Office of Environmental Health and Safety 1.0 INTRODUCTION

Silica Silica, Crystalline (Respirable Size), National Institute of Health

New Silica Standard 11/16/2017. Construction: highway, masonry, concrete, rock drilling

OSHA S RULE ON CRYSTALLINE SILICA: TRAINING ON WHAT YOU NEED TO KNOW

Asbestos Management Program

Big Dog Construction Services, Inc Silica Exposure Control Program

MODEL CRYSTALLINE SILICA EXPOSURE PLAN

RESPIRABLE CRYSTALLINE SILICA

CONSTRUCTION INDUSTRY SAFETY COALITION

RI&E Nano particles *) Carried out by: Faculty: CTW/EWI/TNW Department: 1. Information Nano material Product name:

Asbestos During Brake and Clutch Service Work Self Inspection Checklist

Asbestos cement products in your home

Asbestos Exposure. COMMONWEALTH SCAFFOLD Quality Scaffolding Across New England

Work Plan for Window Removal and Remediation Rooms: 200 Wing classrooms, Cafeteria and Kitchen Thomas Prince School Princeton, Massachusetts

Silica. Jim Gillespie, Hilti North America. Gary Hatcher, NiSource. Tina Weeks, Zachry Group

RESPIRABLE CRYSTALLINE SILICA

CADMIUM AWARENESS Revision Date: 04/2017

A. Illinois Asbestos Abatement Act, as amended through Public Act , effective July 14, 1995.

Bradford T. Hammock. Jackson Lewis P.C. Washington D.C. Region Jackson Lewis P.C.

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

Material Safety Data Sheet Recycled Aggregates, Recycling Centre, Isle of Wight.

SPAN-WORLD Distribution

Understanding OSHA s Crystalline Silica Rule

Project 6668 Second beach Concession-Stanley Park Drive,Vancouver, BC Division 02080

MHEC (MIDWESTERN HIGHER EDUCATION COMPACT) OSHA S NEW FINAL RULE ON CRYSTALLINE SILICA: WHAT YOU NEED TO KNOW

Asbestos Management Program

NAPA EH&S Programs: Striving for EH&S Excellence Protecting industry employees and the environment

ENVIRONMENTAL GUIDELINES FOR PREVENTION AND CONTROL OF FUGITIVE EMISSIONS FROM CEMENT PLANTS

Personal Protective Equipment

BASF Corporation Title: ASBESTOS HANDLING, REMOVAL AND DEMOLITION

CLASS I AND II ABATEMENT PROJECT SUBMITTALS

HEALTH AND SAFETY MANUAL

Policy # 4116 Dust Management

1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:

(2) Separate provisions shall be issued on licences required for asbestos work, competence of asbestos workers and worker health examinations.

BEST MANAGEMENT PRACTICES PLAN FOR FUGITIVE DUST Greenwood Aggregates Company Limited Violet Hill Pit > Town of Mono, ON

ARTICLE 4: ASBESTOS CONTROL STANDARDS

ENVIRONMENTAL MANAGEMENT PLAN

Pollution Incident Response Management Plan

McMaster University Asbestos Awareness Environmental & Occupational Health Support Services Gilmour Hall Room 304

APPENDIX D1. ASBESTOS NESHAP 40 CFR 61 Subpart M PRE CAA90 40 CFR PART 61 NESHAP

Document Number: SILICA CONTROL ZSD-S-MSAFEca Issue Date: August 28, 2017 Revision #: 4 Next Review Date: May 28, 2022

UI Procedures for Asbestos Management

2010 HSC Construction Sample Answers

Glossary. Accredited Testing Laboratory

1.1 SUMMARY.1 Comply with requirements of this Section when performing following work:

SAND SEAL SPECIFICATIONS. The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority.

SPECIFICATIONS FOR SAND SEAL

WORKING GROUP MEETING #6 PROPOSED AMENDED RULE 1407

Larsen & Turbo Limited ENVIRONMENTAL MANAGEMENT PLAN

Project 6668 Kerrisdale Senoirs Centre-5851 West Boulevard,Vancouver, BC Division 02080

COSVR761 SQA Unit Code HN0L 04 Operate plant or machinery to sweep, clean or clear

Certification Number: NAT Lead Renovation, Repair and Painting Program

HOW TO SAFELY REMOVE ASBESTOS

SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY. October Public Disclosure Authorized

Sprayed or Blown Fibre & Ceramic Fibre (Blanket)

Idaho Solid Waste Association

AM-PR-003 Construction Environmental Management Plan (C-EMP)

Calvin College Asbestos Operations and Maintenance Plan

LOS ANGELES COMMUNITY COLLEGES OFFICE OF THE CHANCELLOR ADMINISTRATIVE REGULATIONS INDEX NUMBER B-4

CHAPTER 5 MINIMIZING AIRBORNE SILICA

Environmental Guidelines for Construction Sites

Asbestos Abatement Standard Procedures Indoor Environment Group, Inc.

Plan of Action for Implementing OSHA s Final Rule on Crystalline Silica Exposure

Asbestos Management Program

3. Asbestos Handling Program

SPECIFICATIONS FOR NEW WORK CHIP SEAL

University of Toronto Asbestos Management Program PROCEDURAL CHECKLIST FOR TYPE 1 ASBESTOS ACTIVITIES

Asbestos Management Program

Lead in Construction Guidance

SPECIFICATIONS FOR DOUBLE CHIP SEAL

Warringah Council Policy Policy Number: PL 190 ASBESTOS Asbestos Management Policy

Respirable Silica Exposure Control Program

!"#$%&"'()"*$#+(,"#"()-$$#(

Contractor - Asbestos Related Work including Removal Work Management Guide. For Work on Ergon Energy s Electricity Network

AIR POLLUTION CONTROL REGULATION NO. 24 REMOVAL OF LEAD BASED PAINT FROM EXTERIOR SURFACES

A Brief Submitted to the Royal Commission of Inquiry

VIRGINIA OCCUPATIONAL SAFETY & HEALTH (VOSH) & FINAL SILICA RULE

Handling of high potency drugs: process and containment

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM

Occupational Health and Safety Requirements for Handling of Carcinogenic and Mutagenic Chemicals 1

Form 9: Infection Control Preventive Measures Level 4

1. Title Version 5, 2015 Machining of nickel alloys and nickel-coated metal objects

PIGEON DROPPINGS CLEAN UP WORK TABLE OF CONTENTS

Rockwool insulation - a safe, natural product

DUQUESNE UNIVERSITY ASBESTOS MANAGEMENT PROGRAM

MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL

REGULATION ON PROCEDURE OF ASBESTOS-CONTAINING WASTE

Asbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Materials

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

LEAD-BASED PAINT PRESENT

ES Cleaning/Washing - Aircraft, Vehicles and Equipment Document Identification Number Date: March 15, 2018

SAFETY DATA SHEET (SDS)

Lead Safe Practices and Compliance

Basic Environment,Health & Safety Guidelines for Foundries

McMaster University Asbestos Awareness

Decommissioning of Nuclear Facilities. Dismantling Technologies

Level 2 NVQ Diploma in Roadbuilding and Maintenance (Construction) Pathway 29: Plant Road Sweeping. Qualification Specification

Safety Data Sheet ACROBASE 60 BASE COAT Revision date : 2011/10/17 Page: 1/6

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 8

Transcription:

Preventing Dust Hazards in the Public Works Sector 25 July 2016

Preventing Dust Hazards in the Public Works Sector July 2016 Version 2

- The French Agency for Food, Environmental and Occupational Health & Safety (ANSE) 1 This Dust Hazard Prevention guide is a work in progress, intended to reflect: - On the one hand, the results of exposure measurements, based on which the collective protection measures will be reinforced or modified proportionally to actual risks; - Developments of scientific knowledge on Elongated Mineral Particles (EMP); - The outcome of the supplementary request submitted to ANSES 1 and the consequent recommendations of administrative bodies; and On the other hand, the European-level regulations on HCA and/or CMR, particularly silica, and their transposition into the French regulatory system. 1 In April 2016, the Directorates-General of the Ministry of Labour (DGT), Ministry of Health (DGS) and Ministry of the Environment (DGPR) submitted a supplementary request to ANSES to: - Conduct a sector-wide study intended to collect data on aggregate uses involving the presence of EMPs and document potential exposure; - Perform a review of available data on the presence of EMPs in materials, EMP emissions from such materials and exposure hazards; - Develop a protocol for measuring EMP present in the air and in materials. - Perform a feasibility study for a campaign of measurements focusing on EMP. The results of the work carried out by ANSES are expected to become available in 2017. Preventing Dust Hazards in the Public Works Sector July 2016 Version 3

Introduction The operations carried out at public works sites may cause the emission of dusts containing very fine, hardly visible particle fractions, some of which may pose risks to employees. Such particles may be dangerous to health, especially in the case of emissions of crystalline silica particles or asbestos fibres. In 2013, professional associations in partnership with Occupational Health and Safety bodies developed prevention guides which, among others, also addressed risks related to crystalline silica or asbestos fibres. http://www.usirf.com/les-actions-de-la-profession/prevention-des-risques-professionnels-dans-lestravaux-routiers/ http://travail-emploi.gouv.fr/sante-au-travail/outils-et-guides/article/prevention-des-risquesprofessionnels-lors-de-travaux-routiers The update of the asbestos section of these guides will soon be initiated. The professional and contractors associations are engaged in a systematic approach of comprehensive prevention of dust emissions during works (apart from regulated asbestos, irrespective of origin) and, in this context, have initiated a new document on the prevention of dust risks. This document was developed together with the Organisation for Prevention of Occupational Hazards in the Construction Industry (OPP-BTP) and in association with the Directorate General of Labour (DGT). It is written in a guide format, to enable companies to integrate the Dust Hazards section into their Unique Document of Risk Assessment. It includes the recommendations of the Directorate General of Labour on preventive measures (Note 14-906 of 12 December 2014) relating to actinolite and cleavage fragments (application of the general principles of prevention: lowering dust levels to the lowest levels that are technically feasible using wetting methods, managing residual risks by wearing appropriate PPE, etc. ). The range of collective protection measures recommended for contractor employees at construction sites also cover the protection of residents in the vicinity of work sites. Preventing Dust Hazards in the Public Works Sector July 2016 Version 4

Scope of this guide: At the moment, the scope of the Dust Hazards guide relates to pavement and primarily to bituminous materials, irrespective of the occupations participating in the pavement work. Accordingly, it targets all the players involved in work relating to pavement surfacing layers. Types of dust within the scope of this guide: i. Inhalable dust ii. Crystalline silica dust iii. Non-asbestiform EMPs, including tremolite and actinolite cleavage fragments (refer to DGT Note 14-906 of 12 December 2014) Processes covered by the guide: This guide describes the general organisation steps and the recommended collective preventive measures that should be implemented during road surfacing work to minimise or even eliminate the generation of dust in suspension. It also discusses the recommended personal protective equipment (PPE) for residual risk of dust emission. The targeted operations are: - Milling/planing - Sawing - Chipping - Crust clearing - Core drilling Preventing Dust Hazards in the Public Works Sector July 2016 Version 5

SHEET 1 - MILLING / PLANING Scope of activities: this sheet describes the recommended preventive measures to implement during pavement planing operations. A distinction should be made between planers of less that one metre in size from larger planers. The sheet also covers sweeping after the milling operations. General setup measures for any type of machinery: Perform risk assessment based on data provided by the ordering party or the network administrator on the composition of the road surfacing. Give precedence to the use of techniques that generate the least possible amount of dust. Adopt a work setup that minimises the number of employees exposed to dust as well as the duration of exposure. Arrange the workstations so as to position operators as far as possible from sources of dust. Reduce the dwell time in the immediate vicinity of the planer. Keep the driver's workstation clean (do not use blow guns). Organise cleaning of non-disposable personal protective equipment (PPE). Perform preventive maintenance of machines to ensure: The integrity of the milling compartment; The proper functioning of the suction unit, if existing; Maintaining the cover of the receiving and discharge belts in good condition, if installed; The proper functioning of the sprinkling systems of the milling unit and of the conveyor belts, if existing. Particular attention shall be given to the cleanliness of the work clothing. Preventing Dust Hazards in the Public Works Sector July 2016 Version 6

1-1 PLANERS OF LESS THAN ONE METRE: Systematic work using wet methods by sprinkling the milling drum (the sprinkling primarily serves for cooling the tool). Keeping lorry traffic lanes wet in planed areas This type of planers cannot be outfitted with VCS devices (suction of fines). Within the collective preventive measures, it is recommended to: Give priority to the use of integrated misting and spraying means, when they exist and are available. o As a first step, a misting system should be set up at the top of the discharge belt; - If possible, in a second phase, a misting boom should be installed along the entire belt, - In the event of belt replacement, or when purchasing new equipment, the installation of a belt shroud should be requested, Failing this, an additional misting or spraying system should be planned to make the dust settle during the dust-generating phases. The need for wearing personal anti-dust respiratory protective equipment shall be determined based on assessment of the specific risks at each site (duration of operations, dust level, amount of physical effort involved, temperature, etc.). In case of a need for PPE, the driver shall be equipped with a respiratory protective device (RPD). It is recommended to provide a full-face, TM3P-type assisted ventilation respirator or equivalent. The upcoming performance of measurements of dust amounts at the relevant workstation will enable adapting the currently recommended preventive device to the actual risk, particularly in the choice of PPE (particularly RPD). Preventing Dust Hazards in the Public Works Sector July 2016 Version 7

1-2 PLANERS OF MORE THAN ONE METRE: 1-2-1 Planers outfitted with VCS The main steps to mitigate dust emission at a planing site are: Systematic work using wet methods by sprinkling the milling drum (the sprinkling primarily serves for cooling the tool). Installing skirting around the milling area, to be provided by the machine manufacturer. Using machines outfitted with a dust suction device in the milling area, which enables a significant decrease of operator exposure. Installing shrouding of the discharge conveyor belt of milled material whenever possible. Keeping lorry traffic lanes wet in planed areas. The presence of a VCS device in addition to the collective protection measures identified above can significantly lower dust amounts. The upcoming performance of measurements of dust amounts at the relevant workstation will enable validating this assumption and adapting the currently recommended preventive device to the actual risk, possibly recommending the use of suitable PPEs (particularly RPD). 1-2-2 Planers not outfitted with VCS Systematic work using wet methods by sprinkling the milling drum (the sprinkling primarily serves for cooling the tool). Keeping lorry traffic lanes wet in planed areas, In addition, it is recommended to: Give priority to the use of integrated misting and spraying means, when they exist and are available. o As a first step, a misting system should be set up at the top of the discharge belt; - If possible, in a second phase, a misting boom should be installed along the entire belt, - In the event of belt replacement, or when purchasing new equipment, the installation of a belt shroud should be requested, Preventing Dust Hazards in the Public Works Sector July 2016 Version 8

Failing this, an additional misting or spraying system should be planned to make the dust settle during the dust-generating phases. The need for wearing personal anti-dust respiratory protective equipment shall be determined based on assessment of the specific risks at each site (duration of operations, dust level, amount of physical effort involved, temperature, etc.). If, based on risk assessment, wearing of PPE is necessary, the driver shall be equipped with a respiratory protective device (RPD). It is recommended to provide a full-face, TM3P-type assisted ventilation respirator, or equivalent. The upcoming performance of measurements of dust amounts at the relevant workstation will enable adapting the currently recommended preventive device to the actual risk, particularly in the choice of PPE (particularly RPD). When making new purchases of equipment, it is recommended to invest in equipment outfitted with a VCS system. SWEEPING AFTER PLANING Within the collective protection measures, it is recommended to perform: - On the first passage of the road sweeper: misting - On the second passage: wash using a high pressure spray boom - On the third passage: misting It addition, cabins and windows must be kept closed during sweeping operations. General recommendations for cabin-type road equipment: - Particular attention must be devoted to the maintenance and cleaning of vehicle cabins. In fact, in addition to compliance with the window closing instructions, the maintenance of the door seals, air-conditioner filters and the general state of cleanliness must be monitored by the company to prevent internal and external secondary contamination. Preventing Dust Hazards in the Public Works Sector July 2016 Version 9

The scope of this sheet: pavement and curbs. SHEET 2 - SAWING The equipment covered by this sheet includes floor cutters, thermal chainsaws and cylinder saws. General setup measures for any type of equipment: Perform risk assessment based on data provided by the ordering party or the network administrator on the composition of the road surfacing. Dry sawing should be prohibited. Give precedence to the use of techniques that generate the least possible amount of dust. Adopt a work setup that minimises the number of employees exposed to dust as well as the duration of exposure. Arrange the workstations so as to position operators as far as possible from sources of dust. Reduce the dwell time in the immediate vicinity of the equipment. Organise cleaning of non-disposable personal protective equipment (PPE). Keep the machines well maintained to ensure the proper functioning of the water supply mechanism, when existing. Particular attention shall be given to the cleanliness of the work clothing. 2-1 FLOOR CUTTER This equipment is operated using wet methods (flowing water is needed to cool the disc). Preventing Dust Hazards in the Public Works Sector July 2016 Version 10

The need for wearing personal anti-dust respiratory protective equipment shall be determined based on assessment of the specific risks at each site (duration of operations, dust level, amount of physical effort involved, temperature, etc.). 2-2 THERMAL CHAINSAW This equipment requires a water tank or connection to an external supply network. The need for wearing personal anti-dust respiratory protective equipment shall be determined based on assessment of the specific risks at each site (duration of operations, dust level, amount of physical effort involved, temperature, etc.). If, based on the risk assessment, wearing of an RPD device is necessary, it is recommended to use an FFP3-type respirator or equivalent for non-recurrent operations (<15 minutes) involving a low level of dustiness. The recommended prevention device will be selected based on supplementary dust measurements. Preventing Dust Hazards in the Public Works Sector July 2016 Version 11

2-3 CYLINDER SAW (manhole cutter for utility lines) This equipment requires a water supply. The need for wearing personal anti-dust respiratory protective equipment shall be determined based on assessment of the specific risks at each site (duration of operations, dust level, amount of physical effort involved, temperature, etc.). General recommendations for cabin-type road equipment: - Particular attention must be devoted to the maintenance and cleaning of vehicle cabins. In fact, in addition to compliance with the window closing instructions, the maintenance of the door seals, air-conditioner filters and the general state of cleanliness must be monitored by the company to prevent internal and external secondary contamination. Preventing Dust Hazards in the Public Works Sector July 2016 Version 12

SHEET 3 - CHIPPING This sheet covers two types of equipment: the jackhammer and the hydraulic rock breaker (HRB). General setup measures for any type of equipment: Perform risk assessment based on data provided by the ordering party or the network administrator on the composition of the road surfacing. Give precedence to the use of techniques that generate the least possible amount of dust. Adopt a work setup that minimises the number of employees exposed to dust as well as the duration of exposure. Arrange the workstations so as to position operators as far as possible from sources of dust. Reduce the dwell time in the immediate vicinity of the equipment. Organise cleaning of non-disposable personal protective equipment (PPE). Keep the machines well maintained to preserve the proper functioning of the sprinkling system, when existing. Give priority to the use of integrated misting and spraying means, when they exist and are available. Failing this, an additional misting or spraying system should be planned to make the dust settle during the dust-generating phases. Particular attention shall be given to the cleanliness of the work clothing. 3-1 JACKHAMMER General setup measures: Whenever possible, priority should be given to other operating methods, such as sawing under water. This type of equipment is used for non-recurrent operations of limited duration. This equipment may be used with a mobile misting device. The need for wearing personal anti-dust respiratory protective equipment shall be determined based on assessment of the specific risks at each site (duration of operations, dust level, amount of physical effort involved, temperature, etc.). If, based on the risk assessment, wearing of an RPD device is necessary, it is recommended to use an FFP3-type respirator or equivalent for non-recurrent operations (<15 minutes) involving a low level of dustiness. The recommended protection device will be selected based on supplementary dust measurements. Preventing Dust Hazards in the Public Works Sector July 2016 Version 13

3-2 HRB Depending on the environment, this type of equipment may be outfitted with a misting device. The cabin must be closed. The use of an HRB does not require an operator on foot. The need for wearing personal anti-dust respiratory protective equipment shall be determined based on assessment of the specific risks at each site (duration of operations, dust level, amount of physical effort involved, temperature, etc.). General recommendations for road equipment with cabin: - Particular attention must be devoted to the maintenance and cleaning of vehicle cabins. In fact, in addition to compliance with the window closing instructions, the maintenance of the door seals, air-conditioner filters and the general state of cleanliness must be monitored by the company to prevent internal and external secondary contamination. Preventing Dust Hazards in the Public Works Sector July 2016 Version 14

SHEET 4 - CRUST CLEARING General setup measures for any type of equipment: Perform risk assessment based on data provided by the ordering party or the network administrator on the composition of the road surfacing. Give precedence to the use of techniques that generate the least possible amount of dust. Adopt a work setup that minimises the number of employees exposed to dust as well as the duration of exposure. Arrange the workstations so as to position operators as far as possible from sources of dust. Reduce the dwell time in the immediate vicinity of the equipment. Organise cleaning of non-disposable personal protective equipment (PPE). Give priority to the use of integrated misting and spraying means, when they exist and are available. Otherwise: If possible, the crust clearing shovel should be outfitted with a misting system (tank installed on the cabin roof, a pump and two nozzles, one of each side of the arm). Failing this, provide an additional misting or spraying system to settle the dust during the dust-generating phases. Keep the machines well maintained to preserve the proper functioning of the sprinkling system, when existing. Particular attention shall be given to the cleanliness of the work clothing. Preventing Dust Hazards in the Public Works Sector July 2016 Version 15

Depending on the environment, this type of equipment may be outfitted with a misting device. The cabin must be closed. Using a shovel does not require an operator on foot. The need for wearing personal anti-dust respiratory protective equipment shall be determined based on assessment of the specific risks at each site (duration of operations, dust level, amount of physical effort involved, temperature, etc.). General recommendations for cabin-type road equipment: - Particular attention must be devoted to the maintenance and cleaning of vehicle cabins. In fact, in addition to compliance with the window closing instructions, the maintenance of the door seals, air-conditioner filters and the general state of cleanliness must be monitored by the company to prevent internal and external secondary contamination. Preventing Dust Hazards in the Public Works Sector July 2016 Version 16

SHEET 5 - CORE DRILLING Core drilling must always be performed under water. The core cutter may be surrounded by an antisplatter shield. The results of measurements made available to professional bodies have highlighted the effective control of dust trapped at the source (no dust detected at operator level on sites). Preventing Dust Hazards in the Public Works Sector July 2016 Version 17