Building Information Modelling draft policy and principles for Queensland

Similar documents
SARA key performance indicators and customer satisfaction survey

Queensland Freight Strategy

July State Planning Policy. Department of Infrastructure, Local Government and Planning

Meeting government policy objectives through the adoption of Building Information Modelling (BIM)

Readiness for service. Gate. Great state. Great opportunity.

Disposal Transfer. October Part of the Department of Internal Affairs

Metropolitan Local Government Reform. Information Sheet Determining an agreed approach to the change process

BIM Protocols CIBSE 2015

Which Horse to Back? Cutting through the multitude of Industry Initiatives

Cambridgeshire County Council Publication Scheme

Enterprise Asset Management. Enterprise Asset Management 1

Briefing Pack for the role of Coordinator GIS. Central Highlands Regional Council

Asset management Management systems Requirements

CCAMLR Secretariat Strategic Plan

RECORDS MANAGEMENT FRAMEWORK

Integrated transport planning. Report 4:

ICCS Plus. A Common Approach to. Incident Management

Framework. buildingsmart Australasia Submission MARCH Prepared by: Mr Rodger Hills Executive Officer. buildingsmart Australasia (bsa)

Quick Guide: Meeting ISO Requirements for Asset Management

Stage 2 Procurement Media Protocols

COMPETENCY FRAMEWORK CONSULTING ENDORSEMENT

Energy and water supply. April State Planning Policy state interest guideline. Department of Infrastructure, Local Government and Planning

Asset management Overview, principles and terminology

BIM: Risks & Responsibilities: Can a BIM Protocol provide the solutions?

NHS Organisation. Secondment Policy

Metropolitan Local Government Reform. Information Sheet Organisational review and restructure, including filling positions in the new structure

MY ACCOUNT. Terms of use. New South Wales South Australia Queensland Victoria

Definition document for wholly owned companies

Diversity and Inclusion Strategy

RELATIONSHIPS BETWEEN THE ISO SERIES OF STANDARDS AND OTHER PRODUCTS OF ISO/TC46/SC11: Archives/Records Management

Accounting Friday 25 October 2013 Paper One Response book

Role Description State Inspector

Ullswater Community College FREEDOM OF INFORMATION

Diversity Policy. Shine Corporate Ltd (the Company ) Contact. ACN Level 13, 160 Ann Street Brisbane QLD 4000 Australia

Recognition of Prior Learning and Assessment Kit

Learner Assessment Pack

Fairfield City Council. Job Description. Job Details. Position Purpose/Job Summary. Grade: 5. Asset Manager Civil and Built.

Research Data Management Policy. Glasgow School of Art

BETTER BUILDING PERFORMANCE CIBSE HCNW Region debate 15/02/2017

BIM 2016 and the NEC. Simon Rawlinson, 20 April 2015

OUTCOMES: RESEARCH INTO PRACTICE. National Outcomes Measurement Research Agenda Working Paper No. 2

ONRSR Guideline. Asset Management

The Project Control Framework Quick reference guide

The Australian Council on Healthcare Standards Strategic Plan

National Standard of Competency for Architects

Leading Innovation in Business Analytics

Welsh Language Scheme revised under the Welsh Language Act 1993 (as amended by the Welsh Language (Wales) Measure 2011)

Web Content Officer, Student Information

certificate in asset management planning

Finance and Business Diversity Action Plan April 2015-March 2016

Monitoring and Evaluation Framework

Bernicia Group Job Description. Job Purpose. Key Responsibilities

Managing Intellectual Property in Defence and Marine Procurement

Microsoft Office Futures. Microsoft Corporation

Northern Ireland Fire & Rescue Service Job description

EVALUATION FRAMEWORK 2017

B/555 Roadmap (June 2013 Update)

June Auditor regulation and oversight plan This report is for:

Paddock to Reef Program Integrated monitoring, modelling and reporting

Asset Management Policy

CAVAL Collaborative Solutions THREE YEAR STRATEGIC PLAN

This Network Rail standard contains colour-coding according to the following Red Amber Green classification. Red requirements no variations permitted

Mark Peters, CEO. Gold Coast 2018 Commonwealth Games Corporation (GOLDOC)

JOB DESCRIPTION. Assistant Director of Communications & Marketing

Records Management policy

Building a lower-carbon construction industry Turning good environmental performance into competitive advantage

Auditing Standard ASA 210 Agreeing the Terms of Audit Engagements

SOUTH WEST POLICE PROCUREMENT DEPARTMENT (SWPPD) PROCUREMENT STRATEGY 2014/15

(pronounced krice'-son) (origin Ancient Greek κρείσσων, ον) (noun) stronger, i.e. greater advantage: better

Financial Services Training

WorkWell Mental Health Improvement Fund

BSBSUS201A Participate in environmentally sustainable work practices MAPPING

Open Access to Research Data

Information Guide for Suppliers

UK Research and Innovation (UKRI) Records Management Policy

Sample Social Clauses to Encourage Community Benefits from Waste

Legal Studies Thursday 1 November 2012 Paper Two Question book

POSITION DESCRIPTION. International and Business Development/International Education

What are the key considerations for a board s constitution and committee charters?

Driver Selection Governance Group (DSGG) Strategic Plan Issue two

The Present and Future of BIM in Ireland. Engineers Ireland, November 3 rd, 2016 Roughan & O Donovan Consulting Engineers Aonghus O Keeffe, CEng

Industry Engagement in Training Package Development. Discussion Paper Towards a Contestable Model

Specialist capability for all generation systems

AUDIT GUIDELINES: ELECTRICITY, GAS AND WATER LICENSING: AUDIT TEMPLATE FOR SMALLER ORGANISATIONS

Information Overload Find the tree in the Digital Forest

Persistent Identifier and Linking Infrastructure (PILIN)*

Crown Copyright, State of NSW through its Department of Planning and Environment 2018

Access to re-usable public sector information: the European Data Portal and the CEF programme

Local Content Management

CUSTOMER SERVICE CHARTER

Assistant Regional Asset Manager EU, Wider Europe and Americas. Department/Country Global Estates. Duration of job

Chief Executive Officer, South West Local Health and Hospital Network

Role Profile. Franchise Change Manager. Commissioning, Programme and Project

Our customer driven future

Guideline Asset Management

TERMS AND CONDITION OF EMPLOYMENT

The Welsh Language Commissioner s Regulatory Framework. April 2016

HOW TO REVIEW YOUR WORKPLACE GIVING PROGRAM

Arts Council Customer Service Action Plan

Freedom of Information Act Publication Scheme for Sacred Heart High School

Transcription:

Building Information Modelling draft policy and principles for Queensland February 2017

The State of Queensland, February 2017. Published by the Department of Infrastructure, Local Government and Planning, 100 George Street, Brisbane Qld 4000, Australia. Licence: This work is licensed under the Creative Commons CC BY 4.0 Australia licence. To view a copy of the licence, visit http://creativecommons.org/licenses/by/4.0/. Enquiries about this licence or any copyright issues can be directed to the department by email to info@dilgp.qld.gov.au or in writing to PO Box 15009, City East Qld 4002. Attribution: The State of Queensland, Department of Infrastructure, Local Government and Planning. The Queensland Government supports and encourages the dissemination and exchange of information. However, copyright protects this publication. The State of Queensland has no objection to this material being reproduced, made available online or electronically but only if it is recognised as the owner of the copyright and this material remains unaltered. The Queensland Government is committed to providing accessible services to Queenslanders of all cultural and linguistic backgrounds. If you have difficulty understanding this publication and need a translator, please call the Translating and Interpreting Service (TIS National) on 131 450 and ask them to telephone the Queensland Department of Infrastructure, Local Government and Planning on 13 QGOV (13 74 68). Disclaimer: While every care has been taken in preparing this publication, the State of Queensland accepts no responsibility for decisions or actions taken as a result of any data, information, statement or advice, expressed or implied, contained within. To the best of our knowledge, the content was correct at the time of publishing. Any references to legislation are not an interpretation of the law. They are to be used as a guide only. The information in this publication is general and does not take into account individual circumstances or situations. Where appropriate, independent legal advice should be sought. Building Information Modelling draft policy and principles for Queensland - 2 -

Introduction Building Information Modelling (BIM) is the digital representation of physical and functional characteristics of a building or piece of physical infrastructure. BIM serves as a shared knowledge resource for information about an asset throughout its lifecycle supporting decision making from strategic appraisal and planning, design and construction to operation, maintenance and renewal. BIM enables a collaborative way of working using digital processes to enable more productive methods of planning, designing, constructing, operating and maintaining assets through their lifecycle. Governments in Australia recognise the importance of BIM in the delivery and management of infrastructure assets as it offers many benefits throughout the asset lifecycle and has the potential to drive efficiency, value for money, productivity, innovation and safety. To maximise the benefits from its application of BIM to infrastructure projects within its annual capital program, this framework will support the effective use of BIM across Queensland Government infrastructure delivery agencies. A focus of the framework includes BIM capability development across government and industry. Scope The BIM policy and principles for Queensland apply to: all Queensland Government departments, agencies and statutory authorities. the full lifecycle of all new state infrastructure assets, including all vertical (e.g. buildings such as hospitals and schools) and linear infrastructure (e.g. roads and railways). smaller new projects and existing assets where cost effective. Objectives To provide a framework that enables the use of BIM on the full lifecycle of state infrastructure assets by 2023, delivering measurable benefits which include: - more efficient and on-time project delivery - reduced project risk - improved safety - improved built outcomes - improved asset management - reduced costs. To increase capacity and capability within the public sector to maximise value from the use of BIM on state infrastructure projects. To identify ways for BIM to be incorporated into the regulatory and procurement environments. To promote consistency and interoperability in the information requirements for state infrastructure projects to facilitate a harmonised approach for industry. Building Information Modelling draft policy and principles for Queensland - 3 -

Audience and application The BIM policy and principles for Queensland have been produced for use by officers within the Queensland Government including departments, agencies, bodies and statutory authorities and, in particular, those who are involved in the planning, procurement, design, contract management, construction, maintenance or operation of state infrastructure assets. Principles Open The Queensland Government will use Open BIM 1 so that BIM information, systems, standards and processes, enable interoperability and interconnectivity. BIM information will connect with other relevant information, e.g. geographic information systems, and offer easy and efficient accessibility and re-use. Managed BIM information will be managed securely at least for the life of the infrastructure asset (from conception to demolition) in a central repository by the asset owning/maintaining agency (or an agency such as Queensland State Archives or CITEC). The lifecycle of BIM information will be actively managed (i.e. information is regularly accessed and kept current for asset maintainers) and maintained in up-to-date software versions. Effective The Queensland Government will use BIM on infrastructure projects and, as appropriate, on existing infrastructure projects. Queensland will work collaboratively with all jurisdictions and the private sector to drive best practice in the use of BIM on Queensland Government initiated public infrastructure development. The Queensland Government will utilise the NATSPEC National BIM Guide, for infrastructure projects in consultation with industry and recognise asset class-specific standards. The Queensland Government will develop specific approaches to advance the use of BIM in the regulatory areas of workplace health and safety, and heritage conservation by 2020 to support a more pro-active and efficient approach to regulation in these areas. 1 buildingsmart Australasia has defined Open BIM as a process where the digital BIM prototype is structured in a non-proprietary, open-standard format and the associated processes are supported by industry-standard tools for managing information exchange between proprietary software tools and open access to standardised object libraries that host manufacturer s product data. These open formats support collaboration and provide customers with the freedom to choose any BIM software solution, which meets their business needs, knowing that they can share their BIM data easily with others who use different software solutions. Building Information Modelling draft policy and principles for Queensland - 4 -

The Queensland Government agencies will continuously improve their BIM capability through to 2023. This will include agency endorsed employer information requirements and BIM management plans that outline the use of fully federated models which include scheduling, costing and the use of BIM for asset management. Supported Relevant expertise and capability will be developed and maintained by agencies (such as the Department of Transport and Main Roads, Queensland Health and the Department of Education and Training). The Department of Housing and Public Works will assist and facilitate internal capacity building and development of Employer's Information Requirements (EIRs) for other agencies as required. The Queensland Government will work with education, training and research providers to support the development and maintenance of a BIM-skilled workforce including state government officers. The Queensland Government will foster a Centre of Excellence for training and skilling of BIM users. BIM policy will be incorporated into and align with relevant infrastructure project planning, procurement and assessment frameworks across government. Implementation and alignment of principles a. The Queensland Government will use its best endeavours to apply these principles. b. The Queensland Government will develop and update an implementation plan for the use of BIM. c. To evaluate the outcomes of implementing BIM, the costs and benefits will be measured and reported by agencies to the Queensland Government, with an initial focus on pilot projects. d. These principles align with the National Digital Engineering policy principles and the National Archives of Australia Digital Continuity 2020 policy to ensure consistent approaches for industry across jurisdictions. e. A communications plan will be implemented to facilitate widespread understanding and adoption of these principles by government. f. The Queensland Government will ensure its contractual arrangements provide for the delivery of a BIM model of the asset as built when the asset is handed over to the asset owner/maintainer. g. The Queensland Government will implement a plan to develop relevant expertise and capability within government and industry. h. These principles will be reviewed by the Queensland BIM Working Group within 12 months of their adoption, to incorporate project learnings. Building Information Modelling draft policy and principles for Queensland - 5 -

Department of Infrastructure, Local Government and Planning 1 William Street tel 13 QGOV (13 74 68) www.dilgp.qld.gov.au Building Information Modelling draft policy and principles for Queensland - Error! No text of specified style in document. - 2 -