NPDES/SDS Stormwater Permit Program for Construction Activity Inspection Report Corrective Actions. ( ) - ext. ( ) - ext. Owner Name Telephone Fax

Similar documents
Stormwater Construction Inspector s Field Guide. A Field Guide to Complement the MPCA Stormwater Construction Inspection Guide

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

Watershed Enforcement Environmental Services (ESD)

Minnesota Pollution Control Agency requires that the City of Brainerd develop written procedures for

This permit is effective on the issuance date identified above. This permit expires at midnight on the expiration date identified above.

UMD Storm Water Program Construction Requirements. Greg Archer, MBA Environmental Compliance Specialist

Application for General Stormwater Permit for Construction Activity (MN R100001)

3/1/2013. Minnesota Erosion Control Association. St. Cloud, Minnesota. (March 8, 2013) While the permit must meet the requirements

Complete your application online!

ISSUANCE DATE: August 1, 2003 EXPIRATION DATE: August 1, 2008

What's new in the 2018 Construction Stormwater General Permit

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET

WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

EROSION CONTROL AND GRADING PERMIT APPLICATION

Construction site inspections are conducted for all projects that receive an approved site plan and proceed to construction.

May 14, Keith Capps Stonehenge Subdivision 1315 W. Beebe Capps Searcy, AR RE: Compliance Inspection

Application for General Stormwater Permit for Construction Activity (MN R100001)

Appendix A: SWPPP Template Instructions

Guide for the draft 2018 NPDES/SDS Construction Stormwater General Permit

1) Discharges or releases that are not storm water as defined on Page 18 (see "Prohibitions" on Page 14 of this permit).

LOUISIANA URBAN STORMWATER COALITION. EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum

Division of Water Quality (701)

CON APPENDIX C USAG HI Storm Water Pollution Prevention Plan Content Review Checklist

Good Housekeeping. Phones Weather related emergencies Breaks and facilities. Introductions

RESPONSE TO PUBLIC COMMENTS RECEIVED for the:

NDDOT Erosion & Sediment Control Construction Course

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

11 Ways to Avoid Storm Water Fines. No Exceptions!

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

DIVISION of WATER QUALITY NDPDES PROGRAM

2. Erosion control measures are not being properly maintained required by Part II.B.17.A of the permit.

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

Memo. To: From: cc: For further assistance please contact Ben Ruzowicz, GSWCC Technical Specialist at (706)

1. There was no Notice of Coverage (NOC) posted at the construction site. This is a violation of Part II, Section A. 2. D of the general permit.

Project Information. Check all that are applicable to the construction project site: RIPDES CGP (construction) RIPDES RGP (dewatering)

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

Erosion Control Inspection Form

SECTION 17.1 STORMWATER MANAGEMENT AND EROSION CONTROL

Storm Water Pollution Prevention Plan (SWP3) Checklist

SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY

Small Site Stormwater Quality Permit Application

Module 7: When Things Deviate from the Plan!

CITY OF DURANGO Stormwater Quality Permit FACT SHEET - CONSTRUCTION

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

3. The stormwater pollution prevention plan (SWPPP) did not contain a site map with all the elements required by Part II, A.4.G of the permit.

Stormwater Pollution Prevention Plan Engineering Department Requirements

COON CREEK WATERSHED DISTRICT PERMIT REVIEW

Minnesota Pollution Control Agency

Inspection Requirements of the CGP 2013

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT

Items in this checklist identify the base requirements that are to be provided by the design professional.

Regulatory Requirements

Elements of the Storm Water Management Plan. Storm Water Pollution Prevention Plan (SWPPP)

SWPPP Inspection Procedures and Form 247 Instructions

Middle Tennessee State University (MTSU) Stormwater Plan Review Checklist

Stormwater Compliance Assistance Toolkit for Small Construction Operators

Water Resources Management Plan

Community Development Agency Erosion Control Section 223 Washington Avenue Marietta, Georgia 30060

Building Better Storm Water Quality

Each Permittee s program must meet the requirements of the Los Angeles County municipal storm water permit (Permit), as described in Table 2-1.

Permit Section Ohio EPA Permit Change or Addition Model Ordinance Section to be Changed

Page 1 of 6 Permit No: MN R J. Mineral Mining and Dressing

Re: Erosion Control Report and Drawings Requirements Accompanying Document

EXIST PIPE 12 FT LANDSCAPING PROPOSED PLAN LEFT EXIST. R/W REPLACE INLET TOP EXIST PIPE

Nevada Department of Transportation (NDOT)

Inspection Report: El Dorado Chemical Company, AFIN: , Permit #: ARR FACILITY TYPE: 2 - Industrial

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water

March 1, Jim Jez Jez Commercial Development Wandering Ridge Subdivision 2308 E. Kiehl Sherwood, AR RE: Compliance Inspection

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY FACT SHEET

City of Glendale Stormwater Management Plan Checklist

Stormwater Management Design Standards. City of South St. Paul

Appendix M Framework Stormwater Pollution Prevention Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702

Mn/DOT Outstate District SWPPP

TABLE OF CONTENTS APPENDICES. Appendix A Stormwater Management Plan Checklist Appendix B Construction Sediment and Erosion Control Checklists

Stormwater Construction Inspection Guide

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

July 7, Jason Barnes, Facilities and ESH Manager Facilities and ESH manager Baxter Healthcare Corporation Mountain Home, AR 72653

Erosion and Sediment Control Manual Table of Contents

SWPPP Checklist. Project Name: Review Date(s): Reviewer(s): Project Type: Subdivision. Site Plan City Project

Erosion & Sediment Control (ESC) for Builders

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

STORM WATER POLLUTION PREVENTION PLAN TEMPLATE

STORMWATER POLLUTION PREVENTION PLAN (SWP3)

APPENDIX C EROSION AND SEDIMENTATION CONTROL STANDARDS

SUDAS Revision Submittal Form

Stormwater Pollution Prevention Plan (SWPPP) for Construction Activity for Small Construction Sites

1. The site map does not contain a pre-construction topographic view as required by Part II,A.4.F.1 of the permit.

Performance Standards Compliance Checklist

Construction Phasing Bad

Residential Site Soil Erosion and Sedimentation Control Permit Application

MS4 General contact (with Stormwater Pollution Prevention Program [SWPPP] implementation responsibility)

Construction Site Inspections

LAND DISTURBANCE PERMIT

STANDARD OPERATING PROCEDURES. Minimum Control Measure 4 & 5 Construction Site Erosion and Sediment Control Post-Construction Stormwater Management

Stormwater CGP. CGP Regulatory Overview. CGP Regulatory Overview

City of Maryville Grading & Construction Site Pollution Management Policies & Procedures Manual RESIDENTIAL COMMERCIAL BUSINESS INDUSTRIAL

PERMIT APPLICATION for Part 91 SOIL EROSION AND SEDIMENTATION CONTROL

National Pollutant Discharge Elimination System Stormwater Program MS4 Annual Report Format

Transcription:

NPDES/SDS Stormwater Permit Program for Construction Activity Inspection Report Corrective Actions MPCA use only White-MPCA Canary-Site copy Delta record Project Name / Location MN R100001-C000 Stormwater Permit Identification Number Owner Name Telephone Fax Contractor Name Telephone Fax Contacts @ Inspection Telephone Fax / / Complaint Routine Inspection Date /Time Weather Conditions Type of Inspection / / Date Construction Started Unpermitted site (red bolded areas) Discharge to Appendix A Waters Change of Coverage Needed VIOLATIONS 1) Erosion Control Practices During Construction check violations a) Pond side slopes MISSING temporary protection or permanent cover Separate basin checklist completed? yes no b) Normal wetted perimeter of temporary or permanent (connected) ditch that drains water is NOT stabilized within 24 hrs (200 back from surface water) c) Other exposed, erodable soils w/ positive slopes MISSING stabilization BMPs (installed in appropriate or functional manner) Localized Widespread d) Temporary or permanent energy dissipation (w/i 24 hour) MISSING at outlets connected to surface water 2) Sediment Control Practices During Construction check violations a) Failure to adequately control or minimize sediment discharges (additional upgradient controls required) Localized Widespread b) MISSING temporary sedimentation basins (disturbance > 10 acres, or > 5 acres near special water areas) c) Inlet control BMPs NOT functional or missing d) Perimeter controls MISSING downgradient prior to land disturbing activities 3) Maintenance check violations a) Erosion and sediment control BMPs needs repair, replacement or enhancement b) Temporary sedimentation basin maintenance NOT performed (collected sediment > ½ basin volume) c) Sediment deposits in ditches or surface waters NOT removed, describe affected area or water Localized Widespread d) Sediment tracking on paved surfaces at exits Localized Widespread 4) Inspections check violations a) Stormwater Pollution Prevention Plan (SWPPP): SWPPP ON site SWPPP NOT on site SWPPP not reviewed at inspection Inspections/maintenance (1 per 7 days or 24 hours of.0.5 inch precip.) MISSING: date, name, findings, corrective actions, rainfall, changes to SWPPP 5) Stormwater management (site hydrology) 1 acre or more of new impervious surface added yes no Check management method a) Wet sedimentation basin Regional pond Infiltration/filtration Alternative method b) When required, pretreatment MISSING c1) Dewatering Activities c2) Turbid discharges to surface waters or causing erosion off site d) Project causing wetland impacts If yes: WCA permit required DNR permit required wq-strm2-75 (8-08) MPCA (800) 657-3864 www.pca.state.mn.us/water/stormwater/stormwater-c.html Page 1 of

6) Management Pollution Prevention a) Solid waste NOT disposed of properly b) Hazardous materials NOT in secondary containment or/and NOT restricted access c) Did NOT define areas for construction vehicles external washing d) Did NOT define concrete washout areas on site and post a sign Violations Site NOT in compliance Sediment discharge (documented) Enforcement referral Corrective Actions See Corrective Actions attached Corrective Actions left on site Corrective Actions mailed or faxed Recommendations Penalty Action Stop Work Order Additional inspection Penalty advisory: State law provides for civil and criminal penalties for violations of a NPDES/SDS Permit and water quality laws. Civil penalties could range up to $10,000.00 per day per violation. Evidence Collected Photographs Documents Sample Site size det. Received by As the owner, general contractor, employee and/or agent for either Permittee, I hereby acknowledge receipt of this Inspection Report. My signature does not imply agreement or disagreement with the information in this report. Stormwater Inspector MPCA Other ( ) - ext. Telephone Number wq-strm2-75 (8-08) MPCA (800) 657-3864 www.pca.state.mn.us/water/stormwater/stormwater-c.html Page 1 of

NPDES/SDS General Stormwater Permit for Construction Activity Violation Citations Citation Permit section or rule No permit Minn. R. 70090.2010 Subparts 1, 2, 3 (permit required, permit application deadline, and compliance requirements for un permitted construction, respectively) Change of Coverage II. B. 5 Line 1 Line2 Line 3 Erosion Control Practices during Construction a) All exposed soil must be stabilized no later than 14 days after the construction activity in that portion of the site has temporarily or permanently ceased IV. B. 2 b) Normal wetted perimeter of drainage system - 200 within 24 hours of connecting IV. B. 3 c) Energy dissipation (temp. or perm.) within 24 hours IV. B. 4 Sediment Control Practices during Construction a) Lacking sediment control practices, Overloaded systems eliminated, no unbroken slopes 75 @ 3:1> IV. C. 1 b) Temporary sediment basin required III. B c) Inlet BMPs not functional IV. C. 4 d) Perimeter controls/soil disturbance IV. C. 2 Inspections and Maintenance a) Maintenance of erosion and sediment temporary/permanent cover IV. E. 4 b) Temporary sediment basin 1 2-volume IV. E. 4. b c) Recovery of sediment in waters (name water body) IV. E.4. c - Duty to notify, avoid and recover water pollution Minn. Stat.115.061 - Nuisance conditions prohibited (define discharge) Minn. R 7050.0210, subp.2 d) Vehicle tracking IV. E.4. d Line 4 Inspections and Records Retention III. D a) SWPPP development required III. A SWPPP requirements: III. A. 4 BMPs/locations procedures III. A. 4. a Site map/flow arrows III. A. 4. b Areas not to be disturbed III. A. 4. c Phased areas III. A. 4. d Surface waters/wetlands 1 mile III. A. 4. e Methods for final stabilization III. A. 4. f Amend SWPPP modify BMP III. A. 4 b) Inspections (specifically note failed maintenance) IV. E. c) Training requirement documentation III.A.2 Line 5 Permanent Stormwater Treatment >1 acre impervious, permanent treatment required III. C a) Wet sedimentation basin III. C. 1 Regional ponds III. C. 3 Infiltration/filtration (hydro analysis) III. C. 2 Alternative methods, 90-day review, monitoring III. C. 5 b) Pretreatment required III. C c) Dewatering IV. D d) Turbid discharges off site or waters of the state Minn. R 7050. 0210, subp.2 e) Wetland impacts: authorization and mitigation Line 6 Management Pollution Prevention a) Solid waste disposed of properly IV. F. 1 b) Hazardous materials in secondary containment and restricted access IV. F. 2 c) Defined areas for construction vehicles external washing IV. F. 3 d) Defined concrete washout on site and with a sign IV. F. 4 wq-strm2-75 (8-08) MPCA (800) 657-3864 www.pca.state.mn.us/water/stormwater/stormwater-c.html

A Letter of Warning (LOW) is a notice to a regulated party that documents violations discovered during an inspection, complaint follow-up or review of submittals. The LOW typically includes a reference of the statute, rule, permit condition or checklist that is violated. The LOW typically requires the regulated party to complete specific corrective actions to return the facility to compliance. The LOW usually gives a regulated party between 7-30 days to complete required corrective actions. A Request for Information (RFI) is a notice to a regulated party requiring information. Occasionally additional information is required to determine the status of compliance or for a regulated party to respond to violations discovered. This information can be used to determine if elevated enforcement (including penalties) is appropriate. All Corrective Actions (LOW or RFI) are requirements to correct field conditions and to come into compliance with the permit, statute or rules and must be responded to in the period noted on this field report. This response (including any lack of response) is considered by the MPCA and future enforcement for the violations discovered. wq-strm2-75 (8-08) MPCA (800) 657-3864 www.pca.state.mn.us/water/stormwater/stormwater-c.html

Letter of Warning (LOW) Request for Information (RFI) and Corrective Actions / / / / Inspection date/time Last rainfall Site name Site Conditions Size of site in acres and measurement method The regulated party must respond as indicated below. This LOW/RFI and your response do not preclude the MPCA from taking further action with respect to the violations. The MPCA reserves the right to seek any and all remedies available under Minn. Stat. 115.071, 116.072, 116.073 and 609.971 and all applicable rules or permits for violations cited. Citation/line item Required Information / Documentation / Corrective Actions Note whether photo, document or written response is required Timeline Site Diagram Continuation sheet MPCA use only White-MPCA- Canary-Site copy ( ) - ext. Stormwater Inspector Telephone Number Mail response to: (provide address or affix business card) Signature Printed Name Title As the owner, general contractor, employee and/or agent for either Permittee, I hereby acknowledge receipt of this Inspection Report. My signature does not imply agreement or disagreement with the information in this report. Name Address Line One Address Line Two MN City State Zip Code wq-strm2-75 (8-08) MPCA (800) 657-3864 www.pca.state.mn.us/water/stormwater/stormwater-c.html Page 2 of