REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR

Similar documents
APPENDIX I. (See paragraph-6) FORM 1

Annex F Scoping Checklist

FORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY. Asst.Director of Mines and Geology, Rajamahendravaram

APPENDIX I. (See paragraph-6) FORM 1

FORM 1 BASIC INFORMATION S.NO.

APPENDIX I. (See paragraph 6) FORM 1

FORM-I for seeking clearance for project attracting CRZ notification

APPENDIX I (See paragraph 6) FORM 1

Appendix I. Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN

FORM-I. 13. Name of Applicant District Collector Nasik 14. Registered Address Address : Collector Office, Nasik

M/s. Karthika Mines & Minerals Pvt.Ltd.-Colour Granite Quarry Ha. FORM - I

APPENDIX I (See paragraph 6) FORM 1

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &

APPENDIX VIII. Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

FORM I TERMS OF REFERENCE. For. QUARRY OF ROAD METAL (6.265 Ha) Sri K Kasi Raju. PROP: K.Kasi Raju

FORM 1 & 1 A. Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT. Palladium Grand II, S. No. 17/1A/2, Dhanori, Pune, Maharashtra

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

APPENDIX- I FORM- 1. (I) Basic Information:

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No

Sri.T.N.Balasubramanya

FORM 1. APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006

Details required for submitting Fresh EC Application. (Category B2 Projects: Mining of Minor Minerals)

Project: Bhidauni Khadar Ordinary Sand Mining Project on Yamuna River FORM 1 Applicant: M/s Satyug Foods Pvt. Ltd. FORM- I

Appendix I. Form 1 BASIC INFORMATION MASONARY STONE MINING PROJECT VILLAGE KOLIYA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN

Form -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds-

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))

Sand, Stone & Bajri Mining Project Applicant: Shri Ashish Kumar, M/s Ashish Stone Crusher. Form-1 FORM-1 SRUSHTI SEWA, NAGPUR 1

APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance)

APPENDIX - I (See paragraph 6) FORM 1

-

FORM-1. PROJECT: Sati & Garhi Sand Ghat,Ulai River (Area-22 Ha), Dist:-Jamui. APPLICANT: M/s Westlink Trading Pvt. Ltd. FORM- I.

M/S Overseas Min Tech Consultants, Jaipur 1

APPENDIX I (See paragraph 6) FORM 1

UPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana)

APPENDIX I (See paragraph 6) Form 1 (I) Basic Information

Submitted To State Expert Appraisal Committee (SEAC), State Environmental Impact Assessment Authority, Andhra Pradesh.

No 1 Name of the Project/s M/s. Velchal Laterite Mine 2 S. No in the Schedule 1(a)

A 'N 'E B 'N 'E C 'N 'E D 'N 'E

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))

FORM 1. 8 Does it attract the specific condition? It yes, No Please specify 9 Location At Village Akurli, Akurli Road, Kandivali(E), Mumbai

APPENDIX I (See paragraph - 6) FORM 1

FORM 1. Basic Information Sr. No. 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD.

(I) Basic Information:

UPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE. Sri Fakir Rohidas

(Residential cum Commercial Project) APPENDIX I (See paragraph 6) FORM 1. Plot area: 37,039 m 2 Built up area: 1,11, m 2

APPENDIX I (See paragraph - 6) FORM 1

FORM 1. Gownivaripalli Village, Tehsil. Gorantla Mandal, District. Anantapur District, State

Proposed Ordinary Sand Mining Project at Gata No.- 8Ka/195, Village- Ratauli, Tehsil- Laharpur, District- Sitapur, U.P. FORM 1

FORM 1. No condition? If yes, please specify. 8. Does it attract the specific. No condition? If yes, please specify. 9. Location Geo Coordinates

APPENDIX I. (See paragraph 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1

MANAKAWAS PLOT-1 TEHSIL-DADRI, DISTRICT-BHIWANI, HARYANA

FORM-I Basic Information

.APPENDIX I (See paragraph 6) FORM 1. Sl. No. Item Details 1. Name of the project/s

FORM 1. /area/length/tonnage. No condition? If yes, please specify. 8. Does it attract the specific

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I. (See Paragraph 6) FORM 1

Annexure-IV. Form-I for seeking clearance for project attracting CRZ notification. At Thengamputhur Village, Tamil Nadu by

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &

Salai Godhani Stone Quarry of Mr. Arvind Janraoji Gajbhiye in Village Salai Godhani, Th Nagpur (Gra) & Dist Nagpur Form I APPENDIX-I FORM-1

APPENDIX I (See paragraph 6) FORM 1

APPENDIX I. (See paragraph 6) FORM 1

FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

FORM 1 Riverbed Sand Mining Project

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA), Tamil Nadu

APPENDIX I (See paragraph 6) FORM 1. Plot area: 10,439 m 2 Built up area: 50, m 2

FORM 1. 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a)

APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE FOR QUARRYING BRICK EARTH. Natham Group Village. Kamuthi Taluk, Ramanathapuram District

UPDATED FORM I. SUBMISSION To Ministry of Environment & Forests & Climate Change, New Delhi. Prepared by. M/s. VIJAYNAGAR SUGAR PVT. LTD.

Proposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S. No. in the schedule 8(a)

FORM 1 Riverbed Sand/Morrum / Mining Project

FORM min Village. Chowgund, Tehsil. Doru District. Anantnag State

FORM 1. Basic Information. Sl. No.

APPENDIX I (See paragraph 6) FORM 1. Plot area: 13,114 m 2 Built up area: 81, m 2

Sl. No. 1. Name of the Project/s : Chudeshwar Gravel Deposit (Narmada River) 2. Sl. No. of the Schedule : Category B-2 of Activity 1(A)

Form I. for. Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens

FORM 1 Riverbed Sand Mining Project

Revised FORM - I & PRE-FEASIBILITY REPORT

JAI MAA SHARDA STONE CRUSHING

Application for Prior Environmental Clearance (EC)

S. Item : Details 1. Name of the Project : Flourspar, Quartz Mine (M.L.No. 4/95) 2. S. No. in the schedule : 1(a)

FORM-I. Environmental Clearance (EC)

Ambey Mahila Swa Sahayata Samuh President. Smt. Tuleshwari Vill- Gangikot Post: Gangikot Teh.- Surajpur Dist: Surajpur (C.G.

Haridarshan Residency ( Row Type House & School Building )

FORM I (OPENCAST LATERITE MINE ha)

FORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT ( SQ. M) ANAMOL LIFE STYLE

FOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR

FORM-I, PRE-FEASIBILITY REPORT FOR ENVIRONMENTAL CLEARANCE (EC) (Under Clause 6 of S.O.1533 of Environment Impact Assessment Notification, 2006)

M/s. SURYA ENTERPRISES H.No: , Sri Paradise Apartments, New Andhra Bank Colony, Anantapuramu District

FORM I. [Vide M.o.E.F & C.C Notification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE. M/s.

FORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects.

NON FOREST LAND Ref. NO

Proposed Multiplex & Commercial Complex FORM I

APPENDIX - I (See paragraph 6) FORM 1

UPDATED FORM I 433 TPD CALCINED PETROLEUM COKE PLANT WITH 9 MW COGENERATION OF POWER PROPOSED AT

Ms.Thriveni Earthmovers Private Limited HO.22/110,Greenways Roads,Fairlands,Salem,Tamilnadu

APPENDIX I. (See paragraph -6) FORM- 1. S.No. Item Details 1 Name of the projects/s: Flag Stone Quarry

30 TPH Fertilizer Blending unit for Customized NPK Production at Zuarinagar, Sancoale, Marmugao, SouthGoa, Goa

Transcription:

REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR Near Village Tehsil District State Capacity Lease Area Category of Project Project Cost KANTBARA BIJOLIYA Bhilwara Rajasthan 36561 TPA of salable mineral 4.5534 Ha B2 Rs. 60 Lakhs Name of Project Proponent: SH. BHAWANI SHANKAR PARASHAR SH. LAXMI NARAYAN PARASHAR RES. BIJOLIYA TEHSIL BIJOLIYA DISTT. BHILWARA (RAJASTHAN ) Mobile No: 9414686443 Mail id - bhawani45534@gmail.com

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE (II) Basic Information (I) Name of the Mining Lease site KHATADARI Q.L. NO. 178 NEAR VILLAGE KANTBARA TEHSIL BIJOLIYA & DISTT. BHILWARA (Rajasthan) Mineral - SAND STONE AREA 4.5534 (ii) Location / site (GPS Co-ordinates) PILLAR LATITUDE LONGITUDE A 25-02-57.18 74-22-43.78 B 25-02-57.78 74-22-46.26 C 25-02-58.36 74-22-46.19 D 25-02-59.33 74-22-48.33 E 25-02-59.73 74-22-49.69 F 25-02-57.4 74-22-50.59 G 25-02-55.37 74-22-51.09 H 25-02-52.7 74-22-51.52 I 25-02-51.03 74-22-52.32 J 25-02-48.46 74-22-52.94 K 25-02-48.56 74-22-53.54 L 25-02-46.73 74-22-54.03 M 25-02-46.55 74-22-52.6 N 25-02-46.23 74-22-52.66 O 25-02-45.97 74-22-49.93 P 25-02-47.92 74-22-49.93 Q 25-02-48 74-22-50.13 R 25-02-48.79 74-22-49.93 S 25-02-50.93 74-22-49.07 T 25-02-51.72 74-22-50.2 U 25-02-55.06 74-22-48.7 V 25-02-54.72 74-22-46.59 W 25-02-54.44 74-22-44.65 X 25-02-53.55 74-22-44.31 Y 25-02-53.35 74-22-42.27 Z 25-02-54.09 74-22-42.43 a 25-02-54.3 74-22-43.84 b 25-02-56.38 74-22-43.45 C 25-02-56.95 74-22-43.58 (iii) Size of the Mining Lease (Hectare) 4.5534 HECT (iv) Capacity of Mining Lease (TPA) 36561 MTPA (v) Period of Mining Lease: Up to 30.06.2021 (vi) Expected cost of the Project: 60.00 LACS

(viii) Contact Information: SH. BHAWANI SHANKAR PARASHAR SH. LAXMI NARAYAN PARASHAR RES. BIJOLIYA TEHSIL BIJOLIYA DISTT. BHILWARA (RAJASTHAN ) Mobile No: 9414686443 Mail id - bhawani45534@gmail.com Environmental Sensitivity 1 Areas Distance in kilometer / Details 1 Distance of project site from nearest RAIL ROAD BRIDGE rail or road bridge over the BRIDGE concerned River, Rivulet, Nallah etc. 2 Distance from infrastructural facilities MORE THAN 20 KM MORE THAN 5 KM NALLAH/ RIVULET NIL Infrastructural facilities is 1.5 K.M. from Q.L. Area Railway line Nearest Railway Line Kota Chittorgarh above 30 K.M. form the lease Area National Highway Nearest National Highway Ladpura Kota above 15 K.M. form the lease Area State Highway Major District Road Any Other Road Electric transmission line pole or tower Canal or check dam or reservoirs or lake or ponds In-take for drinking water pump house Intake for Irrigation canal pumps 3 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value 4 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 5 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 6 Inland, coastal, marine or underground waters Nearest State Highway Bhilwara Kota above 15 K.M. form the lease Area Nearest Distt. Road Bijoliya Gudda above 02 K.M. form the lease Area Nearest Gramin Road 1 K.M. form the lease Area No, Electric transmission line pole or tower in the Lease Area or near the lease area No, Canal or check dam or reservoirs or lake or ponds in the Lease Area or near the area No, In-take for drinking water pump house in the Lease Area or near the area No, Intake for Irrigation canal pumps in the Lease Area or near the area Areas does not protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value No, Areas which are not important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests No. Areas not used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration NOT APPLICABLE

7 State, National boundaries State Boundary Above 5.5 K.M. National Boundary more than 200 K.M. 8 Routes or facilities used by the Road, Bus and other transport are available for the public public for access to recreation or other tourist, pilgrim areas 9 Defence installations NOT APPLICABLE 10 Densely populated or built-up area, distance from nearest human habitation Nearest Village is KANTBARA Tehsil Bijoliya & Distt. Bhilwara Above 1.2 Km form Lease Area 11 Areas occupied by sensitive manmade land uses (hospitals, schools, places of worship, community facilities) 12 Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 13 Areas already subjected to pollution or environmental damage. (those where existinglegal environmental standards are exceeded) 14 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) 15 Is proposed mining site located over or near fissure / fracture for ground waterrecharge 16 Whether the proposal involves approval or clearance under the following Regulations or Acts, namely:- (a) The Forest (Conservation) Act, 1980 (b) The Wildlife (Protection) Act, 1972 (c) The Coastal Regulation Zone Notification, 2011. If yes, details of the same and their status to be given. No. Areas not occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) No, Areas does not containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) No, Areas does not already subjected to pollution or environmental damage No, Areas not susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) No. area is not falling over or near fissure / fracture for ground water Not Applicable, Area falls in Pvt. Land Not Applicable Not Applicable 17 Forest land involved (hectares) No Forest land in the area 18 Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court No, litigation pending against the project and/or land in which the project is propose to be set up. Not Applicable (b) Case No. (c) Orders or directions of the Court, if any, and its relevance with the proposed project. Nil Nil

(Signature of Project Proponent) Along with name and address) NAME- BHAWANI SHANKAR SH. LAXMI NARAYAN PARASHAR RES. BIJOLIYA TEHSIL BIJOLIYA, BHILWARA (RAJASTHAN ) Mobile No: 9414686443 (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist Yes/No Details thereof (with approximate quantities confirmation /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in Yes The mining will be done by Manual Open Cast land use, land cover or topography method. There will be permanent changes in land including increase in intensity of land use, land cover and topography. use (with respect to local land use plan). 1.2 Clearance of existing land, vegetation No No vegetation and building exists in the proposed and buildings? lease area hence no clearance is required. 1.3 Creation of new land uses? Yes The mining activity will result in pits; therefore land use of QL area will be changed. The QL area will be restored back by planting trees. 1.4 Pre-construction investigations e.g. Yes Exploration work has been carried out for bore holes, soil testing? estimation of reserve. 1.5 Construction works? No No construction activities are proposed during plan period. Only temporary offices/rest shelter etc. will be provided during plan period 1.6 Demolition works? No No demolition works are involved. 1.7 Temporary sites used for Yes Construction of temporary offices, rest shelter, construction works or housing of Store and water supply, First Aid center etc. construction workers? 1.8 Above ground buildings, structures Yes Excavation of mineral will be carried out by or earthworks including linear bench formation which will lead to change in the structures, cut and fill or excavations topography of the area. No permanent above

ground buildings or structures are involved. However temporary office, rest shelters, first aid centre will be provided. 1.9 Underground works including mining No Only open cast mining will be done, Underground or tunneling? Mining is not involved. 1.10 Reclamation works? No The area excavated cannot be reclaimed, pit will be converted to the water reservoir at the end of mine life. 1.11 Dredging? No No dredging will be involved. 1.12 Offshore structures? No No offshore structure will be involved. 1.13 Production and manufacturing Yes The production of Sand stone through processes? excavation process will change the land use of the mine lease area. 1.14 Facilities for storage of goods or No No storage facility will be provided at the mine materials? lease area. The mineral will be directly loaded and transported to the end users. 1.15 Facilities for treatment or disposal of Yes For Solid Waste: solid waste or liquid effluents? The waste overburden in the area is only fractured rocks of soil and Sand Stone Mining. Overburden will be dumped in the near Q.L. area. For Liquid Effluent: Sewage will be disposed into soak pit within premises. No industrial effluent will be generated 1.16 Facilities for long term housing of No Workers will be hired / employed locally from the Operational workers? nearby villages, for the mining activity. Thus no housing facility will be developed near mine site. 1.17 New road, rail or sea traffic during No Existing facilities are sufficient. During the construction or operation operation phase traffic will be increased. However the road already existing is sufficient to cater the increase. 1.18 New road, rail, air waterborne or No New road, rail, air waterborne or other transport other transport infrastructure infrastructure will be affected, the existing including new or altered routes and facilities area sufficient.

stations, ports, airports etc? 1.19 Closure or diversion of existing No There will be no closure or diversion of existing transport routes or infrastructure routes or infrastructure from the proposed project. leading to changes in traffic movements? 1.20 New or diverted transmission lines or No No transmission or pipelines are involved in the pipelines? proposed project, nor will the project lead to diversion of the same. 1.21 Impoundment, damming, culverting, No The project does not involve activity like realignment or other changes to the Impoundment, damming, converting, realignment. hydrology of watercourses or aquifers? 1.22 Stream crossings? No No surface water body is present and passing through the lease area. Hence there will be no stream crossing involved. 1.23 Abstraction or transfers of water Yes Total water requirement is about 4.0KLD = 2.1 from ground or surface waters? KLD (Drinking & Domestic Uses) + 1.0KLD(Plantation) + 0.9 KLD (Dust Suppression). Water for Drinking, dust suppression and plantation will be collected from nearby villages. 1.24 Changes in water bodies or the land No No water body is present within and near the mine surface affecting drainage or run-off? site; hence there will be no change in the water bodies. Water diversion channels will be made along the periphery of the working pit for proper drainage of water during rainy season. 1.25 Transport of personnel or materials No There will be no change due to the transportation for construction, operation or of material excavated, as only existing roads will decommissioning? be used for the purpose. No construction and decommission is involved. 1.26 Long-term dismantling or Yes Restoration works will be carried out at the end of decommissioning or restoration the plan period, plantation will be carried out near works? the QL, approach road, schools etc. 1.27 Ongoing activity during No No decommission activity is involve in the decommissioning which could have proposed project. an impact on the environment?

1.28 Influx of people to an area in either No No influx of people is envisaged as only local temporarily or permanently? people will be deployed for the mining activity. 1.29 Introduction of alien species? No No introduction of alien species is envisaged. In addition native trees species will be used for plantation purpose. 1.30 Loss of native species or genetic No There will be no loss of native species or genetic diversity? diversity due to proposed project activities. 1.31 Any other actions? No No other actions would be involved for the excavation of the mineral. 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S. No. Information/checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No There is no agricultural land present in the existing agricultural land (ha) area. 2.2 Water (expected source & competing Yes Total water requirement is about 4.0KLD = users) unit: KLD 2.1 (Drinking & Domestic Uses) + 1.0KLD(Plantation) + 0.9 KLD (Dust Suppression). Water for Drinking, dust suppression and plantation will be collected from 2.3 Minerals (MT) No No raw minerals are required for mining operation. 2.4 Construction material stone, No There is no permanent construction needed in lease aggregates, sand / soil (expected area hence no construction material is used. source MT) 2.5 Forests and timber (source MT) No No forest and timber products involved in the proposed project. 2.6 Energy including electricity and fuels Yes Diesel will be required to run vehicles for (source, competing users) Unit: fuel transportation. (MT), energy (MW) 2.7 Any other natural resources (use No No other natural resources will be used. appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

S. No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, which No No hazardous material is used in the proposed are hazardous (as per MSIHC rules) mining project to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or No Not envisaged affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by Yes This project will provide livelihood to the changing living conditions? workforce during the operation which will help in improving their living conditions. 3.4 Vulnerable groups of people who No No Vulnerable groups of people will be affected could be affected by the project e.g. by the project as entry of unauthorized person in hospital patients, children, the elderly the mining lease area will be prohibited. etc., 3.5 Any other causes Yes On long term basis person working in the mine can be affected by dust bronchitis, however all precautions will be taken including provision of dust mask. The mine workers will also be medically examined as per statutory provision. 4. Production of solid wastes during construction or operation or decommissioning (MT/month) S. No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes No No spoil or overburden will be generated, all the mineral produced is saleable. 4.2 Municipal waste (domestic and or Yes Insignificant amount of domestic waste will be commercial wastes) generated by the labours at site which will be treated in septic tank followed by soak pit. 4.3 Hazardous wastes (as per Hazardous No No Hazardous waste (as per Hazardous Waste Waste Management Rules) Management Rules) will be generated. 4.4 Other industrial process wastes No There is no industrial process involved in the project.

4.5 Surplus product No No surplus product will be generated the entire Mineral is saleable. 4.6 Sewage sludge or other sludge from No There is no effluent treatment plant in the proposed effluent treatment project. 4.7 Construction or demolition wastes No No construction or demolition works are involved. 4.8 Redundant machinery or equipment No No machinery is involved; trucks used for transportation will be movable and will be removed from the mine lease area after the lease is over and will be used elsewhere. 4.9 Contaminated soils or other materials No No contamination of soil or other material will be involved. 4.10 Agricultural wastes No No agricultural waste will be generated 4.11 Other solid wastes No No other solid waste is generated. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S. No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 5.1 Emissions from combustion of fossil Yes There will be emissions from trucks engaged for fuels from stationary or mobile transportation and excavation process. sources. It will be managed by the following methods:- Proper maintenance of vehicles PUC certified vehicles will be allowed for transportation purposes. 5.2 Emissions from production processes Yes There will be dust emission from excavation process and during drilling. Water sprinkling on haul roads and wet drilling is proposed to reduce dust emission. 5.3 Emissions from materials handling Yes The transport and handling of mineral likely to including storage or transport emit fugitive dust which will be controlled byregular water sprinkling on the site, dispatch trucks carrying ore will be covered with tarpaulin, all service roads made boulder packed and water

sprayed regularly. 5.8 Emissions from construction No No construction activity will be carried out at site activities including plantand so there will be no emission from any such equipment activities. 5.8 Dust or odors from handling of No There would be no dust or odors from handling of materials including construction construction materials since there is no materials, sewage and waste construction proposed at the site. 5.6 Emissions from incineration of waste No No such waste will be generated, which may be incinerated. 5.7 Emissions from burning of waste in No No burning waste will be done. open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources No There is no other source of emission. 6. Generation of Noise and Vibration, and Emissions of Light and Heat: S. No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 6.1 From operation of equipment e.g. Yes Drilling will be done if hard rock encountered this engines, ventilation plant, crushers will generate noise, Ear plugs will be provided to the persons exposed to high noise level. 6.2 From industrial or similar processes No There will not be any industrial process involved. 6.3 From construction or demolition No No construction or demolition is involved. 6.4 From blasting or piling Yes Noise will generate due to drilling. Protective equipments will be provided to the workers during blasting. 6.5 From construction or operational Yes Noise will be generated due to the operational traffic traffic, only PUC certified vehicles will be used, proper and periodic maintenance will be done. 6.6 From lighting or cooling systems No No lighting or cooling systems are involved. 6.7 From any other sources No No other source generates noise & vibration, heat etc. 7. Risks of contamination of land or water from release of pollutants into ground or into sewers, surface

waters, groundwater, coastal waters or the sea: S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 7.1 From handling, storage, use or No No hazardous Materials will be used. spillage of hazardous materials 7.2 From discharge of sewage or other No No effluent and sewage will be generated from the effluents to water or the land (expected mode and place of discharge proposed project operations. 7.3 By deposition of pollutants emitted to No The only emission envisaged is dust emission, air into the land or into water which will be taken care by adopting water sprinkling at dust prone areas and wet drilling. 7.4 From any other sources No There is no other source from which risk of contamination is anticipated. 7.5 Is there a risk of long term build up No There is no risk of long term buildup of pollutants of pollutants in the environment from these sources? in the environment from the proposed project operations as frequent dust suppression would be done in mining area and surrounding roads. In addition green cover will be developed which will ameliorate the air quality of the area. 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc yes Spillage of fuel, used in Trucks may occur, this from storage, handling, use or production of hazardous substances. will be avoided taking due precaution at the time of mining. 8.2 From any other causes Yes Accidents may occur during : Excavation Mineral handling (loading & unloading) All safety measures will be taken to avoid such incidents. 8.3 Could the project be affected by No Since project site comes under Seismic zone II, natural disasters causing which is least active zone for earthquakes.

environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 9.1 Lead to development of supporting Yes Proposed project will result in further growth of facilities ancillary development or the surrounding area by increasing direct and development stimulated by the project indirect employment opportunities in the region. which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) Housing development Extractive industries Supply industries Other 9.2 Lead to after-use of the site, which Yes At the end of the mining plantation cover will be could have an impact on the environment developed, this will bring a positive impact in the aesthetic environment plus it will improve the air quality of the area 9.3 Set a precedent for later developments Yes A better after use scenario, which is likely to increase aesthetic beauty of the area. 9.4 Have cumulative effects due to Yes There can be cumulative positive impact due to proximity to other existing or planned projects with similar effects proximity to other existing or planned projects with similar effects. (III) Environmental Sensitivity S. No. Areas Name/ Aerial distance (within 5 km.) Identity Proposed project location boundary 1 Areas protected under international conventions,

national or local legislation for Nil -- their ecological, landscape, cultural or other related value. 2 Areas which are important or Water Bodies sensitive for ecological reasons - Wetlands, watercourses or other water bodies, zone, biospheres, forests. coastal mountains, 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration resting, over wintering, migration Inland 4, coastal, marine or underground waters Eru River Nil About 1.5 KM N direction Nil -- 5 State, National boundaries Nil -- 6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Bijoliya Guda About 02 Km in S direction 7 Defense installations Nil -- S 8 Densely populated or built-up Name Population Distance(km) Direction area Katbhara 315 1.2 W Surajvilas 418 2.2 N Ummedpura 215 2.4 N.E Champapur 348 1.6 E Gudda 754 4.2 E Baniya Ka Talab 380 2.00 W 9 Areas occupied by sensitive Name Distance Direction man-made land uses Primary Govt. Schhol, Champapur 1.6 Km E (hospitals, schools, places of Govt sec school 5.00 Km W worship, community facilities) Kasya Govt 1.2 Km W

Dispensry, Katbhara 10 Areas containing important, Water Bodies high quality or scarce resources (ground water resources, surface resources, forestry, Eru River Above 1.50 km N direction agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or environmental damage. (those where existing Nil -- legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which could cause the project to present environmental problems The area comes under Seismic (earthquakes, subsidence, Zone II -- landslides, erosion, flooding or extreme or adverse climatic conditions) Pre-Feasibility Report Attached 15

UNDERTAKING I hereby give undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be at our risk and cost. Date: Place: Signature of the lessee BHAWANI SHANKAR SH. LAXMI NARAYAN PARASHAR RES. BIJOLIYA TEHSIL BIJOLIYA DISTT. BHILWARA (RAJASTHAN ) (Authorized Signatory)