De Montfort Mark 7 Incinerator (Flatpack)

Similar documents
Incinerator Systems NFPA 82 Inspection Form

The Long cycle Fossa alterna

One Meter Internal Dome Oven AVERAGE GUIDE

SECTION ALUMINUM HANDRAIL SYSTEMS

Contraflow Heater Core 22 firebox with replaceable liner Front White Bake Oven

SECTION HANGERS AND SUPPORTS FOR PLUMBING

SECTION ORNAMENTAL WELDED STEEL FENCING

CONSTRUCTION SPECIFICATION FOR TUNNELLING

Raised Basement. Mechanical Installation Guide

END ELEVATION FRONT ELEVATION. LEG (inside view) TOP (1:20) FOOT - FIXING DETAIL (1:5) (1:20) CONSTRUCTION STANDARD

Modern Rumford. MR 48 fireplaces

150MM FREE STANDING WOOD FIRE FLUE KIT MKIII INSTALLATION INSTRUCTIONS

These installation instructions cover the installation and operation of Jetmaster Inset and Freestanding Barbecues

Note on the assessment:

Installation Instructions

AMENDMENTS TO OPSS 408 (OCT 89) CONSTRUCTION SPECIFICATION FOR ADJUSTING OR REBUILDING MANHOLES, CATCH BASINS, DITCH INLETS AND VALVE CHAMBERS

150MM FREE STANDING WOOD FIRE FLUE KIT MKIII INSTALLATION INSTRUCTIONS

150MM FREE STANDING WOOD FIRE FLUE KIT MKIII INSTALLATION INSTRUCTIONS

CONCRETE BLOCK MASONRY

Water for the World. 7 y

WCU ALUMNI TOWER MASONRY & ENVELOPE REPAIRS

Note on the assessment:

SECTION METAL STAIRS

InoxSabiana 25 Flues. Stainless Steel Double Wall

Heat-Kit System Modular Contraflow Masonry Heater Core Assembly Manual

Single-skin, externally reinforced, brick tank. Instructions for manufacture

INDUSTRIAL BOILER. Moving step grate Under feed firing HPKI-R HPKI-K

Installation Manual For Conical Tanks. INSTALLATION and MAINTENANCE INSTRUCTIONS FOR CONICAL TANKS

M C I C. MAERSK Container Inspection Criteria. (All Lines) (For use with all DRY Containers in-service) Version 7: 2016

FERROCEMENT WATER TANKS

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

SECTION MANUAL FOUR FOLD DOORS MODEL 38 DECORATIVE PANEL DESIGN

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

Division 07 Thermal and Moisture Protection Thermal Protection Blanket Insulation Page 1 of 11

FitTech UP166F CHEST PRESS (FOOTING) UP166I CHEST PREES (IN GROUND) UP166S CHEST PRESS (SURFACE)

ENGLISH INSTALLATION INSTRUCTION MANUAL. N550 Bakers Oven. CERTIFIED for USA & CANADA SAFETY TESTED to UL & ULC-S

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.

LATRINE CONSTRUCTION SHELTER. Pour flush latrine 2. Pour flush micro septic tank 3. Initial investment, location, human resources 4.

Note on the assessment:

FitTech UP171F ELLIPTICAL (FOOTING) UP171I ELLIPTICAL (IN GROUND) UP171S ELLIPTICAL (SURFACE) Parts List

Architectural & Structural Design

ROOF MOUNT KIT OWNERS MANUAL

Union County Vocational - Technical Schools Scotch Plains, New Jersey

KILN EFFICIENCY AND INSULATION.

Instructions for Finishing Heater

SECTION ORNAMENTAL ALUMINUM FENCING

SITE VISIT REPORT DATE: JOB: NO. OF VISIT: PAGE OF : PURPOSE OF VISIT: CONTRACTOR: Items to be checked Observations Actions SETTING OUT

Outer Skin Kit & Flue: IB600, IB850, IB1100 Installation Manual

Installation instruction

What can I do with a bag of cement (Start simple and upgrade for toilets and wells)

CERTIFICATE OF APPROVAL No CF 5073 LEMINAR AIR CONDITIONING INDUSTRIES L.L.C.

Superior Aluminum Guide Specification 10/4/2016 Non-Welded Aluminum Pipe Railing

ROOF MOUNT KIT OWNERS MANUAL

Division 07 Thermal and Moisture Protection Thermal Protection Blanket Insulation Page 1 of 17

PROVEN 15/TM1500 FOUNDATION INSTRUCTIONS

Home Not Anchored to Foundation

SECTION ORNAMENTAL ALUMINUM RAILING

Requirements for Measuring and Pricing of Structural Concrete

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

Division 11 - Equipment Section 11401

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

A. Product Data: For each type of cold-formed steel framing product and accessory.

ORDINANCE NO BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BOULDER, COLORADO: CHAPTER 98 - Baled Straw Structures SECTION PURPOSE

NFPA STANDARDS DEVELOPMENT SITE SECOND DRAFT REPORT Closing Date: July 19, 2013

Code Compliance Research Report CCRR-0118

Installation Instructions

C.R. LAURENCE CO., INC. Intelli-Track SPS. Phase One - Installation Instructions

INGLEBEAMS. Our Inglebeam range is available in either solid aggregate versions or hollow light weight version.

Installation guidelines System: Cofraplus 220

Fireplace. Opening. Old. Opening up an old fireplace is like striking gold in your very own home.

City of Westerville Guide to Commercial Inspections

Managing Health Care Waste Disposal: Guidelines on How to Construct, Use, and Maintain a Waste Disposal Unit

Preassembled steel stairs with concrete-filled treads.

ICBO Evaluation Service, Inc Workman Mill Road, Whittier, California

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785)

A-BEAM W Erection Manual 2

assembly an open space between the roof and ceiling of a building attic balloon frame a joist constructed of steel with bars in the verticle web space

PLATON RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS AND FLOORING DRY ADVANCED TECHNOLOGY EASY INSTALLATION

SEISMIC PROTECTION SYSTEMS Bracing Products for Racks & Cabinets

1. Structural Steel Sections Structural steel sections can be classified into various groups according to their shapes.

Curtain Wall Stick System (Capped)

INGLEBEAMS. Our Inglebeam range is available in either solid aggregate versions or hollow light weight version.

A-BEAM S Erection Manual 2

SECTION ORNAMENTAL ALUMINUM RAILING

7 NON-STRUCTURAL ELEMENTS

Smarter. Safer. Leaner.

CHAPTER 3 BEHAVIOUR OF FERROCEMENT HOLLOW SLABS

INGLEBEAMS. Our Inglebeam range is available in either solid aggregate versions or hollow light weight version.

ICC-ES Evaluation Report Reissued May 1, 2010 This report is subject to re-examination in two years.

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

Description Unit Quantity Rate Kshs. Amount Kshs.

CONSTRUCTION PROCESS OF A FUEL EFFICIENT KILN

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.

The Otji-Toilet self builder manual The Clay House Project Otjiwarongo

NOTICE XX/2017 SUPPLY AND ERECT PRE-CAST CONCRETE PALISADE FENCING WITHIN THE KOUGA MUNICIPAL AREA

NORTHWESTERN UNIVERSITY PROJECT NAME JOB #

The affected construction materials listed under The Fourth Schedule Subsection 33 C (1) in the Act 520, namely: 1.1 Ceramic wash basins MS 2578

SECTION METAL STAIRS

Sanitation Marketing Toolkit MANUAL FOR PRODUCTION AND INSTALLATION OF POUR-FLUSH LATRINES

M-Span Shelving. Distributed by R.J. Cox Engineering

Transcription:

De Montfort Mark 7 Incinerator (Flatpack) Introduction This design is specially for those occasions when a large number of incinerators are to be built at one location and transported to the places where they are to be used. It has the same dimensions as the Mark 8a, and has identical performances. The incinerator body is constructed from five concrete flat castings held together by nuts, bolts and steel straps. The incinerator roof and the loading door are fabricated from 3 mm mild steel sheet with reinforcements. Any gaps between concrete castings are sealed with fireclay. The loading door frame is built into the top panel and the ash door frame and the air pipes onto the front panel. The chimney stack is made from thin stainless steel chimney liner supported on an angle steel frame bolted to the rear panel. Each concrete panel is made from an inner layer of high alumina cement 15mm thick, and an outer layer of insulating cement made from a mixture of vermiculite and Portland cement 75 mm thick. A reinforcing mesh is cast into each panel, and 20 mm diameter steel tubes cast into the front, centre and rear panels to mate with holes cast into the two side panels. The incinerator can thus be bolted together, using 10 mm screwed rod, and the joints sealed with fire cement. Summary of characteristics Use: designed especially for emergency situations. Capacity: 12 kg/h Lifespan (average): 6-12 months (the design does not anticipate that it will be used over a long period) Approximate unit cost in USD (materials only): 250-1'000 depending on availability of vermiculite and steel. Time to make components: 2 weeks to allow setting time Time to erect on site: 4-5 hours Remarks: If the ground on which it is to be assembled is not firm, a concrete base must be provided as for the other designs. Because the manufacture includes cement setting in moulds, it is recommended that a few of these should be made and kept at a central store as flatpacks in advance of the need. If the ground on which it is to be assembled is not firm, a concrete base must be provided as for the other designs. The instructions on the following pages cover the manufacture of the components and the assembly. De Montfort construction documentation Mark 7 last updated May 2004 1/11

List of materials Complete layout Item Quantity Purpose Planed Wood (150mmx15mm) Planed wood 8 metres mould frames for cement 2 metres x 1 metre Refractory Cement 4 x 25 kg bags Inner lining of walls Vermiculite 200 litres Outer walls Portland (white) 5 x 25 litre bags Mix with vermiculite cement Screwed rod 5 metres fastening walls together (10mm D) Flat steel sheet (3mm) 600mmx750mm (approx) For loading door Flat steel sheet (3mm) Flat steel sheet (5mm) Rolled steel channel (100x40x5) Rolled steel angle (30x30x3) Stainless steel chimney liner (120 mm D) Sand 250mmx250mm For ash door (approx) 250mmx150mm chimney spigot support (approx) 4 metres For sand frames 30 metres frames and chimney supports 4metres 400 kg Nuts and bolts (10 mm) 20 Hinges 2 chimney 1 2 3 4 plan Front elevation Figure 1: De Montfort incinerator Mark 7 (flatpack) De Montfort construction documentation Mark 7 last updated May 2004 2/11

Construction of panels Each panel should be cast in a rectangular wooden former in the following manner. A 15 mm thick layer of high alumina medium density fire cement should first be cast in the bottom of the former. For one of the two side panels, the vermiculite cement must be cast first, and the fire cement on top in order that each panel can be assembled with the fireclay on the inside. A 75 mm layer of vermiculite cement should then be cast on top of the fire cement. A reinforcing grid should be cast in the centre of the vermiculite cement, and the 20 mm tubes cast in place and positioned using screwed rods pushed through holes drilled through the wooden former. Front and two centre panels (figure 2) Photo 2: Cement former assembled for front and centre cross-pieces Dimensions are 250 mm x 625 mm. Two 20 mm tube are cast 125 mm from each end, 50 mm deep and located by rods pushed through holes drilled through the wooden former. 250 mm 625 mm Figure 2 Photo 3: Front panel (identical to the two centre panels) De Montfort construction documentation Mark 7 last updated May 2004 3/11

Side panels (figure 3) Nine 20 mm tubes are cast 125 mm and 500 mm from top. One off 875 mm from top 50 mm from sides and central, 125 mm apart. Note that the two side panels are handed, i.e. the right hand one is the mirror image of the left hand one. This is necessary to ensure that the refractory cement on both panels is on the inside of the incinerator. 870mm 1 metre Photo 4: former side plates with cement and screwed rods Figure 3 Rear panel (figure 4) Dimensions are 250 mm x 1 metre. Three 20 mm tubes are cast 125 mm, 500 mm and 875 mm from the top and 50 mm deep. 250mm 1 metre Figure 4 Photo 5: First cement side; composite slabe removed from former De Montfort construction documentation Mark 7 last updated May 2004 4/11

Checking assembly of panels The panels are bolted together using 9 lengths of 10 mm screwed rod, each 500 mm long passing through the cast-in tubes. Care should be taken not to overtighten the nuts, as this could result in cracking the side panels. Strips of 30x3 mm steel are used to distribute the load along the sides of the incinerator as shown in Figure 1 and Figure 6. Photo 6: Fitting rear panel first before centre and front panels Photo 7: Checking the proper assembly of panels before delivery De Montfort construction documentation Mark 7 last updated May 2004 5/11

Construction of steel components Making the sand seals (These should be supplied ready made to site) These are made from 100x30x5 mm rolled steel channel, welded together to make two rectangular troughs as shown on Figure 5 below. 2x 30 mm steel strip 200 mm long is welded to the sides and ends of the channels to act as locating brackets when the sand seals are placed on the panels. 530mm 340mm 430mm Photo 8: Steel top complete Figure 5: 2 steel channels, welded together 100mm diameter Figure 6: Sand seals fitted to body Figure 7: Chimney spigot Photo 9: Fitting steel top De Montfort construction documentation Mark 7 last updated May 2004 6/11

Attach Ash Door and ash tunnel (figure 8) The ash door is attached to the front panel by cementing in the ash tunnel. Final preparation All gaps between the panels must be sealed with fire cement. The floor must be covered with a 25 mm layer of fire cement to protect the concrete base. Firing should be delayed for 12 hours to allow initial curing of the fire cement. Figure 8: Ash door fitted to front, leaving room for air holes Attach Chimney The chimney is supplied as a 120 mm stainless steel tube, 4 metres long. it is fitted over the chimney spigot, and supported by the two rolled steel angle supports. (Note that it will not be perfectly straight). The chimney is sealed to the spigot using fire cement. Figure 9: Attach 2 rsa 30x30x3 to support chimney De Montfort construction documentation Mark 7 last updated May 2004 7/11

Making and Fixing the Loading Door Figure 11 attach hinge brackets to door Figure 10 weld angle steel frame and attach to 3 mm ms plate Figure 12 Attach matching hinge brackets to door frame Figure 13 Attach handle to door De Montfort construction documentation Mark 7 last updated May 2004 8/11

Important note for Users All manufacture except for assembly should be complete before the incinerator is delivered to site. Parts list for Flatpack to be delivered to site 1. Two matching side panels 2. Three identical panels for front and centre 3. One rear panel 4. Nine lengths of 10 mm screwed rod, with nuts and washers 5. Four lengths of 30x2mmsteel strip 900mm long to distribute load from screwed rod to side panels 6. One bag fire cement (25 kg) for sealing panels and floor 7. Steel channel sand seal with hinge bracket and locating strips attached 8. Loading door with hinge bracket and handle 9. Steel hinge for loading door 10. Chimney plate and spigot 11. 4 metre stainless steel chimney 12. Two 4 metre rolled steel angles 30x30x2 for supporting chimney 13. Two chimney support brackets 14. Eighteen 5mmx25mm set screws and nuts 15. Front panel 16. Ash door with hinge, latch and securing plates 17. Twelve 10mm masonry bolts for securing plates to panels 18. Steel Grate 19. Ash Scraper Photo 10: Flatpack ready for loading Photo 11: components in van De Montfort construction documentation Mark 7 last updated May 2004 9/11

1. One square metre of earth cleared and levelled 3. Complete but no chimney 2. Sides are assembled and gaps filled with fire cement 4. Incinerator complete and operational. Chimney support brackets attached and chimney erected De Montfort construction documentation Mark 7 last updated May 2004 10/11

Operation The incinerator should be started by putting waste paper, cardboard or similar easily ignited material over the grate. Burning paper can then be dropped on top, and when a good flame is established, more combustible material added till the combustion chamber is half full. If available, about 100 cc of kerosene, diesel oil or used lubricating oil can be poured on top to speed the heating process. Only dry, non-infected waste should be added for the first 10 minutes or until a fierce flame is established. The combustion chamber should be kept at least half full, and infectious and/or wet waste should be added above dry materials to ensure that it dries before reaching the combustion zone, Additional liquid fuel can be added if it is suspected that the combustion rate is decreasing. Any plastic waste available will also help to raise the temperature of combustion, but both this and the oil will give rise to black smoke if used to excess. The incinerator will be most efficient in fuel consumption if it is operated for fairly long periods once it is ignited, but the grate and the flue passage to the base of the chimney must be kept clear by poking a steel rod through the air inlet hole from time to time. It may also be necessary to push down the load from time to time to prevent it arching above the grate. The last load before closing down should be as dry and safe as possible, so that no unburned material is left on the grate. Maintenance As with any type of equipment, there is a need to perform some regular maintenance to ensure both that the system will continue to work properly and to prolong the life span of the incinerator. Before each operation. Check that ashes have been completely cleared from the grate and floor of incinerator. Check that loading door closes properly onto the sand seal in an air-tight manner. Loosen sand if necessary. Annual inspection and rectifications Component Check Rectify if necessary Chimney Vertical fixings Reset or renew Corrosion Repair any holes or weak points. Replace chimney or section thereof if necessary Chimney support plate Corrosion Replace if necessary Top sand seals Ash door Cement seal to brickwork. Adequate sand level Corrosion, hinges, catch, blockage in door-frame Re-seal with refractory cement. Top up sand Repair and clean as necessary Concrete panels Cracks Patch with refractory cement Disclaimer Since the safe and successful use of the incinerator, which operates at very high temperatures, is entirely dependent on the building, operation and maintenance thereof, the University and the organizations supplying the drawings and instructions can bear no responsibility for any mishaps to personnel or inadequate technical performance of the incinerator. Information & questions Any questions relating to these instructions should be referred to: Professor D.J. Picken (De Montfort University, Leicester, UK) Contact formular available at: http://www.mw-incinerator.info/en/601_contact_us.html De Montfort construction documentation Mark 7 last updated May 2004 11/11