LEGAL AUTHORITY AND JURISDICTIONS

Similar documents
Public Notice. Public Notice No. Date: April 8, 2016 CENAP-PL-E Comment Period Closes: May 9, 2016

Projects must fall under one of the nine categories listed in Table 1.

Logan River at Rendezvous Park, Channel and Floodplain Restoration: Crack Willow (Salix fragilis) Issues and Management Strategies

Funding Guidelines State Fiscal Year 2016

Main Regulatory Agencies

The Streamkeepers Handbook

MONTEREY PENINSULA WATER MANAGEMENT DISTRICT PROJECT DESCRIPTION FOR SELECTIVE VEGETATION MANAGEMENT AND BANK RESTORATION (RANCHO SAN CARLOS AREA)

Accelerating Restoration Projects on Private Lands with the Partners in Restoration (PIR) Permit Coordination Program. Analysis Draft Recommendations

IMPROVING OUTCOMES FOR STREAM ALTERATION PROJECTS

Yakima Tributary Access & Habitat Program Summary of Accomplishments Diversion 14 Fish Passage and Screening, 2003 Ahtanum Creek

Terry Benoit 4/1/2009

Public Notice: Application for Permit

FLOODPLAIN PERMIT APPLICATION SUBMITTAL REQUIREMENTS

Notice of Preparation of Environmental Impact Report

NATIONWIDE PERMIT 13 Bank Stabilization Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

GUIDE TO OAKLAND S CREEK PROTECTION ORDINANCE

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

IDEM Wetlands and Streams Regulatory Overview. An overview of IDEM permitting for work in Waters of the State

Portland District Regulatory Branch Permit Streamlining for Restoration Projects

Nationwide Permit Summary

Temporary Stream Crossing

Temporary Stream Crossing

Oatka Creek Stream Stabilization and Habitat Restoration Project Narrative

Case Study 12. Grubbs Concrete Slab Vented Ford

Information for File # MVP SJW

National Marine Fisheries Service ESA/MSA Restoration Project Consultations. Oregon State Habitat Office Oregon Coast Branch Roseburg, Oregon

LITTLE SHADES CREEK RESTORATION PROJECT CWA Section 319(h) Nonpoint Source Implementation Grant Project Workplan #17 ADEM Contract #C

(a) No material is placed in excess of the minimum needed for erosion protection;

Cannabis Cultivation and the Protection of Public Resources

NATIONWIDE PERMIT 13 Terms and Conditions Effective Date: March 19, 2017

A GUIDE TO STREAM RESTORATION

Flooding from Butano Creek on Pescadero Road

Lagunitas Creek Stewardship Plan Marin Municipal Water District Final June 2011 TABLES

Suggested Stormwater Management Practices For Individual House Lots

SHORELINE INVENTORY AND RESTORATION PLANNING

APPENDIX H JOINT PUBLIC NOTICE

Santa Clara Valley Habitat Plan Regional General Permit #18. Training and Workshop for Co-Permittees April 5, 2016

Nationwide Permit General Conditions

DECISION MEMO. West Fork Blacktail Deer Creek Hardened Crossing

Land and Water Management Division Programs. Department of Environmental Quality

Agency Organization Organization Address Information. Name United States Department of Agriculture

TABLE OF CONTENTS. TOC-i

Public Notice of Application for Permit

Chapter 5: Water Quality Buffer Requirements

S.R. 4007, Section 14B PADEP Environmental Assessment Form. Enclosure C Description of Aquatic Habitat

Appendix D - Evaluation of Interim Solutions

Nationwide Permit General Conditions

Carmel River Reroute & San Clemente Dam Removal Project (PLN110373) Monterey County Planning Commission Workshop July 25, 2012

NOTICE OF PREPARATION

City of Valdosta Land Development Regulations

SECTION 11: REGULATORY FLOODWAYS

Wood Canyon Emergent Wetland Project. City of Aliso Viejo 12 Journey, Suite 100 Aliso Viejo, CA 92656

Environmental Assessment Form Part 1 Resource Identification Enclosure C Description of Aquatic Habitat

Biological Opinion. Morse Brothers Habitat Restoration Project. Endangered Species Act - Section 7 Consultation

THE WATERSHED The watershed is an area of land that drains into a stream. This includes both the surface runoff and groundwater. Because a stream is m

LOCATION AND DESIGN DIVISION

Solano Multi-Species Habitat Conservation Plan

Get the Rock Out: Engineered wood structures for stream restoration. Joe Berg, Doug Streaker, Matt Koozer and Kevin Nunnery Biohabitats, Inc.

DRAFT FINDING OF NO SIGNIFICANT IMPACT (FONSI) LEVEE VEGETATION MAINTENANCE MILL CREEK FLOOD CONTROL PROJECT WALLA WALLA, WASHINGTON JULY 2015

(g) Native plants appropriate for current site conditions, including salinity, must be used for bioengineering or vegetative bank stabilization;

Upper Santa Clara River Watershed Arundo/ Tamarisk Removal Program (SCARP)

Public Notice of Application for Permit

Navigating Section 404 Clean Water Act Permitting

Appendix B Draft Fish and Wildlife Coordination Act Report

NATIONWIDE PERMIT 3 Maintenance Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

EXHIBIT 9. Supplemental Environmental Projects Plan

RIPARIAN PROTECTION Questions & Answers

Nationwide Permit 44 - Mining Activities Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860)

STREAM RESTORATION PURPOSE, PRACTICE, AND METHODS. By Marcus Rubenstein, CPESC

STATE OF MISSOURI CLEAN WATER ACT SECTION 401 WATER QUALITY CERTIFICATION 2012 GENERAL AND SPECIFIC CONDITIONS

NATIONWIDE PERMIT 18 Minor Discharges Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

Appendix A. Location of Transects, Study Sections, Instream Structures and U.S. Geological Survey Gage Stations -Russian River and Lower Dry Creek

ACTIVITIES AUTHORIZED BY 2017 NATIONWIDE PERMIT WITHIN THE STATE OF NEW YORK Expiration March 18, 2022

NATIONWIDE PERMIT 33 Temporary Construction, Access, and Dewatering Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 33 Temporary Construction, Access, and Dewatering Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

RIPARIAN CORRIDOR STUDY FINAL CITY CREEK MANAGEMENT PLAN TABLE OF CONTENTS

Nationwide Permit Summary

STREAMBANK RESTORATION DESIGN

CDFW Compliance Guidance

The Public Trust in Wisconsin s Waterways. Carrie Webb Water Management Specialist

There is a reliable, clean water supply for current and future generations.

Massachusetts River and Stream Crossing Standards: Technical Guidelines

General Construction

Norfolk District Regulatory Office

Errata sheet for the Connecticut General Permits March 26, 2019

FORM B: DAMMING AND DIVERSION OF WATER

Mill Creek Restoration in Lower Merion Township. PH (610) ; FAX (610) ;

Nationwide Permit 19 - Minor Dredging Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860)

PUBLIC NOTICE NO. FP13-AB03-05 August 30, 2013 CESAM-PD-EC JOINT PUBLIC NOTICE

Watershed Hydrology: Go with the flow. Greg Jennings, PhD, PE

STREAMBANK STABILIZATION: POST CONSTRUCTION MITIGATION MONITORING REPORT (YEAR 4 OF

PROJECT SCREENING MATRIX: A User s Guide

Project Goals and Scoping

Nationwide Permit 3 - Maintenance Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860)

DECISION MEMO FOR CATEGORICAL EXCLUSION HOLY JIM CREEK CROSSING REPLACEMENT

Monitoring Report #3 Kenston Lake Stream Restoration Bainbridge, Ohio

COMPREHENSIVE MANAGEMENT PLAN FOR THE SACRAMENTO RIVER WILDLIFE AREA

Holly Swartz and Jason Shirey

Good morning, Chairman Yaw, Chairman Yudichak, Chairman Vulakovich, Chairman Costa,

NOXIOUS WEED REGULATORY GUIDELINES. Noxious Weeds in Aquatic Critical Areas: Regulatory Issues. What are Aquatic Critical Areas?

Transcription:

CALIFORNIA DEPARTMENT OF FISH AND GAME RIPARIAN RESOURCES AND REGULATORS: The DFG Lake and Streambed Alteration 1600 Process LEGAL AUTHORITY AND JURISDICTIONS Serge Glushkoff CENTRAL COAST REGION YOUNTVILLE SPRING 2005 FEDERAL: CLEAN WATER ACT SECTION 401: REGIONAL WATER QUALITY CONTROL BOARD Water Quality Certification FEDERAL II INTERNATIONAL MIGRATORY BIRD TREATY ACT SECTION 404: U.S. ARMY CORPS OF ENGINEERS PERMIT: MAY INITIATE CONSULTATION WITH: NOAA (NMFS) FISHERIES U.S. FISH AND WILDLIFE SERVICE (SECTION 7 OR SECTION 10 CONSULTATION) >>> Biological Opinion / Incidental Take Statement STATE OF CALIFORNIA (Department of Fish and Game) CALIFORNIA ENDANGERED SPECIES ACT (CESA) Incidental Take Permit OR Consistency Determination with Federal Incidental Take Statement Fully protected species (no take, e.g. SF garter snake) CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) RESPONSIBLE AGENCY: Formally comment on CEQA documents LEAD AGENCY: Initiate CEQA process COUNTY AND CITY RIPARIAN SETBACKS GRADING ORDINANCES (subject to CEQA if discretionary) CALL FISH AND GAME Elkhorn Slough National Estuarine Research Reserve 1/9 1

The Mission of the Department of Fish and Game is to manage California's diverse fish, wildlife, and plant resources, and the habitats upon which they depend, for their ecological values and for their use and enjoyment by the public. Department of Fish and Game Code Sections 1600-1616 (amended January 1,2004) The 1600 process protects waterways, lakes, ponds, riparian areas and associated resources by providing guidance to design projects so as to avoid or reduce impacts to a less than significant level in these areas. Who needs to apply for a 1600 agreement with the Department of Fish and Game? The Fish and Game Code Section 1602 requires notification for any project that Elkhorn Slough National Estuarine Research Reserve 2/9 2

that will substantially divert or obstruct the natural flow of, or substantially change or use any material. from the bed, channel, or bank of any river, stream, or lake The Department must decide whether 1) project sites and impacts may affect a stream or lake, and whether 2)potential changes may be substantial On Jurisdiction Shading, dripline and root zone Source of Large Woody Debris (LWD) Source of fine litter Hillslope Floodplain Floodplain Active Channel Terrace Hillslope change the bed, channel, or bank of any river, stream, or lake. Elkhorn Slough National Estuarine Research Reserve 3/9 3

Once notified the Department will review the notification and determine if it is necessary to schedule a site visit to determine if the project has potential impacts and 1) needs an agreement, and 2) needs full (CEQA) environmental review. 1602 Reviews should assess: Alteration to bed or bank Alteration of water quantity or flow characteristics Alteration of water quality Impacts to special status species Effects on aquatic resources Effects on riparian vegetation Effects on terrestrial species Critical (program) Flows PREVIOUSLY EXISTING PROJECTS RECREATIONAL AGRICULTURAL GRAVEL OPERATIONS SUMMER DAMS DIVERSIONS / IMPOUNDMENTS Elkhorn Slough National Estuarine Research Reserve 4/9 4

Instream gravel mining New flows Horizontal directional drilling (HDD):through (and sometimes into) the jurisdictional alluvium Bridge projects with effects on the channel But there s no fish here! Riparian ecologistics Fish Frogs and herptiles Birds and bats Sedimentation Invasive species Native species, local genotypes Corridors Cumulative impacts Habitat heterogeneity Channel integrity Elkhorn Slough National Estuarine Research Reserve 5/9 5

Riparian ecologistics Fish Frogs and herptiles Birds and bats Germination Sedimentation Invasive species Native genotypes Corridors Cumulative impacts Habitat heterogeneity Channel integrity Waterscapes Large woody debris (LWD) Retain vegetation for bank stability Dissipate new hydraulic energy entering channel Protect riffles, pools, and spawnable substrate Waterscapes and introduced hardscapes When feasible, retain access to floodplain When feasible, use bioengineering Avoid overarmoring (but engineer adequately) Adequately sized culverts (fish and flood passage) Bridges vs. culverts NRCS Bio-engineered Streambank Stabilization Design by Bob Albers and Phill Blake, Napa Field Office Ellie Insley Property Severe streambank erosion left an 11 foot high vertical bank that After. Bank has stabilized, and willows are providing excellent set up further potential for significant property loss. NRCS design erosion protection and enhanced riparian habitat. Stream called for a brush layering treatment, and woven willow revetment meander is stabilized, without negatively effecting downstream wall. The brush layering consists of 3 alternating lifts of soil, properties. This project has successfully withstood several willow cuttings, and wraps of coconut erosion control fabric. The near-flood stage events and is providing excellent stabilization. willow revetment, constructed of posts and weavings of live, dormant willows will become a live structure, established and maintained with a drip irrigation system. A rock barb was placed just upstream of the brush layering reach, to deflect and roll stream tractive forces back into the channel center. Elkhorn Slough National Estuarine Research Reserve 6/9 6

Waterscapes and introduced hardscapes When feasible, retain access to floodplain When feasible, use bioengineering Avoid overarmoring (but engineer adequately) Adequately sized culverts (fish and flood passage) Bridges vs. culverts The California Environmental Quality Act (CEQA) /1600 process Superior Court of California County of Mendocino, Ukiah Branch Mendocino Environmental Center vs California Department of Fish and Game This court order changed the process for obtaining Lake or Streambed Alteration Agreements after May 1, 1999. February 3, 1999 The Court found: the Department of Fish and Game must comply with the California Environmental Quality Act (CEQA) when issuing Lake or Streambed Alteration Agreements How has CEQA changed the 1600 process? The process now generally takes more time because an environmental review, subject to CEQA parameters, is done in addition to the field review. The environmental review requires that the impacts of the project be assessed and determinations made concerning the significance of those impacts to resources. Elkhorn Slough National Estuarine Research Reserve 7/9 7

To make these determinations, it is sometimes necessary to require additional surveys or for the Department to consult with other agencies. The assessments and determinations are subject to public review and input as part of the process.!reality Check! Resource protection mandates depend on staffing Who prepares the CEQA document? Fish and Game or Another agency Key Concept CEQA reviews must cover the entire project Can a previously prepared CEQA document be used? Yes, if it adequately covers the current project Elkhorn Slough National Estuarine Research Reserve 8/9 8

How to save time, money and the resource: Plan the project to avoid or minimize impacts to sensitive areas. Apply early. This is no longer a hood of the truck process. The less impacts the project has, the quicker it will move through environmental review. The current expected time from receipt of notification by DFG to the mailing of the draft 1600 agreement in the Central Coast Region is 90 days for complete notifications. Impacts, rather than size of project, ultimately dictate the level of agreement conditions and CEQA review required. Apply well. Follow the directions and provide the information requested. Include amounts (linear feet, area, cubic yards, etc.) Completely describe the project including equipment to be used, erosion control measures planned, and the time schedules required to do the project. Notification/Application forms are available online: www.dfg.ca.gov/1600 Or Calling (707) 944-5520 Elkhorn Slough National Estuarine Research Reserve 9/9 9