OLM Environmental, LLC PHONE: (919) LOCKWOOD FOLLY LANE; RALEIGH, NC CELLPHONE: (919)

Similar documents
OLM Environmental, LLC PHONE: (919) LOCKWOOD FOLLY LANE; RALEIGH, NC CELLPHONE: (919)

October 1, Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN Dear Ted,

September 29, Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN Dear Ted,

Asbestos Abatement Standard Procedures Indoor Environment Group, Inc.

VERTEX Corporate Headquarters 400 Libbey Parkway Weymouth, MA p: f:

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM

September 30, Ted Sherman Saint Paul Public Schools 1930 Como Avenue Saint Paul, MN Dear Ted,

Industrial Hygiene Survey

INSTITUTE FOR ENVIRONMENTAL ASSESSMENT, INC.

Work Plan dated February 17, Prepared by Axiom Partners, Inc. Stephen E. Minassian Massachusetts Asbestos Designer License #AD051928

Asbestos Abatement Air Monitoring Report

Final Visual Inspection and Air Monitoring Report Asbestos Abatement Activities 804 Chipeta Road Montrose, Colorado.

If you have any questions or require further assistance, please do not hesitate to contact me at

SECTION ASBESTOS CONTAINING MATERIALS REMEDIATION

T. Harris Environmental Management Inc.

Chapter 10 Air Sampling and Analysis

Project Monitoring & Air Sampling

Asbestos Abatement Air Monitoring Report

INSTITUTE FOR ENVIRONMENTAL ASSESSMENT, INC.

September 26, Ted Sherman Saint Paul Public Schools 1930 Como Avenue Saint Paul, MN Dear Ted,

In general, the management plan development process consisted of:

These procedures are to be followed by all persons required to perform the following work:

A. Illinois Asbestos Abatement Act, as amended through Public Act , effective July 14, 1995.

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION REQUEST FOR PROPOSAL ASBESTOS AIR MONITORING SERVICES

BASF Corporation Title: ASBESTOS HANDLING, REMOVAL AND DEMOLITION

CLASS I AND II ABATEMENT PROJECT SUBMITTALS

TYPE 3 ASBESTOS ABATEMENT UNIVERSITY OF WINDSOR BIOLOGY BUILDING LABS 204 & 206 WINDSOR, ONTARIO. Issued: March 15 th, 2010

September 27, Ted Sherman Saint Paul Public Schools 360 Colborne Street St. Paul, MN Dear Ted:

Occupational Exposure Assessment Report: Airborne Asbestos Fibers

Asbestos Management Program

May 1 st, University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7

Asbestos Management Plan. Program originated: 02/2000 Last updated: 6/2015. Wendel Reece University Safety Manager

September 11, University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7

Asbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Materials

AIR MONITORING REPORT

NAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control

40 CFR 763 THREE-YEAR AHERA ASBESTOS RE-INSPECTION SUMMARY REPORT INDIAN HEAD ELEMENTARY SCHOOL

Emergency Asbestos Abatement Project Monitoring September 21, 2013 Peebles Elementary School Bourne, Massachusetts

ATTACHMENT A RFP # BH ASBESTOS ABATEMENT REQUIREMENTS

DUQUESNE UNIVERSITY ASBESTOS MANAGEMENT PROGRAM

No dry drains/traps were found, eliminating a potentially concern for odors.

TSI SAMPLE MANAGEMENT PLANNER INITIAL. Training Services International, Inc. Qualifications & Functions

INTRODUCTION TO THE PROGRAM

DIVISION 02 EXISTING CONDITIONS 2010 Edition, Published January 1, 2010; Document Revision Date: February 7, 2017

LIMITED ASBESTOS INSPECTION REPORT

FACILITY ASBESTOS MANAGEMENT PLAN

March 29 th, University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7

40 CFR 763 THREE-YEAR AHERA ASBESTOS RE-INSPECTION SUMMARY REPORT

September 19, Ted Sherman Saint Paul Public Schools 1930 Como Avenue Saint Paul, MN Dear Ted,

Work Plan for Window Removal and Remediation Rooms: 200 Wing classrooms, Cafeteria and Kitchen Thomas Prince School Princeton, Massachusetts

GENERIC ASBESTOS OPERATION AND MAINTENANCE (O&M) PLAN

Module 3: Asbestos. 15 th Annual OSC Readiness Training Program.

APPENDIX D1. ASBESTOS NESHAP 40 CFR 61 Subpart M PRE CAA90 40 CFR PART 61 NESHAP

Project 6668 Second beach Concession-Stanley Park Drive,Vancouver, BC Division 02080

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02

Adv. 3.2: Asbestos Abatement Rev

Project 6668 Kerrisdale Senoirs Centre-5851 West Boulevard,Vancouver, BC Division 02080

PROPOSED PILOT PROGRAM WORK PLAN FOR THE REMOVAL OF ALUMINUM COLUMN COVERS AND FASCIA WITH NON-FRIABLE ACM CAULKING MATERIAL

"ASBESTOS AWARENESS IN THE WORKPLACE"

ROY CONSULTING GROUP CORPORATION 9823 Balmoral Circle Charlotte, North Carolina Phone: Fax:

Section Asbestos Removal

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22

Explain in writing if the address of the building is different than the address on this form:

Addendum No. 2. (i) Issued January 23, 2018 REQUEST FOR PROPSALS FOR GENERAL CONTRACTOR. SHSU CJC AHU Replacement. RFP No.

Rowan University Asbestos Management Program

Idaho Solid Waste Association

WESTERN CONNECTICUT STATE UNIVERSITY ASBESTOS ABATEMENT PROCEDURE E-101

1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:

Addendum Number One. USC Preston College Bathroom and Flooring Renovations Part II Project Number: H SG

ASBESTOS SCIENCE TECHNOLOGIES, INC.

Asbestos Management Program April 27, 2017

NAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control

ASBESTOS SURVEY. Old Detective s Building Wadesboro, NC INSPECTED &PREPARED BY:

Asbestos Exposure. COMMONWEALTH SCAFFOLD Quality Scaffolding Across New England

HART ENVIRONMENTAL RESOURCES

University of Toronto Asbestos Management Program PROCEDURAL CHECKLIST FOR TYPE 1 ASBESTOS ACTIVITIES

Assessment Completed by: Asbestos Inspections, LLC 4686 Pee Dee Highway Conway, South Carolina (843)

BID SHEET EAST AND WEST TECHNOLOGY ASBESTOS ABATEMENT

Rutgers Environmental Health and Safety (REHS)

ASBESTOS ABATEMENT PROJECT COMPLETION REPORT

AUBURN UNIVERSITY RISK MANAGEMENT & SAFETY

Limited Asbestos Demolition Survey

RESULTS OF AN ASBESTOS and LEAD PAINT IDENTIFICATION SURVEY. Prepared For: Town of Bethlehem 2155 Main Street Bethlehem, New Hampshire 03574

ASBESTOS REINSPECTION SURVEY REPORT GENERAL SERVICES ADMINISTRATION AUBURN ADMINISTRATION BUILDING BUILDING WA0811KA AUBURN, WASHINGTON

CHAPTER 22 ASBESTOS A. INTRODUCTION... 1 B. DEFINITIONS... 2 C. CHAPTER-SPECIFIC ROLES AND RESPONSIBILITIES... 3 D. HAZARD IDENTIFICATION...

3. Asbestos Handling Program

UI Procedures for Asbestos Management

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Thames Valley District School Board. The Board has assigned the following responsibilities to ensure compliance with the above Policy and Legislation.

ASBESTOS SCIENCE TECHNOLOGIES, INC.

Explain in writing if the address of the building is different than the address on this form:

If the address on this form is different than the address of the building, submit a written explanation.

Roseville OFFICE* 1911 Douglas Blvd, ste * Roseville, CA Phone (916) * Fax (916) *

REGULATION STANDARDS OF PERFORMANCE FOR ASBESTOS PROJECTS

Asbestos Awareness Program

AHERA/NESHAP ASBESTOS INSPECTION REPORT. CLIENT: City of Florence 324 West Evans Street Florence, SC (843)

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 8

BARR & CLARK Independent Environmental Testing Asbestos Lead Mold Phase I ASBESTOS REMOVAL SPECIFICATIONS

ASBESTOS OPERATIONS & MAINTENANCE PROGRAM

If the address on this form is different than the address of the building, submit a written explanation.

Transcription:

OLM Environmental, LLC PHONE: (919) 212-3019 2317 LOCKWOOD FOLLY LANE; RALEIGH, NC 27610 CELLPHONE: (919) 931-0629 July 31, 2016 Zapolski Real Estate, LLC 501 Washington Street Durham, North Carolina 27701 Attention: Subject: Alixander Zapolski Property Manager Final Ambient Air Sampling Report CVS/Pharmacy Plaza Franklin Street Office Building 6 th Floor Main Corridor Near Suite 600 O&M Cleaning for Plumber Access 137 East Franklin Street Chapel Hill, North Carolina 27514 OLME Project No.: OLME-2016-68 Dear Mrs. Zapolski: OLM Environmental, LLC (OLME) is pleased to present this report summarizing the results of the ambient air sampling obtained during abatement activities at the above-mentioned location. The cleanup included the removal, disposal and replacement of water-damaged suspended ceiling panels, over-sprayed asbestos-containing fireproofing from insulated ductwork and fiberglass drain pipe insulation coated with asbestos-containing black mastic along seams adequate to provide access. As per the Operations and Maintenance (O&M) plan prepared for the property, cleaning was performed adequate to complete these repairs. Because of the amount of asbestos-containing materials (ACM) affected by the work, Zapolski Real Estate, LLC (Zapolski) contracted Demolition and Asbestos Removal, Inc. (DARI) located in Raleigh, North Carolina to perform the work. OLME was also contracted to inspect the work and obtain ambient air sampling to determine the air quality resulting from the work activities. This report summarizes our work observations and the ambient air monitoring result obtained. DARI s crew was onsite July 27, 2016 performing the desired scope of work. OLME representative, Oral McGirt, was also onsite during the work and met with DARI project supervisor, Alejandro H. Arreal, and Zapolski property manager, Dan Ivey to coordinate the work and to establish cleaning procedures to follow. DARI s abatement crew consisted of one licensed supervisor and three workers. Each maintained an asbestos accreditation demonstrating that they were licensed by North Carolina s Health Hazard Control Unit (HHCU) to perform asbestos-related abatement activities. Details of DARI s

Final Ambient Air Sampling Report July 31, 2016 CVS/Pharmacy Plaza Page 2 Franklin Street Office Building 6th Floor Main Corridor Near Suite 600 O&M Cleaning for Plumber Access 137 East Franklin Street Chapel Hill, North Carolina 27514 OLME Project No.: OLME-2016-68 abatement crew s accreditation information is detailed in the attached table entitled, Worker Verification Form. Prior to performing any activity that would further disturb or expose the identified asbestos-containing fireproofing exposed by the damages, DARI s crew was required to establish a regulated work area prior to performing the work. Workers installed 6-mil polyethylene sheeting (poly) barriers over doorways and openings to restrict access during the work. 6-mil polyethylene sheeting was placed on the floor to catch any fallen debris. Wet methods and HEPA-equipped vacuum(s) were also required, as per the O&M plan, to control airborne particle during the work. Ambient air sampling was performed to determine the level of airborne particulate generated during the work and to gauge the thoroughness of the cleaning. Sampling was performed inside and outside the regulated work area to gauge the level of airborne particulate generated by the work. Sampling and analyzes of the air sampling obtained were performed by Mr. McGirt, who maintains the appropriate State of North Carolina accreditation for the type of services performed. Details of Mr. McGirt s accreditation information are attached table is entitled, OLME Project Personnel Summary Table. Project Setup and Preparations: Prior to disturbing the identified ACM, DARI s crew 6-mil polyethylene (poly) drop cloths was installed on the floor beneath the water-damaged section of ceiling in order to catch any falling debris during the work. Pre-cleaning of the corridor was also performed to remove visible ACM prior to the start of the work. See the attached Photographs for views of the work preparations and abatement methods. Mr. Arreal, reported that the crew planned to thoroughly saturate the affected materials with water using a Hudson-type sprayer(s). Handtools and a HEPA-equipped vacuum were used throughout the work. He reported that loose and over-sprayed fireproofing was removed from ductwork surfaces adequate to perform the desired repairs. Asbestos-contaminated debris generated during the work was placed inside 6-mil poly waste disposal bag(s) and again be coated with water to minimize fiber release. Once adequately filled, waste was then gooseneck sealed and then placed in a second waste bag and sealed.

Final Ambient Air Sampling Report July 31, 2016 CVS/Pharmacy Plaza Page 3 Franklin Street Office Building 6th Floor Main Corridor Near Suite 600 O&M Cleaning for Plumber Access 137 East Franklin Street Chapel Hill, North Carolina 27514 OLME Project No.: OLME-2016-68 Sealed waste was properly labeled and handled truck prior to being removed from the jobsite and later transport to a State-approved landfill and disposed. approved the work. Mr. McGirt inspected the area after cleaning and Personal Protective Equipment: The following summarizes the types of personal protective equipment (PPE) worn by the workers during the work: DESCRIPTION OF WORK Work Area Preparations Regulated Removal/Cleaning Activities Waste Loadout PERSONAL PROTECTIVE EQUIPMENT Half-Face Negative Pressure Respirators Equipped With P-100 Rated HEPA Filters Disposable Suits, Gloves and Safety Glasses Half-Face Negative Pressure Respirators Equipped With P-100 Rated HEPA Filters Disposable Suits, Gloves and Safety Glasses None Air Sampling Collection and Analysis Procedures: The ambient air samples were obtained using the Asbestos Hazard Emergency Response Act (AHERA) sampling and analysis protocol. The ambient air sampling were obtained and analyzed using Phase Contrast Microscopy sampling and analysis procedures. Analysis of the ambient air sampling performed outside the work area and after cleaning were determined to be acceptable for public access, less than 0.01 fiber per cubic centimeter of air (f/cc) for each sample obtained, as per the North Carolina State regulations. Summaries of our air sampling methodology and the Phase Contrast Microscopy Air Sample Data Sheet are attached.

Final Ambient Air Sampling Report July 31, 2016 CVS/Pharmacy Plaza Page 4 Franklin Street Office Building 6th Floor Main Corridor Near Suite 600 O&M Cleaning for Plumber Access 137 East Franklin Street Chapel Hill, North Carolina 27514 OLME Project No.: OLME-2016-68 OLME appreciates the opportunity to provide these asbestos-related services. Feel free to contact us if you have any questions concerning this report. Sincerely, OLM Environmental, LLC. Oral L. McGirt Asbestos Projects Manager Attachments: Worker Verification Form OLME Project Personnel Summary Table Photographs Air Monitoring Methodology Phase Contrast Microscopy - Air Sample Data Sheet

WORKER VERIFICATION FORM

CVS/PHARMACY PLAZA FRANKLIN STREET OFFICE BUILDING 6TH FLOOR MAIN CORRIDOR NEAR SUITE 600 O&M CLEANING FOR PLUMBER ACCESS 137 EAST FRANKLIN STREET CHAPEL HILL, NORTH CAROLINA 27514 OLME PROJECT NO.: OLME-2016-68 CONTRACTOR: DARI RALEIGH DIVISION DATE NAME ACCREDITATION NUMBER EXPIRATION Alejandro Hernandez Arreal 33945 08-16 07/27/16 Felipe Vasquez Paredes 71633 06-17 Jose Juan Corona 72153 05-17 Martin Paredes 71630 06-17

OLME PROJECT PERSONNEL

CVS/PHARMACY PLAZA FRANKLIN STREET OFFICE BUILDING 6TH FLOOR MAIN CORRIDOR NEAR SUITE 600 O&M CLEANING FOR PLUMBER ACCESS 137 EAST FRANKLIN STREET CHAPEL HILL, NORTH CAROLINA 27514 OLME PROJECT NO.: OLME-2016-68 PERSONNEL NAME Air Monitoring Accreditation Number Expiration Date Inspector Accreditation Number Expiration Date Designer Accreditation Number Expiration Date SAM* Accreditation Number Expiration Date Oral L. McGirt 80131 02-17 10755 02-17 40338 02-17 --- ---

PHOTOGRAPHS

PHOTOGRAPHS FRANKLIN STREET OFFICE BUILDING 6TH FLOOR MAIN CORRIDOR NEAR SUITE 600 O&M CLEANING FOR PLUMBER ACCESS 137 EAST FRANKLIN STREET CHAPEL HILL, NORTH CAROLINA 27514 OLME PROJECT NO.: OLME-2016-68 PHOTO No. 1 View of Work Preparations Installed to Isolate the Work Performed in the Main Corridor Near Suite 600 Entrance PHOTO NO. 2 View of Insulated Ductwork After Removal of Over-Sprayed Fireproofing From Exterior Surface(s) PHOTO No. 3 View of Drain Pipeline in Which Approximately 3-4 Feet of Fiberglass Insulation Sealed With Asbestos-Containing Black Mastic was Removed in Order to Provide Access

AIR MONITORING METHODOLOGY

AIR MONITORING METHODOLOGY The final ambient air clearance sampling for this project were obtained and analyzed to determine the fiber concentration in each air samples. The samples were analyzed by Phase Contrast Microscopy using the National Institute for Occupational Safety and Health (NIOSH) 7400 Method. This method is essentially similar to the Occupational Safety and Health Administration (OSHA) Reference Method and specifies the procedure for analyzing air samples for asbestos. The 7400 Method counts all fibers that meets the counting criteria and does not distinguish between asbestos and non-asbestos fibers. To distinguish between asbestos and non-asbestos fibers would require analysis by Transmission Electron Microscopy. The concentration of airborne fibers in an air sample is controlled by several parameters, including total number of fibers counted on the filter, total number of fields counted, filter area, monitoring time and flow rate. The total number of fibers and fields counted in a sample are governed by the counting rules of the 7400 Method. The filter area is a constant and the monitoring time is a known factor controlled by the sampler. Several high flow electric pumps were utilized to obtain area monitoring. Documentation of the calibration of the pumps was performed before and after monitoring using a secondary standard (a rotometer), which in turn is calibrated every six months using a primary standard. Area samples were generally collected by pulling air at a rate of 10.0 liters per minute (lpm) through a 25-millimeter diameter mixed cellulose ester filter (pore size 0.8 micrometer). Some filter cassettes were analyzed as box blanks. One cassette from every box of fifty was analyzed without having been opened to determine the suitability of that particular box of cassettes for air monitoring. Monitoring was performed for a period of sufficient duration for the limit of qualification to be less than 0.01 f/cc for area sampling. Samples with fiber concentrations below the quantification limit were reported as below (<) the quantification limit.

PHASE CONTRAST MICROSCOPY AIR SAMPLE DATA SHEET

OLME Job No.: OLME-2016-68 Collection Date: 07/27/16 Project Name: CVS/Pharmacy Plaza Analysis Date: 07/27/16 Contractor: DARI - Raleigh Analyst Name: Oral L. McGirt NC Air Monitor No. 80131 Franklin Street Office Building 6 th Floor Main Corridor O&M Cleanup for Plumber Access for Assessment and Planned Repairs 137 E. Franklin Street Chapel Hill, North Carolina 27514 Project Activity: O&M Work Small-Scale Asbestos Abatement and Ceiling Panel Replacement LAB ID No. Job ID. No. General Location Flow Rate (L/M) Start Time Stop Time Total Time (mins.) Volume (Liters) No. of Fibers No. of Fields Conc. DL 2016-156 CVS-01 6 th Floor Elevator Lobby 10.0 2020 2158 98 980 4.5 100 0.002 0.003 2016-157 CVS-02 2016-158 CVS-03 6 th Floor Main Corridor Near Entrance Doorway 6 th Floor Main Corridor Near Suite 600 Entrance 10.0 2030 2202 92 920 5.5 100 0.003 0.003 10.0 2032 2200 88 880 8.5 100 0.005 0.003 2016-159 CVS-04 Field Blank --- --- --- --- --- 0 100 Clean --- 2016-160 CVS-05 Lab Blank --- --- --- --- --- 0 100 Clean --- Samples were analyzed by methods as detailed in Issue 2 of Revision 3 of NIOSH s Method 7400. Oral L. McGirt Collector s Signature Oral L. McGirt Analyst s Signature Gary P. Alexander Reviewer/SAM No. 90090 Note: Air Sampling Data was provided to the SAM for review and approval. L/M = liters per minute DL = Detection Limit SAM = Supervising Air Monitor