (GAP), safety, production and post-harvest practices. Training of agro-dealers (Activity 1.5) took place at the Cocoa Research and Development Centre Kota Samarahan, Sarawak. The agro-dealers participating in the training were selected from three cocoa producing regions in Malaysia, namely Sabah, Peninsular Malaysia and Sarawak. The training for agrodealers covered topics such as SPS, GAP and information on pesticides such as regulations in Malaysia, pesticide classification and formulation, pesticide labelling and registration, list of registered pesticides for cocoa in Malaysia and pesticide and human health. (III) Issues and Results Achieved During Reporting Period During the reporting period, the project achieved considerable progress and is up-to-date in relation to the work plan. In Indonesia, the project was able to successfully deliver training to 20 Master Facilitators (TOMF). Evaluation of Master Facilitator s knowledge prior to the training was recorded. At the end of the training, a post evaluation was undertaken, with all farmers recording a high success of improved knowledge. Preparations are underway to initiate activities related to Training of Facilitators in Indonesia (TOF). In addition, the final version of the training manuals was finalized and printed in Indonesian Bahasa. Malaysia also recorded considerable progress in project implementation. Following the TOMF organized at the beginning of the project, four (4) TOF were organized for farmers leaders and extension service officers, with a total of 160 facilitators attending the training sessions. Of these 160 facilitators, 117 are lead farmers and 43 are extension service officers. It was highlighted that Malaysia has a dedicated extension service office for cocoa, which made the process of selection of extension service officers easier. Malaysia also organized a TOF for agro-dealers, with a total of 17 participants attending. In Malaysia, authorities have set lists of approved products to be used in cocoa, making the process of training easier. According to the national regulation, agro-dealers (pesticide dealers) in Malaysia must register with the National Pesticide Board and attend training on pesticide usage to gain basic information. The regulation also includes a monitoring programme implemented by the Pesticide Board to ensure correct use of pesticides and allowed products for specific commodities. All pesticides sold in Malaysia must comply with national standards of label registration and must be recorded by the Pesticide Board. Questionnaires were distributed to farmers leaders, agro-dealers and processors/collectors who attended the TOF. Completed questionnaires have being received and the information is currently being processed for analysis. The CocoaSafe website in Malaysia was also launched during the reporting period (www.koko.gov.my/cocoasafe). 2

The 2 nd meeting of the Project Steering Committee (PSC) was organized to coincide with the TOMF in Indonesia in September 2014. The meeting was attended by representatives from the National Steering Committee (NSC) from Indonesia and Malaysia, in addition to representatives from CABI, both from the regional office in South East Asia and the UK, and a representative from ICCO. Due to budget constraints, other representatives from the PSC, namely the FAO representative, STDF Expert Working Group, Mars and Papua New Guinea (PNG), were unable to attend; however, the report of the meeting was sent to all Members for comments and observations. A major issue discussed during the Steering Committee meeting was the involvement of PNG during the second year of the project. Consultations are on-going between the project partners to evaluate the possibility of organizing a TOMF in PNG, pending a positive reaction from authorities and availability of funds to carry out this activity. Consultations are currently underway with private sector initiatives in PNG to identify possible cooperation areas for the benefit of the cocoa sector. In addition, the PSC also discussed the issue of underspent budget registered during the first year of the project. It was highlighted that better financial reporting was necessary to ensure that all reports reflect the reality of project implementation. The under-expenditure registered during the first year of the project is already allocated to corresponding project activities and it was highlighted that a change in the time of the organization of the TOMF in Indonesia (following the period of Ramadan) was the main reason why project funds were not fully used in relation to the work plan. A copy of the full report of the PSC is available (see attached report). 3

PART A: PROGRESS AND RESULTS A. PROGRESS & ACHIEVEMENTS: Describe progress in implementation during this report period, including key outputs/outcomes, based on the project logframe. INDONESIA Development of locally adapted training material for TOMF was completed in Indonesia, with changes to the curricula based on local conditions (Activity 1.1). Project partners in Indonesia organized the Training of Master Facilitators (TOMF) from 15-26 September 2014. The training was attended by a total of 20 participants from the following cocoa producing regions: West Sumatra (1), Lampung (1), West Kilamantan (1), East Kilamantan (1), North Kilamantan (2), South Sulawesi (2), West Sulawesi (2), Central Sulawesi (2), Southeast Sulawesi (2), Bali (1), East Java (1) and ICCRI junior scientists (5). (Activity 1.2). MALAYSIA Project partners in Malaysia organized four training courses for TOF farmers group leaders/cooperative leaders in four different locations. The events took place in Sabah (16-20 June 2014), Sarawak (11-15 August 2014), Perak (22-26 June 2014), and Pahang (16-20 June 2014). A total of 117 farmers group/cooperative leaders received training. (Activity 1.3). Project partners in Malaysia organized four training courses for TOF for extension service workers in four different locations. The locations and dates for the TOF are the same as the ones for Activity 1.3. A total of 43 extension service workers received training. (Activity 1.4). The TOF for agro-dealers was organized at the Cocoa Research and Development Centre Kota Samarahan, Sarawak, from 22-26 August 2014. A total of 17 agro-dealers participated in the training. Agro-dealers were selected from the three main cocoa producing areas: Sabah (3), Peninsular Malaysia (7) and Sarawak (7). (Activity 1.5). A baseline/impact survey was carried out in Malaysia following the organization of the TOF for farmers group/cooperatives leaders, extension service workers and agro-dealers (Activity 1.8). The result would be reported in the 3 rd Progress Report. Project partners in Malaysia designed and launched a website/knowledge exchange platform for Malaysia (www.koko.gov.my/cocoasafe). (Activity 2.2). This site is also linked to the main CocoaSafe website managed by CABI. REGIONAL The PEA carried out the updating, maintenance and monitoring of the website/knowledge exchange platform for the project (www.cocoasafe.org). (Activity 2.3). The PEA organized the 2nd PSC meeting, which took place at ICCRI, Jember, Indonesia, from 25-26 September 2014. (Activity 3.1). 4

B. TIMEFRAME AND BUDGETING Explain whether the project is on-track with regard to: (i) the budget; and (ii) the original timeframe. If either the expenditures and/or timeframe are off-track, please explain and describe the corrective actions being taken. The project is on-track with regard to budget and the timeframe. C. OTHER IMPLEMENTATION ISSUES Describe any significant changes to the project design, context or partners during the reporting period, or any other issues faced, and actions that are being taken in response, if appropriate. No significant changes to the project design, context or partners in this reporting period. Authorities from Malaysia have decided to organize a Farmers Field School in early 2015 in Perak using MCB training fund. This is an additional contribution outside the project original budget. D. OTHER COMMENTS: Please provide any other relevant information or observations on the project, e.g. on lessons learned, particular challenges or issues that may arise in the next reporting period, changes to the logframe, etc. Due to issues with the design of the original project activities, a limited budget was allocated for travels expenses and DSA for facilitators during the TOF in Indonesia. As a result, ICCRI has proposed that the TOF in Indonesia should be reduced from 5 days as originally described in the proposal to 3 days. The number of TOF will not be affected (5 in South Sulawesi, Southeast Sulawesi, West Sulawesi, East Java and West Sumatra) as well as the information delivered during the training. Approval from STDF is requested for implementation of these changes. The PSC has held discussions among its members on ways to include PNG in the project. Current project activities for PNG include the production and printing of a locally adapted TOMF training manual and printing of posters. A comment was made during the 2 nd PSC meeting that if printed material for PNG was produced and no commitment or funds for training are secured information may not be distributed adequately. At present, the main obstacles to organize training in PNG are lack of funds and logistic and communication problems within PNG. It is proposed that a delegation of PSC Members organizes a mission to PNG early next year to obtain a firm commitment from local authorities to participate in the project and commit to looking for funding and allocating counterpart contributions for activities in PNG. 5

E. PROJECT DOCUMENTS: Provide a list of key documents (e.g. mission reports, training materials, workshop reports, etc.) produced during this reporting period. Copies of the final versions of these documents should be attached to this report. i. TOMF Training Manual in Malay and Indonesian versions ii. List of participants & TOMF Program for the four TOF held at MCB R&D Centres in Jengka (Pahang), Teluk Intan (Perak), Kota Samarahan (Sarawak) and Kundasang (Sabah). iii. List of participants and programmes for the TOMF in Indonesia iv. Two survey questionnaires (i.e. for farmers and agro-dealers) have been distributed to participants and completed questionnaires are being analysed by MCB. v. Analysis of results from questionnaire. vi. Report of the 2 nd Project Steering Committee Meeting held at ICCRI, Jember, Indonesia vii. Report on Cocoa Safe Website Development for Malaysia viii. Progress Report from Malaysia ix. Progress Report from Indonesia 6

PART B: STATUS OF THE OUTPUTS AND ACTIVITIES Output / Activity Indicator / Target: Actual performance: (% complete) Comments (results and challenges faced) Activity 1.1: Developing locally adapted curricula for training of trainers, tailors for key intervention points in the value chain. Target 2: Manual for TOMF to enable MF to train facilitators developed and translated into Malay and Indonesian 100% The manual for TOMF training ready on time and has been distributed to trainees in hardcopy and softcopy. Activity 1.2: Running the TOMF course. Activity 1.3: Training of facilitators: farm group/cooperative leaders. Activity 1.4: Training of facilitators: local extension staff Activity 1.5: Training of facilitators: agro-dealers. Target 1: 20 master facilitators (farmer leaders and agricultural extension staff) trained in Indonesia. Target: 80 facilitators from farm group/cooperative leaders in Malaysia ready to train farmers in farmers field schools (FFS) Target: 80 facilitators from local extension staff ready to train other officers/extension staff in Field Schools on Cocoa Safe. Target: 40 facilitators representing agro-dealers. 100% TOMF managed to train 20 master facilitators from 10 provinces in Indonesia, i.e. South, South East, Central and West Sulawesi, West, North and East Kalimantan, Lampung and West Sumatra, East Java and Bali. 146% TOF managed to train 117 facilitators from farm group/cooperatives in Malaysia. They are ready to implement Farmer Field School (FFS) if the budget is available. 54% TOF managed to train 43 extension officers in Malaysia. They only have a very limited number of extension staff with focus on cocoa. Therefore, 46% of the allocation were used to train more farmer leaders. 43% TOF only managed to train 17 agro-dealers from Peninsular Malaysia, Sabah and Sarawak. They only have a very limited number of agro-dealers registered under Pesticide Board of Malaysia. 7

Activity 1.8: Designing survey questionnaires for baseline and impact studies. Activity 2.2: Designing and creation of website/knowledge exchange platform. Activity 2.3: Updating, maintenance and monitoring of website/ knowledge exchange platform Activity 3.2. Organizing 2 nd Project Steering Committee Meeting and preparing the Report. Target 1: 3 questionnaires for farmer leaders, agro-dealers and processors/collectors Target 1: Website online in Malaysia www.koko.gov.my/cocoasafe. Website (www.cocoasafe.org) online Target 1: Project Meeting organized. Target 2: Report of the Meeting produced. 100% 2 questionnaires for farmer leaders and agro-dealers have been translated into Malay and used in TOFs for all participants in Malaysia. Analysis of the survey results were still in progress. 100% The website captured all activities to date from the inception meeting to the latest TOMF training workshop in Malaysia. Waiting comments from NIAs and other partners for further improvement. 100% Second Project Steering Committee Meeting was organised at ICCRI, Jember, Indonesia from 25-26 September 2014 and participated by representatives from all NIAs (Indonesia and Malaysia), ICCO and CABI. Final Report of the Meeting was produced in October 2014 and were distributed to all participants electronically. 8