Challenges to Wind Development Review of Representative Wind Projects & Wind Project Siting Concerns

Similar documents
Request for Quotations Acoustic Consultant Services

March 20, Mr. Corey Juhl Juhl Energy Development Inc th Street SE Pipestone, MN 56164

William Cundiff. From: Sent: To: Cc: Subject: Attachments: Bill, Steve, Bob,

Responses to Technical Issues Raised at the June 6, 2011 Falmouth Board of Selectmen Meeting

EDF EN Canada Development Inc.

South Branch Wind Farm Acoustic Audit - Emission Summary for Public Distribution

Appendix T BIWF Shadow Flicker Analysis

Additional information relevant to Section 8 is presented in Appendix E in Volume 2 of 3 of the EIS.

OPEN HOUSE PROJECT OVERVIEW OPEN HOUSE NOVEMBER 16, :00-8:00 PM FALL 2017

Future Generation Wind, LLC

5.6- LAND-BASED WIND ENERGY CONVERSION FACILITIES

6.6 RESIDENTIALLY-SCALED, LAND-BASED WIND ENERGY CONVERSION FACILITIES

South Branch Wind Farm Acoustic Audit - Immission Summary for Public Distribution

9.2 Definitions. The following terms are defined, for purposes of Section 9, as follows:

Salem, Massachusetts

Town of Rensselaerville LOCAL LAW NO. 2 OF THE YEAR 2009

EIGHT POINT WIND, LLC

ACOUSTIC STUDY OF THE SUNY CANTON WIND TURBINE CANTON, NEW YORK. June 2013

APPENDIX R SHADOW FLICKER REPORT

Wind Energy Ordinances

Shadow Flicker Regulations and Guidance: New England and Beyond

ROCKY MOUNTAIN LAND USE INSTITUTE 17 th Annual Conference University of Denver Sturm College of Law March 6 7, 2008

NOISE MODELING STUDY REPORT NO A ROARING BROOK WIND FARM PROJECT AND ENVIRONMENTAL IMPACT ASSESSMENT

Cassadaga Wind Project Exhibit 6. Wind Power Facilities

NOISE IMPACT ASSESSMENT PROTOCOL. Number Three Wind Farm Lewis County, New York. Case 16-F-0328

BARON WINDS SOUND MONITORING AND COMPLIANCE PROTOCOL

6.5 SMALL WIND ENERGY SYSTEMS

ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES

WILSON TOWNSHIP ZONING ORDINANCE AMENDMENT: WIND ENERGY

Welcome To The Public Open House For The Wainfleet Wind Energy Project August 24, 2010

Reducing the Carbon Footprint of the Hyannis WPCF:

COMMUNITY FUND AND INVOLVEMENT

Massachusetts Renewable Energy Portfolio Standard (RPS) Program Status and Overview of Section 83 Long Term Contracts

Garvagh Glebe Wind Energy Project County Leitrim

EXCERPT FROM EMMET COUNTY ZONING ORDINANCE. A. Definitions For purposes of this section, the following definitions shall apply:

CITY OF TONKA BAY COUNTY OF HENNEPIN STATE OF MINNESOTA ORDINANCE NO

O Donnell Wind Turbines Noise Evaluation Kingston, MA

ACOUSTIC MODELING REPORT FOR THE DEVELOPMENT OF WIND ENERGY FACILITIES AT NAVSTA NEWPORT, RHODE ISLAND. March 2011

Section Utility Grid Wind Energy Systems

Grand Valley Wind Farms Phase 3 Wind Project Wind Turbine Specification Report

Cheshire, MA SMALL WIND ENERGY SYSTEMS 12.0 SMALL WIND ENERGY SYSTEMS

Variations of sound from wind turbines during different weather conditions

Noise Level Compliance Report

NOISE ASSESSMENT REPORT White Pines Wind Project Prince Edward County, Ontario

Summit Repower Siting Process August 23, 2016

Shadow Flicker Issues and their Handling for Wind Farm Approval in Germany

Black Oak Getty Wind Farm

Project siting. Lanfine. Wind resource assessment. Wind Power Project

Proceedings of Meetings on Acoustics

Additional information relevant to Section 7 is presented in Appendix D in Volume 2 of 3 of the EIS.

Tullynahaw Wind Energy Project County Roscommon ENVIRONMENTAL IMPACT STATEMENT

C O M M E R C I A L W I N D E N E R G Y R E G U L A T I O N S - R E V I S E D : 3 / 3 0 / 1 6

Sylvia Broneske Hayes McKenzie Partnership Ltd Machynlleth & Salisbury. Overview

Acoustic Analysis - History of Submitted Versions from Atlantic Design Engineers

Section 11.01: Zoning Ordinance Subdivision 9.4: Utility and Communication Uses. 96 Chapter 11: Planning and Development

State code 23: Wind farm development

Burnt Hill Wind Development

Shadow Flicker Impact Analysis for the Alabama Ledge Wind Farm in Genesee County, New York

Rhode Island Renewable Energy Siting Partnership. Teresa Crean Program Manager RESP

Acoustical Analysis of the Horse Creek Wind Project

PAINT TOWNSHIP SOMERSET COUNTY, PENNSYLVANIA. ORDINANCE NO. OS ai? - I \

Robert W. Rand, INCE. Stephen E. Ambrose, INCE, Board Certified. July 26, 2013

BILL NO. B ORDINANCE NO TOWNSHIP OF O HARA ALLEGHENY COUNTY, PENNSYLVANIA

Article 57 WIND GENERATION AND WIRELESS COMMUNICATION TOWERS

DIGBY WIND POWER PROJECT ENVIRONMENTAL ASSESSMENT Appendices APPENDIX F NOISE IMPACT STUDY

Summit Repower Siting Process - Update to August 23, 2016 and November 10, 2016 reports.

Rumster Wind Energy Project

Falmouth Wind Energy --- Time Line

Techni DEVELOPM COMPLIAN NCE WITH STANDARD INTRODUCTION. May, 2011, Performance Preservation by development PURPOSE.

REPORT REF: SFAUSVICXXMOR.1 SHADOW FLICKER AND BLADE GLINT REPORT

Interim Results: Health and Safety Impacts from Large Scale Wind Turbines

Wind farm aural and visual impact in the Netherlands

Falmouth Wind Turbine Noise Studies

EXECUTIVE SUMMARY. Supplemental Environmental Impact Statement Jericho Rise Wind Farm

Wind Energy in New England: Update

Shadow Flicker Assessment for Wind Projects in Kingston, MA

WIND ENERGY CONVERSION SYSTEMS

AMHERST ISLAND WIND ENERGY PROJECT PROPERTY LINE SETBACK ASSESSMENT REPORT. File No April Prepared for:

Technical Bulletin Six Required Setbacks for Wind Turbines

Wind Law - - To replace 17, Noise Standards and Setbacks for Wind Energy Conversion

SMALL WIND ENERGY FACILITIES ORDINANCE. Ordinance No

Anti-icing and De-icing Technologies for Wind Turbines

ZONING BOARD OF APPEALS Town Of Philipstown 238 Main Street Cold Spring NY MEETING AGENDA October 1, :30 p.m.

MOUNTAIN HOUSE SPECIFIC PLAN II

Evance Iskra R9000 Acoustic Noise Assessment according to BWEA Performance and Safety Standard Summary. Issue 02

PRELIMINARY SITE FEASIBILITY REPORT Draft Copy. Ipswich

Comparison of compliance results obtained from the various wind farm standards used in Australia

Project Report. EFP-06 project Low Frequency Noise from Large Wind Turbines. Results from Sound Power Measurements. Client: Danish Energy Authority

14: INTRODUCTION

Barry H. Gutteridge, Commissioner, Works and Emergency Services

WINTHROP, MAINE SMALL WIND ENERGY SYSTEMS ORDINANCE

SECTION 12 WINDPOWER MANAGEMENT ADOPTED: FEBRUARY 15, 2005 TABLE OF CONTENTS SUBDIVISIONS... PAGE

COMFREY WIND PROJECT. NOISE STUDY In Brown and Cottonwood Counties, Minnesota. For WESCO Wind 04/16/12

Wind Turbine Noise, Infrasound and Noise Perception

Wind Energy in Alberta: Sustainable Communities, Sustainable Environment > Communities, neighbours and wind energy facilities page 1

WHY IS WIND TURBINE NOISE POORLY MASKED BY ROAD TRAFFIC NOISE? 2 GGD Amsterdam.

Oldman 2 Wind Farm Limited


APPENDIX M COMMUNITY ENGAGEMENT

Skeabrae Wind Energy Project

Transcription:

Challenges to Wind Development Review of Representative Wind Projects & Wind Project Siting Concerns Massachusetts Wind Working Group Meeting Wednesday, October 17 th, 2012 Held At Aeronautica Windpower 11 Resnik Road Plymouth, MA

Atlantic Wind Project Overview To date we have been involved in the siting analysis, permitting and design of over 50 wind turbine project sites throughout New England. Atlantic has developed in-house skills for effective wind turbine project assessment, permitting and construction. Projects with installed/operating turbines include: Mount Wachusetts Community College, Gardner, MA-(2) Vestas V-82 Turbines Norfolk County Correctional Institute, Gardner, MA-(2) Vestas V-82 Turbines Narragansett Bay Commission, Providence, RI (3) Goldwind 1.5 MW Turbines U Maine, Presque Isle, ME-(1) RRB 600 Turbine UMass Dartmouth, MA (1) Elecon 600 Turbine Fairhaven WWTP, Fairhaven, MA (2) Sinovel 1.5 MW Turbines Barnstable WWTP, Barnstable, MA-(2) Northwind 100 Turbines Deer Island WWTF, Winthrop, MA-(1) FloDesign Demonstrator Unit 100 kw turbine Camelot Wind, Plymouth, MA (1) Goldwind 1.5 MW Turbine Scituate Wind, Scituate, MA (1) Sinovel 1.5 MW Turbine

Camelot Wind Turbine

Presque Isle, Maine

Mount Wachusetts Community College, Gardner, MA

Fields Point WWTP Providence, RI Narragansett Bay Commission

Permitted projects currently in the final design/construction phase include: Technology Drive, Falmouth, MA- (1) Aeronautica Wind 225 Turbine Future Generation Wind, Plymouth, MA- (3) Nordex 2.5 MW Turbines Jericho Mountain, Berlin, NH- (3) Vestas 3.0 MW Turbines Colony Place, Plymouth, MA- (1) 750 kw Aeronautica Wind Turbine Varian Semiconductor, Gloucester, MA (1) Kenersys 2.5 MW Turbine Future Generation, Plymouth, MA- (1) Nordex 2.5 MW Turbine Equity Industrial Partners, Gloucester, MA (2) Gamesa 2.0 MW Turbines Russell Municipal Light Department (3) GE 1.6 MW Turbines

Varian Semiconductor Gloucester, MA

Gloucester Engineering Wind Project Gloucester, MA

Representative Project Site Plans Camelot Wind Project Plymouth, MA Holiday Hill Wind Project Russell, MA Future Generation Wind Plymouth, MA Scituate Wind Project Scituate, MA

Camelot Wind

Russell Municipal Light Department

Future Generation Wind Project

Scituate Wind Project

Massachusetts CEC Acoustic Study Methodology Must use ANSI Type 1 Sound Level Meters or equivalent ISO or IEC standard On-site wind speed measurements by either an on-site MET tower or at 10-meters above ground level and extrapolated to hub height using the appropriate on-site wind shear Locations selected for long-term monitoring to represent the nearby residence with the lowest ambient sound levels Long-term and short-term measurements Long-term Measurements: Must be completed for 14 consecutive days during reasonable meteorological conditions L90 and Leq must be determined in db(a) for 10-minute intervals Short-term Measurements: Must be completed during the 14 day monitoring period, must be taken at least once during the day (6a.m. and 10p.m.) and once between the hours of 1a.m. and 4a.m. Must be completed simultaneously with long-term measurements Must document audible sound sources during entire monitored period

Shadow flicker from wind turbines is the effect resulting from the shadows cast by the rotating turbine blades on a sunny day. Shadow flicker is most commonly measured in terms of the "hours per year" during which a receptor would be exposed to flicker from a wind turbine. Shadow flicker modeling is performed using the software WindPRO, version 2.7, developed by EMD International. This modeling uses geometry and site specific data to estimate the number of hours per year that shadows could be cast on general areas, as well as specific locations or "receptors", surrounding the site.

Shadow Flicker Impact Plan

VISUAL IMPACTS Photosimulations are used to accurately depict what an installed turbine would look like from specified areas surrounding the proposed site. They are meant to provide a fair representation of the visual impact of the project on the surrounding neighborhoods. The procedure involves superimposing an object, such as a wind turbine, onto a photograph at the proper scale, location and elevation to provide a visual representation of what the proposed turbine would look like from the specific location where the photograph was taken. The purpose of a balloon test is to properly orient the photographer in the direction of the proposed turbine and to provide an object in the photograph that can be used during the photosimulation process as a reference point, from which the scale and height of the proposed turbine can be accurately depicted.

MITIGATION OPTIONS Noise Shadow Visual Environmental

Noise Reduced Modes

Mitigation Example Mitigation plan is programmed into the project Control System to operate only at production levels that maintain noise compliance.

Shadow Flicker Mitigation Shadow flicker can impact residences/structures during certain identifiable time periods during the year. The effect can be precisely calculated to determine whether a flickering shadow will fall on a given location near a wind turbine and the time of year, duration and total hours in a year it will do so. Mitigation measures include: Computer modeling Control modules programmed in the turbine for shutdown times to minimize shadow flicker. Outdoor Plantings such as vegetated buffers, fences, window coverings, or screening barriers

VISUAL IMPACT MITIGATION Mitigation measures to prevent and/or minimize visual impact from turbines may include: Design of wind turbine according to the site characteristics and with sensitivity to the surrounding landscape. Maximizing the distance of wind turbines from the nearest property line. Selection of wind turbine design (tower, color) according to landscape characteristics. Selection of neutral color and anti-reflex painting for towers and blades. Underground cables. Screening such as fencing/treelines can provide partial or full visual mitigation.