AS9102 Frequently Asked Questions

Similar documents
Manufacturing Supplier Requirements Manual

TELEPHONICS SUPPLIER QUALITY MANAGEMENT AS9102 FIRST ARTICLE INSPECTION GUIDELINES

PURCHASE ORDER REQUIREMENTS (Quality Assurance Provisions)

Production Part Approval Process (PPAP)

KLINGE COATINGS. 3.1 Deviation A deviation addresses material, which has not been produced or has a known material substitution.

4-OF AS9102 FAIR Forms and Instructions (SC)

SUPPLIER QUALITY SYSTEM SURVEY

SELLER QUALITY REQUIREMENTS QCS-001 PROCESSING SOURCES

Production Part Approval Process (PPAP)

Quality Control Manuals

Control-On-Use Controlados-En-Uso

TURBO MACH A DIVISION OF VT SAA

SUPPLIER QUALITY SYSTEM SURVEY

2001 NBIC Interpretations

SUPPLIER QUALITY REQUIREMENTS. No

BELDEN QUALITY SYSTEM OVERVIEW

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

IBS Electronics, Inc.

1.0 Purpose. 2.0 General notes 3.0 QUALITY SYSTEM REQUIREMENTS. Approved by: G. Stugart Prepared by: Schelert

Supplier Quality Requirements Master List

VERTICAL ASSESSMENT INSPECTION ISO/IEC 17020:2012

Document Type: Main Process: Revision Level: Page: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner Title:

TITLE: SQR-001 Supplier Quality Requirements

AAI CORPORATION TEXTRON SYSTEMS

INS QA Programme Requirements

c) Have personnel been appointed to supervise the production operations across all shifts in order to ensure the product quality?

PURCHASE ORDER PROCUREMENT CLAUSES QA25 Rev N Date: 11/13/2016

TSQA 5 PROCEDURE FOR THE DESIGN AND MANUFACTURE OF CRITICAL VENDOR PARTS. Table deleted

Clause "A" Subcontractor Controls, General Requirements (Applicable when Clause "A" is invoked in the Purchase Order "Remarks")

YOUNG & FRANKLIN / TACTAIR FLUID CONTROLS QUALITY ASSURANCE SURVEY. Company Name: Address: City: State: Zip: Phone: Fax: Response Prepared By:

Quality Management Systems - Requirements for Aviation, Space and Defense Organizations (AS9100)

002 Supplier Quality System Compliance with Rocker Quality System for Suppliers is required for this Purchase Order.

Assured Joint Integrity

NAMMO TALLEY INC QUALITY CODES

L3SN-OP-W Rev A SUPPLIER FIRST ARTICLE INSPECTION (STANDARD REQUIREMENT)

IAQG 9100:2016 Clarifications

Delegated Product Release Verification RATIONALE

CAG 9000 QUALITY REQIRMENTS FOR SUPPLIERS TYPE 12 & 13.

CURTISS WRIGHT Actuation Systems 201 Old Boiling Springs Rd Shelby, NC SUPPLIER QUALITY REQUIREMENTS SQR-100. Rev. L.

Brinkman Precision, Inc. Supplier Quality Requirements. Document No. BPI 1000 Rev. C

Price Electronics,LLC Quality Assurance Manual

PURCHASING QUALITY CLAUSES

TASK REQUIREMENTS. Supplier Quality Requirements

COMPLETED QUALITY SYSTEMS QUESTIONNAIRE

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

QUALITY MANUAL. Origination Date: XXXX. Latest Revision Date. Revision Orig

QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised.

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

Document Rev: 18 State: RELEASED see Smarteam for approval authorities TASK REQUIREMENTS. Supplier Quality Requirements

ISO 9001:2015. Quality Management System. Manual

Strata-G Solutions Quality Assurance Clauses

Requirements for Suppliers

GKN AEROSPACE CTQS 9002

QRS-101 First Article Inspection

Supplier Quality Manual

Supplier Quality Manual

UNCONTROLLED DOCUMENT

PP Quality Assurance Procurement Clauses for Suppliers

AEROSPACE STANDARD. (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE

D.P.E.LTD QUALITY CONTROL PROCEDURE NO 9 QUALITY CONTROL REQUIREMENTS FOR SUPPLIERS MASTER COPY

Supplier Quality Management Survey

c. Temperature monitoring - preheat, spraying temp, cooling, etc

Supplier Quality System Survey

Quality System Requirements for Suppliers

Strata-G Solutions Quality Assurance Clauses

QUALITY REQUIREMENTS FOR SUPPLIERS

FIRST ARTICLE INSPECTIONS

Infinity Precision Inc. Quality Manual

Supplier Quality Requirements SQR-1.0 Rev. 3

Buy The Complete Version of This Book at Booklocker.com:

SUPPLIER QUALITY ASSESSMENT

AS9100 PMA and 14 CFR 21 QUALITY HANDBOOK

Quality Code Matrix Appendix A for 8.4.3

Quality Clause Q2A. First Article Inspection

QUALITY ASSURANCE / QUALITY CONTROL POLICY

Document Title: Icore Supplier Quality Requirements Revision: D Released Date:

Table of Contents Table of Contents... 2 Introduction to Manual... 3 Scope... 3

Purchase Order Quality Clause SCC40 Revision G, Effective 1/20/2015

Supplier Quality Manual

Required Elements of a Quality Management System

Global Standards Engineering Policy & Procedure

Supplier Quality Requirements Revision B Dated November 21, 2017

PMA SUPPLIER QUALITY REQUIREMENTS QS Revision J

Supplier Quality Requirements

Mechanical & Electrical Product Workmanship Standards Procedure

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

Purchase Order Quality Clause SCC20 Revision E, Effective 1/20/2015

Supplier Quality Requirements

Quality Clauses. The Seller shall notify the Buyer when a change in Ownership and/or Quality management has

This document has been printed from the network and will not be updated. The user is responsible for verification of current revision.

Quality Guideline for Suppliers. 1. Purpose

EVANS CAPACITOR COMPANY

Supplier Quality Codes

Document Number: L1-743I003/09 Supplier Quality Requirements

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

THE FOLLOWING GENERAL REQUIREMENTS APPLY ON ALL ORDERS

Orbel Corporation AS9100D Supplier Flow Down Requirements

Pressure Relief Devices Requirements QMS written description verification CHECKLIST AB-524(b)

Modern Industries Inc.

Delivering Engineered Solutions

Transcription:

AS9102 Frequently Asked Questions General Who developed this standard? This International Standard for First Article Inspection (FAI) is developed by International Aerospace Quality Group (IAQG). The IAQG chartered a multi-member writing team with representatives from several member companies to write this standard. The standard outlines the documentation and inspection requirements when performing First Article Inspection of aerospace components. It is copublished as AS9102 by SAE in Americas EN 9102 by AECMA in Europe SJAC 9102 by SJAC in Asia Why are you writing a new standard? We already know how to do FAI! The IAQG recognizes that the aerospace companies have somewhat common requirements for First Article Inspection (FAI), however, the documentation requirements differ. This non-uniformity of the documentation has created unnecessary errors, confusion and rework. The development and adoption of common standard with unified requirements will eliminate common errors and omissions, simplify FAI for suppliers, focus on product quality rather than documentation This was the main motivation for writing this Standard. What was the writing team charter? The writing team s charter was to develop standardized aerospace FAI requirements and establish a common form of documentation for supplier First Article Inspection. Is this a standard or guideline? Do I have to meet every requirement of this standard? Whether AS9102 is a "standard" or a "guideline" depends upon Customer requirements. AS9102 becomes enforceable only when invoked by Customer. If a Customer has not established any specific FAI requirements, then per AS9100, AS9102 is to be used as a "guideline" to perform FAI. However, if a Customer requires FAI to be performed per AS9102, then AS9102 is treated as a "Standard" and not a guideline. In this situation, every requirement of the standard must be met, unless exempted by the Customer. The IAQG member companies have committed to adopt this Standard as an FAI requirement. When will this standard be applicable? Each member company has established its own schedule for adopting this standard as a requirement. Please check with your customer(s) as to when they plan to adopt AS9102. Do I have to verify every note item on the drawing? Yes. That s the purpose of FAI.

Measurement System Evaluations/ Effectiveness Section 5.6 #9 - Gauge correlation, as applicable. Do they refer to calibration records or alternate gauging MSE? Why is Gauge Correlation, as applicable? Why don t you require it? This refers to Measurement System Evaluation (MSE or Gage R&R) study that demonstrates the adequacy of the Measure System. We didn't explicitly include MSE or Gage R&R in the FAI document as a separate "required", since MSE's are generally done as a separate element and may be included in Inspection Plans. Our intent was that MSE's must be performed "sometime" before using the measurement system, but may not be a part of the part specific FAI. And hence, the term "applicable". It leaves some room for customer discretion, as well as flexibility to be referenced in Inspection Plan. Regarding AS9102 Page 18, Paragraph 6.7, item 3A, 5th Bullet States "For First Article Inspections, when these inspection results are near limits of tolerances, additional parts will be inspected to verify hardware conformance". Clarification requested > Define what "near limit" is by a numerical value. > How many additional parts will be required to be inspected when the dimension is near the limit? This requirement is tied to error margin (or measurement uncertainty) in the Measurement System (generally, determined by Measurement System Evaluation - MSE). The intention is: whenever a measurement is very close to the tolerance limits, it might fall into the error margin, and hence we should take some redundant measurements to convince ourselves that the measurement is indeed acceptable. There are statistical methods to deal with it but such detail techniques may not be necessary to give us the required confidence! A simple redundant inspection might do it. We didn't want to tie ourselves down to a specific numerical limits and want to keep some flexibility. And hence the wordings of the Standard. Coming back to the specific question... Here is how we interpret. "When FAI inspection results yield measurements on or near spec or drawing limits, further redundant inspection may be required". For example: Take a dimension with tolerance 0.250 to 0.260 If the measurement is outside tolerance: reject If the measurement is within 10% of the tolerance, (i.e. between.251 and.250 or between.259 and.260), then take two additional but independent measurements of the same feature. If all the measurements are within tolerance, accept. If one of the three measurements are outside the tolerance, then 100% inspection during production. We picked the number 10% because that is the measurement uncertainty some companies accept in MSE. Others might use a different number or range depending upon criticality of the feature or the measurement system (and associated error margin) used.

Clarifications of Documentation Requirements/ Objective Evidence Ref section 5.6 Documented evidence of the evaluation what is expected? Supplier is required to provide objective evidence through quality records that the evaluations of section 5.6 were conducted. The evidence may include (but not limited to) signed record, acceptance stamped (A-Stamped) record, signed reviews by peer, manager or QA, as described by the supplier s quality system, certificates of conformance, corrective action records and closures, MRB records, duly signed published internal reports, etc. Electronic files, so long as they are stored on permanent, secure media, will also be acceptable. Ref Section 5.6.6 Personnel certifications - on one of our assemblies, there could be a dozen welders and a like number of NDT technicians. Often when we are doing a first article it s not on a single bleed air duct assembly but a whole ship set of duct assemblies so there would be tremendous redundancy. Further, it implies if a different welder or NDT technician works on the part, a process change has occurred. The integrity of our certification program is audited extensively both internally and externally it doesn t need to be checked every time we do a first article. Suppliers are required that they have documented evidence that the operator certifications have been evaluated. Documented evidence may be generically demonstrated via quality system assessment. For example, if you can demonstrate that you have a robust quality system that ensures such evaluations, it may be acceptable and the customer may not demand it every time you do an FAI. Independent, third party certification to AS9100 would cover this as well. The purpose of this requirement here is for the supplier review these certifications and make sure that they accurate, current and available to the customer when requested. Ref Section 5.7.16 our routing paper is considered company propriety. It is available to the customer but cannot be included with the first article package. This requirement is related to demonstrating objective evidence that manufacturing process with which the first article is made is appropriately documented, is traceable and has revision control. This requirement states record router number including revision.. It is not expected that you attach routing paper (unless your contract with the customer demands it). A reference to appropriate revision control version of the manufacturing process may be sufficient, as long as you can demonstrate that you are producing parts to that specific process. Ref Section 6.4 Form 2 is required [when accountability] is specified on drawing. I ve never seen accountability specified on a drawing (it is a quality requirement), only the raw materials, processes, etc. What is the paragraph trying to say? Some Customers require accountability of raw material, special process, acceptance testing, etc via drawing or specifications invoked on the drawing. This requirement is to give visibility to such accountability.

Ref Section 6.4.2.e Control, Special Procedures - Describe the basic methods and frequencies used to control the material or process. May refer to characteristic number. - List process specifications. - Include methods/frequencies used by both the material or process source and by the part Supplier. - Reference procedures that require Customer approval (e.g. EB welding, ultrasonic, X-Ray, eddy current), with customer approval date. The descriptions of process controls are specified in procedures and cannot be practically included on the first article. If the procedure is listed, then the requirement is a redundant paper exercise and not value added. You may reference the procedure, internal specification, internal report, etc. where such process controls are defined. Same as above. Ref Section 6.4.3.b & c List only tests called out by the Customer drawing (e.g. leak test, pressure test). For Supplier-designed parts, list only acceptance tests, not design assurance tests or qualification tests. On Form 3, reference the data produced by functional tests. 3b) Type of Equipment, Equipment Accuracy and Control, calibration 3c) Frequency and acceptance criteria You may reference the data-report number and attach the data-report to FAI documentation. Ref Section 3. There is too much detail instruction in this paragraph compliance is going to be tough to achieve. Section 3 is Definitions Section and is to be used for clarification purpose. Section 5.6 #11- Part Marking replication- What is acceptable evidence? Photographs, etching, coupons, actual parts, etc. Where must we fill-out on the form, results with production means and result with FAI means? Form 3, boxes 3 and 4.

Forms Why must I use AS9102 Forms? Can I use my existing forms with appropriate changes? The writing team recognizes that the completeness and accuracy of the FAI report contents is very important, and to assure that, we need clear visibility and uniformity. To ensure uniformity and clear visibility to documentation requirements (e.g. characteristic accountability), AS9102 standardizes the forms. Here is the interpretation of the Section 5.4 regarding Forms: If one uses other electronic form, then that form must have one-to-one correspondence for each box discussed in AS9102 forms, If paper forms are used, then they must be AS9102 forms, Additions to the forms can be made if there are extra company or customer requirements so long as the AS9102 form content remains. Can I use electronic forms? I plan to modify my existing electronic forms with appropriate modifications to ensure each item of AS9102 forms is clearly accounted for and is visible. Is it acceptable? Yes, you may use electronic forms. As long as each box in the AS9102 forms is clearly accounted for and is visible in one place with appropriate Box Number, your use of electronic forms is acceptable. Your Customer may require you to demonstrate that such accountability meets the intent of AS9102 regarding clarity, visibility and uniformity. Where can I get Electronic forms? Are forms available on Internet? AS9102 mentions that forms will be available on Internet, how do I access them? Go to http://www.sae.org/aaqg/publications/as9102a-faq.htm