Olympias: Highlights Q Phase 1 Retreatment. Acquired from European Goldfields in February. EIA approved. Phase 1 Retreatment began

Similar documents
Forward Looking Statement

Seizing Opportunity and Building Value

INNOVATIVE ENERGY EFFICIENT SOTKAMO SILVER

QUARTERLY REPORT for the period ending 30 September 2017

Santacruz Silver Reports First Quarter 2017 Production and Financial Results

QUARTERLY PRODUCTION REPORT: KANMANTOO PRODUCTION AHEAD OF YTD GUIDANCE

Mt Carlton. May Arlene Rofe General Manager

Transitioning from Explorer to Miner

Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017)

MEDIA RELEASE OCEANAGOLD ANNOUNCES COMMENCEMENT OF CONSTRUCTION AT THE DIDIPIO PROJECT IN THE PHILIPPINES

CAPITAL DOWN AT TALA HAMZA

Nymagee Scoping Study

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 MARCH 2016

The Los Bronces Development Project Brian Beamish CEO Anglo Base Metals 28th November 2007

Thalanga Operations Ore Reserve and Mineral Resource Statement

Fast Tracking the Superior Lake Project Re-Start Plan

Financial results for the 6 months to 30 June 2008

VALUE THROUGH GOLD BRUCEJACK PROJECT PREMIER S NATURAL RESOURCE CONFERENCE

PEGMONT PEA HIGHLIGHTS

Expansion Programmes Neves-Corvo and Zinkgruvan

February 2018 KURUÇAY ZINC PROJECT

Confidence in Carrapateena project grows

Outotec OreMet Optimizer

Malachite Resources AGM. November For personal use only. Malachite Resources Limited

Harte Gold Announces Positive PEA For the Sugar Zone Project

Transitioning from Explorer to Miner

OZ MINERALS. JP Morgan Melbourne Mining Day. Terry Burgess, Managing Director and CEO. Melbourne 16 October 2009 OZMINERALS.COM

GOLD RESOURCE CORPORATION UPDATES PROVEN & PROBABLE RESERVES, BOOSTING GLOBAL TONNES BY 16%, GOLD OUNCES BY 18% AND SILVER OUNCES BY 14%

Koka Project Stands to be a Highly Profitable Gold Mine: Scoping Study

AQUILA RESOURCES ANNOUNCES POSITIVE FEASIBILITY STUDY RESULTS FOR ITS BACK FORTY PROJECT

Health and Safety. Update: No LTI at Prestea Open Pits. 5.65M man hours worked with no LTI

Australia s leading explorer in Mexico

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

SUITE WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: FAX:

SCOTGOLD CONONISH GOLD AND SILVER PROJECT BFS UPDATE EXECUTIVE SUMMARY

IDM MINING S RED MOUNTAIN PRELIMINARY ECONOMIC ASSESSMENT DEMONSTRATES ROBUST ECONOMICS

Denver Gold Group European Gold Forum, Zurich April 12-15, 2011 TSX: DPM

MCEWEN MINING FILES FENIX PRELIMINARY ECONOMIC ASSESSMENT EXTENDS EL GALLO MINE LIFE BY 12 YEARS

70 019oz 30 % 0.19Moz LTIFR 0.0. $19.1 million 32% $988/oz 11 % $1.14 million. MALARIA IncIDence RATE. 48 Randgold Resources ANNUAL REPORT 2017

SIERRA METALS REPORTS A 53.5% INCREASE IN NI COMPLIANT MINERAL RESERVES AT ITS YAURICOCHA MINE, PERU

North River Resources plc / Ticker: NRRP / Index: AIM / Sector: Mining 30 June 2014 North River Resources plc ( North River or the Company )

TEMBANG PROJECT OPTIMISATION

For personal use only

METATES UPDATED PEA INDICATES EXCELLENT PROJECT ECONOMICS 26,000 METRE DRILL PROGRAM UNDERWAY

BMO Global Metals & Mining Conference March 2011 TSX: DPM

Powering Up. Tasmanian Minerals Council Forum Thursday 13 May, Launceston, Tasmania.

Mount Morgan Gold Copper Project. Mount Morgan Community Meeting 14th December 2016

INV METALS ANNOUNCES ROBUST PRELIMINARY FEASIBILITY STUDY AT LOMA LARGA

ASX Release Prominent Hill 2012 Annual Mineral Resources and Ore Reserves Statement

For personal use only

TRANS-SIBERIAN GOLD PLC

Gold Producer and Developer Corporate Presentation September 2015

Carrapateena Pre-Feasibility Study

POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR SALAVE UNDERGROUND

FIRST MAJESTIC SILVER CORP.

For personal use only

RE: REVIEW OF THE PRAIRIE CREEK MINE SCOPING STUDY

Contained Gold (koz) Tonnes. Contained Gold (koz)

ALACER GOLD ANNOUNCES FOURTH QUARTER MINE PRODUCTION AND 2012 GUIDANCE

Precious Metals Summit Sept Page 1

For personal use only

NEWS RELEASE GREAT PANTHER SILVER ACHIEVES SEVERAL PRODUCTION RECORDS IN THIRD QUARTER 2013

EXCO S PROJECT PIPELINE

The New Leader in Global Copper

The New Leader in Global Copper

SILVERCORP REPORTS Q3 RESULTS: NET INCOME OF $12.7 MILLION, $0.08 PER SHARE AND PROVIDES FISCAL 2019 PRODUCTION AND CASH COSTS GUIDANCE

For personal use only

African Barrick Gold. Buzwagi Site Overview. November 2014

For personal use only

2014 AGM PRESENTATION

Ravenswood Expansion Project Update

Australia's Newest Gold Producer

Northgate Minerals Reports Record Gold Production of 362,743 Ounces in 2009

A G M P R E S E N T A T I O N O c t o b e r 2018

Advanced Mineral Exploration and Mine Development New Brunswick

For personal use only

August 14, 2018 Hope Bay Site Visit. Doris Mine and Plant

Kibali Mine Development

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 30 JUNE 2016

For personal use only

World s largest silver producing country. Six producing silver mines; 100% owned. Two advanced stage silver projects

Sandspring Resources Positive Pre Feasibility Study for Toroparu demonstrates 2.6 year payback on initial 1.32 g/t gold grade

N E W S R E L E A S E

EUROPEAN GOLDFIELDS LIMITED RESULTS FOR Q2 2009

MINERAL RESERVES AND MINERAL RESOURCES. As of December 31, 2016 unless otherwise noted

Australia s leading explorer in Mexico

For personal use only

Kingsgate 2012 Mineral Resources & Ore Reserves

Rambler Updates the Reserve and Resource Estimates At its Ming Copper Gold Mine

Hochschild Mining plc. BAML Global Metals, Mining & Steel Conference May 2017

Morrie Goodz, Managing Director Nimbus Silver-Zinc-Gold Project, Kalgoorlie

ASX Release ASX Code: YTC

Developing High Grade Projects in Mexico

Vast Resources plc / Ticker: VAST / Index: AIM / Sector: Mining. Quarterly Production Summary & Operations Update

For personal use only

Gum Creek Gold Project Free Milling Scoping Study

Escobal Mine Guatemala

Southern Cross Goldfields Ltd

Sustainable Mining through Continuous Operational Cost Control and Decrease of It Over the Mine Life Saso Kitanoski Director Sales and Service CEE

Plomosas Mine Production Planned for 2018

Transcription:

Olympias

Olympias: Highlights 2011 2012 2013 2016 Q3 2017 EIA approved Acquired from European Goldfields in February Phase 1 Retreatment began Phase 1 Retreatment complete Planned Phase 2 Commercial Production Location Halkidiki, Greece 2017 Deposit Ownership Mining/ Processing Average annual production Life of mine Replacement mixed sulphide 95% Eldorado Gold, 5% AKTOR Phase 2: Underground / Flotation Phase 1: Tailings retreatment complete Phase 2: 85,000 oz/yr Au + ~55,000 oz AuEq Phase 3: ~170,000 oz/yr Au + ~130,000 oz AuEq 25+ years* Commercial Production Q3 2017 *Based on current 2P reserves 1

Olympias: Resource & Reserves and Orebody West - Kassandra ore zone West - Flats East ore zone North ore zone Mined sections Mineral Reserves Tonnes Au (g/t) In-situ Au oz Ag (g/t) In-situ Ag oz Pb (%) In-situ tonnes Zn (%) In-situ tonnes In-situ AuEq (1) oz Proven 4,851 8.65 1,349 124 19,339 4.1 199 5.1 247 2,351 Probable 11,236 7.54 2,724 130 46,962 4.4 494 6.0 674 5,296 Proven & Probable Mineral Resources 16,087 7.87 4,073 128 66,301 4.3 693 5.7 921 7,647 Tonnes Au (g/t) In-situ Au oz Ag (g/t) In-situ Ag oz Pb (%) In-situ tonnes Zn (%) In-situ tonnes In-situ AuEq (1) oz Measured 4,464 9.97 1,431 142 20,380 4.7 210 5.8 259 2,485 Indicated 10,644 8.55 2,926 147 50,305 5.0 532 6.8 724 5,691 Measured & Indicated 15,108 8.97 4,357 146 70,685 4.9 742 6.5 983 8,176 Inferred 3,955 8.34 1,060 118 15,050 3.9 153 4.3 171 1,801 (1) AuEq calculated at Reserve prices ($1,200/oz Au, $16/oz Ag, $2,000/t Pb, $2,000/t Zn) 2

Olympias Phase 1: 2013-2016 Defined in EIA approval by Greek government Old Tailings at Olympias Tails Retreatment by Flotation Tailings retreatment completed in Q1 2016 Over 2M metric tonnes processed Largest environmental rehabilitation project in northern Greece Rehabilitated Area Underground Refurbishment Over 61,000oz gold sold in concentrate 5.8km underground refurbishment plus 8km new development in Olympias mine 3

Olympias Phase 2: Mining Summary Average Over First 5 Full Years* Annual ore tonnage Average Au grade** Average Ag grade** ~420 Kt 9.8 g/t 130 g/t Average Pb grade** 4.1 % Average Zn grade** 4.5 % Average AuEq grade Development meters Mining method Average depth Mining rate 15.5 g/t 1,150 m/yr Drift and Fill (Overhand) 200m below sea level or 260m below surface 1,200 tpd Mining recovery 95% Mining cost $87/t ore Annual sustaining capex $14M *Based on 2018-2022 (excludes 2017). **Grades reported are diluted. 4

Olympias Phase 2: Flowsheet 5

Olympias Phase 2: Processing Summary Average Over First 5 Full Years (2018-2022) Process cost (incl. TC & transport) $77.00/t Throughput 1,200 tpd Au Recovery to concentrate 90% Au Payability up to 71% Au average annual production 85 koz Pb average annual production 13 kt metal Ag average annual production 1,000 koz Zn average annual production 14 kt metal 6

Olympias Phase 2: Operating Costs Operating Cost Summary Unit Cost ($/t ore) Mining $87.00 Processing $44.00 G&A $37.00 Total On-Site Costs $168.00 Total Off-Site Costs (TC/RC) $33.00 Off-Site Costs Pb-Ag, Zn concentrate transport + TC/RC $220 280 / dmt concentrate Total Operating Costs Mining 43% Total Off-Site Costs 17% G&A 18% Processing 22% 7

Olympias Phase 2: 2017 Capex Forecast* $M Total preproduction mine development 22 Phase 2 plant construction 21 Tailings management facility construction 23.5 All others 21 Total Olympias 87.5 8

Olympias Phase 2: Project Status Schedule Operational transfer ongoing Permits Engineering/ Procurement Preparing the operational permit application to submit in May Awaiting the approval of the electro-mechanical permit to complete the build of the paste backfill plant 100% Completed Contracts Ongoing close out of construction/vendor contracts Construction Construction substantially complete/small ongoing support team in place for commissioning. Construction of paste plant permit dependent Commissioning /Ramp up Ore commissioning/ramp up ongoing 9

Olympias Phase 2: In Pictures Crushing Area Commissioning Crushing Circuit Main Production Building Wet Commissioning Gold Concentrate Conveying Area Regrind / Cyclone Area Celebrating 1 Million Safe Hours 10

Olympias Phase 2: Overall Schedule - UPDATE Permitting Project Installation License Mine backfill permit Engineering & Procurement Detailed engineering & procurement Equipment deliveries Construction Pre-production underground development TMF development (Kokkinolakas) Construction mill/process plant Construction backfill plant Plant start-up Phase 2 Plant commissioning & ramp-up 2016 2017 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 11

Olympias Phase 2: 5 Year Plan 2017 2018 2022 Tonnes milled 267,000 Mt 400,000-435,000 Mt Gold grade 9.6 g/t 9.4-10.5 g/t Au payable 40,000-50,000 oz 75,000-85,000 oz Ag payable 610 koz 930-1,250 koz Pb metal 6,200 t 11,000-13,000 t Zn metal 8,700 t 11,000-13,000 t C1 cash cost (net by-product) $250-450/oz $190-330 /oz C2 total cash cost $345/oz $230-370 /oz Sustaining cash cost* $345/oz $400-520 /oz *C2 + sustaining capital 12

Olympias Phase 3: Overview West - Kassandra ore zone West - Flats East ore zone North ore zone Previously mined areas Planned infrastructure Mine Underground Expansion Commission 8 km decline from Stratoni valley New concentrator and gold plant in Stratoni valley Mill throughput of 800,000 tpa Producing Silver-Lead, Zinc, and Gold (AsPy) concentrates AsPy concentrate to be processed through new gold plant Annual payable gold production of ~170,000 oz Start date: between 2022-2025 13

Olympias Net Smelter Revenue (NSR) In-Situ Ore Value (1) $630/t ore 15% 23% 12% 50% Gold Silver Lead Zinc Concentrate Production Pb/Ag concentrate Zn concentrate Au concentrate Flotation Recovery: Gold 92% Silver 78% Lead 85% Zinc 91% Phase II All concentrate sold Pb/Ag + Zn concentrate TC/RC ~$33/t ore Phase III Indicative Performance Au concentrate treated on-site, Pb/Ag + Zn Sold Pb/Ag + Zn concentrate TC/RC ~$33/t ore Payability: Gold 71% Silver 95% Payability: Lead 95% Zinc 84% Recovery: Gold 96% (overall 89%) Payability: Silver 95% Lead 95% Payability:% Zinc 84% NSR $415/t ore NSR $490/t ore 18% 23% 45% Gold Silver Lead Zinc 14% 11% 17% 58% Gold Silver Lead Zinc 14% 14 (1) Assumes average reserve grades and spot metal prices ($1250/oz Au, $18/oz Ag, $2,250/t Pb, $2,500/t Zn)

Olympias Gross Profit Phase II Phase III Indicative Performance NSR (1) $415/t ore Opex = $168/t ore Gross Profit $247/t ore NSR (1) $490/t ore Opex ~$210/t ore = Gross Profit ~$280/t ore Annual throughput ~430,000 tpa = ~$105 million gross profit Annual throughput ~800,000 tpa = ~$225 million gross profit 400 350 300 Phase II Phase III Annual Gross Profit Sensitivity US$ million 250 200 150 100 50 0-30% -25% -20% -15% -10% -5% 0% 5% 10% 15% 20% 25% 30% % Change in Metal Price Assumptions (1) Assumes average reserve grades and spot metal prices ($1250/oz Au, $18/oz Ag, $2,250/t Pb, $2,500/t Zn) 15

Olympias: AuEq Ounces and Grade (by vertical metre) 220,000 22 200,000 20 180,000 18 Gold Equivalent Ounces 160,000 140,000 120,000 100,000 80,000 East Zone West - Flats West - Kassandra Au EQ Ounces Au EQ Grade 16 14 12 10 8 AuEq Grade 60,000 6 40,000 4 20,000 2 0 0-50 -100-150 -200-250 -300-350 -400-450 -500-550 -600-650 0-700 Previously Mined Elevation Limited Exploration 16

Olympias Mine Development Summary World-class orebody with excellent upside potential Orebody open at depth Phase 1 complete Phase 2 currently in commissioning with commercial production expected in Q3 2017 Throughput upside in Phase 2 Phase 3 engineering ongoing 17

Q&A